Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices                                                 39241

                                                35.12: Market-Based Rate Tariff in                          Docket Numbers: ES10–48–000.                       of the intervention or protest to the
                                                Compliance with Order No. 714 to be                         Applicants: Trans-Allegheny                        Federal Energy Regulatory Commission,
                                                effective 6/29/2010.                                     Interstate Line Company.                              888 First St. NE., Washington, DC
                                                   Filed Date: 06/29/2010.                                  Description: Trans-Allegheny                       20426.
                                                   Accession Number: 20100629–5143.                      Interstate Line Company Supplemental                    The filings in the above proceedings
                                                   Comment Date: 5 p.m. Eastern Time                     Filing.                                               are accessible in the Commission’s
                                                on Tuesday, July 20, 2010.                                  Filed Date: 06/29/2010.                            eLibrary system by clicking on the
                                                   Docket Numbers: ER10–1628–000.                           Accession Number: 20100629–5130.                   appropriate link in the above list. They
                                                                                                            Comment Date: 5 p.m. Eastern Time                  are also available for review in the
                                                   Applicants: Texas Electric Marketing,
                                                                                                         on Friday, July 09, 2010.                             Commission’s Public Reference Room in
                                                LLC.
                                                   Description: Texas Electric Marketing,                   Any person desiring to intervene or to             Washington, DC. There is an
                                                LLC submits tariff filing per 35.12:                     protest in any of the above proceedings               eSubscription link on the Web site that
                                                Market-Based Rate Tariff in Compliance                   must file in accordance with Rules 211                enables subscribers to receive e-mail
                                                with Order No. 714 to be effective 6/29/                 and 214 of the Commission’s Rules of                  notification when a document is added
                                                2010.                                                    Practice and Procedure (18 CFR 385.211                to a subscribed dockets(s). For
                                                   Filed Date: 06/29/2010.                               and 385.214) on or before 5 p.m. Eastern              assistance with any FERC Online
                                                   Accession Number: 20100629–5147.                      time on the specified comment date. It                service, please e-mail
                                                   Comment Date: 5 p.m. Eastern Time                     is not necessary to separately intervene              FERCOnlineSupport@ferc.gov, or call
                                                on Tuesday, July 20, 2010.                               again in a subdocket related to a                     (866) 208–3676 (toll free). For TTY, call
                                                                                                         compliance filing if you have previously              (202) 502–8659.
                                                   Docket Numbers: ER10–1629–000.
                                                                                                         intervened in the same docket. Protests
                                                   Applicants: San Diego Gas & Electric                                                                        Nathaniel J. Davis, Sr.,
                                                                                                         will be considered by the Commission
                                                Company.                                                                                                       Deputy Secretary.
                                                                                                         in determining the appropriate action to
                                                   Description: San Diego Gas & Electric
                                                                                                         be taken, but will not serve to make                  [FR Doc. 2010–16634 Filed 7–7–10; 8:45 am]
                                                Company submits tariff filing per 35:
                                                                                                         protestants parties to the proceeding.                BILLING CODE 6717–01–P
                                                San Diego Gas & Electric Company
                                                                                                         Anyone filing a motion to intervene or
                                                Baseline Transmission Owner Tariff
                                                                                                         protest must serve a copy of that
                                                Volume 11 to be effective 6/28/2010.                                                                           DEPARTMENT OF ENERGY
                                                                                                         document on the Applicant. In reference
                                                   Filed Date: 06/29/2010.
                                                                                                         to filings initiating a new proceeding,
                                                   Accession Number: 20100629–5150.                                                                            Bonneville Power Administration
                                                                                                         interventions or protests submitted on
                                                   Comment Date: 5 p.m. Eastern Time
                                                                                                         or before the comment deadline need
                                                on Tuesday, July 20, 2010.                                                                                     Hooper Springs Project
                                                                                                         not be served on persons other than the
                                                   Docket Numbers: ER10–1630–000.                        Applicant.                                            AGENCY: Bonneville Power
                                                   Applicants: Wolf Hills Energy, LLC.                      As it relates to any qualifying facility           Administration (BPA), Department of
                                                   Description: Wolf Hills Energy, LLC                   filings, the notices of self-certification            Energy (DOE).
                                                submits tariff filing per 35.12: Market-                 [or self-recertification] listed above, do            ACTION: Notice of Intent to prepare an
                                                Based Rate Tariff in Compliance with                     not institute a proceeding regarding                  Environmental Impact Statement (EIS)
                                                Order No. 714 to be effective 6/29/2010.                 qualifying facility status. A notice of               and notice of floodplain and wetlands
                                                   Filed Date: 06/29/2010.                               self-certification [or self-recertification]
                                                   Accession Number: 20100629–5151.                                                                            involvement.
                                                                                                         simply provides notification that the
                                                   Comment Date: 5 p.m. Eastern Time                     entity making the filing has determined               SUMMARY: BPA intends to prepare an EIS
                                                on Tuesday, July 20, 2010.                               the facility named in the notice meets                in accordance with the National
                                                   Docket Numbers: ER10–1631–000.                        the applicable criteria to be a qualifying            Environmental Policy Act (NEPA) on
                                                   Applicants: University Park Energy,                   facility. Intervention and/or protest do              the proposed construction, operation,
                                                LLC.                                                     not lie in dockets that are qualifying                and maintenance of a 115-kilovolt (kV)
                                                   Description: University Park Energy,                  facility self-certifications or self-                 transmission line and a 138/115-kV
                                                LLC submits tariff filing per 35.12:                     recertifications. Any person seeking to               substation (collectively referred to as the
                                                Market-Based Rate Tariff in Compliance                   challenge such qualifying facility status             Hooper Springs Project). The new BPA
                                                with Order No. 714 to be effective 6/29/                 may do so by filing a motion pursuant                 substation would be called Hooper
                                                2010.                                                    to 18 CFR 292.207(d)(iii). Intervention               Springs Substation and would be
                                                   Filed Date: 06/29/2010.                               and protests may be filed in response to              located adjacent to PacifiCorp’s existing
                                                   Accession Number: 20100629–5155.                      notices of qualifying facility dockets                345/138-kV Threemile Knoll Substation,
                                                   Comment Date: 5 p.m. Eastern Time                     other than self-certifications and self-              located near the City of Soda Springs in
                                                on Tuesday, July 20, 2010.                               recertifications.                                     Caribou County, Idaho. The new 115-kV
                                                   Docket Numbers: ER10–1632–000.                           The Commission encourages                          single-circuit BPA transmission line
                                                   Applicants: Tenaska Power Services                    electronic submission of protests and                 would extend generally north and east
                                                Co.                                                      interventions in lieu of paper, using the             from these substations to a connection
                                                   Description: Tenaska Power Services                   FERC Online links at http://                          with Lower Valley Energy’s (LVE’s)
                                                Co. submits tariff filing per 35.12:                     www.ferc.gov. To facilitate electronic                existing 115-kV Lane Creek Substation,
                                                Market-Based Rate Tariff in Compliance                   service, persons with Internet access                 east of the City of Wayan, Idaho. The
                                                with Order No. 714 to be effective 6/29/                 who will eFile a document and/or be                   proposed project would address voltage
                                                2010.
srobinson on DSKHWCL6B1PROD with NOTICES




