• Environmental Impact Assessment(EIA)-
INTRODUCTION
• Impacts :
• Evolution of EIA
• Benefits of EIA
• The process of EIA
• Contents of EIA Report
• List of projects requiring EIA
• EXTERNALITIES OF EIA
• Conclusions
Contents:
INTRODUCTION
Environmental Impact Assessment (EIA) refers to the evaluation of the environmental
impacts likely to raise from a major project significantly affecting the environment.
Environmental Impact Assessment (EIA) is a process which ensures that all
environmental matters are taken into account quite early in the project at
planning process itself. It takes into consideration not only technical and
economic considerations but also, traditional aspects like impact on local people,
biodiversity etc.
• A tool used to identify the environmental, social and economic impacts of a project
prior to decision-making.
• It aims to predict environmental impacts at an early stage in project planning and
design, find ways and means to reduce adverse impacts, shape projects to suit the
local environment and present the predictions and options to decision-makers.
• By using EIA both environmental and economic benefits can be achieved, such as
reduced cost and time of project implementation and design, avoided
treatment/clean-up costs and impacts of laws and regulations.
TYPES OF IMPACTS
IMPACTS
• The impact of an activity is a deviation (a change) from
the baseline situation that is caused by the activity.
• The baseline situation is the existing environmental
situation or condition in the absence of the activity.
Ecological Impact
Fisheries, forests, plantation, eutrophication
Physico-chemical Impact
Erosion and Siltation, drainage congestion /water
logging, regional hydrology/flooding, obstruction
to waste water flow, dust /noise pollution
Impact on Human Interest
Loss of agricultural lands, generation of
employment opportunities, navigation and boat
communication, commercial and service
facilities, industrial activities, irrigation facilities
Environmental impacts:
1. Depletion of natural
resources.
2. Destruction of habitats.
3. Change in ph, oxygen level,
toxicity of water.
4. Increase in toxicity of air.
5. Global warming.
6. Ozone depletion.
EIA is one of the successful policy innovations of the 20th Century for environmental
conservation. Thirty-seven years ago, there was no EIA but today, it is a formal process in
many countries and is currently practiced in more than 100 countries. EIA as a mandatory
regulatory procedure originated in the early 1970s, with the implementation of the
National Environment Policy Act (NEPA) 1969 in the US. A large part of the initial
development took place in a few high-income countries, like Canada, Australia, and New
Zealand (1973-74). However, there were some developing countries as well, which
introduced EIA relatively early - Columbia (1974), Philippines (1978).
The EIA process really took off after the mid-1980s. In 1989, the World Bank adopted EIA
for major development projects, in which a borrower country had to undertake an EIA
under the Bank's supervision
EVOLUTION OF EIA
BENEFITS OF EIA
Lower project costs in the long-term
Increased project acceptance
Improved project design
Informed decision making
Environmentally sensitive decisions
Increased accountability and transparency
Reduced environmental damage
Improved integration of projects into their environmental
and social settings
BENEFITS OF EIA
PROCESS OF EIA
EIA process includes following steps:
† Screening
† Scoping
† Impact analysis
† Impact mitigation
† Reporting
† Review
† Decision making
† Monitoring
PROCESS OF EIA
† Screening: to determine which
projects or developments require a full
or partial impact assessment study;
† Scoping: to identify which potential
impacts are relevant to assess (based
on legislative requirements,
international conventions, expert
knowledge and public involvement), to
identify alternative solutions that
avoid, mitigate or compensate adverse
impacts on biodiversity (including the
option of not proceeding with the
development, finding alternative
designs or sites which avoid the
impacts, incorporating safeguards in
the design of the project, or providing
compensation for adverse impacts),
and finally to derive terms of reference
for the impact assessment;
†Assessment and evaluation of impacts and development of alternatives, to predict and identify
the likely environmental impacts of a proposed project or development, including the
detailed elaboration of alternatives;
†Reporting the Environmental Impact Statement (EIS) or EIA report, including an
environmental management plan (EMP), and a non-technical summary for the general
audience.
†Review of the Environmental Impact Statement (EIS), based on the terms of reference
(scoping) and public (including authority) participation.
†Decision-making on whether to approve the project or not, and under what conditions; and
†Monitoring, compliance, enforcement and environmental auditing. Monitor whether the
predicted impacts and proposed mitigation measures occur as defined in the EMP. Verify the
compliance of proponent with the EMP, to ensure that unpredicted impacts or failed
