 Current Practice Study
• Project Culture
• Project Standards
 System Requirement Study
 On site and Remote Assistance
 Local SME Representation
 End to End
PETRONAS PROJECT GOVERNANCE REQUIREMENTS
1
Petronas requires a System Integrator dealing with various projects and armed with the
latest technologies that can compliment most of the existing systems out in the market.
ENGAGE
ANALYSE
DESIGN
DEVELOP
DEPLOY
SUPPORT
 Stakeholders
 Identify Enterprise needs
 Suit Clients Requirements
 Customizable
 Simulation &
Pilot Phase
 Gap Analysis
 Flexible
 Best Practice
GOVERNANCE  MONITORING  COMMISSIONING
Client Customization
Network
Architecture
On-Site
Training
2
SUPPORT
& GUIDE
REVIEW &
BENCHMARK
STANDARDIZE
PLAN
IMPLEMENT
PARADIGM SHIFT APPROACH
Level 2:
DATA ANALYSIS
LEVEL 1:
OVERSIGHT & MONITORING
LEVEL 3
REPORTING
LEVEL 4
SCHEDULE & TASK MANAGEMENT
LEVEL 5
ON-SITE JOB COMPLETION
TRADITIONAL
APPROACH
TRANSFORMATIONAL
SHIFT
3
PRODUCT
SUITE
Safety Risk
Management System
(SRMS)
Operability
Development
Management
System (ODMS)
Labour,
Equipment
& Materials
Management
System
(LEMS)
Project
Governance
Management
System
Single access point
and database for all
information ensuring
standardization and
consistency.
MASTER
ASSET & TAG
MANAGER
Manage through
standards and
naming convention,
approval, revocation,
workflows and a
structured MOC
tailored to the
Enterprise Client.
Assign and track the
completion of
preservation tasks
simply by providing
information on the
equipment, tools and
consumables.
ASSET
PRESERVATION
& WARRANTY
Identify steps,
resources, tools and
documents required
to perform any job.
Develop and maintain
job and task libraries
for both asset and
work activities.
STANDARD
JOB & TASK
MODELLING
Manage project
involvement,
purchasing
information and
track scheduling for
Vendors, Suppliers
and Manufacturers.
RESOURCE
MANAGER
MOC oversees the
assigning, tracking,
reporting and approval
of action items required
to implement changes
in highly regulated
industrial environments.
MANAGEMENT
OF CHANGE
(MOC)
5 Product
Suites
The System is a comprehensive enterprise level cloud software suite that
enables an industrial enterprise to report and oversee multi-discipline
tasks being performed in real-time globally.
DOCUMENT
& DRAWING
CORE MODULE
Commissioning &
Completions
Management
System (CCMS)
Core Modules
PROJECT GOVERNANCE SYSTEM REQUIREMENT
LEVEL 1 – DASHBOARDS & BUSINESS REPORTS
 With Project Governance Management System (PGMS), it is simple.
View the right information, from the right groups, at the right time. Binding the
entire suite of applications, comprising of the Completion & Commissioning (CCMS),
Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment &
Material (LEMS) Management Systems. PGMS allows management to roll up Level 5
data for any phase or discipline of a project. Everything that is needed by the
management team to plan, estimate, execute and control project outcomes are
visible via:
 Project Summary Dashboards
 Project Performance Reporting
 Real-time Data Report
 Alerts & Intervention
 Location Alerts
4
Business Unit / Projects Lifecycle Dashboard
Monthly Executive Reports
Analysis Reports
LEVEL 1 – DASHBOARDS DESIGN
5
LEVEL 1 – ALERTS & INTERVENTION
6
User is able to drill down the information of
each project by clicking on the alerts.
Under Control
Warning
Needs intervention
Performance Summaries
Report Publication and Review
Phase Readiness Reviews / EVM Analysis
Project Reviews & Definition Rating
Reports
LEVEL 2 – ARTIFICIAL INTELLIGENCE
 Data analysis
7
 Consolidated reporting  Trending & Forecasting
LEVEL 3 – DATA ENTRY & REPORTING
 Easy data-entry
8
 Customized Reporting  Customized Workflows
and Approvals
WBS Setup
Risks / Issues / Lessons Learned
Collaboration – Contracts / RFIs
Management of Change
Procurement Estimating & Costing
KEY TAKE-AWAYS
The System Integrator will enable Petronas to :
 Gain ownership and control of all project information
 Have stringent management and full auditable governance
process
 Track responsibilities and accountabilities of project’s
stakeholders
 Detailed and reliable data from top to bottom
9
PROJECT GOVERNANCE FRAMEWORK
10