                                                                                                         listed as a contact for an intervenor                 stability and reliability concerns of two
                                                   Filed Date: 06/29/2010.                               must create and validate an                           of BPA’s full requirements customers,
                                                   Accession Number: 20100629–5162.                      eRegistration account using the                       LVE and Fall River Rural Electric
                                                   Comment Date: 5 p.m. Eastern Time                     eRegistration link. Select the eFiling                Cooperative (Fall River), which
                                                on Tuesday, July 20, 2010.                               link to log on and submit the                         purchase all or almost all of the electric
                                                   Take notice that the Commission                       intervention or protests.                             power required to serve their loads from
                                                received the following electric securities                  Persons unable to file electronically              BPA under existing contracts. With this
                                                filings:                                                 should submit an original and 14 copies               Notice of Intent, BPA is initiating the


                                           VerDate Mar<15>2010   17:09 Jul 07, 2010   Jkt 220001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:FRFM08JYN1.SGM   08JYN1
39242                           Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices

                                                public scoping process for the EIS and                   Manager, Bonneville Power                             across a portion of the U.S. Forest
                                                is requesting comments about the                         Administration—TEP–TPP–3, P.O. Box                    Service Caribou-Targhee National Forest
                                                proposal and its potential                               3621, Portland, Oregon 97208–3621;                    (USFS), U.S. Bureau of Land
                                                environmental impacts that BPA should                    toll-free telephone 1–800–282–3713;                   Management (BLM) land, and private
                                                consider as it prepares the EIS. In                      direct telephone 360–619–6559; or e-                  land, along the Blackfoot River,
                                                accordance with DOE regulations for                      mail etorth@bpa.gov. Additional                       connecting with LVE’s existing Lanes
                                                compliance with floodplain and                           information can be found at BPA’s Web                 Creek-Valley Line at a point about 2
                                                wetlands environmental review                            site: http://www.efw.bpa.gov/                         miles southeast of the intersection of
                                                requirements, BPA will prepare a                         environmental_services/                               Blackfoot River Road and Diamond
                                                floodplain and wetlands assessment to                    Document_Library/HooperSprings/.                      Creek.
                                                avoid or minimize potential harm to or                   SUPPLEMENTARY INFORMATION: BPA                           Based on comments received on the
                                                within any affected floodplains and                      needs to respond to a request from LVE                Preliminary EA, it was discovered that
                                                wetlands. The assessment will be                         to help improve the stability and                     the proposed route identified in the
                                                included in the EIS.                                     reliability of the transmission system in             Preliminary EA crossed four
                                                DATES: Written scoping comments are                      southeastern Idaho. LVE, along with                   contaminated mining sites (Conda,
                                                due to the address below by August 9,                    Fall River, are full requirements                     Ballard, Wooley Valley, and North
                                                2010 to ensure their consideration in the                customers of BPA that purchase all or                 Maybe Phosphate Mines) that are the
                                                preparation of the Draft EIS. Comments                   almost all of the electric power required             subject of an ongoing Superfund Site
                                                may also be submitted at the public                                                                            Investigation for selenium soil
                                                                                                         to serve their electrical loads from BPA
                                                scoping meeting to be held on July 29,                                                                         contamination under the
                                                                                                         under existing contracts. LVE and Fall
                                                2010 in Soda Springs, Idaho at the                                                                             Comprehensive Environmental
                                                                                                         River provide electrical service to
                                                address below. Scoping comments                                                                                Response, Compensation and Liability
                                                                                                         eastern Idaho, northwestern Wyoming,
                                                received after the comment period will                                                                         Act (CERCLA). Each of these Superfund
                                                                                                         and southwestern Montana.
                                                be considered to the extent practicable.                                                                       Site Investigation areas is currently
                                                                                                            Over the past few years, BPA has
                                                                                                                                                               under review to determine the nature
                                                ADDRESSES: Send written comments to                      increased the voltage stability and
                                                                                                                                                               and extent of contamination. Given the
                                                inform the preparation of the Draft EIS,                 reliability of its existing transmission
                                                                                                                                                               presence of these Superfund Sites and
                                                and requests to be placed on the project                 lines in the area (e.g., Palisades-Goshen,
                                                                                                                                                               the routing of the line as originally
                                                mailing list, to Hooper Springs Project,                 Swan Valley-Goshen, Swan Valley-                      proposed, either through or near those
                                                P.O. Box 9250, Portland, OR 97207, or                    Teton, and Goshen-Drummond lines),                    sites, BPA has determined that
                                                by fax to (888) 315–4503. You also may                   which has helped improve the stability                preparation of an EIS is appropriate.
                                                call BPA’s toll free comment line at                     and reliability of the Fall River                        BPA will be the lead agency for
                                                (800) 622–4519 and leave a message                       transmission system and the northern                  preparation of the EIS. The USFS and
                                                (please include the name of this                         portion of LVE’s transmission system.                 BLM will act as cooperating agencies to
                                                project), or submit comments online at                   However, the voltage stability and                    assist with preparation of the EIS,
                                                http://www.bpa.gov/comment. BPA will                     reliability of the southern portion of                including assisting BPA in evaluating
                                                post all comment letters in their entirety               LVE’s transmission system continues to                transmission line alternatives and
                                                on BPA’s Web site at http://                             be a concern. LVE’s system experiences                identifying interests that should be
                                                www.bpa.gov/comment.                                     extreme peaks in electrical load during               addressed in the EIS. If, after
                                                   On Thursday, July 29, 2010, an open-                  winter, when temperatures can drop to                 completion of the environmental review
                                                house style scoping meeting will be                      ¥50 °F and electricity is needed for                  in the EIS, BPA decides to proceed with
                                                held from 5 p.m. to 7 p.m. at the Soda                   heat. If a transmission line were to go               constructing, operating, and
                                                Springs High School, in the commons                      out of service during these times,                    maintaining a new line, both the USFS
                                                area, 300 E 1st N, Soda Springs, Idaho                   voltage instability could occur and                   and BLM would be able to use the
                                                83276. At the meeting, BPA will provide                  utility customers could lose power,                   information in the EIS to support their
                                                maps and other information about the                     potentially creating life-threatening                 respective decisions to grant Special
                                                project and have members of the project                  situations. The proposed project would                Use Permits to BPA, as appropriate,
                                                team available to answer questions and                   allow BPA to provide transmission                     where the line would cross their
                                                accept oral and written comments. You                    reinforcement to avoid loss of LVE’s                  respective lands. Additional cooperating
                                                may stop by any time during the open                     entire voltage load during peak winter                agencies for the EIS may be identified as
                                                house.                                                   conditions, enhance the existing system               the proposed project proceeds through
                                                   Persons needing reasonable                            in the southern Idaho region, and                     the NEPA process.
                                                accommodation to attend and                              prepare to meet ongoing and forecasted                   Alternatives Proposed for
                                                participate in the public meetings                       load growth of about 3 percent per year               Consideration: BPA has identified three
                                                should contact John Barco (see FOR                       in southeast Idaho and the Jackson Hole               potential action alternatives that vary
                                                FURTHER INFORMATION CONTACT) at least                    valley area in Wyoming.                               the transmission line by route,
                                                10 business days prior to the meeting,                      Background: In May 2009, BPA                       connection point, length, and voltage.
                                                to allow sufficient time to process                      completed and issued a Preliminary                    Two of these alternatives would
                                                requests. Information regarding the                      Environmental Assessment (EA) (DOE/                   originate from the same proposed
                                                Hooper Springs Project is available in                   EA–1567) for BPA’s proposal to                        Hooper Springs Substation as was
                                                alternative formats upon request.                        construct, operate, and maintain Hooper               described in the May 2009 Preliminary
srobinson on DSKHWCL6B1PROD with NOTICES




