PRACTICAL TRAINING PRESENTATION
ON
NORTH WESTERN RAILWAY
Submitted in the practical fulfillment of the award of Bachelor Of Technology
(Rajasthan Technical University, Kota)
IN
ELECTRICAL ENGINEERING
Session:2019-20
SUBMITTED TO: Dr. Annapurna Bhargava SUBMITTED BY: Deepak Singh Chauhan
Professor 16/270,E2,7th Semester
TABLE OF CONTENTS
 INTRODUCTION OF INDIAN RAILWAYS
 ABOUT RAILWAY POWER HOUSE
 CONTROL OF POWER HOUSE
 TRAIN AND LIGHTING SYSTEM
 REFRIGENRATION AND AIR CONDITIONING SYSTEM IN
TRAIN
Introduction Of Indian Railway
 Indian Railways (IR) is India's national railway system operated by
the Ministry of Railways. It manages the fourth largest railway network
in the world by size, with a route length of 67,368-kilometre (41,861 mi)
and total track length of 121,407-kilometre (75,439 mi) as of March
2017. Routes are electrified with 25 kV AC electric traction while thirty
33% of them are double or multi-tracked.[
North -Western Railway
North -Western Railway is the second largest zone of Indian railway. Its head quarter is in
Mumbai at church gate. It undertakers the Rajasthan, Gujarat, Maharashtra and some part of
M.P & U.P. The total length of route in north -western railway has reached approximate 10,000
Km. The western offer a long travel of 100 years.
North-Western Railway is also divided into eight divisions which are as follows:-
•Ratlam
•Rajkot
•Ajmer
•Jaipur
•Bharnagar
•Kota
•Bombay
•Baroda
Railway Power House
Railway Power House is situated at “Nagara Ajmer“. In 1922 two major power plants was
established in India by British Govt. One is Ajmer and second is Dahod (Baroda). At that time,
Ajmer power house was a Thermal Power Station and therefore it is still known as Power
House.
In this year a 33 KV feeder is given to the power house from Rajasthan state electricity board
[R.S.E.B] and a three 500 KVA D.G. SET were also installed in this year. In 1988-89
constructions for the installation of 1750 KVA D.G. SET was started. In 1988-90 a modernization
was done. In which some modern oil circuit breaker[O.C.B] were installed. This power house
supplies the electrical energy to different parts of Ajmer division with the rate of 4.5 Lakh Unit
/month.
Classification Of Railway Power House
Railway Power House can be broadly classified into three parts:-
 Electrical power house
 Electrical repair shop
 Mains and office
• Yard
• Control room
• 1750 K.V.A D.G. set room
Equipment Used In Railway Power House Substations
 LIGHTING ARRESTOR
 CIRCUIT BREAKER
 CURRENT TRANSFORMER
 POTENTIAL TRANSFORMER
 RELAY
 INSULATOR
Lightning Arresters :
 The most common device used for protection of the power system against
high voltage surge is the surge diverter which divert the incoming high
voltage wave to earth. Such a diverter alternatively called lightening arrester
Circuit Breaker :
 Circuit Breaker is one of the most important equipment in the power system.It has ability
to close a circuit or break a circuit during maintenance work or where there fault in a
system.
 Circuit Breaker is capable of making and breaking an electrical circuit under normal and
abnormal condition.
Major types of circuit breaker –
 Air blast CB
 Oil CB
 Vacuum CB
 SF6 CB
Current Transformer :
 A current transformer (CT) is a type of transformer that is used to
measure alternating current (AC). It produces a current in its secondary
which is proportional to the current in its primary.
Potential Transformer :
 Potential transformer which step down the voltage at system to sufficiently low
values, are necessary on every power system for –
 Indicator of voltage condition
 Metering of supply for exchange of energy
 Relaying and synchronizing
Relay :
 A relay is the device that detects the fault and initiates the operation of
circuit breaker to isolates the defective element from the rest of the system
 Buchholz relay
 Over current relay
 Earth current relay
INSULATOR :
 The insulator play one of the key roles in provision of safe transmission of
electric energy and minimization of energy loss.
 Rod insulator - to be used as rotary insulating elements ,supporting conductor
lines and outside plant disconnectors, and as a part of bus rod support.
 Line post insulator - to be used at high voltage power transmission line electric
distribution plant.
Control Room Of Power House
A Control Room is the most important part of any sub station. In Railway Power House,
Control Room is situated between yard and 1750 KW D.G. set room.
Control room can be classified into four parts which are as follows :-
