SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Gerald D. Faust
108 Roth Road, Kempton, Pa. 19529 cell #610.349.3772 Email:coachdanf@yahoo.com
Objective
Seeking a Manufacturing Engineer position in a company where I can continuously improve the
effectiveness and efficiency of the company while maintaining safety, by using the vast skill sets
I have acquired.
Lean Manufacturing
• Lean Manufacturing Core Team member of ‘Lean Initiative’ – a value stream mapping process
that produced a production cycle time reduction from 8.3 weeks down to 5.2 weeks which equates
to 2055 DL hours reduced to 1238 for an estimated DL savings of $1.1 M/yr.
• Applied multitasking capabilities to create work cells and relocate KanBan bins to improve
manufacturing efficiency; i.e. controller assembly decreased 3.5 hrs per build after implementing.
• Expressed confidence in implementing a 3 bin Kan Ban system which reduced picking time by an
average of 14% and reduced quantity of P/Os by an average of 8% a month.
• Performed quarantine builds to identify inaccuracies in documentation, BOMs and routings.
Cost Reduction
• 1 of 3 members on solar tool system cost reduction team reduced overall cost from $1.3 M/system
down to $855,000/system via innovative design changes and new manufacturing processes.
• Initiated and conducted the re-sourcing of chuck bearings to new supplier and monitored design
changes which reduced cost from $5200/bearing to $1274/bearing with improved “MTBF”.
• Conceptualized an ERP report to generate manufacturing drawing lists per work order. This saved
an average of 2 hours per tool.
• Generated RMAs and worked with suppliers to reduce supplier defects by an average of 18%.
Problem Solving
• Incorporated innovative layout concepts, as main office increased from 50 to 500 employees, on
teams to re-layout the production areas in times of expansions and times of consolidation.
• Active member of a cross functional team to merge ERN, ECO and ECR into one document as
Phase I and Phase II the team reduced ERN processing times from 5 days to 2 days on average.
• Orchestrated the implementation of a plastic pipe butt welder to enable production to build
assemblies in house and reduced cost of assemblies by an average of 11%.
• Showed perseverance in spearheading the feasibility of purchasing a CNC router table; it was
determined to be not feasible thus saved the company a minimum of $80,000 in upfront costs.
• Supported teams to receive three separate product lines from competitors we purchased in Idaho,
California and Germany.
• Reduced weekly redline drawing generation of 40/wk average down to 12/wk by implementing a
system of ‘working floor redlines’.
Management
• Compiled information to construct monthly KPI reports for VP of Operations.
• Supervised and trained the plumbing department and later the MFE department.
• Exercised strong communication and leadership skills on PACE teams for design of new options.
System/Process Creation
• Constructed a plug & play options based ordering system for our main product line which
standardized the product line and simplified configuring a bench system from 30 hours to 8 hours.
• Developed a program to streamline changing a part from Buy to Make, setting a part as Kan Ban
and changing assembly to a phantom; on average 2 days reduced to 21 minutes per task
• Produced a system to simplify the hundreds of duplicate part numbers, due to merging multiple
part numbering systems, which took processing a duplicate from 3 days to 14 minutes per entry.
• Fabricated a process for legacy drawing redlines, that we were not capable of modifying, which
allowed production, purchasing and engineering to work from accurate drawings.
Skills
• Liaison between manufacturing and engineering for issues that arose during production cycle.
Evaluate and resolved issues in a timely manner in order to minimize downtime.
• Conducted Make/Buy analysis to determine if assemble was a viable candidate for outsourcing.
• Refined AutoCAD skills by designing fixtures to aid in assembly times and improve accuracy.
• Utilized the Project Tracker System to track issues in production, determine the root cause and
ensured the issues were resolved completely.
• Evaluated outsourcing of build to print plenums to Mexico, Europe and nationally.
• Created working assembly procedures and inter-departmental procedures.
Professional Experience
Akrion Systems, Allentown, PA Nov 1991 – April 2016
Manufacturing Engineer, Flow System Supervisor, Flow System Technician
Vista Scientific Corporation, Ivyland, PA May 1988 – Nov 1991
Field Service Engineer
Lehigh John Deere, Allentown, PA Summer 1986
Mechanic
Education and Training
Pennsylvania State University, State College, PA May 1988
B.S. in Agricultural Mechanization
Delaware Valley Industrial Resource Center, Philadelphia, PA May 2004
Kaizen Training
Leadership Management International, Whitehall, PA Nov 2003
Lean Training – Value Stream Mapping, 5S and Kaizen principles
Effective Supervisory Management Course
Synergis, Quakertown, PA Nov 1995 & June 2002
AutoCAD 12 & 2000
Lehigh County Community College, Allentown, PA March 1994
Leadership, Team Building & Management Courses
Akrion Systems, Allentown, PA July 1994
ISO 9001 & 14001 Training

Contenu connexe

Tendances

Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
Jorge Fuentes
 
Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurement
spmosgofian
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
Devon McDonald
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
Dave Thompson
 