mitigation measures are identified and addressed in a timely fashion.
CONTENT OF EIA REPORT
A description of the project
An outline of the main alternatives studied by the developer, and an indication
of the main reasons for this choice
A description of the aspects of the environment likely to be significantly affected
by the proposed project
A description of the likely significant environmental effects of the proposed
project
Measures to prevent, reduce and possibly offset adverse
environmental effects
A non-technical summary
An indication of any difficulties (technical deficiencies or
lack of know-how) encountered while compiling the required information
MOST DEFINITIONS RECOGNIZE THE FOLLOWING FOUR BASIC PRINCIPLES
I. Procedural principle; EIA establishes a systematic method for
incorporating environmental considerations into decision-making;
II. Informational principle; EIA provides the necessary elements to make
an informed decision;
III. Preventive principle; EIA should be applied at the earliest opportunity
within the decision-making process to allow the anticipation and
avoidance of environmental impacts wherever possible; and
IV. Iterative principle; the information generated by EIA is made available
to interested parties to elicit a response which in turn should be fed
back into EIA process.
DATA REQUIREMENTS
• PROJECT
• Type
• Size
• Location
• AREA OF POTENTIAL IMPACT
» Physical resources
» Biological resources
» Economic development resources
» Quality of life
» Other existing and planned projects
The Environmental Impact Assessment (EIA) should be prepared on the basis of the existing
background pollution levels vis-a-vis contributions of pollutants from the proposed plant.
The EIA should address some of the basic factors listed below:
• Meteorology and air quality
Ambient levels of pollutants such as Sulphur Dioxide, oxides of nitrogen, carbon
monoxide, suspended particulate matters, should be determined at the center and at 3
other locations on a radius of 10 km with 120 degrees angle between stations. Additional
contribution of pollutants at the locations are required to be predicted after taking into
account the emission rates of the pollutants from the stacks of the proposed plant, under
different meteorological conditions prevailing in the area.
• Hydrology and water quality
• Site and its surroundings
• Occupational safety and health
• Details of the treatment and disposal of effluentS(liquid,air and solid) and the methods of
alternative uses
• Transportation of raw material and details of material handling
• Control equipment and measures proposed to be adopted
SOCIAL IMPACT ASSESSMENT (SIA)
• Social Impact Assessment (SIA) includes the processes of analysing, monitoring and
managing the intended and unintended social consequences, both positive and negative, of
planned interventions and any social change processes invoked by those interventions
(Vanclay, 1999).
• The analysis should include the use of land, culture, the main economic activities e.g.
tourism, agriculture, employment levels and impact on service provision e.g. education,
water use, traffic, energy use etc.
• Its primary purpose is to bring about a more sustainable and equitable biophysical and
human environment.
• Social Impact Assessment assumes that social, economic and biophysical impacts are
interconnected.
• Social Impact Assessment (SIA) is therefore done to ensure that there is no mismatch
between the development and socio-cultural and economic of the project area.
EIA RELATED STUDIES
HEALTH IMPACT ASSESSMENT (HIA)
• Health is a state of complete physical, mental and social well-being and not merely absence
of disease or infirmity (WHO, 1946).
• In most EIAs, HIA is usually included under SIA. HIA is now emerging as a key component
of EIA because health is determined by a multiplicity of factors including socio-economic
and environmental factors.
• There is no clear definition about where health concerns end and where environmental or
social concerns begin.
• HIA is a broad concept that may be interpreted in different ways by a range of different
users but all imply an interest in the safeguarding and enhancement of human health and
a concern that human activities and decisions, in the form of development projects, plans,
programs and policies can affect human health in both positive and negative ways.
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
SEA is undertaken much earlier in the decision-making process than EIA - it is therefore seen
as a key tool for sustainable development. „Strategic Environmental Assessment aims to
incorporate environmental and sustainability considerations into strategic decision making
processes, such as the formulation of policies, plans and programs.‟
EIA RELATED STUDIES
LIST OF PROJECTS REQUIRING AN EIA
(A) Energy
1. Hydroelectric power generation over 50 MW.
2. Thermal power generation over 200 MW.
3. Transmission lines (11 KV and above) and grid stations.
4. Nuclear Power plants.
5. Petroleum refineries.
(B) Manufacturing and Processing
1. Cement Plants.
2. Chemicals projects.
3. Fertilizers plants.
4. Food processing industries including sugar mills, beverages, milk and dairy products