 11 KV Control Relay and Distribution Panel.
 500 KVA D.G SETS.
 Diesel Power Station 1750 KW D.G. Set
 11 KV Control Relay and Distribution Panel
 500 KVA D.G. SETS
There are two D.G. set in Control Room. Capacity of each D.G. set is 500 KVA. The other details
of D.G. set are as follows:
Capacity
Output Volt
Output Current
Connection
Power factor
R.P.M.
Frequency
Phase
500 KVA
415 V
697 A
Star Connected
0.8
1500
50 Hz
3 Phase
Whenever supply is not available from R.S.E.B. these D.G. sets can be
started for making local arrangements. If any fault occur during starting of
D.G. sets the indicating light for that fault will glow on A.V.R. panel.
 Diesel Power Station 1750 KW D.G. Set
 Diesel Power station is the most
important part of Railway Power
House
 when R.S.E.B. supply is failure due
to any reason then this set is used
to feed the supply to the Loco
workshop and Carriage and Wagon
shop.
This power station is installed here due to its following advantages –
•Diesel is used as a fuel in this plant
which is easily available in Ajmer as
compared to coal.
•The design & installation of this
plant is very simple.
•The space requirement for this plant
is less.
•Less staff is required to operate this
plant because many functions are
controlled by panel board.
Carriage And Wagon Shop
Carriage and Wagon Shop is one of the most important workshop of the western
railway. Here the poll of the meter gauge and board gauge coaches of carried out
even the repairing and over hauling of the coaches of tourism trains like palace
on wheel & royal oriented luxury of western railway express is carried out these
are most important and costly trains here poll of MG & BG wagons are also
carried out.
. In carriage and wagon shop, the electrical repairing of the coaches is done
in following department
 Train lighting
 R.A.C. section
 Carriage motor
Types of Train
Lighting System
Self Generation
Mid-On-
Generation(MOG)
End-On-
Generation(EOG)
Train Lighting System
Train Lighting System
On the basis of generation following train lightning system are used :-
1. EOG (End On Generation)
1.1 Generating Voltage 415 V
1.2 Generating Voltage 450V
2. Mid On Generation (MOG)
3 Self Generating System0
3.1 V DC (from Dynamo)
3.2 24 V DC (from Alternator)
1. End On Generation
In this type of system electricity is generated in power car instead of coach. This system
is used in trains having AC coaches like Rajdhani express, Shatabdi express etc. In this
system two power cars are installed on the basis of generating voltage. Two type of
power cars are used
 415 V, 3 Phase AC
 750 V, 3 Phase AC
 In this days 750V, 3 Phase AC system are preferred.
 In 415 V AC capacity of alternator is 160KVA, 220 KVA, 250 KVA etc. while in 750
volt system 500KVA alternator are used.
 This alternator is coupled to 390 BHP. 1500 RPM diesel engine.
 Electricity generation from alternator is given to individual coach from two feeders.
These feeder are provided with overload, earth fault and fuses. Alternator are also
provided with overload, earth leakage, under voltage protection etc.
2. MOG (Mid On Generation)
 This train lightning system is used on small branch lines, hill area. In this system
power car is used in the middle of all coaches therefore it is called as Mid On
Generator. In this trains maximum 13 coaches are used with power car.
 In power car two DG sets of 30 KVA capacity each are used which generates 415
V, 3 f AC diesel engine of 41,43,47BHP 1500RPM air cooled are used.
 Only one alternator is used at a time. Second is used as a stand by for alternator
excitation 24V 320 AH battery and battery charger are given.
 415V generated by alternating is step down to 110 V 3 A f C 50Hz by 30 KVA step
down transformer. This 110 V 3 f is given to bus bar
3. Self Generation System
In self generating coach the apparatus used for generating electricity are known as
generating equipment. In old T/L system dynamo was used but in modified system
brushless alternator are used. Alternator produces AC which is converted into DC
rectifier cum regulator and this DC is given to coach load and battery.
Following alternator are used in coaches .
1. 3 KW , 30 V , 100 AMP Meter Gauge , Non AC Coach
2. 4.5 KW , 120 V , 150 Amp Broad Gauge , Non AC Coach
3. 3 KW , 120 V , 150 Amp Meter Gauge , Non AC Coach
4. 12 KW , 120 V , 100 Amp Meter Gauge , AC Coach
5. 18 KW , 130 V , 133 Amp Broad Gauge , AC Coach
6. 22.75 KW / 25 KW , 130 V Broad Gauge , AC-3 tier Coach
RRU / ERRU ( Rectifier Regulated Unit)