                                                FOR FURTHER INFORMATION CONTACT: John                    Springs Substation and to partially fund              EA, while the third alternative would
                                                Barco, Environmental Project Lead,                       LVE’s construction, operation, and                    originate from PacifiCorp’s existing
                                                Bonneville Power Administration—                         maintenance of a new 22-mile double-                  ThreeMile Knoll Substation. The three
                                                KEC–4, P.O. Box 3621, Portland, Oregon                   circuit 115-kV Hooper Springs-Lower                   potential alternatives are as follows:
                                                97208–3621; toll-free telephone 1–800–                   Valley Line. The proposed line                           • Hooper Springs Substation and
                                                282–3713; direct telephone 503–230–                      considered in the Preliminary EA                      Northernmost Route (Proposed Action):
                                                3223; or e-mail jwbarco@bpa.gov. You                     extended from the proposed Hooper                     Under this alternative, BPA would
                                                may also contact Erich Orth, Project                     Springs Substation generally northeast                construct, operate, and maintain a new


                                           VerDate Mar<15>2010   17:09 Jul 07, 2010   Jkt 220001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:FRFM08JYN1.SGM   08JYN1
Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices                                          39243

                                                115-kV, 32-mile, single-circuit                          The potential environmental resources                 DEPARTMENT OF ENERGY
                                                transmission line, from BPA’s proposed                   identified for analysis in most
                                                Hooper Springs Substation, extending                     transmission line projects include land               Federal Energy Regulatory
                                                generally north along Highway 34 before                  use, recreation, transportation and                   Commission
                                                heading east to connect with LVE’s                       aviation, socioeconomics, cultural                    [Docket No. ER10–1634–000]
                                                existing 115-kV Lane Creek Substation                    resources, visual resources, public
                                                east of the City of Wayan, Idaho,                        health and safety, noise, electric and                California Independent System;
                                                crossing both private land and public                    magnetic field effects, sensitive plants              Operator Corporation; Notice of Filing
                                                land (USFS and BLM lands), but                           and animals and their habitats, soil
                                                remaining south of Grays Lake National                                                                         June 30, 2010.
                                                                                                         erosion, wetlands and floodplains, and                   Take notice that on June 29, 2010, the
                                                Wildlife Refuge and outside the four
                                                                                                         fish and water resources. BPA is seeking              California Independent System Operator
                                                known contaminated mining sites to the
                                                maximum extent practicable.                              any additional information about these                Corporation (CAISO) and the City of
                                                   • Hooper Springs Substation and                       environmental resources, and impacts to               Riverside, California (Riverside) filed a
                                                Easternmost Route, with Line                             those resources, from the proposed                    Joint Petition For Limited Waiver Of
                                                Adjustments: Under this alternative,                     alternatives, including potential                     Tariff Provisions And Request For
                                                BPA would construct, operate, and                        mitigation measures for each proposed                 Shortened Comment Period And
                                                maintain a new 115-kV, 22- to 30-mile,                   alternative or different alternatives that            Expedited Commission Order (tariff
                                                double-circuit transmission line,                        may meet the technical requirements of                waiver) to allow CAISO to correct an
                                                connecting PacifiCorp’s existing                         the transmission system.                              inadvertent data entry error that
                                                Threemile Knoll Substation with the                                                                            resulted in an erroneous wheeling
                                                                                                            While all comments are appreciated,
                                                proposed BPA-constructed, operated,                                                                            access charge to Riverside in the amount
                                                                                                         BPA specifically seeks comment to
                                                and maintained Hooper Springs                                                                                  of $30 million dollars. The tariff waiver
                                                                                                         inform its analysis of the effects of any             would exempt Riverside from the
                                                Substation, extending generally
                                                                                                         potential line route on bird species,                 obligation of paying the erroneous
                                                northeast and then east before
                                                                                                         habitat, and habitat use, including                   amount of $30 million due on July 1,
                                                connecting with LVE’s existing Lane
                                                Creek-Valley Line at a point about 2                     flyway patterns and other behaviors in                2010, exempt Riverside from the
                                                miles southeast of the intersection of                   the Grays Lake National Wildlife Refuge               obligation to post Financial Security to
                                                Blackfoot River Road and Diamond                         area and any other flyway areas                       secure this amount, and also exempt
                                                Creek Road. This alternative is similar                  identified through this process. BPA                  CAISO from the obligation to pay this
                                                to the action originally proposed in the                 also particularly seeks information                   amount to Southern California Edison
                                                Preliminary EA, except that BPA, rather                  about the nature and extent of the four               Company.