with total cost of Rs. 100 Million and above.
5. Industrial Estates (including export processing zones)
6. Man-made fibers and resin projects with total cost of Rs. 100 Million and above.
7. Pesticides (manufacture or formulation).
8. Petrochemicals complex.
9. Synthetic resins, plastic and man-made fibers, paper and paperboard, paper pulping,
plastic products, textile (except apparel), printing and publishing, paints and dyes, oils
and fats and vegetable ghee projects with a total cost more than Rs. 10 Million.
10. Tanning and lather finishing projects.
(C) Mining and Mineral Processing.
1. Mining and processing of coal, gold, copper, sulphur and precious stones.
2. Mining and processing of major non-ferrous metals, iron and steel rolling.
3. Smelting plants with total cost of Rs. 50 Million and above.
(D)Transport
1. Airports.
2. Federal or provincial highways (except maintenance, rebuilding or reconstruction
of existing roads) with total cost of Rs.50 million and above.
3. Ports and harbors development for ships 500 gross tons and above.
4. Railway works.
(E)Water Management, Dams, Irrigation and Flood Protection..
1. Dams and reservoirs with storage volume 50 million cubic meters and above or
surface area of 08 square kilometers and above.
2. Irrigation and drainage projects serving 15,000 hectares and above.
(F)Water supply schemes and treatment.
Water supply schemes and treatment plants with total cost of Rs. 25 million and above
(G) Waste Disposal
1. Waste disposal and / or storage of hazardous or toxic wastes (including land fill
sites incineration of hospital toxic waste).
2. Waste disposal facility for domestic or industrial waste with annual capacity more
than 10,000 cubic meters.
(H)Urban development and tourism.
1. Land use studies and urban plans (large cities).
2. Large scale tourism development projects with total cost more than Rs. 50 million.
(I)Environmentally Sensitive Areas.
1. All projects situated in environmentally sensitive areas.
EXTERNALITIES OF EIA
POSITIVE EXTERNALITIES:
1. New jobs generated, economic growth stimulated.
2. Growth of local business enterprises supported.
3. Development of supporting and complementary industries.
4. Influx of capital and disposable income.
 NEGATIVE EXTERNALITIES:
• Social impacts:
1. Impacts on health of local population.
2. Increase in crime and deviant behavior.
3. Additional pressure on the existing physical infrastructure (sewage, water supply )
4. Decline in community cohesion.
5. Changed cultural values
BENEFITS OF THE EIA PROCESS
†Potentially screens out environmentally-unsound projects
†Proposes modified designs to reduce environmental impacts
†Identifies feasible alternatives
†Predicts significant adverse impacts
†Identifies mitigation measures to reduce, offset, or eliminate major
impacts
†Engages and informs potentially affected communities and individuals
†Influences decision-making and the development of terms and conditions
BENEFITS OF CONDUCTING EIA
†Facilitates informed decision making by providing clear, well structured dispassionate
analysis of the effect and consequences of proposed projects.
†Pre-emption or early withdrawal of unsound proposals.
†Assists in the selection of alternatives, including the selection of the best practicable and
most environmentally friendly option.
†Results in best practice prediction and mitigation of adverse effects of projects.
†Influences both project selection and design by screening out environmentally unsound
projects, as well as modifying feasible projects - Mitigation of negative environmental
and social impacts.
†Guides formal approval, including the establishment of terms and conditions of project
implementation and follow-up.
†Mitigation of negative environmental and social impacts.
†Serves as an adaptive, organizational learning process, in which the lessons of
experience are feedback into policy, institutional and project design - Enhancement of
positive aspects.
CONCLUSION
†Environment Impact Assessment is a very beneficial step to check, whether the project is
environment friendly or not.
†Since economic development is result of interaction between natural resources and technology
supported by designed for people, so all human activity should be economic, social and
environment friendly.
†EIA certainly has a crucial role to play in addressing environmental issues surrounding project
development and especially power projects.
†The integration of environment into development planning is the most important tool in
achieving sustainable development.
†Environmental protection and economic development must thus be dealt with in an integrated
manner.
†EIA process is necessary in providing an anticipatory and preventive mechanism for
environmental management and protection in any development.
†Several developing countries are still at the infancy stage of operationalization of their EIA
processes.
†The need for capacity building for quality EIA is also eminent in these countries.
†Despite these small setbacks, environmental impact assessment has become an integral part of
project planning one, which is continually being improved for posterity.

