SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
System prior to dewatering worksite Baffle shifts to stabilize system Dewatered worksite;
baffle has stabilized the system
TM
AQUA-BARRIER IS A WATER FILLED DAM THAT UTILIZES A PATENTED
INTERNAL BAFFLE FOR STABILITY
Available for Rent or Purchase Compact for Shipping & Storage
Environmentally Friendly
Available for Rent or Purchase Compact for Shipping & Storage
Environmentally Friendly
TM
AQUA-BARRIER
AN ESSENTIAL COMPONENT
OF YOUR
PIPELINE CONSTRUCTION PROJECT
COMPACT IN
SHIPPING & STORAGE
TM
AQUA-BARRIER OFFERS UNIQUE
ACCESSORIES TO FACILITATE INFIELD USE
DRAIN PORTS
REPAIRABILITY
END PIPELOOPS
FILL PORTS
41232 Park 290 Drive, Bldg A • Waller, TX 77484
Schedule
# GS-07F-0543N
PIPELINE INSTALLATION & REPAIRPipeline repair or replacement projects can be complex, particularly when water is present. We understand that pipeline repairs often require
completion in a short time frame. Aqua-Barriers™ provide the fastest cofferdam method available. The next time that you are confronted
with a temporary cofferdam need, let us save you time and money.
The Canal Block Formation is
beneficial when working in narrow
channels. Water pumps or
diversion pipes can be utilized to
maintain appropriate upstream
water levels.
PIPELINE INSTALLATION & REPAIR
PARTIAL BLOCK FORMATION
COMPLETE ENCLOSURE FORMATION
CANAL BLOCK FORMATION
T h e C o m p l e t e
Enclosure Formation
is beneficial when
access to the shoreline
is difficult.
The Partial Block Formation is
beneficial when creating a work area
on a shoreline.
Aqua-Barrier™ Water Inflated Dam
Product Specification
1.1 Specification
A water-inflated temporary dam shall consist of the following:
1) The water inflated dam will consist of a self contained, single tube with an
inner restraint baffle(s)/diaphragm(s) stabilization system. The water-
inflated dam must have the ability to stand alone, without any additional
external mechanical or gravitational stabilization devices, as a positive water
barrier and water management system.
2) The water-inflated dam shall be produced from heavy gauge polyvinyl chloride (PVC) reinforced
with polyester. The PVC fabric used to create the inflatable dam will be infield repairable utilizing a
vinyl adhesive and patch material.
3) The water-inflated dam must maintain mechanical stability in addition to providing anti rolling
when exposed to uneven hydrostatic pressure from either side
4) The self-contained water inflated dam shall have threaded fill ports and drain ports for rapid
inflation and draining. The dam will be equipped with end lifting loops used to control the dam
with equipment during the installation and removal process.
5) Method for connecting the individual units together will consist of overlapping the end of the units a
specific length which will create a watertight connection. No other devices or methods for
connecting the barriers are required.
1.2 Aqua-Barrier™ Product Description
Aqua-Barriers™ are water-inflated dams used to control invasive water in floodwater situations, a
means of water management to provide access to underwater areas for construction and maintenance
operations, hazardous liquid containment, sediment retention in environmentally sensitive areas in
addition to a continually expanding list of water control related applications.
Aqua-Barriers™ are a single tube devise with a patented inner restraint baffle(s)/diaphragm(s)
stabilizing system required for stability.
1.3 Dam size requirements
The water-inflated temporary dam height shall be determined as follows:
1) Static water height conditions shall not exceed 75% of the properly filled height of the barrier.
2) Dynamic water height conditions shall not exceed stated value during hydrodynamic installation
procedures (See dynamic installation instructions for complete list of requirements).
3) Installation site criteria are required for assessment of all relevant factors.
Excess slope, high water velocities, dynamic loads resulting from wave actions, mounting surface
irregularities, and changes in interrelated hydrological conditions can increase the required water
inflated dam height verses retention height requirements.
Hydro-Solutions, Inc. 5119 Ashley Court Houston, TX 77041 Ph 800-245-0199 Fax 832/243-9109
Aqua-Barrier™ Water Inflated Dam
Product Specification
1.1 Specification
A water-inflated temporary dam shall consist of the following:
1) The water inflated dam will consist of a self contained, single tube with an
inner restraint baffle(s)/diaphragm(s) stabilization system. The water-