                                                than LVE, would retain ownership,                        known Superfund sites, and any other                     Any person desiring to intervene or to
                                                operation, and maintenance of the line,                  contamination in the area not currently               protest this filing must file in
                                                and would route the line around known                    known to the agency.                                  accordance with Rules 211 and 214 of
                                                Superfund Sites, thus also lengthening                                                                         the Commission’s Rules of Practice and
                                                                                                            Scoping will help BPA further assess
                                                the line.                                                                                                      Procedure (18 CFR 385.211, 385.214).
                                                                                                         and refine the transmission line
                                                   • Threemile Knoll Substation and                                                                            Protests will be considered by the
                                                                                                         alternatives to be studied in the Draft               Commission in determining the
                                                Northernmost Route: Under this
                                                                                                         EIS. Scoping will also ensure that a full             appropriate action to be taken, but will
                                                alternative, BPA would not construct
                                                Hooper Springs Substation. BPA would                     range of issues related to this proposal              not serve to make protestants parties to
                                                construct, operate, and maintain a new                   are addressed in the Draft EIS, and                   the proceeding. Any person wishing to
                                                138-kV (230-kV construction), 32-mile,                   identify significant or potentially                   become a party must file a notice of
                                                single-circuit transmission line,                        significant impacts that may result from              intervention or motion to intervene, as
                                                connecting PacifiCorp’s existing                         the proposed project. When completed,                 appropriate. Such notices, motions, or
                                                Threemile Knoll Substation with LVE’s                    the Draft EIS will be circulated for                  protests must be filed on or before the
                                                existing 138/115-kV Lane Creek                           review and comment, and BPA will                      comment date. On or before the
                                                Substation, using the route specified in                 hold public meetings to answer                        comment date, it is not necessary to
                                                the Proposed Action.                                     questions and receive comments. At this               serve motions to intervene or protests
                                                   In addition to these three action                     time, BPA expects to issue the Draft EIS              on persons other than the Applicant.
                                                alternatives, BPA also will consider a                   in spring 2012. BPA will consider and                    The Commission encourages
                                                No Action Alternative. Under this                        respond to comments received on the                   electronic submission of protests and
                                                alternative, BPA would not construct                     Draft EIS in the Final EIS. The Final EIS             interventions in lieu of paper using the
                                                the Hooper Springs Substation or a                       is expected to be published in fall 2012.             ‘‘eFiling’’ link at http://www.ferc.gov.
                                                transmission line. Other alternatives                    BPA’s decision will be documented in                  Persons unable to file electronically
                                                may be identified through the scoping                    a Record of Decision that will follow the             should submit an original and 14 copies
                                                process.                                                 Final EIS.                                            of the protest or intervention to the
                                                   Public Participation and                                                                                    Federal Energy Regulatory Commission,
                                                Identification of Environmental                            Issued in Portland, Oregon, on June 29,             888 First Street, NE., Washington, DC
                                                Resources: With this Notice of Intent,                   2010.                                                 20426.
                                                BPA is initiating the public scoping                     Stephen J. Wright,                                       This filing is accessible on-line at
srobinson on DSKHWCL6B1PROD with NOTICES




                                                process for the Hooper Springs Project                   Administrator and Chief Executive Officer.            http://www.ferc.gov, using the
                                                EIS. BPA will conduct a 30-day scoping                   [FR Doc. 2010–16622 Filed 7–7–10; 8:45 am]            ‘‘eLibrary’’ link and is available for
                                                period during which Tribes, affected                                                                           review in the Commission’s Public
                                                                                                         BILLING CODE 6450–01–P
                                                landowners, concerned citizens, special                                                                        Reference Room in Washington, DC.
                                                interest groups, local, State, and Federal                                                                     There is an ‘‘eSubscription’’ link on the
                                                governments, and any other interested                                                                          Web site that enables subscribers to
                                                parties are invited to comment on the                                                                          receive e-mail notification when a
                                                scope of the Draft EIS to be prepared.                                                                         document is added to a subscribed


                                           VerDate Mar<15>2010   17:09 Jul 07, 2010   Jkt 220001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:FRFM08JYN1.SGM   08JYN1

Contenu connexe

En vedette (8)

NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOI - Texas Clean Energy
NOI - Texas Clean EnergyNOI - Texas Clean Energy
NOI - Texas Clean Energy
 
March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
10 Insightful Quotes On Designing A Better Customer Experience
10 Insightful Quotes On Designing A Better Customer Experience10 Insightful Quotes On Designing A Better Customer Experience
10 Insightful Quotes On Designing A Better Customer Experience
 