Tendances (18)

Frederick r kelly
Frederick r kellyFrederick r kelly
Frederick r kelly
 
Types of loading, production & operations management
Types of loading, production & operations managementTypes of loading, production & operations management
Types of loading, production & operations management
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
 
Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurement
 
Leigh anne ritter resume 2016
Leigh anne ritter resume 2016Leigh anne ritter resume 2016
Leigh anne ritter resume 2016
 
Computer Aided Process Planning
Computer Aided Process PlanningComputer Aided Process Planning
Computer Aided Process Planning
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
GE 494 Final Presentation
GE 494 Final PresentationGE 494 Final Presentation
GE 494 Final Presentation
 
Resume
ResumeResume
Resume
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Capp
CappCapp
Capp
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Meenu Resume
Meenu ResumeMeenu Resume
Meenu Resume
 
3 Opportunities to Increase Your Printing Operations Efficiency
3 Opportunities to Increase Your Printing Operations Efficiency3 Opportunities to Increase Your Printing Operations Efficiency
3 Opportunities to Increase Your Printing Operations Efficiency
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 

En vedette

Last post part 1 audio script
Last post part 1 audio scriptLast post part 1 audio script
Last post part 1 audio script
evadibden
 
Black Heart_Michelle Petty & Vicki Gentes
Black Heart_Michelle Petty & Vicki GentesBlack Heart_Michelle Petty & Vicki Gentes
Black Heart_Michelle Petty & Vicki Gentes
Michelle Petty
 

En vedette (20)

GF - JB
GF - JBGF - JB
GF - JB
 
Linea de tiempo
Linea de tiempo Linea de tiempo
Linea de tiempo
 
Abhishek
AbhishekAbhishek
Abhishek
 
Violencia contra la mujer y la salud
Violencia contra la mujer y la saludViolencia contra la mujer y la salud
Violencia contra la mujer y la salud
 
Grupos sanguineos
Grupos sanguineosGrupos sanguineos
Grupos sanguineos
 
Last post part 1 audio script
Last post part 1 audio scriptLast post part 1 audio script
Last post part 1 audio script
 
Dr No - JB
Dr No - JBDr No - JB
Dr No - JB
 
Health
HealthHealth
Health
 
Ensamble de un computador de escritorio
Ensamble de un computador de escritorioEnsamble de un computador de escritorio
Ensamble de un computador de escritorio
 
Richard Stallman
Richard StallmanRichard Stallman
Richard Stallman
 
Enoturismo en méxico
Enoturismo en méxicoEnoturismo en méxico
Enoturismo en méxico
 
Black Heart_Michelle Petty & Vicki Gentes
Black Heart_Michelle Petty & Vicki GentesBlack Heart_Michelle Petty & Vicki Gentes
Black Heart_Michelle Petty & Vicki Gentes
 
Presentation scluby
Presentation sclubyPresentation scluby
Presentation scluby
 
Arquitectura del pc
Arquitectura del   pcArquitectura del   pc
Arquitectura del pc
 
The Christ Centered Life (Part 6): Unity Through Humility
The Christ Centered Life (Part 6): Unity Through HumilityThe Christ Centered Life (Part 6): Unity Through Humility
The Christ Centered Life (Part 6): Unity Through Humility
 
EGYPT AND MESOPOTAMIA.
EGYPT AND MESOPOTAMIA.EGYPT AND MESOPOTAMIA.
EGYPT AND MESOPOTAMIA.
 
The Christ Centered Life (Part 7): The Church
The Christ Centered Life (Part 7): The ChurchThe Christ Centered Life (Part 7): The Church
The Christ Centered Life (Part 7): The Church
 
The Christ Centered Life (Part 1)
The Christ Centered Life (Part 1)The Christ Centered Life (Part 1)
The Christ Centered Life (Part 1)
 
The Christ Centered Life (Part 3, cont): The Christ Centered Family (Part 2)
The Christ Centered Life (Part 3, cont): The Christ Centered Family (Part 2)The Christ Centered Life (Part 3, cont): The Christ Centered Family (Part 2)
The Christ Centered Life (Part 3, cont): The Christ Centered Family (Part 2)
 
Diversidad cultural de méxico
Diversidad cultural de méxicoDiversidad cultural de méxico
Diversidad cultural de méxico
 

Similaire à 05262016 resume

Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
michael burns
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
Sean Hedden
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
Ken Probst
 
Rich_Elwell_Resume & successes_
Rich_Elwell_Resume & successes_Rich_Elwell_Resume & successes_
Rich_Elwell_Resume & successes_
Richard Elwell
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
Ajit Kumar
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015
Fred Duchow
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
Tom Mikols
 
Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
Rick Inserra
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
Steve Majors
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
Eric
 

Similaire à 05262016 resume (20)

Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
dapski042116
dapski042116dapski042116
dapski042116
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Rich_Elwell_Resume & successes_
Rich_Elwell_Resume & successes_Rich_Elwell_Resume & successes_
Rich_Elwell_Resume & successes_
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
 