inflated dam must have the ability to stand alone, without any additional
external mechanical or gravitational stabilization devices, as a positive water
barrier and water management system.
2) The water-inflated dam shall be produced from heavy gauge polyvinyl chloride (PVC) reinforced
with polyester. The PVC fabric used to create the inflatable dam will be infield repairable utilizing a
vinyl adhesive and patch material.
3) The water-inflated dam must maintain mechanical stability in addition to providing anti rolling
when exposed to uneven hydrostatic pressure from either side
4) The self-contained water inflated dam shall have threaded fill ports and drain ports for rapid
inflation and draining. The dam will be equipped with end lifting loops used to control the dam
with equipment during the installation and removal process.
5) Method for connecting the individual units together will consist of overlapping the end of the units a
specific length which will create a watertight connection. No other devices or methods for
connecting the barriers are required.
1.2 Aqua-Barrier™ Product Description
Aqua-Barriers™ are water-inflated dams used to control invasive water in floodwater situations, a
means of water management to provide access to underwater areas for construction and maintenance
operations, hazardous liquid containment, sediment retention in environmentally sensitive areas in
addition to a continually expanding list of water control related applications.
Aqua-Barriers™ are a single tube devise with a patented inner restraint baffle(s)/diaphragm(s)
stabilizing system required for stability.
1.3 Dam size requirements
The water-inflated temporary dam height shall be determined as follows:
1) Static water height conditions shall not exceed 75% of the properly filled height of the barrier.
2) Dynamic water height conditions shall not exceed stated value during hydrodynamic installation
procedures (See dynamic installation instructions for complete list of requirements).
3) Installation site criteria are required for assessment of all relevant factors.
Excess slope, high water velocities, dynamic loads resulting from wave actions, mounting surface
irregularities, and changes in interrelated hydrological conditions can increase the required water
inflated dam height verses retention height requirements.
Hydro-Solutions, Inc. 41232 Park 290 Road Bldg A Waller, TX 77484 800/245-0199
AQUA-BARRIER FEATURES AND BENEFITS
PATENTED BAFFLE SYSTEM:
The Aqua-Barrier utilizes a patented fixed internal baffle system which insures a
safe and stable system. When the Aqua-Barrier is exposed to uneven hydrostatic
pressure, the internal baffle system locks into place. The Aqua-Barriers’ system
provides stability & safety.
USER FRIENDLY:
Aqua-Barriers have a unique lifting loop on each end which enables a track hoe
arm to control the barrier while installing and removing. This allows for
minimal manual labor during the installation & removal process.
ENVIRONMENTALLY FRIENDLY:
Aqua-Barriers are installed using the available water source at the jobsite with
minimal adverse impact to the environment. Post job restoration is not needed
using Aqua-Barriers. Simple drain and remove the barriers from the water with
little or no turbidity.
LARGE SCALE JOBS:
Multiple Aqua-Barriers can be connected together to cover large areas. The
Aqua-Barriers are connected to one another by utilizing a simple overlapping
procedure that requires no additional time during the installation and no
potentially hazardous underwater work
SAVE TIME AND MONEY:
Aqua-Barriers install in less time than most conventional cofferdam methods.
Approximately 500 linear feet of Aqua-Barriers can be installed in 1 day using 6
men, 2 track hoes and 2 water pumps
DURABILITY:
Aqua-Barriers are made with a scrim reinforced PVC material and industrial
grade fittings and intended to be reused numerous times. The Aqua-Barrier
system is infield repairable in wet or dry conditions utilizing a repair kit which
is provided with each order.
AQUA-BARRIER REFERRALS - PIPELINE & UTILITY LINE PROJECTS
Submar
Michael Gallup
805 Dunn St.
Houma, LA 70360
985/ 868-0001
325 linear feet of the 6-ft high Aqua Barriers were used for pipeline repair outside of Riverside
Arkansas. This was the company's first use of the Aqua Barriers. Customer said "the product worked
well and we are very pleased."
Marathon Petroleum Company
Alan Schulze
539 South Main Street
Findlay, OH 45840
419/957-5235
140 linear feet of 8-ft high Aqua-Barriers were used for pipeline inspection; used instead of sandbags.