Contenu connexe

Tendances

Network operations center best practices (3)
Network operations center best practices (3)Network operations center best practices (3)
Network operations center best practices (3)
Gabby Nizri
 
Sudarsan Jayaraman - Open information security management maturity model
Sudarsan Jayaraman  - Open information security management maturity modelSudarsan Jayaraman  - Open information security management maturity model
Sudarsan Jayaraman - Open information security management maturity model
nooralmousa
 
Securing your IT infrastructure with SOC-NOC collaboration TWP
Securing your IT infrastructure with SOC-NOC collaboration TWPSecuring your IT infrastructure with SOC-NOC collaboration TWP
Securing your IT infrastructure with SOC-NOC collaboration TWP
Sridhar Karnam
 
IT Asset Management System for UL-Software Engineering
IT Asset Management System for UL-Software EngineeringIT Asset Management System for UL-Software Engineering
IT Asset Management System for UL-Software Engineering
Shiv Koppad
 

Tendances (20)

AMB300: Lessons Learned from ITAM Customers
AMB300: Lessons Learned from ITAM CustomersAMB300: Lessons Learned from ITAM Customers
AMB300: Lessons Learned from ITAM Customers
 
Network operations center best practices (3)
Network operations center best practices (3)Network operations center best practices (3)
Network operations center best practices (3)
 
LANDesk End to End Service Management
LANDesk End to End Service ManagementLANDesk End to End Service Management
LANDesk End to End Service Management
 
Sudarsan Jayaraman - Open information security management maturity model
Sudarsan Jayaraman  - Open information security management maturity modelSudarsan Jayaraman  - Open information security management maturity model
Sudarsan Jayaraman - Open information security management maturity model
 
Why Corporate Security Professionals Should Care About Information Security
Why Corporate Security Professionals Should Care About Information Security Why Corporate Security Professionals Should Care About Information Security
Why Corporate Security Professionals Should Care About Information Security
 
CNIT 160 3a Information Risk Management
CNIT 160 3a Information Risk ManagementCNIT 160 3a Information Risk Management
CNIT 160 3a Information Risk Management
 
Hl7 Analytics for IT and Clinical Insights
Hl7 Analytics for IT and Clinical InsightsHl7 Analytics for IT and Clinical Insights
Hl7 Analytics for IT and Clinical Insights
 
Aplication data security compliances
Aplication data security compliancesAplication data security compliances
Aplication data security compliances
 
How to measure your cybersecurity performance
How to measure your cybersecurity performanceHow to measure your cybersecurity performance
How to measure your cybersecurity performance
 
Securing your IT infrastructure with SOC-NOC collaboration TWP
Securing your IT infrastructure with SOC-NOC collaboration TWPSecuring your IT infrastructure with SOC-NOC collaboration TWP
Securing your IT infrastructure with SOC-NOC collaboration TWP
 
IT Asset Management System for UL-Software Engineering
IT Asset Management System for UL-Software EngineeringIT Asset Management System for UL-Software Engineering
IT Asset Management System for UL-Software Engineering
 
Board secretaries and general counsels
Board secretaries and general counsels Board secretaries and general counsels
Board secretaries and general counsels
 
IT - Enterprise Service Operation Center
IT - Enterprise Service Operation CenterIT - Enterprise Service Operation Center
IT - Enterprise Service Operation Center
 
Information Security Metrics - Practical Security Metrics
Information Security Metrics - Practical Security MetricsInformation Security Metrics - Practical Security Metrics
Information Security Metrics - Practical Security Metrics
 
