SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices                                               8517

                                         consistent with legislated activities and               Washington, DC 20585–0350 (FAX 202–                   provided above in accordance with
                                         to determine the dollar share of the                    586–8008).                                            §§ 385.211 or 385.214 of the Federal
                                         Congressional appropriation to be                       FOR FURTHER INFORMATION CONTACT:                      Energy Regulatory Commission’s Rules
                                         awarded to successful applicants.                       Ellen Russell (Program Office) 202–586–               of Practice and Procedure (18 CFR
                                            This information collection is being                 9624 or Michael Skinker (Program                      385.211, 385.214). Fifteen copies of each
                                         submitted under the Streamlined                         Attorney) 202–586–2793.                               petition and protest should be filed with
                                         Clearance Process for Discretionary                     SUPPLEMENTARY INFORMATION: Exports of                 DOE on or before the date listed above.
                                         Grant Information Collections (1894–                    electricity from the United States to a                  Comments on the Bruce Power Inc.
                                         0001). Therefore, the 30-day public                     foreign country are regulated by the                  application to export electric energy to
                                         comment period notice will be the only                  Department of Energy (DOE) pursuant to                Canada should be clearly marked with
                                         public comment notice published for                     sections 301(b) and 402(f) of the                     Docket No. EA–349. Additional copies
                                         this information collection.                            Department of Energy Organization Act                 are to be filed directly with Richard
                                            Requests for copies of the information               (42 U.S.C. 7151(b), 7172(f)) and require              Horrobin, Vice President of Power
                                         collection submission for OMB review                    authorization under section 202(e) of                 Marketing, Bruce Power L.P., 177 Tie
                                         may be accessed from http://                            the FPA (16 U.S.C. 824a(e)).                          Road, R.R. #2, P.O. Box 1540, Building
                                         edicsweb.ed.gov, by selecting the                          On February 3, 2009, DOE received an               B10, Tiverton, ON N0G 2T0 AND Brian
                                         ‘‘Browse Pending Collections’’ link and                 application from Bruce Power Inc. for                 Armstrong, Executive Vice President &
                                         by clicking on link number 3958. When                   authority to transmit electric energy                 General Counsel, Bruce Power L.P., 177
                                         you access the information collection,                  from the United States to Canada as a                 Tie Road, R.R. #2, P.O. Box 1540,
                                         click on ‘‘Download Attachments’’ to                    power marketer using international                    Building B10, Tiverton, ON N0G 2T0. A
                                         view. Written requests for information                  transmission facilities located at the                final decision will be made on this
                                         should be addressed to U.S. Department                  United States border with Canada.                     application after the environmental
                                         of Education, 400 Maryland Avenue,                      Bruce Power Inc. is incorporated under                impacts have been evaluated pursuant
                                         SW., LBJ, Washington, DC 20202–4537.                    the Business Corporations Act (Ontario)               to the National Environmental Policy
                                         Requests may also be electronically                     and has its principal place of business               Act of 1969, and a determination is
                                         mailed to the Internet address                          in Tiverton, Ontario, Canada. Bruce                   made by DOE that the proposed action
                                         ICDocketMgr@ed.gov or faxed to 202–                     Power Inc. does not own any electric                  will not adversely impact on the
                                         401–0920. Please specify the complete                   transmission facilities nor does it hold              reliability of the U.S. electric power
                                         title of the information collection when                a franchised service area. The electric               supply system.
                                         making your request.                                    energy which Bruce Power Inc.                            Copies of this application will be
                                            Comments regarding burden and/or                     proposes to export to Canada would be                 made available, upon request, for public
                                         the collection activity requirements                    surplus energy purchased from electric                inspection and copying at the address
                                         should be electronically mailed to                      utilities, Federal power marketing                    provided above, by accessing the
                                         ICDocketMgr@ed.gov. Individuals who                     agencies, and other entities within the               program Web site at http://
                                         use a telecommunications device for the                 United States. Bruce Power Inc. has                   www.oe.energy.gov/
                                         deaf (TDD) may call the Federal                         requested an electricity export                       permits_pending.htm, or by e-mailing
                                         Information Relay Service (FIRS) at 1–                  authorization with a 5-year term.                     Odessa Hopkins at
                                         800–877–8339.                                              Bruce Power Inc. will arrange for the              Odessa.hopkins@hq.doe.gov.
                                         [FR Doc. E9–3994 Filed 2–24–09; 8:45 am]                delivery of exports to Canada over the                  Issued in Washington, DC, on February 18,
                                         BILLING CODE 4000–01–P                                  international transmission facilities                 2009.
                                                                                                 owned by Bangor Hydro-Electric                        Anthony J. Como,
                                                                                                 Company, Basin Electric Power                         Director, Permitting and Siting, Office of
                                                                                                 Cooperative, Bonneville Power                         Electricity Delivery and Energy Reliability.
                                         DEPARTMENT OF ENERGY                                    Administration, Eastern Maine Electric                [FR Doc. E9–4051 Filed 2–24–09; 8:45 am]
                                         [OE Docket No. EA–349]                                  Cooperative, International Transmission               BILLING CODE 6450–01–P
                                                                                                 Co., Joint Owners of the Highgate
                                         Application To Export Electric Energy;                  Project, Long Sault, Inc., Maine Electric
                                         Bruce Power Inc.                                        Power Company, Maine Public Service                   DEPARTMENT OF ENERGY
                                                                                                 Company, Minnesota Power, Inc.,
                                         AGENCY: Office of Electricity Delivery                  Minnkota Power Cooperative, Inc., New                 [OE Docket No. PP–334]
                                         and Energy Reliability, DOE.                            York Power Authority, Niagara Mohawk
                                         ACTION: Notice of application.
                                                                                                                                                       Notice of Intent To Prepare an
                                                                                                 Power Corp., Northern States Power                    Environmental Impact Statement;
                                                                                                 Company, Vermont Electric Power                       Energia Sierra Juarez U.S.
                                         SUMMARY: Bruce Power Inc. has applied
                                                                                                 Company, and Vermont Electric                         Transmission, LLC
                                         for authority to transmit electric energy
                                                                                                 Transmission Co.
                                         from the United States to Canada                           The construction, operation,                       AGENCY:Department of Energy (DOE).
                                         pursuant to section 202(e) of the Federal               maintenance, and connection of each of
                                         Power Act.                                                                                                    ACTION:Notice of Intent to Prepare an
                                                                                                 the international transmission facilities             Environmental Impact Statement (EIS).
                                         DATES: Comments, protests, or requests                  to be utilized by Bruce Power Inc. have
                                         to intervene must be submitted on or                    previously been authorized by a                       SUMMARY: The Department of Energy
                                         before March 27, 2009.                                  Presidential permit issued pursuant to                (DOE) announces its intention to
                                         ADDRESSES: Comments, protests, or                       Executive Order 10485, as amended.                    prepare an EIS on the proposed Federal
                                         requests to intervene should be                            Procedural Matters: Any person                     action of granting a Presidential permit
pwalker on PROD1PC71 with NOTICES




