Introduction
The construction site for the prophase of the project will be a multi-story commercial dwelling with
deep basement carpark located in city centre at Smithfield where there is a high level of water content
as it is in close proximity to the river Liffey, lack of space due to other buildings, traffic level are high
and one way system is the only option. The design team have proposed ‘type C drained cavity’ basement
that will consist of ‘secant piling system that has to be delivered in accordance with the project schedule.
Project management has to plan for the following in relation to deep basement construction:
The first thing a CM will do is find out the ground conditions/cut-off points on the Smithfield project
determining the water levels below ground and depth of the required excavation. Also problems that
may be incurred during a city centre project are existing underground services such as water mains and
drainage. Cat-scan will be carried out to locate these services that will allow for additional measures
that may be necessary such as diversion of services. (DEEPEX, 2015)
Specific management plans
All basement projects are to include traffic management plan regards to impact on traffic surrounding
the site showing the impact for the construction schedule and surrounding services such as ambulances,
buses etc. and demolition management plan (CDMP) showing materials handling and storage,
establishment of welfare facilities for the workers on the site a clear construction sequence illustrated
with sketches and detailed diversion of working swears. (personal.cityu)
Project Scheduling
As time equals money quality of planning and scheduling of highly efficient working programme will
be vital for success of a safe on time project without any disturbances to works that may set back the
project to the completion date or require more resources that were not planned for. The project will
require layout and planning of the site accommodation and phasing/sectioning of the job. (teckrackher,
n.d.)
Associated risk and safety
(ADSC, 2015) Health and safety plan will have to be made stating the nature of the work, method
statement of the project, and risks associated with the project. Potential unforeseeable problems during
the construction process of deep basement construction are:
1. The effect of water ingress or pressure on the stability of bored pile walls and excavations
2. Collapse or failure of excavation walls
3. Disturbance of adjoining buildings and structures
Such risks will have to be eliminated by putting in place corrective measures such as:
1. To eliminate the effect of water egress predictability of conditions during the construction
period will be made. Temporary pumping and measures to prevent flooding will be installed.
Monitoring of water levels during construction period to predict potential risk.
2. To prevent the collapse of the basement wall anchors and tiebacks will be used to retain the
wall in place. Available expertise skill will be needed to calculate the vertical loads and lateral
loads to determine if the piles will be able to carry out their function additional shoring can be
placed against the excavated piles.
3. Disturbance to adjoining buildings can be eliminated through public relations and minimization
of the noise control during specified hours. Sprinkler systems will be used to eliminate
construction debris. (ADSC, 2015)
Introduction to Secant piles
The following section will focus on the construction methods used to
deliver Secant pile deep basement from site management perspective.
Secant pile walls are formed by drilling intersecting (one pile with
another) reinforced concrete piles. The research shows that secant
piles are reinforced with either steel rebar or with steel beams.
Primary (female) piles are installed first with secondary (male) piles
constructed in between primary (female) piles once the concrete
gains sufficient strength. Pile overlap is typically in the order of 8 cm
and can go in depths of up to 45 meters. (Baxter, 2012)
Construction procedures of secant pile wall
The secant pile wall will be set out with the piles distances centre-to-centre spacing and is drilled in two
stages. 1st
stage involves drilling and placing of primary piles and 2nd
stage will involve drilling the
secondary piles in-between the primary wall. (Concrete-group, 2016)
 The guide wall will be excavated which is a precast concrete wall to secure the wall alignment
but is not necessary.
 The male piles are bored through the female piles before the concrete has achieved its full
strength.
 Once the Rebar is placed and poured the levelling of the excavation can begin. First the guide
wall is removed.
 Once the wall is excavated to a depth of 2 meters ground anchors may be used.
Ground anchors
Ground anchors are used for installation that is capable of
transmitting an applied tensile load to a load bearing
section which may be a soil or rock to provide resistance to
structural movements. The advantage of ground anchors is
that excavation can stay unobstructed. The ground anchors
will be installed at an angle in the concrete pile. The hole
will be bored where the rebar will be placed and then
injected with concrete. The end of the anchor will be cut
and a cap put on top. (Ergun, 2008)
Ground water barriers
To achieve a water tightens it will be necessary for the CM
to build a skin wall to the sides of the piles. First step is by
cleaning the piles from any remaining spoil. Next shotcrete
will be pumped to the wall. Then waterproof membrane will
be placed on the wall by screwed to the main structure of
the wall. Once the membrane will be on polyethylene
studded sheets will be overlapped to seal the secant pile
wall. Then reinforced concrete levelled walls will be made
to cover the drainage system where it will be poured over
drainage pipe located 20cm from the wall. 50mm concrete
blinding will provide clean working surface for positioning
the mesh floor slab so the concrete can be poured pour.
Advantages of using secant piles
The main advantages of secant pile walls are:
1. Increased wall stiffness compared to sheet piles.
2. Can be installed in difficult ground.
3. Used in high water table conditions.
4. Columns can be as close as 5m from existing
buildings. (Wong, 2002)
The main disadvantages of secant pile walls are:
1. Verticality tolerances may be hard to achieve
for deep piles.
2. Total waterproofing is very difficult to obtain in
joints.
3. Increased cost compared to sheet pile.