IT Service & Asset Management Better Together
IT Service & Asset Management Better TogetherIT Service & Asset Management Better Together
IT Service & Asset Management Better Together
 
AMB110: IT Asset Management – How to Start When You Don’t Know Where to Start
AMB110: IT Asset Management – How to Start When You Don’t Know Where to StartAMB110: IT Asset Management – How to Start When You Don’t Know Where to Start
AMB110: IT Asset Management – How to Start When You Don’t Know Where to Start
 
Meaningfull security metrics
Meaningfull security metricsMeaningfull security metrics
Meaningfull security metrics
 
Audit Sample Report
Audit Sample ReportAudit Sample Report
Audit Sample Report
 
How to Best Prepare for a Software Audit
How to Best Prepare for a Software AuditHow to Best Prepare for a Software Audit
How to Best Prepare for a Software Audit
 
Optimizing Identity Governance using Perseus IAM
Optimizing Identity Governance using Perseus IAMOptimizing Identity Governance using Perseus IAM
Optimizing Identity Governance using Perseus IAM
 

En vedette

En vedette (8)

TRATADOS INTERNACIONALES DEL MEDIO AMBIENTE
TRATADOS INTERNACIONALES DEL MEDIO AMBIENTETRATADOS INTERNACIONALES DEL MEDIO AMBIENTE
TRATADOS INTERNACIONALES DEL MEDIO AMBIENTE
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Clifton Gunderson IT Oversight
Clifton Gunderson IT OversightClifton Gunderson IT Oversight
Clifton Gunderson IT Oversight
 
Third-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in OversightThird-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in Oversight
 
Chap007
Chap007Chap007
Chap007
 
Chap016-Oversight
Chap016-OversightChap016-Oversight
Chap016-Oversight
 
Third-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a StrategyThird-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a Strategy
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 

Similaire à Petronas Project Oversight and Corporate Governance System Requirements

MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
muneer khan
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nyc
spendam
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application Lifecycle
Software Guru
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
Avi Kumar
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other Software
Fabienne Salimi
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
cbb010
 

Similaire à Petronas Project Oversight and Corporate Governance System Requirements (20)

Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services Marlabs Capabilities Overview: Application Maintenance Support Services
Marlabs Capabilities Overview: Application Maintenance Support Services
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
 
Srinivas pendam resume-nyc
Srinivas pendam resume-nycSrinivas pendam resume-nyc
Srinivas pendam resume-nyc
 
Brad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application LifecycleBrad Hipps: Mastering the Modern Application Lifecycle
Brad Hipps: Mastering the Modern Application Lifecycle
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
 
Evolution of Software Engineering in NCTR Projects
Evolution of Software Engineering in NCTR  Projects   Evolution of Software Engineering in NCTR  Projects
Evolution of Software Engineering in NCTR Projects
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other Software
 
Software Development Life Cycle Part II
Software Development Life Cycle Part IISoftware Development Life Cycle Part II
Software Development Life Cycle Part II
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Harvinder Singh-Resume
Harvinder Singh-ResumeHarvinder Singh-Resume
Harvinder Singh-Resume
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
 
Louie Relano
Louie RelanoLouie Relano
Louie Relano
 
Maria Managment Spectrum
Maria Managment SpectrumMaria Managment Spectrum
Maria Managment Spectrum
 
CV -UmerAslam
CV -UmerAslamCV -UmerAslam
CV -UmerAslam
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
 
Saurabh Malhotra-CV
Saurabh Malhotra-CVSaurabh Malhotra-CV
Saurabh Malhotra-CV
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
 
Company Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation SlidesCompany Operations Management PowerPoint Presentation Slides
Company Operations Management PowerPoint Presentation Slides
 
