• Environmental Impact Assessment(EIA)-
INTRODUCTION
• Impacts :
• Evolution of EIA
• Benefits of EIA
• The process of EIA
• Contents of EIA Report
• List of projects requiring EIA
• EXTERNALITIES OF EIA
• Conclusions
Contents:
INTRODUCTION
Environmental Impact Assessment (EIA) refers to the evaluation of the environmental
impacts likely to raise from a major project significantly affecting the environment.
Environmental Impact Assessment (EIA) is a process which ensures that all
environmental matters are taken into account quite early in the project at
planning process itself. It takes into consideration not only technical and
economic considerations but also, traditional aspects like impact on local people,
biodiversity etc.
• A tool used to identify the environmental, social and economic impacts of a project
prior to decision-making.
• It aims to predict environmental impacts at an early stage in project planning and
design, find ways and means to reduce adverse impacts, shape projects to suit the
local environment and present the predictions and options to decision-makers.
• By using EIA both environmental and economic benefits can be achieved, such as
reduced cost and time of project implementation and design, avoided
treatment/clean-up costs and impacts of laws and regulations.
TYPES OF IMPACTS
IMPACTS
• The impact of an activity is a deviation (a change) from
the baseline situation that is caused by the activity.
• The baseline situation is the existing environmental
situation or condition in the absence of the activity.
Ecological Impact
Fisheries, forests, plantation, eutrophication
Physico-chemical Impact
Erosion and Siltation, drainage congestion /water
logging, regional hydrology/flooding, obstruction
to waste water flow, dust /noise pollution
Impact on Human Interest
Loss of agricultural lands, generation of
employment opportunities, navigation and boat
communication, commercial and service
facilities, industrial activities, irrigation facilities
Environmental impacts:
1. Depletion of natural
resources.
2. Destruction of habitats.
3. Change in ph, oxygen level,
toxicity of water.
4. Increase in toxicity of air.
5. Global warming.
6. Ozone depletion.
EIA is one of the successful policy innovations of the 20th Century for environmental
conservation. Thirty-seven years ago, there was no EIA but today, it is a formal process in
many countries and is currently practiced in more than 100 countries. EIA as a mandatory
regulatory procedure originated in the early 1970s, with the implementation of the
National Environment Policy Act (NEPA) 1969 in the US. A large part of the initial
development took place in a few high-income countries, like Canada, Australia, and New
Zealand (1973-74). However, there were some developing countries as well, which
introduced EIA relatively early - Columbia (1974), Philippines (1978).
The EIA process really took off after the mid-1980s. In 1989, the World Bank adopted EIA
for major development projects, in which a borrower country had to undertake an EIA
under the Bank's supervision
EVOLUTION OF EIA
BENEFITS OF EIA
Lower project costs in the long-term
Increased project acceptance
Improved project design
Informed decision making
Environmentally sensitive decisions
Increased accountability and transparency
Reduced environmental damage
Improved integration of projects into their environmental
and social settings
BENEFITS OF EIA
PROCESS OF EIA
EIA process includes following steps:
† Screening
† Scoping
† Impact analysis
† Impact mitigation
† Reporting
† Review
† Decision making
† Monitoring
PROCESS OF EIA
† Screening: to determine which
projects or developments require a full
or partial impact assessment study;
† Scoping: to identify which potential
impacts are relevant to assess (based
on legislative requirements,
international conventions, expert
knowledge and public involvement), to
identify alternative solutions that
avoid, mitigate or compensate adverse
impacts on biodiversity (including the
option of not proceeding with the
development, finding alternative
designs or sites which avoid the
impacts, incorporating safeguards in
the design of the project, or providing
compensation for adverse impacts),
and finally to derive terms of reference
for the impact assessment;
†Assessment and evaluation of impacts and development of alternatives, to predict and identify
the likely environmental impacts of a proposed project or development, including the
detailed elaboration of alternatives;
†Reporting the Environmental Impact Statement (EIS) or EIA report, including an
environmental management plan (EMP), and a non-technical summary for the general
audience.
†Review of the Environmental Impact Statement (EIS), based on the terms of reference
(scoping) and public (including authority) participation.
†Decision-making on whether to approve the project or not, and under what conditions; and
†Monitoring, compliance, enforcement and environmental auditing. Monitor whether the
predicted impacts and proposed mitigation measures occur as defined in the EMP. Verify the
compliance of proponent with the EMP, to ensure that unpredicted impacts or failed