B and G Pipeline Company
Monte Himshoot
PO Box 1285
Searcy, AR 72145
501/305-3677
200 linear feet of 8-ft high Aqua-Barriers were used for a pipeline project in Central, AR.
Geeding Construction
Greg Geeding
600 Hwy H
Troy, MO 63379
314/486-5361
400 linear feet of 8-ft high Aqua-Barriers were used for a pipeline repair in the middle of a lake.
Customer said “the product exceeded my expectations.”
McCizer Pipeline Inc
Larry McCabe
1416 S Evening St
Judsonia, AR 72081
501/729-1147
100 linear feet of 4-ft high Aqua-Barriers were used for a pipeline dig project in Russellville, AR.
Latex Construction
Matt Sullivan
PO Box 43406
Atlanta, GA 30336
404/691-0349
75 linear feet of 6ft. high Aqua- Barriers were used on the Atlanta Gas Light pipeline project.
Sunland Construction Co.
Shannon Jet
5401 Kauloosa
Tuscaloosa, AL 35405
205/750-2004
150 linear feet of 8ft high Aqua-Barriers were used to do an installation on Mill Creek.
Cravens Partners, LTD
Travis Schulze
7700 San Felipe, Suite 485
Houston, TX 77251-1660
713/300-1526
50 linear feet of 4ft high Aqua-Barriers were used to replace water line under bayou.
Juniper Hill Golf Course
Dudley Darling
202 Brigham Street
Northboro, MA 01532
508/393-2444
(2) 8ft x 30ft Aqua-Barriers were used for a pump station intake repair project.
Unity Construction Co., Inc.
Alan Hamby
3941 Flint Hill Road
Powder Springs, GA 30127
770/943-9886
225 linear feet of 6ft high Aqua-Barriers were used for installation of raw water intake for Newnan
Utilities in Newnan, GA
Florida Gas Transmission Co.
Gary Corless
601 S. Lake Destiny, Suite 450
Maitland, FL 32751
407/838-7109
200 linear feet of 8ft high Aqua-Barriers were used for pipeline repair in Orlando, FL.
Mears Group, Inc.
Jay Fluharty
4500 N. Mission
Rosebush, MI 48878
989/433-2929
(1) 8ft x 55ft Aqua-Barrier was used for a waterline installation project in Knoxville, TN.
Foutz & Bursum
Gill Millstine
PO Box 187
Bloomfield, NM 878413
505/634-4000
(2) 4ft x 50ft Aqua-Barriers were used for gas pipeline repair in San Carlos, AZ.
Tanner Pipeline
Poke Naquin
68022 I 10 East
Baytown, TX 77521
281/839-3905
200 linear feet of 4ft high Aqua-Barriers were used for pipeline installation projects crossing several
streams in Nashville, TN
Koch Pipeline
Will Swisher
8606 IH 37
Corpus Christi, TX 78409
361/242-5536
275 linear feet of 7ft high Aqua-Barriers were used for pipeline repair projects in sensitive wetland areas
in and around Corpus Christi.
Latex Construction
Tom Cochran
51455 St. Hwy 255
Bay Minette, AL 36507
251/580-3317
200 linear feet of 7ft high Aqua-Barriers were used to install pipeline across several environmentally
sensitive streams in the Mobile, AL area.
Progressive Pipeline Company
Mike Castle, Jr.
PO Drawer 100
Livingston, AL 35470
205/652-6512
(2) 7ft x 75ft Aqua-Barriers were used in a pipeline installation project for Florida Gas project located in
an environmentally sensitive wetlands area with access restrictions
Wanasek Corporation
Jim Wanasek
29606 Durand Avenue
Burlington, WI 53105
262/763-3561
400 linear feet of 6ft high Aqua-Barriers were used for a sewer line installation in Burlington, WI across
the Fox River. Worked 24hrs/day and was able to complete the project in 5 days – (two days ahead of
schedule)
ET Mackenzie
Bob Farrier
4248 West Saginaw
Grand Ledge, MI 48837
517/627-8408
325 linear feet of 7ft high Aqua-Barriers were used for sewer line crossing in Lansing, MI. Work
completed in just 1 week.
Anderson Underground
Dave Anderson
1202 Ipsen Road
Belvidere, IL 61008
815/332-5700
525 linear feet of 6ft high Aqua-Barriers were used to install utility line across 300ft wide Fox River in
Oswego, IL. Work completed in 5 days
Brown Builders
James Brown
2807 Clinard Drive
Springfield, TN 37172
615/384-5654
(1) 8ft x 50ft and (3) 6ft x 75ft Aqua-Barriers were purchased for utility line installation that crossed
several streams in Springfield, TN
US Pipeline, Inc.
Johnny Pee
11767 Katy Fwy, Suite 100
Houston, TX 77079
281/531-6100
600 linear feet of 6ft high and 300 linear feet of 4ft high Aqua-Barriers were used to cross a
stream in Towner, ND for the Alliance Pipeline project. The barriers were successfully deployed and
removed in just 7 days.
Dominion Transmission
Tom Verden
PO Box 2450
Clarksburg, WV 26302
304/623-8000
Aqua-Barriers were used in Tompkins, County, NY to install gas pipeline across a stream.
Bryant Electric Co., Inc.
Richard Money
PO Box 4819
Archdale, NC 27263-1811
910/434-9232
6ft high Aqua-Barriers were used to dewater a portion of the Roanoke River to allow for the installation
of a pipeline.