May 01 Resume[1]
May 01 Resume[1]May 01 Resume[1]
May 01 Resume[1]
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
 
Karamjit Sekhon Resume
Karamjit Sekhon ResumeKaramjit Sekhon Resume
Karamjit Sekhon Resume
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 

05262016 resume

  • 1. Gerald D. Faust 108 Roth Road, Kempton, Pa. 19529 cell #610.349.3772 Email:coachdanf@yahoo.com Objective Seeking a Manufacturing Engineer position in a company where I can continuously improve the effectiveness and efficiency of the company while maintaining safety, by using the vast skill sets I have acquired. Lean Manufacturing • Lean Manufacturing Core Team member of ‘Lean Initiative’ – a value stream mapping process that produced a production cycle time reduction from 8.3 weeks down to 5.2 weeks which equates to 2055 DL hours reduced to 1238 for an estimated DL savings of $1.1 M/yr. • Applied multitasking capabilities to create work cells and relocate KanBan bins to improve manufacturing efficiency; i.e. controller assembly decreased 3.5 hrs per build after implementing. • Expressed confidence in implementing a 3 bin Kan Ban system which reduced picking time by an average of 14% and reduced quantity of P/Os by an average of 8% a month. • Performed quarantine builds to identify inaccuracies in documentation, BOMs and routings. Cost Reduction • 1 of 3 members on solar tool system cost reduction team reduced overall cost from $1.3 M/system down to $855,000/system via innovative design changes and new manufacturing processes. • Initiated and conducted the re-sourcing of chuck bearings to new supplier and monitored design changes which reduced cost from $5200/bearing to $1274/bearing with improved “MTBF”. • Conceptualized an ERP report to generate manufacturing drawing lists per work order. This saved an average of 2 hours per tool. • Generated RMAs and worked with suppliers to reduce supplier defects by an average of 18%. Problem Solving • Incorporated innovative layout concepts, as main office increased from 50 to 500 employees, on teams to re-layout the production areas in times of expansions and times of consolidation. • Active member of a cross functional team to merge ERN, ECO and ECR into one document as Phase I and Phase II the team reduced ERN processing times from 5 days to 2 days on average. • Orchestrated the implementation of a plastic pipe butt welder to enable production to build assemblies in house and reduced cost of assemblies by an average of 11%. • Showed perseverance in spearheading the feasibility of purchasing a CNC router table; it was determined to be not feasible thus saved the company a minimum of $80,000 in upfront costs. • Supported teams to receive three separate product lines from competitors we purchased in Idaho, California and Germany. • Reduced weekly redline drawing generation of 40/wk average down to 12/wk by implementing a system of ‘working floor redlines’. Management • Compiled information to construct monthly KPI reports for VP of Operations. • Supervised and trained the plumbing department and later the MFE department. • Exercised strong communication and leadership skills on PACE teams for design of new options.
  • 2. System/Process Creation • Constructed a plug & play options based ordering system for our main product line which standardized the product line and simplified configuring a bench system from 30 hours to 8 hours. • Developed a program to streamline changing a part from Buy to Make, setting a part as Kan Ban and changing assembly to a phantom; on average 2 days reduced to 21 minutes per task • Produced a system to simplify the hundreds of duplicate part numbers, due to merging multiple part numbering systems, which took processing a duplicate from 3 days to 14 minutes per entry. • Fabricated a process for legacy drawing redlines, that we were not capable of modifying, which allowed production, purchasing and engineering to work from accurate drawings. Skills • Liaison between manufacturing and engineering for issues that arose during production cycle. Evaluate and resolved issues in a timely manner in order to minimize downtime. • Conducted Make/Buy analysis to determine if assemble was a viable candidate for outsourcing. • Refined AutoCAD skills by designing fixtures to aid in assembly times and improve accuracy. • Utilized the Project Tracker System to track issues in production, determine the root cause and ensured the issues were resolved completely. • Evaluated outsourcing of build to print plenums to Mexico, Europe and nationally. • Created working assembly procedures and inter-departmental procedures. Professional Experience Akrion Systems, Allentown, PA Nov 1991 – April 2016 Manufacturing Engineer, Flow System Supervisor, Flow System Technician Vista Scientific Corporation, Ivyland, PA May 1988 – Nov 1991 Field Service Engineer Lehigh John Deere, Allentown, PA Summer 1986 Mechanic Education and Training Pennsylvania State University, State College, PA May 1988 B.S. in Agricultural Mechanization Delaware Valley Industrial Resource Center, Philadelphia, PA May 2004 Kaizen Training Leadership Management International, Whitehall, PA Nov 2003 Lean Training – Value Stream Mapping, 5S and Kaizen principles Effective Supervisory Management Course Synergis, Quakertown, PA Nov 1995 & June 2002 AutoCAD 12 & 2000 Lehigh County Community College, Allentown, PA March 1994 Leadership, Team Building & Management Courses Akrion Systems, Allentown, PA July 1994 ISO 9001 & 14001 Training