mitigation measures are identified and addressed in a timely fashion.
CONTENT OF EIA REPORT
A description of the project
An outline of the main alternatives studied by the developer, and an indication
of the main reasons for this choice
A description of the aspects of the environment likely to be significantly affected
by the proposed project
A description of the likely significant environmental effects of the proposed
project
Measures to prevent, reduce and possibly offset adverse
environmental effects
A non-technical summary
An indication of any difficulties (technical deficiencies or
lack of know-how) encountered while compiling the required information
MOST DEFINITIONS RECOGNIZE THE FOLLOWING FOUR BASIC PRINCIPLES
I. Procedural principle; EIA establishes a systematic method for
incorporating environmental considerations into decision-making;
II. Informational principle; EIA provides the necessary elements to make
an informed decision;
III. Preventive principle; EIA should be applied at the earliest opportunity
within the decision-making process to allow the anticipation and
avoidance of environmental impacts wherever possible; and
IV. Iterative principle; the information generated by EIA is made available
to interested parties to elicit a response which in turn should be fed
back into EIA process.
DATA REQUIREMENTS
• PROJECT
• Type
• Size
• Location
• AREA OF POTENTIAL IMPACT
» Physical resources
» Biological resources
» Economic development resources
» Quality of life
» Other existing and planned projects
The Environmental Impact Assessment (EIA) should be prepared on the basis of the existing
background pollution levels vis-a-vis contributions of pollutants from the proposed plant.
The EIA should address some of the basic factors listed below:
• Meteorology and air quality
Ambient levels of pollutants such as Sulphur Dioxide, oxides of nitrogen, carbon
monoxide, suspended particulate matters, should be determined at the center and at 3
other locations on a radius of 10 km with 120 degrees angle between stations. Additional
contribution of pollutants at the locations are required to be predicted after taking into
account the emission rates of the pollutants from the stacks of the proposed plant, under
different meteorological conditions prevailing in the area.
• Hydrology and water quality
• Site and its surroundings
• Occupational safety and health
• Details of the treatment and disposal of effluentS(liquid,air and solid) and the methods of
alternative uses
• Transportation of raw material and details of material handling
• Control equipment and measures proposed to be adopted
SOCIAL IMPACT ASSESSMENT (SIA)
• Social Impact Assessment (SIA) includes the processes of analysing, monitoring and
managing the intended and unintended social consequences, both positive and negative, of
planned interventions and any social change processes invoked by those interventions
(Vanclay, 1999).
• The analysis should include the use of land, culture, the main economic activities e.g.
tourism, agriculture, employment levels and impact on service provision e.g. education,
water use, traffic, energy use etc.
• Its primary purpose is to bring about a more sustainable and equitable biophysical and
human environment.
• Social Impact Assessment assumes that social, economic and biophysical impacts are
interconnected.
• Social Impact Assessment (SIA) is therefore done to ensure that there is no mismatch
between the development and socio-cultural and economic of the project area.
EIA RELATED STUDIES
HEALTH IMPACT ASSESSMENT (HIA)
• Health is a state of complete physical, mental and social well-being and not merely absence
of disease or infirmity (WHO, 1946).
• In most EIAs, HIA is usually included under SIA. HIA is now emerging as a key component
of EIA because health is determined by a multiplicity of factors including socio-economic
and environmental factors.
• There is no clear definition about where health concerns end and where environmental or
social concerns begin.
• HIA is a broad concept that may be interpreted in different ways by a range of different
users but all imply an interest in the safeguarding and enhancement of human health and
a concern that human activities and decisions, in the form of development projects, plans,
programs and policies can affect human health in both positive and negative ways.
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
SEA is undertaken much earlier in the decision-making process than EIA - it is therefore seen
as a key tool for sustainable development. „Strategic Environmental Assessment aims to
incorporate environmental and sustainability considerations into strategic decision making
processes, such as the formulation of policies, plans and programs.‟
EIA RELATED STUDIES
LIST OF PROJECTS REQUIRING AN EIA
(A) Energy
1. Hydroelectric power generation over 50 MW.
2. Thermal power generation over 200 MW.
3. Transmission lines (11 KV and above) and grid stations.
4. Nuclear Power plants.
5. Petroleum refineries.
(B) Manufacturing and Processing
1. Cement Plants.
2. Chemicals projects.
3. Fertilizers plants.
4. Food processing industries including sugar mills, beverages, milk and dairy products