Contenu connexe

Tendances

Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eiaJoseph Asem
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management PlanShehab Sajeeb
 
Environmental management
Environmental managementEnvironmental management
Environmental managementManoj Mota
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIASakthivel R
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationKinza Irshad
 
Eia in Bangladesh by Abu Khairul Bashar
Eia in Bangladesh by Abu Khairul BasharEia in Bangladesh by Abu Khairul Bashar
Eia in Bangladesh by Abu Khairul BasharAbu Khairul Bashar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentShyam Bajpai
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 

Tendances (20)

Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eia
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
 
Eia in Bangladesh by Abu Khairul Bashar
Eia in Bangladesh by Abu Khairul BasharEia in Bangladesh by Abu Khairul Bashar
Eia in Bangladesh by Abu Khairul Bashar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 

En vedette

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)eAmbiente
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentationsujit roy
 
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...PROCASUR Corporation / Corporación PROCASUR
 
Amaaravati the new capital of andhra
Amaaravati the new capital of andhraAmaaravati the new capital of andhra
Amaaravati the new capital of andhraakhil gorantla
 
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)mandava geethabhargava
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developersAbdul Muneer
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Arvind Kumar
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessmentPrabha Panth
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEffah Effervescence
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorchMayur Bhangale
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Akhil Chibber
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017Yu-Hsun (lymanblue) Lin
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeShivaji Dutta
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기NAVER Engineering
 

En vedette (20)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
Climate change and adaptation (cca) strategies malawi
Climate change and adaptation (cca) strategies malawiClimate change and adaptation (cca) strategies malawi
Climate change and adaptation (cca) strategies malawi
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
Andhra Pradesh
Andhra PradeshAndhra Pradesh
Andhra Pradesh
 
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...
Pour une gestion inclusive des savoirs locaux grâce à la systématisation de b...
 
Amaaravati the new capital of andhra
Amaaravati the new capital of andhraAmaaravati the new capital of andhra
Amaaravati the new capital of andhra
 
Andhra pradesh State Report October 2017
Andhra pradesh State Report October 2017Andhra pradesh State Report October 2017
Andhra pradesh State Report October 2017
 
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
 

Similaire à Environmental Impact Assessment(EIA)

Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
 
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...AbdirahmanYusufAli1
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptxKalaimani
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxSubhajitNandi15
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact AssessmentRJ
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsIgiegie Oghenegueke
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfPranshuSharma18498
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problemsinventionjournals
 

Similaire à Environmental Impact Assessment(EIA) (20)

Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
 
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptx
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact Assessment
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessments
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problems
 