To start the fan, light in a Indian rail battery system are used . the o/p of a 3
phase AC of the alternator is change in DC with the help of RRU ( rectifier
regulated unit) and new technical electronic based ERRU are used,
Function of RRU
 AC to DC for battery charging.
 Control the alternator o/p by the field excitation.
 To control the o/p voltage according to o/p current.
ELECTRONIC RECTIFIER CUM REGULATOR UNIT (ERRU)
This is Electronic Control is having two numbers IGBTs to control
the field current of the 25 KW Alternator. The out put Voltage can
be set from 125 to 130 Volts DC insteps of 0.5 Volts and the
current can be set from 180 to 212 Amps. as per the
requirements of Railway.
An OVP (Over Voltage Protection) with electronic Control is
used in the Control box to open the field control in case the
control fails or the control components damage to avoid the Over
Voltage Generation which will be harmful for the coach
appliances and maintain fail safe operation.
A display board is provided in the control panel to set the
voltage and current.
Battery Set Arrangement :
 Train lighting cells are secondary cells such as “lead acid cell” .In a charged lead
acid cell the positive active material consist of lead peroxide [Pbo2] and the
negative spongy lead [ pb ]. Dilute sulphuric acid [HSo4] serves as a electrolyte
 One battery set consisting 56 cells, 120 Amp-hour capacity is in parallel with the
alternator and feeds electrical loads when the alternator is not generating.
 Fuses are provided for safety against excessive current for each component.
 At a junction box, rotary switches and MCBs are provided to switch ON and OFF
power supply to light/fan and emergency feeding terminals (EFT).
 Emergency feeding terminals give electrical power supply to adjoining coach in
emergency through temporary connections (TC).
Flow Chart of Self Generating System of Train Lighting
Fans used in trains
There may be of three main types of fans i.e. DC fans, A.C. fans, DC / AC
fans. An electric fans is simply an electric motor to which the blades are fixed
so that when the motor of the fan rotates the blades throw the air.
In the train bogies generally two types of fans are used
1. 110 V A.C. fans
2. 24 V D.C. fans
Scale of Illumination
Here are the specification of lamp fitted in train
1.
2.
3.
4.
5.
6.
Night lamp fitting
Cooling fitting gallery
Cooling light passage
Postal van dining
Reading light
Bulbs (BG), Bulbs(MG)
20 Watt.
20 Watt.
30 Watt.
30 Watt.
10 Watt.
110V/ 25 Watt, 24 V/20 Watt.
Line Diagram of Train Lighting System :
Head On Generation
 750 V DC - light & fan works on 110 V AC
 1500 V DC - light & fan works on 110 V AC
 25 KV AC - light & fan works on 141 V AC
Pantograph :
 A pantograph (or "pan") is an apparatus mounted on the roof of an electric train,
tram or electric bus to collect power through contact with an overhead catenary
wire.
 They are provided with steel stripes for current collection .
 The raising and lowering of pantograph is by means of pneumatically operated
servomotor.
 Used for suitable operation up to 140 km/hr.
REFRIGENRATION AND AIR CONDITIONING
SYSTEM(R.A.C)
EQUIPMENTS OF AC SYSTEM :
 COMPRESSOR :- Compress & delivers gas into condenser at a high pressure
& high temperature.
 CONDENSOR :- It cools the hot gas and liquidates it under pressure.
 EXPANSION VALVE :- It controls and regulates the rate of flow of liquid Freon
under high pressure.
 EVAPORATOR :- The cooling unit in which liquid Freon under low pressure
evaporators & in-doing so takes away the latent heat thereby cooling the
medium surrounding the cooling coil.
Air-Conditioning Comfort Factors :
In air-conditioning, the following factors decide comfort or discomfort for
human beings –
 Temperature
 Humidity
 Draft (velocity of air)
 Purity of air and noise
Travel Classes of Indian Railway
Indian railway uses the two types of coaches,
1. ICF (Integral Coach Factory)
2. LHB (Link Hofmann Busch) coaches.
ICF Coaches is a conventional railway bogie used on
the majority of Indian Railway main line passenger
coaches. The design of the bogie was developed by
ICF (Integral Coach Factory), Paramour, Chennai,
India. The ICF design refers to the conventional
design of coaches seen across trains in India.
LHB Coaches are the passenger compartments of Indian Railways that have
been developed by Linke-Hofmann-Busch of Germany. The coaches are designed
for an operating speed up to 160 km/h and could go up to 200 km/h. However,
they have been tested up to 180 km/h.
THANK YOU