with total cost of Rs. 100 Million and above.
5. Industrial Estates (including export processing zones)
6. Man-made fibers and resin projects with total cost of Rs. 100 Million and above.
7. Pesticides (manufacture or formulation).
8. Petrochemicals complex.
9. Synthetic resins, plastic and man-made fibers, paper and paperboard, paper pulping,
plastic products, textile (except apparel), printing and publishing, paints and dyes, oils
and fats and vegetable ghee projects with a total cost more than Rs. 10 Million.
10. Tanning and lather finishing projects.
(C) Mining and Mineral Processing.
1. Mining and processing of coal, gold, copper, sulphur and precious stones.
2. Mining and processing of major non-ferrous metals, iron and steel rolling.
3. Smelting plants with total cost of Rs. 50 Million and above.
(D)Transport
1. Airports.
2. Federal or provincial highways (except maintenance, rebuilding or reconstruction
of existing roads) with total cost of Rs.50 million and above.
3. Ports and harbors development for ships 500 gross tons and above.
4. Railway works.
(E)Water Management, Dams, Irrigation and Flood Protection..
1. Dams and reservoirs with storage volume 50 million cubic meters and above or
surface area of 08 square kilometers and above.
2. Irrigation and drainage projects serving 15,000 hectares and above.
(F)Water supply schemes and treatment.
Water supply schemes and treatment plants with total cost of Rs. 25 million and above
(G) Waste Disposal
1. Waste disposal and / or storage of hazardous or toxic wastes (including land fill
sites incineration of hospital toxic waste).
2. Waste disposal facility for domestic or industrial waste with annual capacity more
than 10,000 cubic meters.
(H)Urban development and tourism.
1. Land use studies and urban plans (large cities).
2. Large scale tourism development projects with total cost more than Rs. 50 million.
(I)Environmentally Sensitive Areas.
1. All projects situated in environmentally sensitive areas.
EXTERNALITIES OF EIA
POSITIVE EXTERNALITIES:
1. New jobs generated, economic growth stimulated.
2. Growth of local business enterprises supported.
3. Development of supporting and complementary industries.
4. Influx of capital and disposable income.
 NEGATIVE EXTERNALITIES:
• Social impacts:
1. Impacts on health of local population.
2. Increase in crime and deviant behavior.
3. Additional pressure on the existing physical infrastructure (sewage, water supply )
4. Decline in community cohesion.
5. Changed cultural values
Environmental Impact Assessment(EIA)
BENEFITS OF THE EIA PROCESS
†Potentially screens out environmentally-unsound projects
†Proposes modified designs to reduce environmental impacts
†Identifies feasible alternatives
†Predicts significant adverse impacts
†Identifies mitigation measures to reduce, offset, or eliminate major
impacts
†Engages and informs potentially affected communities and individuals
†Influences decision-making and the development of terms and conditions
BENEFITS OF CONDUCTING EIA
†Facilitates informed decision making by providing clear, well structured dispassionate
analysis of the effect and consequences of proposed projects.
†Pre-emption or early withdrawal of unsound proposals.
†Assists in the selection of alternatives, including the selection of the best practicable and
most environmentally friendly option.
†Results in best practice prediction and mitigation of adverse effects of projects.
†Influences both project selection and design by screening out environmentally unsound
projects, as well as modifying feasible projects - Mitigation of negative environmental
and social impacts.
†Guides formal approval, including the establishment of terms and conditions of project
implementation and follow-up.
†Mitigation of negative environmental and social impacts.
†Serves as an adaptive, organizational learning process, in which the lessons of
experience are feedback into policy, institutional and project design - Enhancement of
positive aspects.
CONCLUSION
†Environment Impact Assessment is a very beneficial step to check, whether the project is
environment friendly or not.
†Since economic development is result of interaction between natural resources and technology
supported by designed for people, so all human activity should be economic, social and
environment friendly.
†EIA certainly has a crucial role to play in addressing environmental issues surrounding project
development and especially power projects.
†The integration of environment into development planning is the most important tool in
achieving sustainable development.
†Environmental protection and economic development must thus be dealt with in an integrated
manner.
†EIA process is necessary in providing an anticipatory and preventive mechanism for
environmental management and protection in any development.
†Several developing countries are still at the infancy stage of operationalization of their EIA
processes.
†The need for capacity building for quality EIA is also eminent in these countries.
†Despite these small setbacks, environmental impact assessment has become an integral part of
project planning one, which is continually being improved for posterity.
1 sur 25