Question
QuestionQuestion
Question
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
 

Plus de Deepika Verma

lift and escalator.pdf
lift and escalator.pdflift and escalator.pdf
lift and escalator.pdfDeepika Verma
 
Common Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdfCommon Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdfDeepika Verma
 
Sustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdfSustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdfDeepika Verma
 
Teri university case study
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
 
Sustainable building design
Sustainable building designSustainable building design
Sustainable building designDeepika Verma
 
NATIONAL INSTITUTE OF SOLAR ENERGY
NATIONAL INSTITUTE OF SOLAR ENERGYNATIONAL INSTITUTE OF SOLAR ENERGY
NATIONAL INSTITUTE OF SOLAR ENERGYDeepika Verma
 
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)Deepika Verma
 
Griha avoided post construction landfill
Griha avoided post construction landfillGriha avoided post construction landfill
Griha avoided post construction landfillDeepika Verma
 
Griha design to mitigate urban heat island effect
Griha design to mitigate urban heat island effectGriha design to mitigate urban heat island effect
Griha design to mitigate urban heat island effectDeepika Verma
 

Plus de Deepika Verma (14)

lift and escalator.pdf
lift and escalator.pdflift and escalator.pdf
lift and escalator.pdf
 
Common Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdfCommon Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdf
 
ACOUSTICS.pdf
ACOUSTICS.pdfACOUSTICS.pdf
ACOUSTICS.pdf
 
Sustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdfSustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdf
 
Teri university case study
Teri university case studyTeri university case study
Teri university case study
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
 
Sustainable building design
Sustainable building designSustainable building design
Sustainable building design
 
Earth materials
Earth materials Earth materials
Earth materials
 
NATIONAL INSTITUTE OF SOLAR ENERGY
NATIONAL INSTITUTE OF SOLAR ENERGYNATIONAL INSTITUTE OF SOLAR ENERGY
NATIONAL INSTITUTE OF SOLAR ENERGY
 
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
 
Water conservation
Water conservationWater conservation
Water conservation
 
Griha avoided post construction landfill
Griha avoided post construction landfillGriha avoided post construction landfill
Griha avoided post construction landfill
 
Griha design to mitigate urban heat island effect
Griha design to mitigate urban heat island effectGriha design to mitigate urban heat island effect
Griha design to mitigate urban heat island effect
 
Dynamic insulation
Dynamic insulationDynamic insulation
Dynamic insulation
 

Dernier

原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentariansipcc-media
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxMyBrightestStarParkJ
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书zdzoqco
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceSwag Cycle
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 

Dernier (20)

原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentarians
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptx
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling Difference
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 

Environmental Impact Assessment(EIA)