                                         addressed as follows: Office of                         desiring to become a party to these                   to construct a new electric transmission
                                         Electricity Delivery and Energy                         proceedings or to be heard by filing                  line across the U.S.-Mexico border in
                                         Reliability, Mail Code: OE–20, U.S.                     comments or protests to this application              southeastern California. DOE has
                                         Department of Energy, 1000                              should file a petition to intervene,                  determined that issuance of a
                                         Independence Avenue, SW.,                               comment, or protest at the address                    Presidential permit for the proposed


                                    VerDate Nov<24>2008   18:09 Feb 24, 2009   Jkt 217001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:FRFM25FEN1.SGM   25FEN1
8518                      Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices

                                         project would constitute a major Federal                a finding that the proposed project is                requests by power suppliers to connect
                                         action that may have a significant effect               consistent with the public interest and               to the SWPL. The substation, to be
                                         upon the environment within the                         after favorable recommendations from                  known as the East County Substation,
                                         meaning of the National Environmental                   the U.S. Departments of State and                     would be located just south of the SWPL
                                         Policy Act of 1969 (NEPA). For this                     Defense. In determining consistency                   right-of-way near the community of
                                         reason, DOE intends to prepare an EIS                   with the public interest, DOE considers               Jacumba, California, and would contain
                                         entitled Energia Sierra Juarez                          the environmental impacts of the                      equipment for accepting
                                         Transmission Line Environmental                         proposed project under NEPA,                          interconnections at both the 230-kV and
                                         Impact Statement (DOE/EIS–0414) to                      determines the project’s impact on                    the 500-kV level. The 230-kV
                                         address potential environmental                         electric reliability (including whether               connection equipment would be located
                                         impacts from the proposed action and                    the proposed project would adversely                  just to the west of the 500-kV
                                         reasonable alternatives. The EIS will be                affect the operation of the U.S. electric             connection equipment, both within the
                                         prepared in compliance with NEPA and                    power supply system under normal and                  confines of the substation boundary.
                                         applicable regulations, including DOE                   contingency conditions), and considers                Accordingly, ESJ has identified two
                                         NEPA implementing regulations at 10                     any other factors that DOE may find                   routing/voltage alternatives to coincide
                                         CFR Part 1021. Because of previous                      relevant to the public interest. The                  with interconnection at the 230-kV or at
                                         public participation activities, DOE does               regulations implementing the EO have                  the 500-kV level.
                                         not plan to conduct additional scoping                  been codified at 10 CFR 205.320–
                                                                                                                                                       Agency Purpose and Need, Proposed
                                         meetings for this EIS. However, any                     205.329. DOE’s issuance of a
                                                                                                                                                       Action, and Alternatives
                                         timely written comments submitted will                  Presidential permit indicates that there
                                         be considered by DOE in determining                     is no Federal objection to the project,                  The purpose and need for DOE’s
                                         the scope of the EIS.                                   but does not mandate that the project be              action is to decide whether to grant
                                         DATES: As discussed below, the public                   undertaken.                                           ESJ’s application for a Presidential
                                         participation process that DOE                             Energia Sierra Juarez U.S.                         permit for the proposed international
                                         conducted following publication of a                    Transmission, LLC (ESJ, formerly Baja                 electric transmission line. DOE’s
                                         notice of intent to prepare an                          Wind U.S. Transmission, LLC), has                     proposed action is to issue a
                                         environmental assessment will serve as                  applied to DOE’s Office of Electricity                Presidential permit for the construction,
                                         the scoping for this EIS. DOE will                      Delivery and Energy Reliability (OE) for              operation, maintenance, and connection
                                         consider any additional comments                        a Presidential permit to construct either             of the proposed international electric
                                         received or postmarked by March 27,                     a double-circuit 230,000-volt (230-kV)                transmission line. If granted, the
                                         2009 in defining the scope of the EIS.                  or a single-circuit 500-kV transmission               Presidential permit would authorize
                                         Comments received or postmarked after                   line on either lattice towers or steel                only the one-mile portion of the
                                         that date will be considered to the                     monopoles. ESJ’s proposed transmission                applicant’s proposal that would be
                                         extent practicable.                                     line would connect wind turbines (the                 constructed and operated wholly within
                                                                                                 La Rumorosa Project) to be located in                 the United States.
                                         ADDRESSES: Comments on the scope of                                                                              Both of ESJ’s proposed route
                                                                                                 the vicinity of La Rumorosa, Baja
                                         the EIS and requests to be added to the                                                                       alternatives would cross the U.S.-
                                                                                                 California, Mexico, to the existing
                                         document mailing list should be                                                                               Mexico border at the same location.
                                                                                                 Southwest Powerlink (SWPL) 500-kV
                                         addressed to: Dr. Jerry Pell, Office of                                                                       However, the route alternative
                                                                                                 transmission line. The ESJ Presidential
                                         Electricity Delivery and Energy                                                                               identified as A1 in the Presidential
                                                                                                 permit application, including associated
                                         Reliability (OE–20), U.S. Department of                                                                       permit application would be
                                                                                                 maps and drawings, can be downloaded
                                         Energy, 1000 Independence Avenue,                                                                             constructed at 500-kV and would be the
                                                                                                 in its entirety from the DOE program
                                         SW., Washington, DC 20585; by                                                                                 eastern alternative; the other route
                                                                                                 Web site at http://www.oe.energy.gov/
                                         electronic mail to Jerry.Pell@hq.doe.gov;                                                                     alternative, identified as A2, would be
                                                                                                 permits_pending.htm (see PP–334).
                                         or by facsimile to 202–318–7761.                           One portion of the proposed                        constructed at 230-kV and be located to
                                            For general information on the DOE                   transmission project would consist of                 the west of the A1 alternative. Both
                                         NEPA process contact: Ms. Carol M.                      two miles of transmission located in                  alternatives would be located wholly
                                         Borgstrom, Director, Office of NEPA                     Mexico that would be constructed,                     within private property in eastern San
                                         Policy and Compliance (GC–20), U.S.                     owned, operated, and maintained by a                  Diego County near the unincorporated
                                         Department of Energy, 1000                              subsidiary of Sempra Energy Mexico                    community of Jacumba. In addition to
                                         Independence Avenue, SW.,                               and would be subject to the permitting                the alternatives proposed by ESJ, DOE
                                         Washington, DC 20585; or by facsimile                   requirements of the Mexican                           will also consider the environmental
                                         at 202–586–7031.                                        Government. The remaining portion of                  impacts of a ‘‘No Action’’ alternative.
                                         FOR FURTHER INFORMATION CONTACT: Dr.                    the proposed transmission project                        DOE originally considered an
                                         Jerry Pell, 202–586–3362, or                            would consist of a one-mile                           environmental assessment (EA) (to be
                                         Jerry.Pell@hq.doe.gov. For general                      transmission line constructed by ESJ                  titled Baja Wind U.S. Transmission
                                         information on the DOE NEPA process,                    within the United States on private                   Environmental Assessment) to be the
                                         contact Ms. Carol M. Borgstrom at 202–                  land. The entire electrical output of the             appropriate level of review under
                                         586–4600 or leave a message at 800–                     La Rumorosa Project (1250 megawatts)                  NEPA. DOE published a Notice of Intent
                                         472–2756.                                               would be dedicated to the U.S. market                 to Prepare an Environmental
                                         SUPPLEMENTARY INFORMATION: Executive                    and delivered using the proposed                      Assessment and to Conduct Public
                                         Order (EO) 10485, as amended by EO                      international transmission line. For                  Scoping Meetings in the Federal
                                         12038, requires that a Presidential                     reasons discussed below, the EIS will                 Register on August 4, 2008 (73 FR
                                         permit be issued by DOE before electric                 consider only impacts that occur inside               45218). In that notice DOE stated ‘‘if at
pwalker on PROD1PC71 with NOTICES




