Pre-Design
Phase
Group 1
Arevalo, Jury
Balababa, Marcelo Jr.
Baldo, Hannah
Barrameda, Dainty
Salamero, Yvonne
IMPORTANCE OF PRE-DESIGN PHASE
• Extend pre-design as long as possible.
• It is a defense mechanism against those "hot ideas" that will come up midway
through the project.
• Invent ways to force yourself not to dive into design immediately
• Find ways of getting the client involved in this discovery phase
• Look for ways - writing, diagrams, mass models, etc. - for describing both the
minimum and requirements and your highest aspirations for the project.
• Ask yourself: How will you know later that you succeeded?
• Describe - again without designing the building - the strongest, best formal
concepts to be explored in the design.
• Involve the client in the program, budget, and expectations.
INTRODUCTION
The Pre- Design Services cover a broad line of architectural services ranging from initial problem
identification to activities that would allow the Architect to initially conceptualize an array of
architectural and allied solutions.
The Pre-Design Services nominally include the following:
• consultation
• pre-feasibility studies
• feasibility studies
• site selection and analysis
• site utilization and land-use studies
• architectural research
• architectural programming
• space planning
• space management studies
• value management
• design brief preparation
• promotional services, and other related activities
CONSULTATION
When a Client calls upon the Architect to give oral or written advice and
direction, to attend conferences, to make evaluations and appraisals regarding a
contemplated project and similar activities, the Architect renders valuable inputs
whether or not the Client pursues the project.
PRE-FEASIBILITY STUDIES
These preliminary studies involve the procurement, analysis, and use of
secondary information gathered for the project to aid the Client in early decision-
making. They represent the Architect’s initial assessment of a project’s
soundness, allowing the Client to promptly explore available/ readily identifiable
directions/options. Researched/processed/validated secondary data are
generally used for such studies e.g., electronic, print, etc.
FEASIBILITY STUDIES
Detailed analysis of the project based on pre-feasibility studies will determine the
viability of a proposed development. The studies will set the project against present
and future trends to forecast how it will perform over time. This requires primary data
gathering and analysis.
SITE SELECTION AND ANALYSIS
This entails the formulation of site criteria, assistance to the Client in site
evaluation as well as analysis to determine the most appropriate site/s for a
proposed project or building program.
• Site analysis includes site selection, geotechnical reports, and review of existing structures.
• Programming defines the project needs of the user. Programming includes cataloging the spaces and equipment needed, and functional relationships.
• The construction cost analysis provides a construction budget amount for the capital improvement budget (CIB) and a cost plan to assist in explaining the budget and in guiding project management.
• Value engineering in the pre-design phase scrutinizes the program, site selection, and project budget
SITE UTILIZATION AND LAND-USE
STUDIES
The detailed analysis of the site involves the identification of a site’s development
potentials through the proper utilization of land. The analysis covers the context of
the site as well as that of its surrounding environment and the development controls
that apply to the site and its environs.
ARCHITECTURAL RESEARCH
Architectural research entails the conduct of primary and secondary researches
and assembled facts used as basis for conclusion.
ARCHITECTURAL PROGRAMMING
This analytical problem-seeking process will lead to the statement and
identification of both horizontal and vertical requirements in offering a solution. It
incorporates a space program with characterizations of the envisioned spaces such
as ambiance, cost range, etc.
SPACE PLANNING
The Architect determines the adequate size and appropriate configuration
and assemblage for a proposed project in consideration of the use,
allocation, and interface of spaces for given activities. Space planning is done
mainly through primary data gathering such as interviews, consultations,
interfaces, focus group discussions (FGDs), space planning surveys, space
audits, etc., and subsequent analyses i.e. spatial layouts with stacking
concepts, particularly for multi-story structures.
SPACE MANAGEMENT STUDIES
An analysis of the space requirements of the project based on organizational
structure and functional set-up pinpoints linkages and interaction of spaces. The
formulation of the space program will serve as the basis for the development of the
architectural plan / design.
VALUE MANAGEMENT
This technique is applied in the cost management process to minimize the
negative effect of simplified operations associated with many cost-reduction
programs. The goal of value management is to achieve an unimpaired program at
minimum cost. Thus, a plan, design or system that has been successfully value-
managed will still satisfy the same performance criteria as the costlier alternatives.
DESIGN BRIEF PREPARATION
Under design brief preparation, the Architect states the project terms of reference
(ToR) including the concept, objectives, and other necessary requirements to bid out
architectural services (whether public or private).
PROMOTIONAL SERVICES
Projects may require promotional activities in order to develop and generate financial
support and acceptance from governing agencies or from the general public. In such
cases, the Architect can act as the agent of the Owner by producing and coordinating the
additional activities necessary to complete the services. In all such activities, the Architect
must maintain his professional status as the representative of the Owner.
After the initial meeting/conversation/correspondence with the Client, the Architect must submit his proposal for pre-
design services, stating the following:
• Scope of Work
• Manner of Payment
• Owner’s Responsibilities
• Other Conditions of Services
• The Architect can render services in any of the following ways:
- As an individual Architect he must have special training and be knowledgeable in different fields to supplement
his skills.
- Architect’s Own Staff
It is possible for Architects (as natural persons) working in a single firm to specialize in a variety of ways. Many
Architects and firms (juridical persons) specialize without losing the generalist approach of the Architect or firm.
- By Association, Consultation, or Networking
Another common practice is consultation between an Architect and a firm of other disciplines, under the extended terms
of the Owner-Architect Agreement.
MANNER OF PROVIDING SERVICES
METHODS OF COMPENSATION
Lump-Sum or Fixed Fee
A lump sum or fixed fee is an amount negotiated with the Client for
professional services that can be sufficiently defined at the outset of the
project. This arrangement is only suitable if the scope of the project, the
schedule for design and approvals, and the construction schedule and other
variables can be determined with reasonable accuracy by the Architect.
Time basis
-Time basis fees are fees that are charged on an agreed-to hourly or daily (per diem) rate. This
method of compensation is useful when the services are difficult to determine in advance or they
are interim in nature and often short in duration.
-Time-basis fees are typically used for the following:
o services which are not well defined;
o pre-design services;
o partial services;
o additional services;
o conceptual design;
o for a particular phase of the project;
o for services as an expert witness;
o renovation projects;
o preparation of record drawings
o specialist expertise or services.
The hourly or per diem (daily) rates for Architects and their staff should be agreed upon at the
outset and, additionally, the Client and Architect should agree upon a time period for review and
adjustment of the hourly rates (perhaps annually) in order to adjust for inflation and other factors.
Percentage-based
Fee
A percentage-based fee is a method of compensation which links the fee for the
Architect’s services to a percentage of the construction cost of the project. The
percentage will vary depending on the type of building, the construction value, and
the type of construction contract, and of course, the other variables (fee
adjustments)
REFERENCES:
• http://philarchitecturenotes.weebly.com/spp-201-pre-design-
services.html?fbclid=IwAR3pPAR2m-_Dd66LOpaw-
69525l53kiD5gLrpTSpnMpOTe4yRfHsIivI5AE
• https://network.aia.org/HigherLogic/System/DownloadDocumentFil
e.ashx?DocumentFileKey=f7ea7369-a39e-4310-837d-
f0d0d0c06270