Contenu connexe

Tendances

crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimationKumar Anjneya
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiakamal bhatia
 
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdfSoldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdfDr.youssef hamida
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringPrakash Kumar Jha
 
Concept of floating foundation
Concept of floating foundationConcept of floating foundation
Concept of floating foundationMilind Rao
 
General layout of steel structures
General layout of steel structuresGeneral layout of steel structures
General layout of steel structuresMaha Hassan
 
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDING
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDINGANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDING
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDINGIAEME Publication
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Earthquake and effect in building types precaution
Earthquake and effect in building types precaution Earthquake and effect in building types precaution
Earthquake and effect in building types precaution Aditya Sanyal
 
Case study on the kansai international airport
Case study on the kansai international airportCase study on the kansai international airport
Case study on the kansai international airportAglaia Connect
 
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)Suman Sau
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 

Tendances (20)

crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimation
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdfSoldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdf
 
04 Building floors & Slabs.pdf
04 Building floors & Slabs.pdf04 Building floors & Slabs.pdf
04 Building floors & Slabs.pdf
 
Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil Engineering
 
Concept of floating foundation
Concept of floating foundationConcept of floating foundation
Concept of floating foundation
 
Skyscraper
SkyscraperSkyscraper
Skyscraper
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
General layout of steel structures
General layout of steel structuresGeneral layout of steel structures
General layout of steel structures
 
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDING
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDINGANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDING
ANALYSIS OF WIND & EARTHQUAKE LOAD FOR DIFFERENT SHAPES OF HIGH RISE BUILDING
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Earthquake and effect in building types precaution
Earthquake and effect in building types precaution Earthquake and effect in building types precaution
Earthquake and effect in building types precaution
 
Case study on the kansai international airport
Case study on the kansai international airportCase study on the kansai international airport
Case study on the kansai international airport
 
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
PLANNING AND DESIGN OF G+3 RESIDENTIAL HOUSING COMPLEX (Share By Suman Sau)
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 

En vedette

basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinningOkwera David
 
Smart city proposal citizens initiative for smart portblair - final lite ver
Smart city proposal   citizens initiative for smart portblair - final lite verSmart city proposal   citizens initiative for smart portblair - final lite ver
Smart city proposal citizens initiative for smart portblair - final lite verANIRBAN CHOUDHURY
 

En vedette (7)

EXCAVATIONS
EXCAVATIONSEXCAVATIONS
EXCAVATIONS
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 
Smart city proposal citizens initiative for smart portblair - final lite ver
Smart city proposal   citizens initiative for smart portblair - final lite verSmart city proposal   citizens initiative for smart portblair - final lite ver
Smart city proposal citizens initiative for smart portblair - final lite ver
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
 
Deep carious lesions
Deep carious lesionsDeep carious lesions
Deep carious lesions
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 

Similaire à Deep basement excavation

CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 
Summer training report
Summer training reportSummer training report
Summer training reportaki8872233
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdfRanadita
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Developmentijsrd.com
 
Precast Concrete is the most prominent structure
Precast Concrete is the most prominent structurePrecast Concrete is the most prominent structure
Precast Concrete is the most prominent structureNisshantSinghSaud
 
Bubble deck & hollow core slab
Bubble deck & hollow core slabBubble deck & hollow core slab
Bubble deck & hollow core slabErik Ong
 
Bubble deck&hollow core slab
Bubble deck&hollow core slabBubble deck&hollow core slab
Bubble deck&hollow core slabPenny3688
 