  • 1. Submitted by: DEEPIKA VERMA (15001506003) HIMANSHI BAGGA (15001506004) SHIVANI GOEL (15001506013) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of Science & Technology, Murthal
  • 2. • Environmental Impact Assessment(EIA)- INTRODUCTION • Impacts : • Evolution of EIA • Benefits of EIA • The process of EIA • Contents of EIA Report • List of projects requiring EIA • EXTERNALITIES OF EIA • Conclusions Contents:
  • 3. INTRODUCTION Environmental Impact Assessment (EIA) refers to the evaluation of the environmental impacts likely to raise from a major project significantly affecting the environment. Environmental Impact Assessment (EIA) is a process which ensures that all environmental matters are taken into account quite early in the project at planning process itself. It takes into consideration not only technical and economic considerations but also, traditional aspects like impact on local people, biodiversity etc. • A tool used to identify the environmental, social and economic impacts of a project prior to decision-making. • It aims to predict environmental impacts at an early stage in project planning and design, find ways and means to reduce adverse impacts, shape projects to suit the local environment and present the predictions and options to decision-makers. • By using EIA both environmental and economic benefits can be achieved, such as reduced cost and time of project implementation and design, avoided treatment/clean-up costs and impacts of laws and regulations.
  • 4. TYPES OF IMPACTS IMPACTS • The impact of an activity is a deviation (a change) from the baseline situation that is caused by the activity. • The baseline situation is the existing environmental situation or condition in the absence of the activity. Ecological Impact Fisheries, forests, plantation, eutrophication Physico-chemical Impact Erosion and Siltation, drainage congestion /water logging, regional hydrology/flooding, obstruction to waste water flow, dust /noise pollution Impact on Human Interest Loss of agricultural lands, generation of employment opportunities, navigation and boat communication, commercial and service facilities, industrial activities, irrigation facilities Environmental impacts: 1. Depletion of natural resources. 2. Destruction of habitats. 3. Change in ph, oxygen level, toxicity of water. 4. Increase in toxicity of air. 5. Global warming. 6. Ozone depletion.
  • 5. EIA is one of the successful policy innovations of the 20th Century for environmental conservation. Thirty-seven years ago, there was no EIA but today, it is a formal process in many countries and is currently practiced in more than 100 countries. EIA as a mandatory regulatory procedure originated in the early 1970s, with the implementation of the National Environment Policy Act (NEPA) 1969 in the US. A large part of the initial development took place in a few high-income countries, like Canada, Australia, and New Zealand (1973-74). However, there were some developing countries as well, which introduced EIA relatively early - Columbia (1974), Philippines (1978). The EIA process really took off after the mid-1980s. In 1989, the World Bank adopted EIA for major development projects, in which a borrower country had to undertake an EIA under the Bank's supervision EVOLUTION OF EIA
  • 6. BENEFITS OF EIA Lower project costs in the long-term Increased project acceptance Improved project design Informed decision making Environmentally sensitive decisions Increased accountability and transparency Reduced environmental damage Improved integration of projects into their environmental and social settings
  • 8. PROCESS OF EIA EIA process includes following steps: † Screening † Scoping † Impact analysis † Impact mitigation † Reporting † Review † Decision making † Monitoring
  • 9. PROCESS OF EIA † Screening: to determine which projects or developments require a full or partial impact assessment study; † Scoping: to identify which potential impacts are relevant to assess (based on legislative requirements, international conventions, expert knowledge and public involvement), to identify alternative solutions that avoid, mitigate or compensate adverse impacts on biodiversity (including the option of not proceeding with the development, finding alternative designs or sites which avoid the impacts, incorporating safeguards in the design of the project, or providing compensation for adverse impacts), and finally to derive terms of reference for the impact assessment;
  • 10. †Assessment and evaluation of impacts and development of alternatives, to predict and identify the likely environmental impacts of a proposed project or development, including the detailed elaboration of alternatives; †Reporting the Environmental Impact Statement (EIS) or EIA report, including an environmental management plan (EMP), and a non-technical summary for the general audience. †Review of the Environmental Impact Statement (EIS), based on the terms of reference (scoping) and public (including authority) participation. †Decision-making on whether to approve the project or not, and under what conditions; and †Monitoring, compliance, enforcement and environmental auditing. Monitor whether the predicted impacts and proposed mitigation measures occur as defined in the EMP. Verify the compliance of proponent with the EMP, to ensure that unpredicted impacts or failed mitigation measures are identified and addressed in a timely fashion.
