Personal Information
Entreprise/Lieu de travail
Toronto, Canada Area Canada
Profession
Megacities and sustainable transport solutions
Secteur d’activité
Real Estate/ Construction / Architecture
Site Web
http://www.tu-varna.bg/tu-varna/
À propos
Focusing on solving some of the worst problems related to the Megacities - Transportation and Health.
1. Containing the cost of roads and infrastructure maintenance.
1. Traffic jams
1. Traffic accidents
1. Air-pollution
1. Noise pollution
“GREEN CITY “Project can be applied to any Megacity and most cities with population over 1 million, below are some examples of what your city can gain.
Phase 1 (11 months) AADT a minimum Decrease of
Light Commercial Vehicles in Downtown area of at least:
CANADA, Toronto minimum of 11 970 (Phase 2)
France, Paris from 37 417 to 93 543 (Phase 3)
UK, London 17 289 (Phase
J’aime
(20)Increasing the Probability of Success with Continuous Risk Management
Glen Alleman
•
il y a 5 ans
Model-Based Systems Engineering Demystified
Elizabeth Steiner
•
il y a 5 ans
50 Planning Fundamentals V5.0 - procedures only
M Maged Hegazy, LLM, MBA, CCP, P3O
•
il y a 5 ans
Managing cost and schedule risk
Glen Alleman
•
il y a 5 ans
Managing risk as Opportunity
Glen Alleman
•
il y a 5 ans
Control Account Manager Short Course
Glen Alleman
•
il y a 5 ans
Improving Strategic Capital Management with Integraated Valuation and Risk Modelling methods
Michael Samis
•
il y a 5 ans
The potential role of ai in the minimisation and mitigation of project delay
Pieter Rautenbach
•
il y a 6 ans
Delhi metro rail corporation project
Vimal Maurya
•
il y a 12 ans
Makkah Metro - Makkah Mass Rail Project (MMRP)
Ibrahim Al-Hudhaif
•
il y a 8 ans
Jeddah metro full presentation - Briefing Day March, 30th
Ibrahim Al-Hudhaif
•
il y a 9 ans
Riyadh Metro Presentation ADA
Ibrahim Al-Hudhaif
•
il y a 9 ans
Improving DOE Project Performance Using the DOD Integrated Master Plan
Glen Alleman
•
il y a 9 ans
Building the perfect schedule (v6)
Glen Alleman
•
il y a 9 ans
The integrated master plan and integrated master schedule
Glen Alleman
•
il y a 10 ans
Principles and Practices of Performance-Based Project Management®
Glen Alleman
•
il y a 10 ans
Building the perfect schedule (v5)(notes)
Glen Alleman
•
il y a 11 ans
Integrated Master Plan / Integrated Master Schedule (IMP/IMS)
Glen Alleman
•
il y a 10 ans
Adopting the Quadratic Mean Process to Quantify the Qualitative Risk Analysis
Ricardo Viana Vargas
•
il y a 10 ans
Components of a successful program management process
Glen Alleman
•
il y a 11 ans
Personal Information
Entreprise/Lieu de travail
Toronto, Canada Area Canada
Profession
Megacities and sustainable transport solutions
Secteur d’activité
Real Estate/ Construction / Architecture
Site Web
http://www.tu-varna.bg/tu-varna/
À propos
Focusing on solving some of the worst problems related to the Megacities - Transportation and Health.
1. Containing the cost of roads and infrastructure maintenance.
1. Traffic jams
1. Traffic accidents
1. Air-pollution
1. Noise pollution
“GREEN CITY “Project can be applied to any Megacity and most cities with population over 1 million, below are some examples of what your city can gain.
Phase 1 (11 months) AADT a minimum Decrease of
Light Commercial Vehicles in Downtown area of at least:
CANADA, Toronto minimum of 11 970 (Phase 2)
France, Paris from 37 417 to 93 543 (Phase 3)
UK, London 17 289 (Phase