Contenu connexe

Tendances

Implementing Rules and Regulations of Republic Act no. 9266
Implementing Rules and Regulations of Republic Act no. 9266Implementing Rules and Regulations of Republic Act no. 9266
Implementing Rules and Regulations of Republic Act no. 9266Marla Mendoza
 
PLANNED UNIT DEVELOPMENT
PLANNED UNIT DEVELOPMENTPLANNED UNIT DEVELOPMENT
PLANNED UNIT DEVELOPMENTANISHALALU1
 
Site analysis presentation board
Site analysis presentation board  Site analysis presentation board
Site analysis presentation board KohSungJie
 
Muni seva oldage home case study,goraj ,vadodara
Muni seva oldage home case study,goraj ,vadodaraMuni seva oldage home case study,goraj ,vadodara
Muni seva oldage home case study,goraj ,vadodaraPankti Gajjar
 
Research Methodology in Architecture
Research Methodology in ArchitectureResearch Methodology in Architecture
Research Methodology in ArchitectureNeha Bansal
 
Architectural Design Process - In brief
Architectural Design Process - In briefArchitectural Design Process - In brief
Architectural Design Process - In briefSharaniSomasundaram
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design servicesMelvin Patawaran
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use buildingTonmoy Barua
 
Design Guidelines: Home for the Elderly
Design Guidelines: Home for the ElderlyDesign Guidelines: Home for the Elderly
Design Guidelines: Home for the ElderlyDhiraj Salhotra
 
convention center litrature
convention center litratureconvention center litrature
convention center litratureSrujanaReddy41
 