  • 11. CONTENT OF EIA REPORT A description of the project An outline of the main alternatives studied by the developer, and an indication of the main reasons for this choice A description of the aspects of the environment likely to be significantly affected by the proposed project A description of the likely significant environmental effects of the proposed project Measures to prevent, reduce and possibly offset adverse environmental effects A non-technical summary An indication of any difficulties (technical deficiencies or lack of know-how) encountered while compiling the required information
  • 12. MOST DEFINITIONS RECOGNIZE THE FOLLOWING FOUR BASIC PRINCIPLES I. Procedural principle; EIA establishes a systematic method for incorporating environmental considerations into decision-making; II. Informational principle; EIA provides the necessary elements to make an informed decision; III. Preventive principle; EIA should be applied at the earliest opportunity within the decision-making process to allow the anticipation and avoidance of environmental impacts wherever possible; and IV. Iterative principle; the information generated by EIA is made available to interested parties to elicit a response which in turn should be fed back into EIA process.
  • 13. DATA REQUIREMENTS • PROJECT • Type • Size • Location • AREA OF POTENTIAL IMPACT » Physical resources » Biological resources » Economic development resources » Quality of life » Other existing and planned projects
  • 14. The Environmental Impact Assessment (EIA) should be prepared on the basis of the existing background pollution levels vis-a-vis contributions of pollutants from the proposed plant. The EIA should address some of the basic factors listed below: • Meteorology and air quality Ambient levels of pollutants such as Sulphur Dioxide, oxides of nitrogen, carbon monoxide, suspended particulate matters, should be determined at the center and at 3 other locations on a radius of 10 km with 120 degrees angle between stations. Additional contribution of pollutants at the locations are required to be predicted after taking into account the emission rates of the pollutants from the stacks of the proposed plant, under different meteorological conditions prevailing in the area. • Hydrology and water quality • Site and its surroundings • Occupational safety and health • Details of the treatment and disposal of effluentS(liquid,air and solid) and the methods of alternative uses • Transportation of raw material and details of material handling • Control equipment and measures proposed to be adopted
  • 15. SOCIAL IMPACT ASSESSMENT (SIA) • Social Impact Assessment (SIA) includes the processes of analysing, monitoring and managing the intended and unintended social consequences, both positive and negative, of planned interventions and any social change processes invoked by those interventions (Vanclay, 1999). • The analysis should include the use of land, culture, the main economic activities e.g. tourism, agriculture, employment levels and impact on service provision e.g. education, water use, traffic, energy use etc. • Its primary purpose is to bring about a more sustainable and equitable biophysical and human environment. • Social Impact Assessment assumes that social, economic and biophysical impacts are interconnected. • Social Impact Assessment (SIA) is therefore done to ensure that there is no mismatch between the development and socio-cultural and economic of the project area. EIA RELATED STUDIES
  • 16. HEALTH IMPACT ASSESSMENT (HIA) • Health is a state of complete physical, mental and social well-being and not merely absence of disease or infirmity (WHO, 1946). • In most EIAs, HIA is usually included under SIA. HIA is now emerging as a key component of EIA because health is determined by a multiplicity of factors including socio-economic and environmental factors. • There is no clear definition about where health concerns end and where environmental or social concerns begin. • HIA is a broad concept that may be interpreted in different ways by a range of different users but all imply an interest in the safeguarding and enhancement of human health and a concern that human activities and decisions, in the form of development projects, plans, programs and policies can affect human health in both positive and negative ways. STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) SEA is undertaken much earlier in the decision-making process than EIA - it is therefore seen as a key tool for sustainable development. „Strategic Environmental Assessment aims to incorporate environmental and sustainability considerations into strategic decision making processes, such as the formulation of policies, plans and programs.‟ EIA RELATED STUDIES
  • 17. LIST OF PROJECTS REQUIRING AN EIA (A) Energy 1. Hydroelectric power generation over 50 MW. 2. Thermal power generation over 200 MW. 3. Transmission lines (11 KV and above) and grid stations. 4. Nuclear Power plants. 5. Petroleum refineries. (B) Manufacturing and Processing 1. Cement Plants. 2. Chemicals projects. 3. Fertilizers plants. 4. Food processing industries including sugar mills, beverages, milk and dairy products with total cost of Rs. 100 Million and above. 5. Industrial Estates (including export processing zones)