How to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanHow to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media Plan
 
Learn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionLearn BEM: CSS Naming Convention
Learn BEM: CSS Naming Convention
 
SEO: Getting Personal
SEO: Getting PersonalSEO: Getting Personal
SEO: Getting Personal
 

Similaire à NOI - Hooper Springs EIS

Friends of lanai filing on transcripts
Friends of lanai filing on transcriptsFriends of lanai filing on transcripts
Friends of lanai filing on transcriptsHonolulu Civil Beat
 
98065 California Utilities March 2009
98065 California Utilities March 200998065 California Utilities March 2009
98065 California Utilities March 2009guesta50256e
 
A comparison of pstn and ip traffic from 1997 to 2015
A comparison of pstn and ip traffic from 1997 to 2015A comparison of pstn and ip traffic from 1997 to 2015
A comparison of pstn and ip traffic from 1997 to 2015Shawn DuBravac
 
TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012Patton Boggs LLP
 
Public Citizen Petition to FERC to Establish Office of Public Participation
Public Citizen Petition to FERC to Establish Office of Public ParticipationPublic Citizen Petition to FERC to Establish Office of Public Participation
Public Citizen Petition to FERC to Establish Office of Public ParticipationMarcellus Drilling News
 
Siemens%20Case.pptx
Siemens%20Case.pptxSiemens%20Case.pptx
Siemens%20Case.pptxgoharyaseen
 
Legislative Staff Briefing - January 26, 2017
Legislative Staff Briefing - January 26, 2017Legislative Staff Briefing - January 26, 2017
Legislative Staff Briefing - January 26, 2017aectnet
 
C.08-12 CS admitted for analysis acquisition authorization request between AM...
C.08-12 CS admitted for analysis acquisition authorization request between AM...C.08-12 CS admitted for analysis acquisition authorization request between AM...
C.08-12 CS admitted for analysis acquisition authorization request between AM...Superintendencia de Competencia
 
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Air
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot AirWhat Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Air
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Airhandsomelykeepe65
 

Similaire à NOI - Hooper Springs EIS (15)

Fcc
FccFcc
Fcc
 
Cs Confirms Fines Amounting Us$29,343.60
Cs Confirms Fines Amounting Us$29,343.60Cs Confirms Fines Amounting Us$29,343.60
Cs Confirms Fines Amounting Us$29,343.60
 
Friends of lanai filing on transcripts
Friends of lanai filing on transcriptsFriends of lanai filing on transcripts
Friends of lanai filing on transcripts
 
NOI - Energia Sierra Juarez
NOI - Energia Sierra JuarezNOI - Energia Sierra Juarez
NOI - Energia Sierra Juarez
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 
98065 California Utilities March 2009
98065 California Utilities March 200998065 California Utilities March 2009
98065 California Utilities March 2009
 
A comparison of pstn and ip traffic from 1997 to 2015
A comparison of pstn and ip traffic from 1997 to 2015A comparison of pstn and ip traffic from 1997 to 2015
A comparison of pstn and ip traffic from 1997 to 2015
 
TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012TechComm Industry Update - August 17, 2012
TechComm Industry Update - August 17, 2012
 
Public Citizen Petition to FERC to Establish Office of Public Participation
Public Citizen Petition to FERC to Establish Office of Public ParticipationPublic Citizen Petition to FERC to Establish Office of Public Participation
Public Citizen Petition to FERC to Establish Office of Public Participation
 
Lawrence lee meco
Lawrence lee mecoLawrence lee meco
Lawrence lee meco
 
Siemens%20Case.pptx
Siemens%20Case.pptxSiemens%20Case.pptx
Siemens%20Case.pptx
 
Legislative Staff Briefing - January 26, 2017
Legislative Staff Briefing - January 26, 2017Legislative Staff Briefing - January 26, 2017
Legislative Staff Briefing - January 26, 2017
 
C.08-12 CS admitted for analysis acquisition authorization request between AM...
C.08-12 CS admitted for analysis acquisition authorization request between AM...C.08-12 CS admitted for analysis acquisition authorization request between AM...
C.08-12 CS admitted for analysis acquisition authorization request between AM...
 
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Air
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot AirWhat Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Air
What Net Neutrality Opponents Are Saying Now — And Why It’s A Lot Of Hot Air
 

Plus de DOE Office of NEPA Policy & Compliance

Plus de DOE Office of NEPA Policy & Compliance (20)

NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC ProjectNOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy ProjectNOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy Project
 
NOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy ProjectNOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy Project
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
NOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - MercuryNOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - Mercury
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)
 
NOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa BiorefineryNOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa Biorefinery
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
Amended NOI - Abengoa Biorefinery
Amended NOI - Abengoa BiorefineryAmended NOI - Abengoa Biorefinery
Amended NOI - Abengoa Biorefinery
 
NOI - Abengoa Biorefinery
NOI - Abengoa BiorefineryNOI - Abengoa Biorefinery
NOI - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 
NOI - Champlain Hudson Power
NOI - Champlain Hudson PowerNOI - Champlain Hudson Power
NOI - Champlain Hudson Power
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project
 