Contenu connexe

Tendances

26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
John Grover
 
OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06
John Grover
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
petroEDGE
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
Craig Lang
 
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction newMK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
Ross Johnston
 
Pacific Netting Products (1)
Pacific Netting Products (1)Pacific Netting Products (1)
Pacific Netting Products (1)
Andy Peters
 
Case-Study-Mechanically-Attached-Pipe-Fittings
Case-Study-Mechanically-Attached-Pipe-FittingsCase-Study-Mechanically-Attached-Pipe-Fittings
Case-Study-Mechanically-Attached-Pipe-Fittings
Jared Dyer
 

Tendances (20)

26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06
 
RedFox Brochure
RedFox BrochureRedFox Brochure
RedFox Brochure
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenance
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Spe26043 (fluid entry)
Spe26043 (fluid entry)Spe26043 (fluid entry)
Spe26043 (fluid entry)
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
Project Dewatering Ltd 2016
Project Dewatering Ltd 2016Project Dewatering Ltd 2016
Project Dewatering Ltd 2016
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
 
OC Brochure
OC BrochureOC Brochure
OC Brochure
 
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction newMK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
MK50 Lifejacket & PSTASS EBS - Helicopter Operator Introduction new
 
Hyde marine gold presentation
Hyde marine gold presentationHyde marine gold presentation
Hyde marine gold presentation
 
SCC WITH KIM.PPTX
SCC WITH KIM.PPTXSCC WITH KIM.PPTX
SCC WITH KIM.PPTX
 
Pacific Netting Products (1)
Pacific Netting Products (1)Pacific Netting Products (1)
Pacific Netting Products (1)
 
Life extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreLife extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshore
 
Well work over
Well work overWell work over
Well work over
 
Center for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal RegulationsCenter for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal Regulations
 
Case-Study-Mechanically-Attached-Pipe-Fittings
Case-Study-Mechanically-Attached-Pipe-FittingsCase-Study-Mechanically-Attached-Pipe-Fittings
Case-Study-Mechanically-Attached-Pipe-Fittings
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
ERIKS Marine Brochure
ERIKS Marine BrochureERIKS Marine Brochure
ERIKS Marine Brochure
 

En vedette

Riyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process EngineerRiyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh
 
Breakfast quesadilla
Breakfast quesadillaBreakfast quesadilla
Breakfast quesadilla
jessicarohde
 
Dallas Suess' Gaffer-Grip CV2015
Dallas Suess' Gaffer-Grip CV2015Dallas Suess' Gaffer-Grip CV2015
Dallas Suess' Gaffer-Grip CV2015
Dallas Suess
 
សហប្រតិបត្តិការ
សហប្រតិបត្តិការសហប្រតិបត្តិការ
សហប្រតិបត្តិការ
phearun soum
 

En vedette (20)

Riyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process EngineerRiyaz Shaikh_2+yr_Process Engineer
Riyaz Shaikh_2+yr_Process Engineer
 
Breakfast quesadilla
Breakfast quesadillaBreakfast quesadilla
Breakfast quesadilla
 
Краткий обзор бизнес-тренинга "Управление временем для достижения целей"
Краткий обзор бизнес-тренинга "Управление временем для достижения целей"Краткий обзор бизнес-тренинга "Управление временем для достижения целей"
Краткий обзор бизнес-тренинга "Управление временем для достижения целей"
 
Breakfast quesadilla
Breakfast quesadillaBreakfast quesadilla
Breakfast quesadilla
 
Approaches to scaling byBoru Douthwaite and Ann Degrande
Approaches to scaling byBoru Douthwaite and Ann DegrandeApproaches to scaling byBoru Douthwaite and Ann Degrande
Approaches to scaling byBoru Douthwaite and Ann Degrande
 
Savannah taste-culinary-explorer
Savannah taste-culinary-explorerSavannah taste-culinary-explorer
Savannah taste-culinary-explorer
 