                                         transmission facilities may be                          the United States.                                    any time during preparation of the EA
                                         constructed, operated, maintained, or                      ESJ’s proposed transmission line                   DOE determines that an environmental
                                         connected at the U.S. international                     would connect to a substation to be                   impact statement (EIS) is needed * * *
                                         border. The EO provides that a                          constructed by the San Diego Gas &                    DOE will consider any comments on the
                                         Presidential permit may be issued after                 Electric Company in response to                       scope of the EA received during [the EA


                                    VerDate Nov<24>2008   18:09 Feb 24, 2009   Jkt 217001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:FRFM25FEN1.SGM   25FEN1
Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices                                            8519

                                         scoping process] in preparing such an                   Agency’s (EPA’s) Notice of Availability               of 17,000 acre-feet and normal water
                                         EIS.’’                                                  (NOA) of the Draft EIS and will hold at               surface elevation of 1,527 feet mean sea
                                                                                                 least one public hearing during the                   level (msl); (3) a proposed 12,600-foot-
                                         Identification of Environmental Issues
                                                                                                 public comment period.                                long, 6 to 12-inch diameter combination
                                            When publishing its notice of intent                   DOE will include all comments                       bored tunnel and steel penstock; (4) a
                                         to prepare an EA on August 4, 2008,                     received on the Draft EIS, and responses              proposed powerhouse containing three
                                         DOE opened a 30-day scoping period                      to those comments, in the Final EIS.                  new generating units having an installed
                                         during which the public was invited to                  DOE will issue a Record of Decision no                capacity of 20 megawatts; (5) an existing
                                         participate in the identification of                    sooner than 30 days from EPA’s NOA of                 20-mile-long, 138 kilovolt transmission
                                         potential environmental impacts that                    the Final EIS.                                        line; and (6) appurtenant facilities. The
                                         may result from construction of the ESJ                   Persons who submitted comments                      proposed Ruth Lake Project would have
                                         transmission line project and reasonable                during the scoping process will receive               an average annual generation of 70
                                         alternatives. DOE conducted two                         a copy of the Draft EIS. Other persons                gigawatt-hours. Cascade is also
                                         scoping meetings in Jacumba. Nine                       who would like to receive a copy of the               exploring alternatives that would
                                         issues and concerns were identified as                  document for review when it is issued                 connect this project to their Cascade
                                         a result of the scoping opportunity.                    should notify Dr. Jerry Pell at the                   Creek Project, which they have
                                         These issues and concerns are (1) visual                address provided above.                               preliminary permit for FERC No. 12495.
                                         impacts, (2) avian mortality, (3) impacts                 Issued in Washington, DC, on February 18,              The proposed Ruth Lake Project by
                                         to protected, threatened, endangered, or                2009.                                                 City and Borough of Wrangell, Alaska
                                         sensitive species of animals or plants, or              Patricia A. Hoffman,                                  for Project No. 13363–000 filed on
                                         their critical habitats, (4) impacts to                                                                       February 3, 2009 at 8:30 a.m. would
                                                                                                 Acting Assistant Secretary, Office of
                                         cultural or historic resources, (6)                     Electricity Delivery and Energy Reliability.          consist of: (1) A proposed 170-foot-high
                                         impacts to human health and safety, (6)                                                                       concrete arch dam at the exit of the
                                                                                                 [FR Doc. E9–4049 Filed 2–24–09; 8:45 am]
                                         impacts to air, soil, and water, (7) land                                                                     natural Ruth Lake; (2) an existing
                                                                                                 BILLING CODE 6450–01–P
                                         use impacts, (8) impacts of seismic                                                                           reservoir having a surface area of 130
                                         activity, and (9) impacts from                                                                                acres and a storage capacity of 17,000
                                         development of wind generation. In the                  DEPARTMENT OF ENERGY                                  acre-feet and normal water surface
                                         EIS DOE will analyze these issues and                                                                         elevation of 1,527 feet mean sea level
                                         others it finds appropriate to address,                 Federal Energy Regulatory                             (msl); (3) a proposed 12,600-foot-long, 6
                                         such as greenhouse gas emissions and                    Commission                                            to 12-foot diameter combination bored
                                         global climate change and also                                                                                tunnel and steel penstock; (4) a
                                                                                                 [Project No. 12619–002; Project No. 13363–            proposed powerhouse containing three
                                         intentional destructive acts, such as
                                                                                                 000; Project No. 13364–000; Project No.
                                         terrorism. No additional construction or                13366–000]                                            new generating units having an installed
                                         routing alternatives were proposed as a                                                                       capacity of 20 megawatts; (5) an existing
                                         result of the scoping process.                          Cascade Creek, LLC; City and Borough                  20-mile-long, 138 kilovolt transmission
                                            Several commenters in this                           of Wrangell, AK; Petersburg Municipal                 line; and (6) appurtenant facilities. The
                                         proceeding have asked DOE to evaluate                   Power and Light; City of Angoon, AK;                  proposed Ruth Lake Project would have
                                         the impacts associated with activities                  Notice of Competing Preliminary                       an average annual generation of 70
                                         that will occur inside Mexico (e.g., from               Permit Applications Accepted for                      gigawatt-hours.
                                         the construction and operation in                       Filing and Soliciting Comment,                           The proposed Ruth Lake Project by
                                         Mexico of the wind generators). NEPA                    Motions To Intervene, and Competing                   Petersburg Municipal Power and Light
                                         does not require an analysis of                         Applications                                          for Project No. 13363–000 filed on
                                         environmental impacts that occur                                                                              February 3, 2009 at 8:30 a.m. would
                                         within another sovereign nation that                    February 18, 2009.                                    consist of: (1) A proposed 200-foot-high
                                         result from approved actions by that                      Cascade Creek, LLC (Cascade), City                  concrete faced rockfill dam at the exit of
                                         nation. The EIS, however, will evaluate                 and Borough of Wrangell, Alaska                       the natural Ruth Lake; (2) an existing
                                         all relevant environmental impacts                      (Wrangell), Petersburg Municipal Power                reservoir having a surface area of 190
                                         within the U.S. related to or caused by                 and Light (Petersburg) and the City of                acres and a storage capacity of 17,000
                                         project-related activities in Mexico.                   Angoon, Alaska filed applications,                    acre-feet and normal water surface
                                            Based on comments received during                    pursuant to section 4(f) of the Federal               elevation of 1,560 feet mean sea level
                                         the initial EA process, and the potential               Power Act, proposing to study the                     (msl); (3) a proposed 3,500-foot-long, 10-
                                         for public controversy, DOE has                         feasibility of the Ruth Lake Project, to be           foot diameter tunnel and a 7,800-foot-
                                         determined an EIS to be the proper                      located on Ruth Lake and Delta Creek,                 long, 6-foot-diameter steel penstock; (4)
                                         NEPA compliance document.                               in an unorganized Borough near                        a proposed powerhouse containing
                                                                                                 Petersburg, Alaska. There are no                      three new generating units having an
                                         EIS Preparation and Schedule                            existing facilities. The project would be             installed capacity of 20 megawatts; (5)
                                           In preparing the Draft EIS, DOE will                  located in the Tongass National Forest.               would connect directly to their
                                         consider comments received during the                   All of these applications were filed                  distribution system; and (6) appurtenant
                                         scoping period. Because of previous                     electronically and given the filing date              facilities. The proposed Ruth Lake
                                         public participation activities, DOE does               of February 3, 2009, at 8:30 a.m.                     Project would have an average annual
                                         not plan to conduct additional scoping                    The proposed Ruth Lake Projects:                    generation of 70 gigawatt-hours.
                                         meetings for this EIS. However, any                       The proposed Ruth Lake Project by                      The proposed Ruth Lake Project by
                                         timely additional written comments                      Cascade Creek, LLC for Project No.                    City of Angoon, Alaska for Project No.
                                         submitted will be considered by DOE in                  12619–002 filed on February 3, 2009 at                13366–000 filed on February 3, 2009 at
pwalker on PROD1PC71 with NOTICES