NOI - Hooper Springs EIS

  • 1. Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices 39241 35.12: Market-Based Rate Tariff in Docket Numbers: ES10–48–000. of the intervention or protest to the Compliance with Order No. 714 to be Applicants: Trans-Allegheny Federal Energy Regulatory Commission, effective 6/29/2010. Interstate Line Company. 888 First St. NE., Washington, DC Filed Date: 06/29/2010. Description: Trans-Allegheny 20426. Accession Number: 20100629–5143. Interstate Line Company Supplemental The filings in the above proceedings Comment Date: 5 p.m. Eastern Time Filing. are accessible in the Commission’s on Tuesday, July 20, 2010. Filed Date: 06/29/2010. eLibrary system by clicking on the Docket Numbers: ER10–1628–000. Accession Number: 20100629–5130. appropriate link in the above list. They Comment Date: 5 p.m. Eastern Time are also available for review in the Applicants: Texas Electric Marketing, on Friday, July 09, 2010. Commission’s Public Reference Room in LLC. Description: Texas Electric Marketing, Any person desiring to intervene or to Washington, DC. There is an LLC submits tariff filing per 35.12: protest in any of the above proceedings eSubscription link on the Web site that Market-Based Rate Tariff in Compliance must file in accordance with Rules 211 enables subscribers to receive e-mail with Order No. 714 to be effective 6/29/ and 214 of the Commission’s Rules of notification when a document is added 2010. Practice and Procedure (18 CFR 385.211 to a subscribed dockets(s). For Filed Date: 06/29/2010. and 385.214) on or before 5 p.m. Eastern assistance with any FERC Online Accession Number: 20100629–5147. time on the specified comment date. It service, please e-mail Comment Date: 5 p.m. Eastern Time is not necessary to separately intervene FERCOnlineSupport@ferc.gov, or call on Tuesday, July 20, 2010. again in a subdocket related to a (866) 208–3676 (toll free). For TTY, call compliance filing if you have previously (202) 502–8659. Docket Numbers: ER10–1629–000. intervened in the same docket. Protests Applicants: San Diego Gas & Electric Nathaniel J. Davis, Sr., will be considered by the Commission Company. Deputy Secretary. in determining the appropriate action to Description: San Diego Gas & Electric be taken, but will not serve to make [FR Doc. 2010–16634 Filed 7–7–10; 8:45 am] Company submits tariff filing per 35: protestants parties to the proceeding. BILLING CODE 6717–01–P San Diego Gas & Electric Company Anyone filing a motion to intervene or Baseline Transmission Owner Tariff protest must serve a copy of that Volume 11 to be effective 6/28/2010. DEPARTMENT OF ENERGY document on the Applicant. In reference Filed Date: 06/29/2010. to filings initiating a new proceeding, Accession Number: 20100629–5150. Bonneville Power Administration interventions or protests submitted on Comment Date: 5 p.m. Eastern Time or before the comment deadline need on Tuesday, July 20, 2010. Hooper Springs Project not be served on persons other than the Docket Numbers: ER10–1630–000. Applicant. AGENCY: Bonneville Power Applicants: Wolf Hills Energy, LLC. As it relates to any qualifying facility Administration (BPA), Department of Description: Wolf Hills Energy, LLC filings, the notices of self-certification Energy (DOE). submits tariff filing per 35.12: Market- [or self-recertification] listed above, do ACTION: Notice of Intent to prepare an Based Rate Tariff in Compliance with not institute a proceeding regarding Environmental Impact Statement (EIS) Order No. 714 to be effective 6/29/2010. qualifying facility status. A notice of and notice of floodplain and wetlands Filed Date: 06/29/2010. self-certification [or self-recertification] Accession Number: 20100629–5151. involvement. simply provides notification that the Comment Date: 5 p.m. Eastern Time entity making the filing has determined SUMMARY: BPA intends to prepare an EIS on Tuesday, July 20, 2010. the facility named in the notice meets in accordance with the National Docket Numbers: ER10–1631–000. the applicable criteria to be a qualifying Environmental Policy Act (NEPA) on Applicants: University Park Energy, facility. Intervention and/or protest do the proposed construction, operation, LLC. not lie in dockets that are qualifying and maintenance of a 115-kilovolt (kV) Description: University Park Energy, facility self-certifications or self- transmission line and a 138/115-kV LLC submits tariff filing per 35.12: recertifications. Any person seeking to substation (collectively referred to as the Market-Based Rate Tariff in Compliance challenge such qualifying facility status Hooper Springs Project). The new BPA with Order No. 714 to be effective 6/29/ may do so by filing a motion pursuant substation would be called Hooper 2010. to 18 CFR 292.207(d)(iii). Intervention Springs Substation and would be Filed Date: 06/29/2010. and protests may be filed in response to located adjacent to PacifiCorp’s existing Accession Number: 20100629–5155. notices of qualifying facility dockets 345/138-kV Threemile Knoll Substation, Comment Date: 5 p.m. Eastern Time other than self-certifications and self- located near the City of Soda Springs in on Tuesday, July 20, 2010. recertifications. Caribou County, Idaho. The new 115-kV Docket Numbers: ER10–1632–000. The Commission encourages single-circuit BPA transmission line Applicants: Tenaska Power Services electronic submission of protests and would extend generally north and east Co. interventions in lieu of paper, using the from these substations to a connection Description: Tenaska Power Services FERC Online links at http:// with Lower Valley Energy’s (LVE’s) Co. submits tariff filing per 35.12: www.ferc.gov. To facilitate electronic existing 115-kV Lane Creek Substation, Market-Based Rate Tariff in Compliance service, persons with Internet access east of the City of Wayan, Idaho. The with Order No. 714 to be effective 6/29/ who will eFile a document and/or be proposed project would address voltage 2010. srobinson on DSKHWCL6B1PROD with NOTICES listed as a contact for an intervenor stability and reliability concerns of two Filed Date: 06/29/2010. must create and validate an of BPA’s full requirements customers, Accession Number: 20100629–5162. eRegistration account using the LVE and Fall River Rural Electric Comment Date: 5 p.m. Eastern Time eRegistration link. Select the eFiling Cooperative (Fall River), which on Tuesday, July 20, 2010. link to log on and submit the purchase all or almost all of the electric Take notice that the Commission intervention or protests. power required to serve their loads from received the following electric securities Persons unable to file electronically BPA under existing contracts. With this filings: should submit an original and 14 copies Notice of Intent, BPA is initiating the VerDate Mar<15>2010 17:09 Jul 07, 2010 Jkt 220001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:FRFM08JYN1.SGM 08JYN1