Contenu connexe

Tendances

Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfAbhisheksamal22
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction pptragulkncet
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)shovandey07
 
Electrification of railway, problems and types of solution
Electrification of railway, problems and types of solutionElectrification of railway, problems and types of solution
Electrification of railway, problems and types of solutionRITESH WANJARI
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Electric motor
Electric motorElectric motor
Electric motorMasud Rana
 
methods to control speed of dc motors
methods to control speed of dc motorsmethods to control speed of dc motors
methods to control speed of dc motorsharshid panchal
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
Drives lec 13_14_Speed Control of DC Motors
Drives lec 13_14_Speed Control of DC MotorsDrives lec 13_14_Speed Control of DC Motors
Drives lec 13_14_Speed Control of DC MotorsMohammad Umar Rehman
 

Tendances (20)

Electric traction
Electric tractionElectric traction
Electric traction
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
UPQC ppt main
UPQC ppt mainUPQC ppt main
UPQC ppt main
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Railway training
Railway trainingRailway training
Railway training
 
GENERATOR PROTECTIONS
GENERATOR PROTECTIONS GENERATOR PROTECTIONS
GENERATOR PROTECTIONS
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
Lhb ac buffet car
Lhb ac buffet carLhb ac buffet car
Lhb ac buffet car
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)
 
Electrification of railway, problems and types of solution
Electrification of railway, problems and types of solutionElectrification of railway, problems and types of solution
Electrification of railway, problems and types of solution
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Electric motor
Electric motorElectric motor
Electric motor
 
Dual converters (1)
Dual converters (1)Dual converters (1)
Dual converters (1)
 
methods to control speed of dc motors
methods to control speed of dc motorsmethods to control speed of dc motors
methods to control speed of dc motors
 
Adaptive relaying
Adaptive relayingAdaptive relaying
Adaptive relaying
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Drives lec 13_14_Speed Control of DC Motors
Drives lec 13_14_Speed Control of DC MotorsDrives lec 13_14_Speed Control of DC Motors
Drives lec 13_14_Speed Control of DC Motors
 

Similaire à Northern western raiways ppt

Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...ravi9898000178
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)99sunilkumar
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.pptPrakasBhowmik
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting bookfiroj shaik
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training reportGyanendra Prakash
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coachjjasdxjz
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotivesiva1501
 
trainlighting.pdf
trainlighting.pdftrainlighting.pdf
trainlighting.pdfAsif682330
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railwaySURAJBHAKTA4
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750Mdtarique Anwar
 

Similaire à Northern western raiways ppt (20)

Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Electric traction
Electric tractionElectric traction
Electric traction
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training report
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coach
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Engine control
Engine controlEngine control
Engine control
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotive
 
trainlighting.pdf
trainlighting.pdftrainlighting.pdf
trainlighting.pdf
 
Train lighting
Train lightingTrain lighting
Train lighting
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 

Dernier

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Dernier (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Northern western raiways ppt