Public Library ,Thesis dissertation.
Public Library ,Thesis  dissertation.Public Library ,Thesis  dissertation.
Public Library ,Thesis dissertation.Utpol saha
 
Residential Condominium
Residential CondominiumResidential Condominium
Residential Condominiumvcb smarthomes
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture IIAr. Mukunda K.S
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied servicesKatrina Bibe
 
Sense and Sensitivity in Architecture – The Use of Five Senses in Space making
Sense and Sensitivity in Architecture – The Use of Five Senses in Space makingSense and Sensitivity in Architecture – The Use of Five Senses in Space making
Sense and Sensitivity in Architecture – The Use of Five Senses in Space makingPremier Publishers
 

Tendances (20)

Implementing Rules and Regulations of Republic Act no. 9266
Implementing Rules and Regulations of Republic Act no. 9266Implementing Rules and Regulations of Republic Act no. 9266
Implementing Rules and Regulations of Republic Act no. 9266
 
THEORY OF DESIGN
THEORY OF DESIGN THEORY OF DESIGN
THEORY OF DESIGN
 
PLANNED UNIT DEVELOPMENT
PLANNED UNIT DEVELOPMENTPLANNED UNIT DEVELOPMENT
PLANNED UNIT DEVELOPMENT
 
Site analysis presentation board
Site analysis presentation board  Site analysis presentation board
Site analysis presentation board
 
Muni seva oldage home case study,goraj ,vadodara
Muni seva oldage home case study,goraj ,vadodaraMuni seva oldage home case study,goraj ,vadodara
Muni seva oldage home case study,goraj ,vadodara
 
Research Methodology in Architecture
Research Methodology in ArchitectureResearch Methodology in Architecture
Research Methodology in Architecture
 
Architectural Design Process - In brief
Architectural Design Process - In briefArchitectural Design Process - In brief
Architectural Design Process - In brief
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design services
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
 
Design Guidelines: Home for the Elderly
Design Guidelines: Home for the ElderlyDesign Guidelines: Home for the Elderly
Design Guidelines: Home for the Elderly
 
convention center litrature
convention center litratureconvention center litrature
convention center litrature
 
Site planning
Site planningSite planning
Site planning
 
Public Library ,Thesis dissertation.
Public Library ,Thesis  dissertation.Public Library ,Thesis  dissertation.
Public Library ,Thesis dissertation.
 
Residential Condominium
Residential CondominiumResidential Condominium
Residential Condominium
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture II
 
Theory of architecture 2
Theory of architecture 2Theory of architecture 2
Theory of architecture 2
 
Architectural programming
Architectural programmingArchitectural programming
Architectural programming
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied services
 
Sense and Sensitivity in Architecture – The Use of Five Senses in Space making
Sense and Sensitivity in Architecture – The Use of Five Senses in Space makingSense and Sensitivity in Architecture – The Use of Five Senses in Space making
Sense and Sensitivity in Architecture – The Use of Five Senses in Space making
 

Similaire à pre-design phase

Programming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdfProgramming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdfIftikhar Ahmad Mukhtar
 
Programming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdfProgramming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdfIftikhar Ahmad Mukhtar
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Virtu Institute
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3POOJA UDAYAN
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfSaqib Imran
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2keshava murthy
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptxJanak82
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.pptravi590686
 
2. Project identification.ppt
2. Project identification.ppt2. Project identification.ppt
2. Project identification.pptPedadaSaikumar
 

Similaire à pre-design phase (20)

Programming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdfProgramming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdf
 
Programming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdfProgramming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdf
 
CEM unit -I ppt.pptx
CEM unit -I ppt.pptxCEM unit -I ppt.pptx
CEM unit -I ppt.pptx
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdf
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Project management
Project managementProject management
Project management
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt
 