                                         determining the scope of the EIS.                       8:30 a.m. would consist of: (1) A                     8:30 a.m. would consist of: (1) A
                                           DOE anticipates issuing a Draft EIS in                proposed 170-foot-high concrete arch                  proposed 170-foot-high concrete arched
                                         the fall of 2009. DOE will provide a                    dam at the exit of the natural Ruth Lake;             dam at the exit of the natural Ruth Lake;
                                         public comment period of at least 45                    (2) an existing reservoir having a surface            (2) an existing reservoir having a surface
                                         days from the Environmental Protection                  area of 130 acres and a storage capacity              area of 130 acres and a storage capacity


                                    VerDate Nov<24>2008   18:09 Feb 24, 2009   Jkt 217001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:FRFM25FEN1.SGM   25FEN1

Contenu connexe

En vedette

English compulsory 2010-IAS
English compulsory 2010-IASEnglish compulsory 2010-IAS
English compulsory 2010-IASAlok Kumar
 
Percussion Ensemble Concert 2/17
Percussion Ensemble Concert 2/17Percussion Ensemble Concert 2/17
Percussion Ensemble Concert 2/17pejril
 
Eb4voc les8
Eb4voc les8Eb4voc les8
Eb4voc les8shahed
 
Hindi compulsory 2010-IAS
Hindi compulsory 2010-IASHindi compulsory 2010-IAS
Hindi compulsory 2010-IASAlok Kumar
 
Thinkers
ThinkersThinkers
Thinkershmoulds
 
Condos + Smoke = Trouble
Condos + Smoke = TroubleCondos + Smoke = Trouble
Condos + Smoke = Troublemarkpetrie1
 
Tic ii – temática 1 – práctica 1 – ruiz mariel
Tic ii – temática 1 – práctica 1 – ruiz marielTic ii – temática 1 – práctica 1 – ruiz mariel
Tic ii – temática 1 – práctica 1 – ruiz marielmarslidetic
 
Shakespeare In The Bush
Shakespeare In The BushShakespeare In The Bush
Shakespeare In The BushAshlynRye
 
xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Roadfinance26
 
Sociology i 2010
Sociology i 2010Sociology i 2010
Sociology i 2010Alok Kumar
 
Nuevas temáticas para enseñar y aprender [autoguardado]
Nuevas  temáticas  para enseñar y aprender [autoguardado]Nuevas  temáticas  para enseñar y aprender [autoguardado]
Nuevas temáticas para enseñar y aprender [autoguardado]Nutricion Humana
 
Humanities government
Humanities governmentHumanities government
Humanities governmentcatsnpizza
 
What's in a name pt.2
What's in a name pt.2What's in a name pt.2
What's in a name pt.2lithlithe
 
xcel energy Q308_release
xcel energy Q308_releasexcel energy Q308_release
xcel energy Q308_releasefinance26
 
En the manners_of_joking
En the manners_of_jokingEn the manners_of_joking
En the manners_of_jokingLoveofpeople
 
Source analysis
Source analysisSource analysis
Source analysiscatsnpizza
 
xel_05/16/03a
xel_05/16/03axel_05/16/03a
xel_05/16/03afinance26
 

En vedette (20)

English compulsory 2010-IAS
English compulsory 2010-IASEnglish compulsory 2010-IAS
English compulsory 2010-IAS
 
Percussion Ensemble Concert 2/17
Percussion Ensemble Concert 2/17Percussion Ensemble Concert 2/17
Percussion Ensemble Concert 2/17
 
Eb4voc les8
Eb4voc les8Eb4voc les8
Eb4voc les8
 
Hindi compulsory 2010-IAS
Hindi compulsory 2010-IASHindi compulsory 2010-IAS
Hindi compulsory 2010-IAS
 
Thinkers
ThinkersThinkers
Thinkers
 
Sowell
SowellSowell
Sowell
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
Condos + Smoke = Trouble
Condos + Smoke = TroubleCondos + Smoke = Trouble
Condos + Smoke = Trouble
 