  • 1. A PRACTICAL TRAINING PRESENTATION ON NORTH WESTERN RAILWAY Submitted in the practical fulfillment of the award of Bachelor Of Technology (Rajasthan Technical University, Kota) IN ELECTRICAL ENGINEERING Session:2019-20 SUBMITTED TO: Dr. Annapurna Bhargava SUBMITTED BY: Deepak Singh Chauhan Professor 16/270,E2,7th Semester
  • 2. TABLE OF CONTENTS  INTRODUCTION OF INDIAN RAILWAYS  ABOUT RAILWAY POWER HOUSE  CONTROL OF POWER HOUSE  TRAIN AND LIGHTING SYSTEM  REFRIGENRATION AND AIR CONDITIONING SYSTEM IN TRAIN
  • 3. Introduction Of Indian Railway  Indian Railways (IR) is India's national railway system operated by the Ministry of Railways. It manages the fourth largest railway network in the world by size, with a route length of 67,368-kilometre (41,861 mi) and total track length of 121,407-kilometre (75,439 mi) as of March 2017. Routes are electrified with 25 kV AC electric traction while thirty 33% of them are double or multi-tracked.[
  • 4. North -Western Railway North -Western Railway is the second largest zone of Indian railway. Its head quarter is in Mumbai at church gate. It undertakers the Rajasthan, Gujarat, Maharashtra and some part of M.P & U.P. The total length of route in north -western railway has reached approximate 10,000 Km. The western offer a long travel of 100 years. North-Western Railway is also divided into eight divisions which are as follows:- •Ratlam •Rajkot •Ajmer •Jaipur •Bharnagar •Kota •Bombay •Baroda
  • 5. Railway Power House Railway Power House is situated at “Nagara Ajmer“. In 1922 two major power plants was established in India by British Govt. One is Ajmer and second is Dahod (Baroda). At that time, Ajmer power house was a Thermal Power Station and therefore it is still known as Power House. In this year a 33 KV feeder is given to the power house from Rajasthan state electricity board [R.S.E.B] and a three 500 KVA D.G. SET were also installed in this year. In 1988-89 constructions for the installation of 1750 KVA D.G. SET was started. In 1988-90 a modernization was done. In which some modern oil circuit breaker[O.C.B] were installed. This power house supplies the electrical energy to different parts of Ajmer division with the rate of 4.5 Lakh Unit /month.
  • 6. Classification Of Railway Power House Railway Power House can be broadly classified into three parts:-  Electrical power house  Electrical repair shop  Mains and office • Yard • Control room • 1750 K.V.A D.G. set room
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Equipment Used In Railway Power House Substations  LIGHTING ARRESTOR  CIRCUIT BREAKER  CURRENT TRANSFORMER  POTENTIAL TRANSFORMER  RELAY  INSULATOR
  • 12. Lightning Arresters :  The most common device used for protection of the power system against high voltage surge is the surge diverter which divert the incoming high voltage wave to earth. Such a diverter alternatively called lightening arrester
  • 13. Circuit Breaker :  Circuit Breaker is one of the most important equipment in the power system.It has ability to close a circuit or break a circuit during maintenance work or where there fault in a system.  Circuit Breaker is capable of making and breaking an electrical circuit under normal and abnormal condition. Major types of circuit breaker –  Air blast CB  Oil CB  Vacuum CB  SF6 CB
  • 14. Current Transformer :  A current transformer (CT) is a type of transformer that is used to measure alternating current (AC). It produces a current in its secondary which is proportional to the current in its primary.
  • 15. Potential Transformer :  Potential transformer which step down the voltage at system to sufficiently low values, are necessary on every power system for –  Indicator of voltage condition  Metering of supply for exchange of energy  Relaying and synchronizing
  • 16. Relay :  A relay is the device that detects the fault and initiates the operation of circuit breaker to isolates the defective element from the rest of the system  Buchholz relay  Over current relay  Earth current relay
  • 17. INSULATOR :  The insulator play one of the key roles in provision of safe transmission of electric energy and minimization of energy loss.  Rod insulator - to be used as rotary insulating elements ,supporting conductor lines and outside plant disconnectors, and as a part of bus rod support.  Line post insulator - to be used at high voltage power transmission line electric distribution plant.
  • 18. Control Room Of Power House A Control Room is the most important part of any sub station. In Railway Power House, Control Room is situated between yard and 1750 KW D.G. set room. Control room can be classified into four parts which are as follows :-  11 KV Control Relay and Distribution Panel.  500 KVA D.G SETS.  Diesel Power Station 1750 KW D.G. Set