  • 2. 39242 Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices public scoping process for the EIS and Manager, Bonneville Power across a portion of the U.S. Forest is requesting comments about the Administration—TEP–TPP–3, P.O. Box Service Caribou-Targhee National Forest proposal and its potential 3621, Portland, Oregon 97208–3621; (USFS), U.S. Bureau of Land environmental impacts that BPA should toll-free telephone 1–800–282–3713; Management (BLM) land, and private consider as it prepares the EIS. In direct telephone 360–619–6559; or e- land, along the Blackfoot River, accordance with DOE regulations for mail etorth@bpa.gov. Additional connecting with LVE’s existing Lanes compliance with floodplain and information can be found at BPA’s Web Creek-Valley Line at a point about 2 wetlands environmental review site: http://www.efw.bpa.gov/ miles southeast of the intersection of requirements, BPA will prepare a environmental_services/ Blackfoot River Road and Diamond floodplain and wetlands assessment to Document_Library/HooperSprings/. Creek. avoid or minimize potential harm to or SUPPLEMENTARY INFORMATION: BPA Based on comments received on the within any affected floodplains and needs to respond to a request from LVE Preliminary EA, it was discovered that wetlands. The assessment will be to help improve the stability and the proposed route identified in the included in the EIS. reliability of the transmission system in Preliminary EA crossed four DATES: Written scoping comments are southeastern Idaho. LVE, along with contaminated mining sites (Conda, due to the address below by August 9, Fall River, are full requirements Ballard, Wooley Valley, and North 2010 to ensure their consideration in the customers of BPA that purchase all or Maybe Phosphate Mines) that are the preparation of the Draft EIS. Comments almost all of the electric power required subject of an ongoing Superfund Site may also be submitted at the public Investigation for selenium soil to serve their electrical loads from BPA scoping meeting to be held on July 29, contamination under the under existing contracts. LVE and Fall 2010 in Soda Springs, Idaho at the Comprehensive Environmental River provide electrical service to address below. Scoping comments Response, Compensation and Liability eastern Idaho, northwestern Wyoming, received after the comment period will Act (CERCLA). Each of these Superfund and southwestern Montana. be considered to the extent practicable. Site Investigation areas is currently Over the past few years, BPA has under review to determine the nature ADDRESSES: Send written comments to increased the voltage stability and and extent of contamination. Given the inform the preparation of the Draft EIS, reliability of its existing transmission presence of these Superfund Sites and and requests to be placed on the project lines in the area (e.g., Palisades-Goshen, the routing of the line as originally mailing list, to Hooper Springs Project, Swan Valley-Goshen, Swan Valley- proposed, either through or near those P.O. Box 9250, Portland, OR 97207, or Teton, and Goshen-Drummond lines), sites, BPA has determined that by fax to (888) 315–4503. You also may which has helped improve the stability preparation of an EIS is appropriate. call BPA’s toll free comment line at and reliability of the Fall River BPA will be the lead agency for (800) 622–4519 and leave a message transmission system and the northern preparation of the EIS. The USFS and (please include the name of this portion of LVE’s transmission system. BLM will act as cooperating agencies to project), or submit comments online at However, the voltage stability and assist with preparation of the EIS, http://www.bpa.gov/comment. BPA will reliability of the southern portion of including assisting BPA in evaluating post all comment letters in their entirety LVE’s transmission system continues to transmission line alternatives and on BPA’s Web site at http:// be a concern. LVE’s system experiences identifying interests that should be www.bpa.gov/comment. extreme peaks in electrical load during addressed in the EIS. If, after On Thursday, July 29, 2010, an open- winter, when temperatures can drop to completion of the environmental review house style scoping meeting will be ¥50 °F and electricity is needed for in the EIS, BPA decides to proceed with held from 5 p.m. to 7 p.m. at the Soda heat. If a transmission line were to go constructing, operating, and Springs High School, in the commons out of service during these times, maintaining a new line, both the USFS area, 300 E 1st N, Soda Springs, Idaho voltage instability could occur and and BLM would be able to use the 83276. At the meeting, BPA will provide utility customers could lose power, information in the EIS to support their maps and other information about the potentially creating life-threatening respective decisions to grant Special project and have members of the project situations. The proposed project would Use Permits to BPA, as appropriate, team available to answer questions and allow BPA to provide transmission where the line would cross their accept oral and written comments. You reinforcement to avoid loss of LVE’s respective lands. Additional cooperating may stop by any time during the open entire voltage load during peak winter agencies for the EIS may be identified as house. conditions, enhance the existing system the proposed project proceeds through Persons needing reasonable in the southern Idaho region, and the NEPA process. accommodation to attend and prepare to meet ongoing and forecasted Alternatives Proposed for participate in the public meetings load growth of about 3 percent per year Consideration: BPA has identified three should contact John Barco (see FOR in southeast Idaho and the Jackson Hole potential action alternatives that vary FURTHER INFORMATION CONTACT) at least valley area in Wyoming. the transmission line by route, 10 business days prior to the meeting, Background: In May 2009, BPA connection point, length, and voltage. to allow sufficient time to process completed and issued a Preliminary Two of these alternatives would requests. Information regarding the Environmental Assessment (EA) (DOE/ originate from the same proposed Hooper Springs Project is available in EA–1567) for BPA’s proposal to Hooper Springs Substation as was alternative formats upon request. construct, operate, and maintain Hooper described in the May 2009 Preliminary srobinson on DSKHWCL6B1PROD with NOTICES FOR FURTHER INFORMATION CONTACT: John Springs Substation and to partially fund EA, while the third alternative would Barco, Environmental Project Lead, LVE’s construction, operation, and originate from PacifiCorp’s existing Bonneville Power Administration— maintenance of a new 22-mile double- ThreeMile Knoll Substation. The three KEC–4, P.O. Box 3621, Portland, Oregon circuit 115-kV Hooper Springs-Lower potential alternatives are as follows: 97208–3621; toll-free telephone 1–800– Valley Line. The proposed line • Hooper Springs Substation and 282–3713; direct telephone 503–230– considered in the Preliminary EA Northernmost Route (Proposed Action): 3223; or e-mail jwbarco@bpa.gov. You extended from the proposed Hooper Under this alternative, BPA would may also contact Erich Orth, Project Springs Substation generally northeast construct, operate, and maintain a new VerDate Mar<15>2010 17:09 Jul 07, 2010 Jkt 220001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:FRFM08JYN1.SGM 08JYN1