Continuous rigid PC frame box girder cantilever pouring construction reasonab...
Continuous rigid PC frame box girder cantilever pouring construction reasonab...Continuous rigid PC frame box girder cantilever pouring construction reasonab...
Continuous rigid PC frame box girder cantilever pouring construction reasonab...IJERA Editor
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.pptssusera0ac221
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsErbil Polytechnic University
 
Methodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingMethodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingGRD Journals
 

Similaire à Deep basement excavation (20)

Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
JEEVA.pptx
JEEVA.pptxJEEVA.pptx
JEEVA.pptx
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Site report 1
Site report 1Site report 1
Site report 1
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
Precast Concrete is the most prominent structure
Precast Concrete is the most prominent structurePrecast Concrete is the most prominent structure
Precast Concrete is the most prominent structure
 
Bubble deck & hollow core slab
Bubble deck & hollow core slabBubble deck & hollow core slab
Bubble deck & hollow core slab
 
Bubble deck&hollow core slab
Bubble deck&hollow core slabBubble deck&hollow core slab
Bubble deck&hollow core slab
 
Continuous rigid PC frame box girder cantilever pouring construction reasonab...
Continuous rigid PC frame box girder cantilever pouring construction reasonab...Continuous rigid PC frame box girder cantilever pouring construction reasonab...
Continuous rigid PC frame box girder cantilever pouring construction reasonab...
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
 
Methodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in BuildingMethodology for Prevention and Repair of Cracks in Building
Methodology for Prevention and Repair of Cracks in Building
 
Connstruction engg ppt 2016
Connstruction engg ppt 2016Connstruction engg ppt 2016
Connstruction engg ppt 2016
 

Plus de Davis Ciprikis

Green Building Rating Systems and the Role of the Project Manager
Green Building Rating Systems and the Role of the Project ManagerGreen Building Rating Systems and the Role of the Project Manager
Green Building Rating Systems and the Role of the Project ManagerDavis Ciprikis
 
Health and safety management 2
Health and safety management 2Health and safety management 2
Health and safety management 2Davis Ciprikis
 
Project management document control software system
Project management document control software systemProject management document control software system
Project management document control software systemDavis Ciprikis
 
Exchange Rate Risk Management project
Exchange Rate Risk Management projectExchange Rate Risk Management project
Exchange Rate Risk Management projectDavis Ciprikis
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessmentDavis Ciprikis
 

Plus de Davis Ciprikis (6)

Green Building Rating Systems and the Role of the Project Manager
Green Building Rating Systems and the Role of the Project ManagerGreen Building Rating Systems and the Role of the Project Manager
Green Building Rating Systems and the Role of the Project Manager
 
Table formwork
Table formwork Table formwork
Table formwork
 
Health and safety management 2
Health and safety management 2Health and safety management 2
Health and safety management 2
 
Project management document control software system
Project management document control software systemProject management document control software system
Project management document control software system
 
Exchange Rate Risk Management project
Exchange Rate Risk Management projectExchange Rate Risk Management project
Exchange Rate Risk Management project
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessment
 

Dernier

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Dernier (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Deep basement excavation