Drive Retail Velocity With Weather Geotargeting Digital Advertising
Drive Retail Velocity With Weather Geotargeting Digital AdvertisingDrive Retail Velocity With Weather Geotargeting Digital Advertising
Drive Retail Velocity With Weather Geotargeting Digital Advertising
 
VMware Starbucks Infographic
VMware Starbucks InfographicVMware Starbucks Infographic
VMware Starbucks Infographic
 
Building the Courage to Break Out Your Comfort Zone
Building the Courage to Break Out Your Comfort ZoneBuilding the Courage to Break Out Your Comfort Zone
Building the Courage to Break Out Your Comfort Zone
 
Infographic Design
Infographic DesignInfographic Design
Infographic Design
 
Project Euphoria III
Project Euphoria IIIProject Euphoria III
Project Euphoria III
 
Ultimate Care
Ultimate CareUltimate Care
Ultimate Care
 
qrd°by - Create QR Codes for your mobile marketing campaigns
qrd°by - Create QR Codes for your mobile marketing campaignsqrd°by - Create QR Codes for your mobile marketing campaigns
qrd°by - Create QR Codes for your mobile marketing campaigns
 
Gv token presentation (new)
Gv token presentation (new)Gv token presentation (new)
Gv token presentation (new)
 
Educational CV
Educational CVEducational CV
Educational CV
 
赚钱机会 Cn.jaymelee1688.com
赚钱机会 Cn.jaymelee1688.com赚钱机会 Cn.jaymelee1688.com
赚钱机会 Cn.jaymelee1688.com
 
Value proposition for systems research by Richard Thomas (DS-ICARDA)
Value proposition for systems research by Richard Thomas (DS-ICARDA)Value proposition for systems research by Richard Thomas (DS-ICARDA)
Value proposition for systems research by Richard Thomas (DS-ICARDA)
 
Umts (2)
Umts (2)Umts (2)
Umts (2)
 
Dallas Suess' Gaffer-Grip CV2015
Dallas Suess' Gaffer-Grip CV2015Dallas Suess' Gaffer-Grip CV2015
Dallas Suess' Gaffer-Grip CV2015
 
សហប្រតិបត្តិការ
សហប្រតិបត្តិការសហប្រតិបត្តិការ
សហប្រតិបត្តិការ
 

Similaire à Aqua-Barrier Pipeline Literature

Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams Literature
Darren Miller
 
Waterwise Garden Irrigator Program - Australia
Waterwise Garden Irrigator Program - AustraliaWaterwise Garden Irrigator Program - Australia
Waterwise Garden Irrigator Program - Australia
Kaila694m
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
John Grover
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
Amit Nitharwal
 
Legacy Shield General Product Information
Legacy Shield General Product InformationLegacy Shield General Product Information
Legacy Shield General Product Information
Jason Wilke
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E Brochure
Cherylwitmer
 
Ampac usa capabilities
Ampac usa capabilitiesAmpac usa capabilities
Ampac usa capabilities
Sammy Farag
 
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGESAquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
Shai Silbermann
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
Iouri Vaisman
 

Similaire à Aqua-Barrier Pipeline Literature (20)

Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams Literature
 
Waterwise Garden Irrigator Program - Australia
Waterwise Garden Irrigator Program - AustraliaWaterwise Garden Irrigator Program - Australia
Waterwise Garden Irrigator Program - Australia
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
 
Legacy Shield General Product Information
Legacy Shield General Product InformationLegacy Shield General Product Information
Legacy Shield General Product Information
 
The Fuse gate System
The Fuse gate SystemThe Fuse gate System
The Fuse gate System
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E Brochure
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?Can I Dry Floodproof My Building?
Can I Dry Floodproof My Building?
 
Ampac usa capabilities
Ampac usa capabilitiesAmpac usa capabilities
Ampac usa capabilities
 
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGESAquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 
Siw Issue 3
Siw Issue 3Siw Issue 3
Siw Issue 3
 
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XAquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
 
Elgin Equipment Group 316b solutions
Elgin Equipment Group 316b solutionsElgin Equipment Group 316b solutions
Elgin Equipment Group 316b solutions
 
Collaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion systemCollaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion system
 
CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098 CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098
 