Tic ii – temática 1 – práctica 1 – ruiz mariel
Tic ii – temática 1 – práctica 1 – ruiz marielTic ii – temática 1 – práctica 1 – ruiz mariel
Tic ii – temática 1 – práctica 1 – ruiz mariel
 
Part23 a
Part23 aPart23 a
Part23 a
 
Shakespeare In The Bush
Shakespeare In The BushShakespeare In The Bush
Shakespeare In The Bush
 
xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Road
 
Sociology i 2010
Sociology i 2010Sociology i 2010
Sociology i 2010
 
Nuevas temáticas para enseñar y aprender [autoguardado]
Nuevas  temáticas  para enseñar y aprender [autoguardado]Nuevas  temáticas  para enseñar y aprender [autoguardado]
Nuevas temáticas para enseñar y aprender [autoguardado]
 
Humanities government
Humanities governmentHumanities government
Humanities government
 
What's in a name pt.2
What's in a name pt.2What's in a name pt.2
What's in a name pt.2
 
xcel energy Q308_release
xcel energy Q308_releasexcel energy Q308_release
xcel energy Q308_release
 
En the manners_of_joking
En the manners_of_jokingEn the manners_of_joking
En the manners_of_joking
 
Source analysis
Source analysisSource analysis
Source analysis
 
xel_05/16/03a
xel_05/16/03axel_05/16/03a
xel_05/16/03a
 

Similaire à NOI - Energia Sierra Juarez

Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...
Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...
Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...Dr Dev Kambhampati
 
Boeing 787s can lose control while flying due to Software bug: Report
Boeing 787s can lose control while flying due to Software bug: ReportBoeing 787s can lose control while flying due to Software bug: Report
Boeing 787s can lose control while flying due to Software bug: ReportWaqas Amir
 
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion ProjectFERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion ProjectMarcellus Drilling News
 
FERC & DOE Incentives for Renewables
FERC & DOE Incentives for RenewablesFERC & DOE Incentives for Renewables
FERC & DOE Incentives for Renewableselwalsh
 
Columbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC PermitColumbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC PermitNate Sandvig
 
(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...RepentSinner
 
(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...AnonDownload
 
FERC Environmental Assessment for the Cove Point Liquefaction Project
FERC Environmental Assessment for the Cove Point Liquefaction ProjectFERC Environmental Assessment for the Cove Point Liquefaction Project
FERC Environmental Assessment for the Cove Point Liquefaction ProjectMarcellus Drilling News
 
TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013Patton Boggs LLP
 
2012.07.23 letter to ferc detailing acquisition
2012.07.23 letter to ferc detailing acquisition2012.07.23 letter to ferc detailing acquisition
2012.07.23 letter to ferc detailing acquisitionHindenburg Research
 
US Power Grid Vs. Smart Grid
US Power Grid Vs. Smart GridUS Power Grid Vs. Smart Grid
US Power Grid Vs. Smart GridJosh Wentz
 
Whitney MCMurdie's Intern Presentation Fall 2013 Legal
Whitney MCMurdie's Intern Presentation Fall 2013 Legal Whitney MCMurdie's Intern Presentation Fall 2013 Legal
Whitney MCMurdie's Intern Presentation Fall 2013 Legal RenewMO
 
TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012Patton Boggs LLP
 
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas Industry
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas IndustryEPA Greenhouse Gas Reporting Rule Change for Oil & Gas Industry
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas IndustryMarcellus Drilling News
 
The Digitalization / Electrification Nexus - The Changing Role of Data in the...
The Digitalization / Electrification Nexus - The Changing Role of Data in the...The Digitalization / Electrification Nexus - The Changing Role of Data in the...
The Digitalization / Electrification Nexus - The Changing Role of Data in the...Jill Kirkpatrick
 

Similaire à NOI - Energia Sierra Juarez (20)

Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...
Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...
Dr Dev Kambhampati | EPA- Carbon Pollution Emission Guidelines for Existing S...
 
Boeing 787s can lose control while flying due to Software bug: Report
Boeing 787s can lose control while flying due to Software bug: ReportBoeing 787s can lose control while flying due to Software bug: Report
Boeing 787s can lose control while flying due to Software bug: Report
 
CAR Email 2.10.03
CAR Email 2.10.03CAR Email 2.10.03
CAR Email 2.10.03
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion ProjectFERC DEIS for Mountain Valley Project and Equitrans Expansion Project
FERC DEIS for Mountain Valley Project and Equitrans Expansion Project
 
FERC & DOE Incentives for Renewables
FERC & DOE Incentives for RenewablesFERC & DOE Incentives for Renewables
FERC & DOE Incentives for Renewables
 
Columbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC PermitColumbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC Permit
 
(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...
 
(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...(U fouo) dhs infrastructure protection note- most significant tactics against...
(U fouo) dhs infrastructure protection note- most significant tactics against...
 
FERC Environmental Assessment for the Cove Point Liquefaction Project
FERC Environmental Assessment for the Cove Point Liquefaction ProjectFERC Environmental Assessment for the Cove Point Liquefaction Project
FERC Environmental Assessment for the Cove Point Liquefaction Project
 
TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013
 
2012.07.23 letter to ferc detailing acquisition
2012.07.23 letter to ferc detailing acquisition2012.07.23 letter to ferc detailing acquisition
2012.07.23 letter to ferc detailing acquisition
 
US Power Grid Vs. Smart Grid
US Power Grid Vs. Smart GridUS Power Grid Vs. Smart Grid
US Power Grid Vs. Smart Grid
 
CAR Email 3.5.03
CAR Email 3.5.03CAR Email 3.5.03
CAR Email 3.5.03
 
Whitney MCMurdie's Intern Presentation Fall 2013 Legal
Whitney MCMurdie's Intern Presentation Fall 2013 Legal Whitney MCMurdie's Intern Presentation Fall 2013 Legal
Whitney MCMurdie's Intern Presentation Fall 2013 Legal
 
TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012
 
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas Industry
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas IndustryEPA Greenhouse Gas Reporting Rule Change for Oil & Gas Industry
EPA Greenhouse Gas Reporting Rule Change for Oil & Gas Industry
 
The Digitalization / Electrification Nexus - The Changing Role of Data in the...
The Digitalization / Electrification Nexus - The Changing Role of Data in the...The Digitalization / Electrification Nexus - The Changing Role of Data in the...
The Digitalization / Electrification Nexus - The Changing Role of Data in the...
 
NOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy ProjectNOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy Project
 

Plus de DOE Office of NEPA Policy & Compliance

Plus de DOE Office of NEPA Policy & Compliance (20)

Dec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons LearnedDec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons Learned
 
March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
Sept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons LearnedSept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons Learned
 
NOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon CaptureNOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon Capture
 
NOI - Texas Clean Energy
NOI - Texas Clean EnergyNOI - Texas Clean Energy
NOI - Texas Clean Energy
 
NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC ProjectNOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy ProjectNOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy Project
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
NOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - MercuryNOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - Mercury
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
NOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa BiorefineryNOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa Biorefinery
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
Amended NOI - Abengoa Biorefinery
Amended NOI - Abengoa BiorefineryAmended NOI - Abengoa Biorefinery
Amended NOI - Abengoa Biorefinery
 
NOI - Abengoa Biorefinery
NOI - Abengoa BiorefineryNOI - Abengoa Biorefinery
NOI - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 

NOI - Energia Sierra Juarez

  • 1. Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices 8517 consistent with legislated activities and Washington, DC 20585–0350 (FAX 202– provided above in accordance with to determine the dollar share of the 586–8008). §§ 385.211 or 385.214 of the Federal Congressional appropriation to be FOR FURTHER INFORMATION CONTACT: Energy Regulatory Commission’s Rules awarded to successful applicants. Ellen Russell (Program Office) 202–586– of Practice and Procedure (18 CFR This information collection is being 9624 or Michael Skinker (Program 385.211, 385.214). Fifteen copies of each submitted under the Streamlined Attorney) 202–586–2793. petition and protest should be filed with Clearance Process for Discretionary SUPPLEMENTARY INFORMATION: Exports of DOE on or before the date listed above. Grant Information Collections (1894– electricity from the United States to a Comments on the Bruce Power Inc. 0001). Therefore, the 30-day public foreign country are regulated by the application to export electric energy to comment period notice will be the only Department of Energy (DOE) pursuant to Canada should be clearly marked with public comment notice published for sections 301(b) and 402(f) of the Docket No. EA–349. Additional copies this information collection. Department of Energy Organization Act are to be filed directly with Richard Requests for copies of the information (42 U.S.C. 7151(b), 7172(f)) and require Horrobin, Vice President of Power collection submission for OMB review authorization under section 202(e) of Marketing, Bruce Power L.P., 177 Tie may be accessed from http:// the FPA (16 U.S.C. 824a(e)). Road, R.R. #2, P.O. Box 1540, Building edicsweb.ed.gov, by selecting the On February 3, 2009, DOE received an B10, Tiverton, ON N0G 2T0 AND Brian ‘‘Browse Pending Collections’’ link and application from Bruce Power Inc. for Armstrong, Executive Vice President & by clicking on link number 3958. When authority to transmit electric energy General Counsel, Bruce Power L.P., 177 you access the information collection, from the United States to Canada as a Tie Road, R.R. #2, P.O. Box 1540, click on ‘‘Download Attachments’’ to power marketer using international Building B10, Tiverton, ON N0G 2T0. A view. Written requests for information transmission facilities located at the final decision will be made on this should be addressed to U.S. Department United States border with Canada. application after the environmental of Education, 400 Maryland Avenue, Bruce Power Inc. is incorporated under impacts have been evaluated pursuant SW., LBJ, Washington, DC 20202–4537. the Business Corporations Act (Ontario) to the National Environmental Policy Requests may also be electronically and has its principal place of business Act of 1969, and a determination is mailed to the Internet address in Tiverton, Ontario, Canada. Bruce made by DOE that the proposed action ICDocketMgr@ed.gov or faxed to 202– Power Inc. does not own any electric will not adversely impact on the 401–0920. Please specify the complete transmission facilities nor does it hold reliability of the U.S. electric power title of the information collection when a franchised service area. The electric supply system. making your request. energy which Bruce Power Inc. Copies of this application will be Comments regarding burden and/or proposes to export to Canada would be made available, upon request, for public the collection activity requirements surplus energy purchased from electric inspection and copying at the address should be electronically mailed to utilities, Federal power marketing provided above, by accessing the ICDocketMgr@ed.gov. Individuals who agencies, and other entities within the program Web site at http:// use a telecommunications device for the United States. Bruce Power Inc. has www.oe.energy.gov/ deaf (TDD) may call the Federal requested an electricity export permits_pending.htm, or by e-mailing Information Relay Service (FIRS) at 1– authorization with a 5-year term. Odessa Hopkins at 800–877–8339. Bruce Power Inc. will arrange for the Odessa.hopkins@hq.doe.gov. [FR Doc. E9–3994 Filed 2–24–09; 8:45 am] delivery of exports to Canada over the Issued in Washington, DC, on February 18, BILLING CODE 4000–01–P international transmission facilities 2009. owned by Bangor Hydro-Electric Anthony J. Como, Company, Basin Electric Power Director, Permitting and Siting, Office of Cooperative, Bonneville Power Electricity Delivery and Energy Reliability. DEPARTMENT OF ENERGY Administration, Eastern Maine Electric [FR Doc. E9–4051 Filed 2–24–09; 8:45 am] [OE Docket No. EA–349] Cooperative, International Transmission BILLING CODE 6450–01–P Co., Joint Owners of the Highgate Application To Export Electric Energy; Project, Long Sault, Inc., Maine Electric Bruce Power Inc. Power Company, Maine Public Service DEPARTMENT OF ENERGY Company, Minnesota Power, Inc., AGENCY: Office of Electricity Delivery Minnkota Power Cooperative, Inc., New [OE Docket No. PP–334] and Energy Reliability, DOE. York Power Authority, Niagara Mohawk ACTION: Notice of application. Notice of Intent To Prepare an Power Corp., Northern States Power Environmental Impact Statement; Company, Vermont Electric Power Energia Sierra Juarez U.S. SUMMARY: Bruce Power Inc. has applied Company, and Vermont Electric Transmission, LLC for authority to transmit electric energy Transmission Co. from the United States to Canada The construction, operation, AGENCY:Department of Energy (DOE). pursuant to section 202(e) of the Federal maintenance, and connection of each of Power Act. ACTION:Notice of Intent to Prepare an the international transmission facilities Environmental Impact Statement (EIS). DATES: Comments, protests, or requests to be utilized by Bruce Power Inc. have to intervene must be submitted on or previously been authorized by a SUMMARY: The Department of Energy before March 27, 2009. Presidential permit issued pursuant to (DOE) announces its intention to ADDRESSES: Comments, protests, or Executive Order 10485, as amended. prepare an EIS on the proposed Federal requests to intervene should be Procedural Matters: Any person action of granting a Presidential permit pwalker on PROD1PC71 with NOTICES addressed as follows: Office of desiring to become a party to these to construct a new electric transmission Electricity Delivery and Energy proceedings or to be heard by filing line across the U.S.-Mexico border in Reliability, Mail Code: OE–20, U.S. comments or protests to this application southeastern California. DOE has Department of Energy, 1000 should file a petition to intervene, determined that issuance of a Independence Avenue, SW., comment, or protest at the address Presidential permit for the proposed VerDate Nov<24>2008 18:09 Feb 24, 2009 Jkt 217001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:FRFM25FEN1.SGM 25FEN1