  • 18. 6. Man-made fibers and resin projects with total cost of Rs. 100 Million and above. 7. Pesticides (manufacture or formulation). 8. Petrochemicals complex. 9. Synthetic resins, plastic and man-made fibers, paper and paperboard, paper pulping, plastic products, textile (except apparel), printing and publishing, paints and dyes, oils and fats and vegetable ghee projects with a total cost more than Rs. 10 Million. 10. Tanning and lather finishing projects. (C) Mining and Mineral Processing. 1. Mining and processing of coal, gold, copper, sulphur and precious stones. 2. Mining and processing of major non-ferrous metals, iron and steel rolling. 3. Smelting plants with total cost of Rs. 50 Million and above.
  • 19. (D)Transport 1. Airports. 2. Federal or provincial highways (except maintenance, rebuilding or reconstruction of existing roads) with total cost of Rs.50 million and above. 3. Ports and harbors development for ships 500 gross tons and above. 4. Railway works. (E)Water Management, Dams, Irrigation and Flood Protection.. 1. Dams and reservoirs with storage volume 50 million cubic meters and above or surface area of 08 square kilometers and above. 2. Irrigation and drainage projects serving 15,000 hectares and above. (F)Water supply schemes and treatment. Water supply schemes and treatment plants with total cost of Rs. 25 million and above
  • 20. (G) Waste Disposal 1. Waste disposal and / or storage of hazardous or toxic wastes (including land fill sites incineration of hospital toxic waste). 2. Waste disposal facility for domestic or industrial waste with annual capacity more than 10,000 cubic meters. (H)Urban development and tourism. 1. Land use studies and urban plans (large cities). 2. Large scale tourism development projects with total cost more than Rs. 50 million. (I)Environmentally Sensitive Areas. 1. All projects situated in environmentally sensitive areas.
  • 21. EXTERNALITIES OF EIA POSITIVE EXTERNALITIES: 1. New jobs generated, economic growth stimulated. 2. Growth of local business enterprises supported. 3. Development of supporting and complementary industries. 4. Influx of capital and disposable income.  NEGATIVE EXTERNALITIES: • Social impacts: 1. Impacts on health of local population. 2. Increase in crime and deviant behavior. 3. Additional pressure on the existing physical infrastructure (sewage, water supply ) 4. Decline in community cohesion. 5. Changed cultural values
  • 22.
  • 23. BENEFITS OF THE EIA PROCESS †Potentially screens out environmentally-unsound projects †Proposes modified designs to reduce environmental impacts †Identifies feasible alternatives †Predicts significant adverse impacts †Identifies mitigation measures to reduce, offset, or eliminate major impacts †Engages and informs potentially affected communities and individuals †Influences decision-making and the development of terms and conditions
  • 24. BENEFITS OF CONDUCTING EIA †Facilitates informed decision making by providing clear, well structured dispassionate analysis of the effect and consequences of proposed projects. †Pre-emption or early withdrawal of unsound proposals. †Assists in the selection of alternatives, including the selection of the best practicable and most environmentally friendly option. †Results in best practice prediction and mitigation of adverse effects of projects. †Influences both project selection and design by screening out environmentally unsound projects, as well as modifying feasible projects - Mitigation of negative environmental and social impacts. †Guides formal approval, including the establishment of terms and conditions of project implementation and follow-up. †Mitigation of negative environmental and social impacts. †Serves as an adaptive, organizational learning process, in which the lessons of experience are feedback into policy, institutional and project design - Enhancement of positive aspects.
  • 25. CONCLUSION †Environment Impact Assessment is a very beneficial step to check, whether the project is environment friendly or not. †Since economic development is result of interaction between natural resources and technology supported by designed for people, so all human activity should be economic, social and environment friendly. †EIA certainly has a crucial role to play in addressing environmental issues surrounding project development and especially power projects. †The integration of environment into development planning is the most important tool in achieving sustainable development. †Environmental protection and economic development must thus be dealt with in an integrated manner. †EIA process is necessary in providing an anticipatory and preventive mechanism for environmental management and protection in any development. †Several developing countries are still at the infancy stage of operationalization of their EIA processes. †The need for capacity building for quality EIA is also eminent in these countries. †Despite these small setbacks, environmental impact assessment has become an integral part of project planning one, which is continually being improved for posterity.