ROOFWATER HARVESTING
ROOFWATER HARVESTINGROOFWATER HARVESTING
ROOFWATER HARVESTING
 

Aqua-Barrier Pipeline Literature

  • 1. System prior to dewatering worksite Baffle shifts to stabilize system Dewatered worksite; baffle has stabilized the system TM AQUA-BARRIER IS A WATER FILLED DAM THAT UTILIZES A PATENTED INTERNAL BAFFLE FOR STABILITY Available for Rent or Purchase Compact for Shipping & Storage Environmentally Friendly Available for Rent or Purchase Compact for Shipping & Storage Environmentally Friendly TM AQUA-BARRIER AN ESSENTIAL COMPONENT OF YOUR PIPELINE CONSTRUCTION PROJECT COMPACT IN SHIPPING & STORAGE TM AQUA-BARRIER OFFERS UNIQUE ACCESSORIES TO FACILITATE INFIELD USE DRAIN PORTS REPAIRABILITY END PIPELOOPS FILL PORTS 41232 Park 290 Drive, Bldg A • Waller, TX 77484 Schedule # GS-07F-0543N
  • 2. PIPELINE INSTALLATION & REPAIRPipeline repair or replacement projects can be complex, particularly when water is present. We understand that pipeline repairs often require completion in a short time frame. Aqua-Barriers™ provide the fastest cofferdam method available. The next time that you are confronted with a temporary cofferdam need, let us save you time and money. The Canal Block Formation is beneficial when working in narrow channels. Water pumps or diversion pipes can be utilized to maintain appropriate upstream water levels. PIPELINE INSTALLATION & REPAIR PARTIAL BLOCK FORMATION COMPLETE ENCLOSURE FORMATION CANAL BLOCK FORMATION T h e C o m p l e t e Enclosure Formation is beneficial when access to the shoreline is difficult. The Partial Block Formation is beneficial when creating a work area on a shoreline.
  • 3. Aqua-Barrier™ Water Inflated Dam Product Specification 1.1 Specification A water-inflated temporary dam shall consist of the following: 1) The water inflated dam will consist of a self contained, single tube with an inner restraint baffle(s)/diaphragm(s) stabilization system. The water- inflated dam must have the ability to stand alone, without any additional external mechanical or gravitational stabilization devices, as a positive water barrier and water management system. 2) The water-inflated dam shall be produced from heavy gauge polyvinyl chloride (PVC) reinforced with polyester. The PVC fabric used to create the inflatable dam will be infield repairable utilizing a vinyl adhesive and patch material. 3) The water-inflated dam must maintain mechanical stability in addition to providing anti rolling when exposed to uneven hydrostatic pressure from either side 4) The self-contained water inflated dam shall have threaded fill ports and drain ports for rapid inflation and draining. The dam will be equipped with end lifting loops used to control the dam with equipment during the installation and removal process. 5) Method for connecting the individual units together will consist of overlapping the end of the units a specific length which will create a watertight connection. No other devices or methods for connecting the barriers are required. 1.2 Aqua-Barrier™ Product Description Aqua-Barriers™ are water-inflated dams used to control invasive water in floodwater situations, a means of water management to provide access to underwater areas for construction and maintenance operations, hazardous liquid containment, sediment retention in environmentally sensitive areas in addition to a continually expanding list of water control related applications. Aqua-Barriers™ are a single tube devise with a patented inner restraint baffle(s)/diaphragm(s) stabilizing system required for stability. 1.3 Dam size requirements The water-inflated temporary dam height shall be determined as follows: 1) Static water height conditions shall not exceed 75% of the properly filled height of the barrier. 2) Dynamic water height conditions shall not exceed stated value during hydrodynamic installation procedures (See dynamic installation instructions for complete list of requirements). 3) Installation site criteria are required for assessment of all relevant factors. Excess slope, high water velocities, dynamic loads resulting from wave actions, mounting surface irregularities, and changes in interrelated hydrological conditions can increase the required water inflated dam height verses retention height requirements. Hydro-Solutions, Inc. 5119 Ashley Court Houston, TX 77041 Ph 800-245-0199 Fax 832/243-9109