I nearshore
I nearshore I nearshore
I nearshore
 
Lecture 6 & 7.pdf
Lecture 6 & 7.pdfLecture 6 & 7.pdf
Lecture 6 & 7.pdf
 

Petronas Project Oversight and Corporate Governance System Requirements

  • 1.  Current Practice Study • Project Culture • Project Standards  System Requirement Study  On site and Remote Assistance  Local SME Representation  End to End PETRONAS PROJECT GOVERNANCE REQUIREMENTS 1 Petronas requires a System Integrator dealing with various projects and armed with the latest technologies that can compliment most of the existing systems out in the market. ENGAGE ANALYSE DESIGN DEVELOP DEPLOY SUPPORT  Stakeholders  Identify Enterprise needs  Suit Clients Requirements  Customizable  Simulation & Pilot Phase  Gap Analysis  Flexible  Best Practice GOVERNANCE  MONITORING  COMMISSIONING Client Customization Network Architecture On-Site Training
  • 2. 2 SUPPORT & GUIDE REVIEW & BENCHMARK STANDARDIZE PLAN IMPLEMENT PARADIGM SHIFT APPROACH Level 2: DATA ANALYSIS LEVEL 1: OVERSIGHT & MONITORING LEVEL 3 REPORTING LEVEL 4 SCHEDULE & TASK MANAGEMENT LEVEL 5 ON-SITE JOB COMPLETION TRADITIONAL APPROACH TRANSFORMATIONAL SHIFT
  • 3. 3 PRODUCT SUITE Safety Risk Management System (SRMS) Operability Development Management System (ODMS) Labour, Equipment & Materials Management System (LEMS) Project Governance Management System Single access point and database for all information ensuring standardization and consistency. MASTER ASSET & TAG MANAGER Manage through standards and naming convention, approval, revocation, workflows and a structured MOC tailored to the Enterprise Client. Assign and track the completion of preservation tasks simply by providing information on the equipment, tools and consumables. ASSET PRESERVATION & WARRANTY Identify steps, resources, tools and documents required to perform any job. Develop and maintain job and task libraries for both asset and work activities. STANDARD JOB & TASK MODELLING Manage project involvement, purchasing information and track scheduling for Vendors, Suppliers and Manufacturers. RESOURCE MANAGER MOC oversees the assigning, tracking, reporting and approval of action items required to implement changes in highly regulated industrial environments. MANAGEMENT OF CHANGE (MOC) 5 Product Suites The System is a comprehensive enterprise level cloud software suite that enables an industrial enterprise to report and oversee multi-discipline tasks being performed in real-time globally. DOCUMENT & DRAWING CORE MODULE Commissioning & Completions Management System (CCMS) Core Modules PROJECT GOVERNANCE SYSTEM REQUIREMENT
  • 4. LEVEL 1 – DASHBOARDS & BUSINESS REPORTS  With Project Governance Management System (PGMS), it is simple. View the right information, from the right groups, at the right time. Binding the entire suite of applications, comprising of the Completion & Commissioning (CCMS), Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment & Material (LEMS) Management Systems. PGMS allows management to roll up Level 5 data for any phase or discipline of a project. Everything that is needed by the management team to plan, estimate, execute and control project outcomes are visible via:  Project Summary Dashboards  Project Performance Reporting  Real-time Data Report  Alerts & Intervention  Location Alerts 4 Business Unit / Projects Lifecycle Dashboard Monthly Executive Reports Analysis Reports
  • 5. LEVEL 1 – DASHBOARDS DESIGN 5
  • 6. LEVEL 1 – ALERTS & INTERVENTION 6 User is able to drill down the information of each project by clicking on the alerts. Under Control Warning Needs intervention
  • 7. Performance Summaries Report Publication and Review Phase Readiness Reviews / EVM Analysis Project Reviews & Definition Rating Reports LEVEL 2 – ARTIFICIAL INTELLIGENCE  Data analysis 7  Consolidated reporting  Trending & Forecasting
  • 8. LEVEL 3 – DATA ENTRY & REPORTING  Easy data-entry 8  Customized Reporting  Customized Workflows and Approvals WBS Setup Risks / Issues / Lessons Learned Collaboration – Contracts / RFIs Management of Change Procurement Estimating & Costing
  • 9. KEY TAKE-AWAYS The System Integrator will enable Petronas to :  Gain ownership and control of all project information  Have stringent management and full auditable governance process  Track responsibilities and accountabilities of project’s stakeholders  Detailed and reliable data from top to bottom 9