2. Project identification.ppt
2. Project identification.ppt2. Project identification.ppt
2. Project identification.ppt
 

Dernier

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 

Dernier (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

pre-design phase

  • 1. Pre-Design Phase Group 1 Arevalo, Jury Balababa, Marcelo Jr. Baldo, Hannah Barrameda, Dainty Salamero, Yvonne
  • 2. IMPORTANCE OF PRE-DESIGN PHASE • Extend pre-design as long as possible. • It is a defense mechanism against those "hot ideas" that will come up midway through the project. • Invent ways to force yourself not to dive into design immediately • Find ways of getting the client involved in this discovery phase • Look for ways - writing, diagrams, mass models, etc. - for describing both the minimum and requirements and your highest aspirations for the project. • Ask yourself: How will you know later that you succeeded? • Describe - again without designing the building - the strongest, best formal concepts to be explored in the design. • Involve the client in the program, budget, and expectations.
  • 3. INTRODUCTION The Pre- Design Services cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions. The Pre-Design Services nominally include the following: • consultation • pre-feasibility studies • feasibility studies • site selection and analysis • site utilization and land-use studies • architectural research • architectural programming • space planning • space management studies • value management • design brief preparation • promotional services, and other related activities
  • 4. CONSULTATION When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project. PRE-FEASIBILITY STUDIES These preliminary studies involve the procurement, analysis, and use of secondary information gathered for the project to aid the Client in early decision- making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions/options. Researched/processed/validated secondary data are generally used for such studies e.g., electronic, print, etc.
  • 5. FEASIBILITY STUDIES Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development. The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.
  • 6. SITE SELECTION AND ANALYSIS This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program. • Site analysis includes site selection, geotechnical reports, and review of existing structures. • Programming defines the project needs of the user. Programming includes cataloging the spaces and equipment needed, and functional relationships. • The construction cost analysis provides a construction budget amount for the capital improvement budget (CIB) and a cost plan to assist in explaining the budget and in guiding project management. • Value engineering in the pre-design phase scrutinizes the program, site selection, and project budget
  • 7. SITE UTILIZATION AND LAND-USE STUDIES The detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs. ARCHITECTURAL RESEARCH Architectural research entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.
  • 8. ARCHITECTURAL PROGRAMMING This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc. SPACE PLANNING The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation, and interface of spaces for given activities. Space planning is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc., and subsequent analyses i.e. spatial layouts with stacking concepts, particularly for multi-story structures.
  • 9. SPACE MANAGEMENT STUDIES An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan / design. VALUE MANAGEMENT This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs. The goal of value management is to achieve an unimpaired program at minimum cost. Thus, a plan, design or system that has been successfully value- managed will still satisfy the same performance criteria as the costlier alternatives.
  • 10. DESIGN BRIEF PREPARATION Under design brief preparation, the Architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private). PROMOTIONAL SERVICES Projects may require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public. In such cases, the Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services. In all such activities, the Architect must maintain his professional status as the representative of the Owner.
  • 11. After the initial meeting/conversation/correspondence with the Client, the Architect must submit his proposal for pre- design services, stating the following: • Scope of Work • Manner of Payment • Owner’s Responsibilities • Other Conditions of Services • The Architect can render services in any of the following ways: - As an individual Architect he must have special training and be knowledgeable in different fields to supplement his skills. - Architect’s Own Staff It is possible for Architects (as natural persons) working in a single firm to specialize in a variety of ways. Many Architects and firms (juridical persons) specialize without losing the generalist approach of the Architect or firm. - By Association, Consultation, or Networking Another common practice is consultation between an Architect and a firm of other disciplines, under the extended terms of the Owner-Architect Agreement. MANNER OF PROVIDING SERVICES
  • 12. METHODS OF COMPENSATION Lump-Sum or Fixed Fee A lump sum or fixed fee is an amount negotiated with the Client for professional services that can be sufficiently defined at the outset of the project. This arrangement is only suitable if the scope of the project, the schedule for design and approvals, and the construction schedule and other variables can be determined with reasonable accuracy by the Architect.
  • 13. Time basis -Time basis fees are fees that are charged on an agreed-to hourly or daily (per diem) rate. This method of compensation is useful when the services are difficult to determine in advance or they are interim in nature and often short in duration. -Time-basis fees are typically used for the following: o services which are not well defined; o pre-design services; o partial services; o additional services; o conceptual design; o for a particular phase of the project; o for services as an expert witness; o renovation projects; o preparation of record drawings o specialist expertise or services. The hourly or per diem (daily) rates for Architects and their staff should be agreed upon at the outset and, additionally, the Client and Architect should agree upon a time period for review and adjustment of the hourly rates (perhaps annually) in order to adjust for inflation and other factors.
  • 14. Percentage-based Fee A percentage-based fee is a method of compensation which links the fee for the Architect’s services to a percentage of the construction cost of the project. The percentage will vary depending on the type of building, the construction value, and the type of construction contract, and of course, the other variables (fee adjustments)