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Aqua-Barrier™ Water Inflated Dam Product Specification 1.1 Specification A water-inflated temporary dam shall consist of the following: 1) The water inflated dam will consist of a self contained, single tube with an inner restraint baffle(s)/diaphragm(s) stabilization system. The water- inflated dam must have the ability to stand alone, without any additional external mechanical or gravitational stabilization devices, as a positive water barrier and water management system. 2) The water-inflated dam shall be produced from heavy gauge polyvinyl chloride (PVC) reinforced with polyester. The PVC fabric used to create the inflatable dam will be infield repairable utilizing a vinyl adhesive and patch material. 3) The water-inflated dam must maintain mechanical stability in addition to providing anti rolling when exposed to uneven hydrostatic pressure from either side 4) The self-contained water inflated dam shall have threaded fill ports and drain ports for rapid inflation and draining. The dam will be equipped with end lifting loops used to control the dam with equipment during the installation and removal process. 5) Method for connecting the individual units together will consist of overlapping the end of the units a specific length which will create a watertight connection. No other devices or methods for connecting the barriers are required. 1.2 Aqua-Barrier™ Product Description Aqua-Barriers™ are water-inflated dams used to control invasive water in floodwater situations, a means of water management to provide access to underwater areas for construction and maintenance operations, hazardous liquid containment, sediment retention in environmentally sensitive areas in addition to a continually expanding list of water control related applications. Aqua-Barriers™ are a single tube devise with a patented inner restraint baffle(s)/diaphragm(s) stabilizing system required for stability. 1.3 Dam size requirements The water-inflated temporary dam height shall be determined as follows: 1) Static water height conditions shall not exceed 75% of the properly filled height of the barrier. 2) Dynamic water height conditions shall not exceed stated value during hydrodynamic installation procedures (See dynamic installation instructions for complete list of requirements). 3) Installation site criteria are required for assessment of all relevant factors. Excess slope, high water velocities, dynamic loads resulting from wave actions, mounting surface irregularities, and changes in interrelated hydrological conditions can increase the required water inflated dam height verses retention height requirements. Hydro-Solutions, Inc. 41232 Park 290 Road Bldg A Waller, TX 77484 800/245-0199
  • 9. AQUA-BARRIER FEATURES AND BENEFITS PATENTED BAFFLE SYSTEM: The Aqua-Barrier utilizes a patented fixed internal baffle system which insures a safe and stable system. When the Aqua-Barrier is exposed to uneven hydrostatic pressure, the internal baffle system locks into place. The Aqua-Barriers’ system provides stability & safety. USER FRIENDLY: Aqua-Barriers have a unique lifting loop on each end which enables a track hoe arm to control the barrier while installing and removing. This allows for minimal manual labor during the installation & removal process. ENVIRONMENTALLY FRIENDLY: Aqua-Barriers are installed using the available water source at the jobsite with minimal adverse impact to the environment. Post job restoration is not needed using Aqua-Barriers. Simple drain and remove the barriers from the water with little or no turbidity. LARGE SCALE JOBS: Multiple Aqua-Barriers can be connected together to cover large areas. The Aqua-Barriers are connected to one another by utilizing a simple overlapping procedure that requires no additional time during the installation and no potentially hazardous underwater work SAVE TIME AND MONEY: Aqua-Barriers install in less time than most conventional cofferdam methods. Approximately 500 linear feet of Aqua-Barriers can be installed in 1 day using 6 men, 2 track hoes and 2 water pumps DURABILITY: Aqua-Barriers are made with a scrim reinforced PVC material and industrial grade fittings and intended to be reused numerous times. The Aqua-Barrier system is infield repairable in wet or dry conditions utilizing a repair kit which is provided with each order.