  • 19.  11 KV Control Relay and Distribution Panel
  • 20.  500 KVA D.G. SETS There are two D.G. set in Control Room. Capacity of each D.G. set is 500 KVA. The other details of D.G. set are as follows: Capacity Output Volt Output Current Connection Power factor R.P.M. Frequency Phase 500 KVA 415 V 697 A Star Connected 0.8 1500 50 Hz 3 Phase
  • 21. Whenever supply is not available from R.S.E.B. these D.G. sets can be started for making local arrangements. If any fault occur during starting of D.G. sets the indicating light for that fault will glow on A.V.R. panel.
  • 22.  Diesel Power Station 1750 KW D.G. Set  Diesel Power station is the most important part of Railway Power House  when R.S.E.B. supply is failure due to any reason then this set is used to feed the supply to the Loco workshop and Carriage and Wagon shop.
  • 23. This power station is installed here due to its following advantages – •Diesel is used as a fuel in this plant which is easily available in Ajmer as compared to coal. •The design & installation of this plant is very simple. •The space requirement for this plant is less. •Less staff is required to operate this plant because many functions are controlled by panel board.
  • 24. Carriage And Wagon Shop Carriage and Wagon Shop is one of the most important workshop of the western railway. Here the poll of the meter gauge and board gauge coaches of carried out even the repairing and over hauling of the coaches of tourism trains like palace on wheel & royal oriented luxury of western railway express is carried out these are most important and costly trains here poll of MG & BG wagons are also carried out. . In carriage and wagon shop, the electrical repairing of the coaches is done in following department  Train lighting  R.A.C. section  Carriage motor
  • 25. Types of Train Lighting System Self Generation Mid-On- Generation(MOG) End-On- Generation(EOG) Train Lighting System
  • 26. Train Lighting System On the basis of generation following train lightning system are used :- 1. EOG (End On Generation) 1.1 Generating Voltage 415 V 1.2 Generating Voltage 450V 2. Mid On Generation (MOG) 3 Self Generating System0 3.1 V DC (from Dynamo) 3.2 24 V DC (from Alternator)
  • 27. 1. End On Generation In this type of system electricity is generated in power car instead of coach. This system is used in trains having AC coaches like Rajdhani express, Shatabdi express etc. In this system two power cars are installed on the basis of generating voltage. Two type of power cars are used  415 V, 3 Phase AC  750 V, 3 Phase AC  In this days 750V, 3 Phase AC system are preferred.  In 415 V AC capacity of alternator is 160KVA, 220 KVA, 250 KVA etc. while in 750 volt system 500KVA alternator are used.  This alternator is coupled to 390 BHP. 1500 RPM diesel engine.  Electricity generation from alternator is given to individual coach from two feeders. These feeder are provided with overload, earth fault and fuses. Alternator are also provided with overload, earth leakage, under voltage protection etc.
  • 28. 2. MOG (Mid On Generation)  This train lightning system is used on small branch lines, hill area. In this system power car is used in the middle of all coaches therefore it is called as Mid On Generator. In this trains maximum 13 coaches are used with power car.  In power car two DG sets of 30 KVA capacity each are used which generates 415 V, 3 f AC diesel engine of 41,43,47BHP 1500RPM air cooled are used.  Only one alternator is used at a time. Second is used as a stand by for alternator excitation 24V 320 AH battery and battery charger are given.  415V generated by alternating is step down to 110 V 3 A f C 50Hz by 30 KVA step down transformer. This 110 V 3 f is given to bus bar
  • 29. 3. Self Generation System In self generating coach the apparatus used for generating electricity are known as generating equipment. In old T/L system dynamo was used but in modified system brushless alternator are used. Alternator produces AC which is converted into DC rectifier cum regulator and this DC is given to coach load and battery. Following alternator are used in coaches . 1. 3 KW , 30 V , 100 AMP Meter Gauge , Non AC Coach 2. 4.5 KW , 120 V , 150 Amp Broad Gauge , Non AC Coach 3. 3 KW , 120 V , 150 Amp Meter Gauge , Non AC Coach 4. 12 KW , 120 V , 100 Amp Meter Gauge , AC Coach 5. 18 KW , 130 V , 133 Amp Broad Gauge , AC Coach 6. 22.75 KW / 25 KW , 130 V Broad Gauge , AC-3 tier Coach