  • 1. DEPARTMENT OF CONSTRUCTION MANAGEMENT PROJECT COVER SHEET STUDENT NAME: DC STUDENT NUMBER: C 123 COURSE/ YEAR DT117/4 SUBJECT: Advanced Construction Technology PROJECT TITLE: Deep Basement Excavation LECTURER: FOR OFFICE USE ONLY: DATE DUE: 10th February 2016 DATE RECEIVED: RECEIVED BY: REPEAT PROJECT? MARKS:
  • 2. Introduction The construction site for the prophase of the project will be a multi-story commercial dwelling with deep basement carpark located in city centre at Smithfield where there is a high level of water content as it is in close proximity to the river Liffey, lack of space due to other buildings, traffic level are high and one way system is the only option. The design team have proposed ‘type C drained cavity’ basement that will consist of ‘secant piling system that has to be delivered in accordance with the project schedule. Project management has to plan for the following in relation to deep basement construction: The first thing a CM will do is find out the ground conditions/cut-off points on the Smithfield project determining the water levels below ground and depth of the required excavation. Also problems that may be incurred during a city centre project are existing underground services such as water mains and drainage. Cat-scan will be carried out to locate these services that will allow for additional measures that may be necessary such as diversion of services. (DEEPEX, 2015) Specific management plans All basement projects are to include traffic management plan regards to impact on traffic surrounding the site showing the impact for the construction schedule and surrounding services such as ambulances, buses etc. and demolition management plan (CDMP) showing materials handling and storage, establishment of welfare facilities for the workers on the site a clear construction sequence illustrated with sketches and detailed diversion of working swears. (personal.cityu) Project Scheduling As time equals money quality of planning and scheduling of highly efficient working programme will be vital for success of a safe on time project without any disturbances to works that may set back the project to the completion date or require more resources that were not planned for. The project will require layout and planning of the site accommodation and phasing/sectioning of the job. (teckrackher, n.d.) Associated risk and safety (ADSC, 2015) Health and safety plan will have to be made stating the nature of the work, method statement of the project, and risks associated with the project. Potential unforeseeable problems during the construction process of deep basement construction are: 1. The effect of water ingress or pressure on the stability of bored pile walls and excavations 2. Collapse or failure of excavation walls 3. Disturbance of adjoining buildings and structures Such risks will have to be eliminated by putting in place corrective measures such as: 1. To eliminate the effect of water egress predictability of conditions during the construction period will be made. Temporary pumping and measures to prevent flooding will be installed. Monitoring of water levels during construction period to predict potential risk. 2. To prevent the collapse of the basement wall anchors and tiebacks will be used to retain the wall in place. Available expertise skill will be needed to calculate the vertical loads and lateral loads to determine if the piles will be able to carry out their function additional shoring can be placed against the excavated piles. 3. Disturbance to adjoining buildings can be eliminated through public relations and minimization of the noise control during specified hours. Sprinkler systems will be used to eliminate construction debris. (ADSC, 2015)
  • 3. Introduction to Secant piles The following section will focus on the construction methods used to deliver Secant pile deep basement from site management perspective. Secant pile walls are formed by drilling intersecting (one pile with another) reinforced concrete piles. The research shows that secant piles are reinforced with either steel rebar or with steel beams. Primary (female) piles are installed first with secondary (male) piles constructed in between primary (female) piles once the concrete gains sufficient strength. Pile overlap is typically in the order of 8 cm and can go in depths of up to 45 meters. (Baxter, 2012) Construction procedures of secant pile wall The secant pile wall will be set out with the piles distances centre-to-centre spacing and is drilled in two stages. 1st stage involves drilling and placing of primary piles and 2nd stage will involve drilling the secondary piles in-between the primary wall. (Concrete-group, 2016)  The guide wall will be excavated which is a precast concrete wall to secure the wall alignment but is not necessary.  The male piles are bored through the female piles before the concrete has achieved its full strength.  Once the Rebar is placed and poured the levelling of the excavation can begin. First the guide wall is removed.  Once the wall is excavated to a depth of 2 meters ground anchors may be used. Ground anchors Ground anchors are used for installation that is capable of transmitting an applied tensile load to a load bearing section which may be a soil or rock to provide resistance to structural movements. The advantage of ground anchors is that excavation can stay unobstructed. The ground anchors will be installed at an angle in the concrete pile. The hole will be bored where the rebar will be placed and then injected with concrete. The end of the anchor will be cut and a cap put on top. (Ergun, 2008) Ground water barriers To achieve a water tightens it will be necessary for the CM to build a skin wall to the sides of the piles. First step is by cleaning the piles from any remaining spoil. Next shotcrete will be pumped to the wall. Then waterproof membrane will be placed on the wall by screwed to the main structure of the wall. Once the membrane will be on polyethylene studded sheets will be overlapped to seal the secant pile wall. Then reinforced concrete levelled walls will be made to cover the drainage system where it will be poured over drainage pipe located 20cm from the wall. 50mm concrete blinding will provide clean working surface for positioning the mesh floor slab so the concrete can be poured pour.
  • 4. Advantages of using secant piles The main advantages of secant pile walls are: 1. Increased wall stiffness compared to sheet piles. 2. Can be installed in difficult ground. 3. Used in high water table conditions. 4. Columns can be as close as 5m from existing buildings. (Wong, 2002) The main disadvantages of secant pile walls are: 1. Verticality tolerances may be hard to achieve for deep piles. 2. Total waterproofing is very difficult to obtain in joints. 3. Increased cost compared to sheet pile.