  • 3. Federal Register / Vol. 75, No. 130 / Thursday, July 8, 2010 / Notices 39243 115-kV, 32-mile, single-circuit The potential environmental resources DEPARTMENT OF ENERGY transmission line, from BPA’s proposed identified for analysis in most Hooper Springs Substation, extending transmission line projects include land Federal Energy Regulatory generally north along Highway 34 before use, recreation, transportation and Commission heading east to connect with LVE’s aviation, socioeconomics, cultural [Docket No. ER10–1634–000] existing 115-kV Lane Creek Substation resources, visual resources, public east of the City of Wayan, Idaho, health and safety, noise, electric and California Independent System; crossing both private land and public magnetic field effects, sensitive plants Operator Corporation; Notice of Filing land (USFS and BLM lands), but and animals and their habitats, soil remaining south of Grays Lake National June 30, 2010. erosion, wetlands and floodplains, and Take notice that on June 29, 2010, the Wildlife Refuge and outside the four fish and water resources. BPA is seeking California Independent System Operator known contaminated mining sites to the maximum extent practicable. any additional information about these Corporation (CAISO) and the City of • Hooper Springs Substation and environmental resources, and impacts to Riverside, California (Riverside) filed a Easternmost Route, with Line those resources, from the proposed Joint Petition For Limited Waiver Of Adjustments: Under this alternative, alternatives, including potential Tariff Provisions And Request For BPA would construct, operate, and mitigation measures for each proposed Shortened Comment Period And maintain a new 115-kV, 22- to 30-mile, alternative or different alternatives that Expedited Commission Order (tariff double-circuit transmission line, may meet the technical requirements of waiver) to allow CAISO to correct an connecting PacifiCorp’s existing the transmission system. inadvertent data entry error that Threemile Knoll Substation with the resulted in an erroneous wheeling While all comments are appreciated, proposed BPA-constructed, operated, access charge to Riverside in the amount BPA specifically seeks comment to and maintained Hooper Springs of $30 million dollars. The tariff waiver inform its analysis of the effects of any would exempt Riverside from the Substation, extending generally potential line route on bird species, obligation of paying the erroneous northeast and then east before habitat, and habitat use, including amount of $30 million due on July 1, connecting with LVE’s existing Lane Creek-Valley Line at a point about 2 flyway patterns and other behaviors in 2010, exempt Riverside from the miles southeast of the intersection of the Grays Lake National Wildlife Refuge obligation to post Financial Security to Blackfoot River Road and Diamond area and any other flyway areas secure this amount, and also exempt Creek Road. This alternative is similar identified through this process. BPA CAISO from the obligation to pay this to the action originally proposed in the also particularly seeks information amount to Southern California Edison Preliminary EA, except that BPA, rather about the nature and extent of the four Company. than LVE, would retain ownership, known Superfund sites, and any other Any person desiring to intervene or to operation, and maintenance of the line, contamination in the area not currently protest this filing must file in and would route the line around known known to the agency. accordance with Rules 211 and 214 of Superfund Sites, thus also lengthening the Commission’s Rules of Practice and Scoping will help BPA further assess the line. Procedure (18 CFR 385.211, 385.214). and refine the transmission line • Threemile Knoll Substation and Protests will be considered by the alternatives to be studied in the Draft Commission in determining the Northernmost Route: Under this EIS. Scoping will also ensure that a full appropriate action to be taken, but will alternative, BPA would not construct Hooper Springs Substation. BPA would range of issues related to this proposal not serve to make protestants parties to construct, operate, and maintain a new are addressed in the Draft EIS, and the proceeding. Any person wishing to 138-kV (230-kV construction), 32-mile, identify significant or potentially become a party must file a notice of single-circuit transmission line, significant impacts that may result from intervention or motion to intervene, as connecting PacifiCorp’s existing the proposed project. When completed, appropriate. Such notices, motions, or Threemile Knoll Substation with LVE’s the Draft EIS will be circulated for protests must be filed on or before the existing 138/115-kV Lane Creek review and comment, and BPA will comment date. On or before the Substation, using the route specified in hold public meetings to answer comment date, it is not necessary to the Proposed Action. questions and receive comments. At this serve motions to intervene or protests In addition to these three action time, BPA expects to issue the Draft EIS on persons other than the Applicant. alternatives, BPA also will consider a in spring 2012. BPA will consider and The Commission encourages No Action Alternative. Under this respond to comments received on the electronic submission of protests and alternative, BPA would not construct Draft EIS in the Final EIS. The Final EIS interventions in lieu of paper using the the Hooper Springs Substation or a is expected to be published in fall 2012. ‘‘eFiling’’ link at http://www.ferc.gov. transmission line. Other alternatives BPA’s decision will be documented in Persons unable to file electronically may be identified through the scoping a Record of Decision that will follow the should submit an original and 14 copies process. Final EIS. of the protest or intervention to the Public Participation and Federal Energy Regulatory Commission, Identification of Environmental Issued in Portland, Oregon, on June 29, 888 First Street, NE., Washington, DC Resources: With this Notice of Intent, 2010. 20426. BPA is initiating the public scoping Stephen J. Wright, This filing is accessible on-line at srobinson on DSKHWCL6B1PROD with NOTICES process for the Hooper Springs Project Administrator and Chief Executive Officer. http://www.ferc.gov, using the EIS. BPA will conduct a 30-day scoping [FR Doc. 2010–16622 Filed 7–7–10; 8:45 am] ‘‘eLibrary’’ link and is available for period during which Tribes, affected review in the Commission’s Public BILLING CODE 6450–01–P landowners, concerned citizens, special Reference Room in Washington, DC. interest groups, local, State, and Federal There is an ‘‘eSubscription’’ link on the governments, and any other interested Web site that enables subscribers to parties are invited to comment on the receive e-mail notification when a scope of the Draft EIS to be prepared. document is added to a subscribed VerDate Mar<15>2010 17:09 Jul 07, 2010 Jkt 220001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:FRFM08JYN1.SGM 08JYN1