  • 2. 8518 Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices project would constitute a major Federal a finding that the proposed project is requests by power suppliers to connect action that may have a significant effect consistent with the public interest and to the SWPL. The substation, to be upon the environment within the after favorable recommendations from known as the East County Substation, meaning of the National Environmental the U.S. Departments of State and would be located just south of the SWPL Policy Act of 1969 (NEPA). For this Defense. In determining consistency right-of-way near the community of reason, DOE intends to prepare an EIS with the public interest, DOE considers Jacumba, California, and would contain entitled Energia Sierra Juarez the environmental impacts of the equipment for accepting Transmission Line Environmental proposed project under NEPA, interconnections at both the 230-kV and Impact Statement (DOE/EIS–0414) to determines the project’s impact on the 500-kV level. The 230-kV address potential environmental electric reliability (including whether connection equipment would be located impacts from the proposed action and the proposed project would adversely just to the west of the 500-kV reasonable alternatives. The EIS will be affect the operation of the U.S. electric connection equipment, both within the prepared in compliance with NEPA and power supply system under normal and confines of the substation boundary. applicable regulations, including DOE contingency conditions), and considers Accordingly, ESJ has identified two NEPA implementing regulations at 10 any other factors that DOE may find routing/voltage alternatives to coincide CFR Part 1021. Because of previous relevant to the public interest. The with interconnection at the 230-kV or at public participation activities, DOE does regulations implementing the EO have the 500-kV level. not plan to conduct additional scoping been codified at 10 CFR 205.320– Agency Purpose and Need, Proposed meetings for this EIS. However, any 205.329. DOE’s issuance of a Action, and Alternatives timely written comments submitted will Presidential permit indicates that there be considered by DOE in determining is no Federal objection to the project, The purpose and need for DOE’s the scope of the EIS. but does not mandate that the project be action is to decide whether to grant DATES: As discussed below, the public undertaken. ESJ’s application for a Presidential participation process that DOE Energia Sierra Juarez U.S. permit for the proposed international conducted following publication of a Transmission, LLC (ESJ, formerly Baja electric transmission line. DOE’s notice of intent to prepare an Wind U.S. Transmission, LLC), has proposed action is to issue a environmental assessment will serve as applied to DOE’s Office of Electricity Presidential permit for the construction, the scoping for this EIS. DOE will Delivery and Energy Reliability (OE) for operation, maintenance, and connection consider any additional comments a Presidential permit to construct either of the proposed international electric received or postmarked by March 27, a double-circuit 230,000-volt (230-kV) transmission line. If granted, the 2009 in defining the scope of the EIS. or a single-circuit 500-kV transmission Presidential permit would authorize Comments received or postmarked after line on either lattice towers or steel only the one-mile portion of the that date will be considered to the monopoles. ESJ’s proposed transmission applicant’s proposal that would be extent practicable. line would connect wind turbines (the constructed and operated wholly within La Rumorosa Project) to be located in the United States. ADDRESSES: Comments on the scope of Both of ESJ’s proposed route the vicinity of La Rumorosa, Baja the EIS and requests to be added to the alternatives would cross the U.S.- California, Mexico, to the existing document mailing list should be Mexico border at the same location. Southwest Powerlink (SWPL) 500-kV addressed to: Dr. Jerry Pell, Office of However, the route alternative transmission line. The ESJ Presidential Electricity Delivery and Energy identified as A1 in the Presidential permit application, including associated Reliability (OE–20), U.S. Department of permit application would be maps and drawings, can be downloaded Energy, 1000 Independence Avenue, constructed at 500-kV and would be the in its entirety from the DOE program SW., Washington, DC 20585; by eastern alternative; the other route Web site at http://www.oe.energy.gov/ electronic mail to Jerry.Pell@hq.doe.gov; alternative, identified as A2, would be permits_pending.htm (see PP–334). or by facsimile to 202–318–7761. One portion of the proposed constructed at 230-kV and be located to For general information on the DOE transmission project would consist of the west of the A1 alternative. Both NEPA process contact: Ms. Carol M. two miles of transmission located in alternatives would be located wholly Borgstrom, Director, Office of NEPA Mexico that would be constructed, within private property in eastern San Policy and Compliance (GC–20), U.S. owned, operated, and maintained by a Diego County near the unincorporated Department of Energy, 1000 subsidiary of Sempra Energy Mexico community of Jacumba. In addition to Independence Avenue, SW., and would be subject to the permitting the alternatives proposed by ESJ, DOE Washington, DC 20585; or by facsimile requirements of the Mexican will also consider the environmental at 202–586–7031. Government. The remaining portion of impacts of a ‘‘No Action’’ alternative. FOR FURTHER INFORMATION CONTACT: Dr. the proposed transmission project DOE originally considered an Jerry Pell, 202–586–3362, or would consist of a one-mile environmental assessment (EA) (to be Jerry.Pell@hq.doe.gov. For general transmission line constructed by ESJ titled Baja Wind U.S. Transmission information on the DOE NEPA process, within the United States on private Environmental Assessment) to be the contact Ms. Carol M. Borgstrom at 202– land. The entire electrical output of the appropriate level of review under 586–4600 or leave a message at 800– La Rumorosa Project (1250 megawatts) NEPA. DOE published a Notice of Intent 472–2756. would be dedicated to the U.S. market to Prepare an Environmental SUPPLEMENTARY INFORMATION: Executive and delivered using the proposed Assessment and to Conduct Public Order (EO) 10485, as amended by EO international transmission line. For Scoping Meetings in the Federal 12038, requires that a Presidential reasons discussed below, the EIS will Register on August 4, 2008 (73 FR permit be issued by DOE before electric consider only impacts that occur inside 45218). In that notice DOE stated ‘‘if at pwalker on PROD1PC71 with NOTICES transmission facilities may be the United States. any time during preparation of the EA constructed, operated, maintained, or ESJ’s proposed transmission line DOE determines that an environmental connected at the U.S. international would connect to a substation to be impact statement (EIS) is needed * * * border. The EO provides that a constructed by the San Diego Gas & DOE will consider any comments on the Presidential permit may be issued after Electric Company in response to scope of the EA received during [the EA VerDate Nov<24>2008 18:09 Feb 24, 2009 Jkt 217001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:FRFM25FEN1.SGM 25FEN1
