Personal Information
Entreprise/Lieu de travail
Toronto, Canada Area Canada
Profession
Megacities and sustainable transport solutions
Secteur d’activité
Real Estate/ Construction / Architecture
Site Web
http://www.tu-varna.bg/tu-varna/
À propos
Focusing on solving some of the worst problems related to the Megacities - Transportation and Health.
1. Containing the cost of roads and infrastructure maintenance.
1. Traffic jams
1. Traffic accidents
1. Air-pollution
1. Noise pollution
“GREEN CITY “Project can be applied to any Megacity and most cities with population over 1 million, below are some examples of what your city can gain.
Phase 1 (11 months) AADT a minimum Decrease of
Light Commercial Vehicles in Downtown area of at least:
CANADA, Toronto minimum of 11 970 (Phase 2)
France, Paris from 37 417 to 93 543 (Phase 3)
UK, London 17 289 (Phase
- Présentations
- Documents
- Infographies
Increasing the Probability of Success with Continuous Risk Management
Glen Alleman
•
il y a 5 ans
Model-Based Systems Engineering Demystified
Elizabeth Steiner
•
il y a 5 ans
50 Planning Fundamentals V5.0 - procedures only
M Maged Hegazy, LLM, MBA, CCP, P3O
•
il y a 5 ans
Managing cost and schedule risk
Glen Alleman
•
il y a 5 ans
Managing risk as Opportunity
Glen Alleman
•
il y a 5 ans
Control Account Manager Short Course
Glen Alleman
•
il y a 5 ans
Improving Strategic Capital Management with Integraated Valuation and Risk Modelling methods
Michael Samis
•
il y a 5 ans
The potential role of ai in the minimisation and mitigation of project delay
Pieter Rautenbach
•
il y a 6 ans
Delhi metro rail corporation project
Vimal Maurya
•
il y a 12 ans
Makkah Metro - Makkah Mass Rail Project (MMRP)
Ibrahim Al-Hudhaif
•
il y a 8 ans
Jeddah metro full presentation - Briefing Day March, 30th
Ibrahim Al-Hudhaif
•
il y a 9 ans
Riyadh Metro Presentation ADA
Ibrahim Al-Hudhaif
•
il y a 9 ans
Improving DOE Project Performance Using the DOD Integrated Master Plan
Glen Alleman
•
il y a 9 ans
Building the perfect schedule (v6)
Glen Alleman
•
il y a 9 ans
The integrated master plan and integrated master schedule
Glen Alleman
•
il y a 10 ans
Principles and Practices of Performance-Based Project Management®
Glen Alleman
•
il y a 10 ans
Building the perfect schedule (v5)(notes)
Glen Alleman
•
il y a 11 ans
Integrated Master Plan / Integrated Master Schedule (IMP/IMS)
Glen Alleman
•
il y a 10 ans
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Ricardo Viana Vargas
•
il y a 10 ans
Components of a successful program management process
Glen Alleman
•
il y a 11 ans