  • 10. AQUA-BARRIER REFERRALS - PIPELINE & UTILITY LINE PROJECTS Submar Michael Gallup 805 Dunn St. Houma, LA 70360 985/ 868-0001 325 linear feet of the 6-ft high Aqua Barriers were used for pipeline repair outside of Riverside Arkansas. This was the company's first use of the Aqua Barriers. Customer said "the product worked well and we are very pleased." Marathon Petroleum Company Alan Schulze 539 South Main Street Findlay, OH 45840 419/957-5235 140 linear feet of 8-ft high Aqua-Barriers were used for pipeline inspection; used instead of sandbags. B and G Pipeline Company Monte Himshoot PO Box 1285 Searcy, AR 72145 501/305-3677 200 linear feet of 8-ft high Aqua-Barriers were used for a pipeline project in Central, AR. Geeding Construction Greg Geeding 600 Hwy H Troy, MO 63379 314/486-5361 400 linear feet of 8-ft high Aqua-Barriers were used for a pipeline repair in the middle of a lake. Customer said “the product exceeded my expectations.” McCizer Pipeline Inc Larry McCabe 1416 S Evening St Judsonia, AR 72081 501/729-1147 100 linear feet of 4-ft high Aqua-Barriers were used for a pipeline dig project in Russellville, AR.
  • 11. Latex Construction Matt Sullivan PO Box 43406 Atlanta, GA 30336 404/691-0349 75 linear feet of 6ft. high Aqua- Barriers were used on the Atlanta Gas Light pipeline project. Sunland Construction Co. Shannon Jet 5401 Kauloosa Tuscaloosa, AL 35405 205/750-2004 150 linear feet of 8ft high Aqua-Barriers were used to do an installation on Mill Creek. Cravens Partners, LTD Travis Schulze 7700 San Felipe, Suite 485 Houston, TX 77251-1660 713/300-1526 50 linear feet of 4ft high Aqua-Barriers were used to replace water line under bayou. Juniper Hill Golf Course Dudley Darling 202 Brigham Street Northboro, MA 01532 508/393-2444 (2) 8ft x 30ft Aqua-Barriers were used for a pump station intake repair project. Unity Construction Co., Inc. Alan Hamby 3941 Flint Hill Road Powder Springs, GA 30127 770/943-9886 225 linear feet of 6ft high Aqua-Barriers were used for installation of raw water intake for Newnan Utilities in Newnan, GA Florida Gas Transmission Co. Gary Corless 601 S. Lake Destiny, Suite 450 Maitland, FL 32751 407/838-7109 200 linear feet of 8ft high Aqua-Barriers were used for pipeline repair in Orlando, FL.
  • 12. Mears Group, Inc. Jay Fluharty 4500 N. Mission Rosebush, MI 48878 989/433-2929 (1) 8ft x 55ft Aqua-Barrier was used for a waterline installation project in Knoxville, TN. Foutz & Bursum Gill Millstine PO Box 187 Bloomfield, NM 878413 505/634-4000 (2) 4ft x 50ft Aqua-Barriers were used for gas pipeline repair in San Carlos, AZ. Tanner Pipeline Poke Naquin 68022 I 10 East Baytown, TX 77521 281/839-3905 200 linear feet of 4ft high Aqua-Barriers were used for pipeline installation projects crossing several streams in Nashville, TN Koch Pipeline Will Swisher 8606 IH 37 Corpus Christi, TX 78409 361/242-5536 275 linear feet of 7ft high Aqua-Barriers were used for pipeline repair projects in sensitive wetland areas in and around Corpus Christi. Latex Construction Tom Cochran 51455 St. Hwy 255 Bay Minette, AL 36507 251/580-3317 200 linear feet of 7ft high Aqua-Barriers were used to install pipeline across several environmentally sensitive streams in the Mobile, AL area.
  • 13. Progressive Pipeline Company Mike Castle, Jr. PO Drawer 100 Livingston, AL 35470 205/652-6512 (2) 7ft x 75ft Aqua-Barriers were used in a pipeline installation project for Florida Gas project located in an environmentally sensitive wetlands area with access restrictions Wanasek Corporation Jim Wanasek 29606 Durand Avenue Burlington, WI 53105 262/763-3561 400 linear feet of 6ft high Aqua-Barriers were used for a sewer line installation in Burlington, WI across the Fox River. Worked 24hrs/day and was able to complete the project in 5 days – (two days ahead of schedule) ET Mackenzie Bob Farrier 4248 West Saginaw Grand Ledge, MI 48837 517/627-8408 325 linear feet of 7ft high Aqua-Barriers were used for sewer line crossing in Lansing, MI. Work completed in just 1 week. Anderson Underground Dave Anderson 1202 Ipsen Road Belvidere, IL 61008 815/332-5700 525 linear feet of 6ft high Aqua-Barriers were used to install utility line across 300ft wide Fox River in Oswego, IL. Work completed in 5 days Brown Builders James Brown 2807 Clinard Drive Springfield, TN 37172 615/384-5654 (1) 8ft x 50ft and (3) 6ft x 75ft Aqua-Barriers were purchased for utility line installation that crossed several streams in Springfield, TN
  • 14. US Pipeline, Inc. Johnny Pee 11767 Katy Fwy, Suite 100 Houston, TX 77079 281/531-6100 600 linear feet of 6ft high and 300 linear feet of 4ft high Aqua-Barriers were used to cross a stream in Towner, ND for the Alliance Pipeline project. The barriers were successfully deployed and removed in just 7 days. Dominion Transmission Tom Verden PO Box 2450 Clarksburg, WV 26302 304/623-8000 Aqua-Barriers were used in Tompkins, County, NY to install gas pipeline across a stream. Bryant Electric Co., Inc. Richard Money PO Box 4819 Archdale, NC 27263-1811 910/434-9232 6ft high Aqua-Barriers were used to dewater a portion of the Roanoke River to allow for the installation of a pipeline.