  • 3. Federal Register / Vol. 74, No. 36 / Wednesday, February 25, 2009 / Notices 8519 scoping process] in preparing such an Agency’s (EPA’s) Notice of Availability of 17,000 acre-feet and normal water EIS.’’ (NOA) of the Draft EIS and will hold at surface elevation of 1,527 feet mean sea least one public hearing during the level (msl); (3) a proposed 12,600-foot- Identification of Environmental Issues public comment period. long, 6 to 12-inch diameter combination When publishing its notice of intent DOE will include all comments bored tunnel and steel penstock; (4) a to prepare an EA on August 4, 2008, received on the Draft EIS, and responses proposed powerhouse containing three DOE opened a 30-day scoping period to those comments, in the Final EIS. new generating units having an installed during which the public was invited to DOE will issue a Record of Decision no capacity of 20 megawatts; (5) an existing participate in the identification of sooner than 30 days from EPA’s NOA of 20-mile-long, 138 kilovolt transmission potential environmental impacts that the Final EIS. line; and (6) appurtenant facilities. The may result from construction of the ESJ Persons who submitted comments proposed Ruth Lake Project would have transmission line project and reasonable during the scoping process will receive an average annual generation of 70 alternatives. DOE conducted two a copy of the Draft EIS. Other persons gigawatt-hours. Cascade is also scoping meetings in Jacumba. Nine who would like to receive a copy of the exploring alternatives that would issues and concerns were identified as document for review when it is issued connect this project to their Cascade a result of the scoping opportunity. should notify Dr. Jerry Pell at the Creek Project, which they have These issues and concerns are (1) visual address provided above. preliminary permit for FERC No. 12495. impacts, (2) avian mortality, (3) impacts Issued in Washington, DC, on February 18, The proposed Ruth Lake Project by to protected, threatened, endangered, or 2009. City and Borough of Wrangell, Alaska sensitive species of animals or plants, or Patricia A. Hoffman, for Project No. 13363–000 filed on their critical habitats, (4) impacts to February 3, 2009 at 8:30 a.m. would Acting Assistant Secretary, Office of cultural or historic resources, (6) Electricity Delivery and Energy Reliability. consist of: (1) A proposed 170-foot-high impacts to human health and safety, (6) concrete arch dam at the exit of the [FR Doc. E9–4049 Filed 2–24–09; 8:45 am] impacts to air, soil, and water, (7) land natural Ruth Lake; (2) an existing BILLING CODE 6450–01–P use impacts, (8) impacts of seismic reservoir having a surface area of 130 activity, and (9) impacts from acres and a storage capacity of 17,000 development of wind generation. In the DEPARTMENT OF ENERGY acre-feet and normal water surface EIS DOE will analyze these issues and elevation of 1,527 feet mean sea level others it finds appropriate to address, Federal Energy Regulatory (msl); (3) a proposed 12,600-foot-long, 6 such as greenhouse gas emissions and Commission to 12-foot diameter combination bored global climate change and also tunnel and steel penstock; (4) a [Project No. 12619–002; Project No. 13363– proposed powerhouse containing three intentional destructive acts, such as 000; Project No. 13364–000; Project No. terrorism. No additional construction or 13366–000] new generating units having an installed routing alternatives were proposed as a capacity of 20 megawatts; (5) an existing result of the scoping process. Cascade Creek, LLC; City and Borough 20-mile-long, 138 kilovolt transmission Several commenters in this of Wrangell, AK; Petersburg Municipal line; and (6) appurtenant facilities. The proceeding have asked DOE to evaluate Power and Light; City of Angoon, AK; proposed Ruth Lake Project would have the impacts associated with activities Notice of Competing Preliminary an average annual generation of 70 that will occur inside Mexico (e.g., from Permit Applications Accepted for gigawatt-hours. the construction and operation in Filing and Soliciting Comment, The proposed Ruth Lake Project by Mexico of the wind generators). NEPA Motions To Intervene, and Competing Petersburg Municipal Power and Light does not require an analysis of Applications for Project No. 13363–000 filed on environmental impacts that occur February 3, 2009 at 8:30 a.m. would within another sovereign nation that February 18, 2009. consist of: (1) A proposed 200-foot-high result from approved actions by that Cascade Creek, LLC (Cascade), City concrete faced rockfill dam at the exit of nation. The EIS, however, will evaluate and Borough of Wrangell, Alaska the natural Ruth Lake; (2) an existing all relevant environmental impacts (Wrangell), Petersburg Municipal Power reservoir having a surface area of 190 within the U.S. related to or caused by and Light (Petersburg) and the City of acres and a storage capacity of 17,000 project-related activities in Mexico. Angoon, Alaska filed applications, acre-feet and normal water surface Based on comments received during pursuant to section 4(f) of the Federal elevation of 1,560 feet mean sea level the initial EA process, and the potential Power Act, proposing to study the (msl); (3) a proposed 3,500-foot-long, 10- for public controversy, DOE has feasibility of the Ruth Lake Project, to be foot diameter tunnel and a 7,800-foot- determined an EIS to be the proper located on Ruth Lake and Delta Creek, long, 6-foot-diameter steel penstock; (4) NEPA compliance document. in an unorganized Borough near a proposed powerhouse containing Petersburg, Alaska. There are no three new generating units having an EIS Preparation and Schedule existing facilities. The project would be installed capacity of 20 megawatts; (5) In preparing the Draft EIS, DOE will located in the Tongass National Forest. would connect directly to their consider comments received during the All of these applications were filed distribution system; and (6) appurtenant scoping period. Because of previous electronically and given the filing date facilities. The proposed Ruth Lake public participation activities, DOE does of February 3, 2009, at 8:30 a.m. Project would have an average annual not plan to conduct additional scoping The proposed Ruth Lake Projects: generation of 70 gigawatt-hours. meetings for this EIS. However, any The proposed Ruth Lake Project by The proposed Ruth Lake Project by timely additional written comments Cascade Creek, LLC for Project No. City of Angoon, Alaska for Project No. submitted will be considered by DOE in 12619–002 filed on February 3, 2009 at 13366–000 filed on February 3, 2009 at pwalker on PROD1PC71 with NOTICES determining the scope of the EIS. 8:30 a.m. would consist of: (1) A 8:30 a.m. would consist of: (1) A DOE anticipates issuing a Draft EIS in proposed 170-foot-high concrete arch proposed 170-foot-high concrete arched the fall of 2009. DOE will provide a dam at the exit of the natural Ruth Lake; dam at the exit of the natural Ruth Lake; public comment period of at least 45 (2) an existing reservoir having a surface (2) an existing reservoir having a surface days from the Environmental Protection area of 130 acres and a storage capacity area of 130 acres and a storage capacity VerDate Nov<24>2008 18:09 Feb 24, 2009 Jkt 217001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:FRFM25FEN1.SGM 25FEN1