  • 30. RRU / ERRU ( Rectifier Regulated Unit) To start the fan, light in a Indian rail battery system are used . the o/p of a 3 phase AC of the alternator is change in DC with the help of RRU ( rectifier regulated unit) and new technical electronic based ERRU are used, Function of RRU  AC to DC for battery charging.  Control the alternator o/p by the field excitation.  To control the o/p voltage according to o/p current.
  • 31. ELECTRONIC RECTIFIER CUM REGULATOR UNIT (ERRU) This is Electronic Control is having two numbers IGBTs to control the field current of the 25 KW Alternator. The out put Voltage can be set from 125 to 130 Volts DC insteps of 0.5 Volts and the current can be set from 180 to 212 Amps. as per the requirements of Railway. An OVP (Over Voltage Protection) with electronic Control is used in the Control box to open the field control in case the control fails or the control components damage to avoid the Over Voltage Generation which will be harmful for the coach appliances and maintain fail safe operation. A display board is provided in the control panel to set the voltage and current.
  • 32. Battery Set Arrangement :  Train lighting cells are secondary cells such as “lead acid cell” .In a charged lead acid cell the positive active material consist of lead peroxide [Pbo2] and the negative spongy lead [ pb ]. Dilute sulphuric acid [HSo4] serves as a electrolyte  One battery set consisting 56 cells, 120 Amp-hour capacity is in parallel with the alternator and feeds electrical loads when the alternator is not generating.  Fuses are provided for safety against excessive current for each component.  At a junction box, rotary switches and MCBs are provided to switch ON and OFF power supply to light/fan and emergency feeding terminals (EFT).
  • 33.  Emergency feeding terminals give electrical power supply to adjoining coach in emergency through temporary connections (TC).
  • 34. Flow Chart of Self Generating System of Train Lighting
  • 35. Fans used in trains There may be of three main types of fans i.e. DC fans, A.C. fans, DC / AC fans. An electric fans is simply an electric motor to which the blades are fixed so that when the motor of the fan rotates the blades throw the air. In the train bogies generally two types of fans are used 1. 110 V A.C. fans 2. 24 V D.C. fans
  • 36. Scale of Illumination Here are the specification of lamp fitted in train 1. 2. 3. 4. 5. 6. Night lamp fitting Cooling fitting gallery Cooling light passage Postal van dining Reading light Bulbs (BG), Bulbs(MG) 20 Watt. 20 Watt. 30 Watt. 30 Watt. 10 Watt. 110V/ 25 Watt, 24 V/20 Watt.
  • 37. Line Diagram of Train Lighting System :
  • 38. Head On Generation  750 V DC - light & fan works on 110 V AC  1500 V DC - light & fan works on 110 V AC  25 KV AC - light & fan works on 141 V AC
  • 39. Pantograph :  A pantograph (or "pan") is an apparatus mounted on the roof of an electric train, tram or electric bus to collect power through contact with an overhead catenary wire.  They are provided with steel stripes for current collection .  The raising and lowering of pantograph is by means of pneumatically operated servomotor.  Used for suitable operation up to 140 km/hr.
  • 40. REFRIGENRATION AND AIR CONDITIONING SYSTEM(R.A.C)
  • 41. EQUIPMENTS OF AC SYSTEM :  COMPRESSOR :- Compress & delivers gas into condenser at a high pressure & high temperature.  CONDENSOR :- It cools the hot gas and liquidates it under pressure.  EXPANSION VALVE :- It controls and regulates the rate of flow of liquid Freon under high pressure.  EVAPORATOR :- The cooling unit in which liquid Freon under low pressure evaporators & in-doing so takes away the latent heat thereby cooling the medium surrounding the cooling coil.
  • 42. Air-Conditioning Comfort Factors : In air-conditioning, the following factors decide comfort or discomfort for human beings –  Temperature  Humidity  Draft (velocity of air)  Purity of air and noise
  • 43. Travel Classes of Indian Railway Indian railway uses the two types of coaches, 1. ICF (Integral Coach Factory) 2. LHB (Link Hofmann Busch) coaches. ICF Coaches is a conventional railway bogie used on the majority of Indian Railway main line passenger coaches. The design of the bogie was developed by ICF (Integral Coach Factory), Paramour, Chennai, India. The ICF design refers to the conventional design of coaches seen across trains in India.
  • 44. LHB Coaches are the passenger compartments of Indian Railways that have been developed by Linke-Hofmann-Busch of Germany. The coaches are designed for an operating speed up to 160 km/h and could go up to 200 km/h. However, they have been tested up to 180 km/h.