Recommandé

Environmental impact assessment (EIA) par
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)School of planning and architecture
128.4K vues25 diapositives
Environmental impact assessment par
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSayyid Ina
14K vues26 diapositives
ENVIRONMENTAL IMPACTS ASSESMENT (EIA) par
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
3.2K vues15 diapositives
Environmental Impact Assessment par
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
1.8K vues21 diapositives
Environment impact assessment par
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
128.6K vues21 diapositives
EIA par
EIAEIA
EIAMithun Ray
1.2K vues15 diapositives

Contenu connexe

Tendances

Environmental Impact Assessment par
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrateek Bansal
5.7K vues13 diapositives
EIA par
EIAEIA
EIABimal Antony
9K vues21 diapositives
environmental impact assessment par
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
70K vues28 diapositives
ENVIRONMENT IMPACT ASSESSMENT par
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
2K vues32 diapositives
Environmental impact assessment methodology par
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
14.2K vues19 diapositives
Environmental impact assessment concept par
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment conceptIntan Ayuna
5.5K vues13 diapositives

Tendances(20)

Environmental Impact Assessment par Prateek Bansal
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal5.7K vues
environmental impact assessment par Pramoda Raj
environmental impact assessment environmental impact assessment
environmental impact assessment
Pramoda Raj70K vues
ENVIRONMENT IMPACT ASSESSMENT par goswamikusum
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
goswamikusum2K vues
Environmental impact assessment methodology par Justin Joy
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
Justin Joy14.2K vues
Environmental impact assessment concept par Intan Ayuna
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
Intan Ayuna5.5K vues
Environmental impact assessment and Initial Environmental Examination par Kinza Irshad
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
Kinza Irshad14.4K vues
Environmental impact assessment par Kashmeera N.A.
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Kashmeera N.A.19.6K vues
Environment impact assessment.ppt par Apoorva Mathur
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
Apoorva Mathur8.6K vues
Unit 7 eia and sd par Kumar
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar 19.3K vues
ENVIRONMENTAL IMPACT ASSESSMENT - EIA par Sakthivel R
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
Sakthivel R3.7K vues
Environmental Management Plan par Shehab Sajeeb
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
Shehab Sajeeb2.4K vues
Environmental Impact Assessment par Prithvi Ghag
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prithvi Ghag49.4K vues
Eia - environmental impact assessment par Parth Patel
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
Parth Patel7.9K vues
Environmental Impact Assessment (EIA) par Palash Mehar
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
Palash Mehar694 vues
Environmental impact assessment par Samanth kumar
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Samanth kumar7.3K vues
Environmental Impact Assessment and Environmental Audit- Unit III par GAURAV. H .TANDON
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON39.6K vues

En vedette

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) par
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)eAmbiente
19.9K vues56 diapositives
EIA Methods par
EIA MethodsEIA Methods
EIA MethodsSOUBAM INDRAKUMAR SINGH
138.8K vues39 diapositives
Climate change and adaptation (cca) strategies malawi par
Climate change and adaptation (cca) strategies malawiClimate change and adaptation (cca) strategies malawi
Climate change and adaptation (cca) strategies malawiPROCASUR Corporation / Corporación PROCASUR
521 vues7 diapositives
EIA an introduction - Case study wrt Coastal development & Aquaculture par
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
8.9K vues33 diapositives
EIA report presentation par
EIA report presentationEIA report presentation
EIA report presentationsujit roy
11.4K vues30 diapositives
Andhra Pradesh par
Andhra PradeshAndhra Pradesh
Andhra PradeshDr. Amit Kapoor
9.2K vues112 diapositives

En vedette(20)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) par eAmbiente
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
eAmbiente19.9K vues
EIA an introduction - Case study wrt Coastal development & Aquaculture par KANTHARAJAN GANESAN
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA report presentation par sujit roy
EIA report presentationEIA report presentation
EIA report presentation
sujit roy11.4K vues
Amaaravati the new capital of andhra par akhil gorantla
Amaaravati the new capital of andhraAmaaravati the new capital of andhra
Amaaravati the new capital of andhra
akhil gorantla3K vues
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU) par mandava geethabhargava
ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)ENVIRONMENTAL IMPACT ASSESSMENT ON  NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
ENVIRONMENTAL IMPACT ASSESSMENT ON NEW ANDHRAPRADESH CAPITAL AREA (THULLURU)
Pytorch for tf_developers par Abdul Muneer
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
Abdul Muneer1.2K vues
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep... par Arvind Kumar
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Arvind Kumar3.8K vues
Environmental impact assessment par Jini Rajendran
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Jini Rajendran18.4K vues
13 environmental impact assessment par Prabha Panth
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
Prabha Panth5.8K vues
Environmental Audit and Environmental Impact Assessment par Effah Effervescence
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
Effah Effervescence12.4K vues
Methods of eia(environmental impact assessment) par Akhil Chibber
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
Akhil Chibber8.1K vues
Deep learning an Introduction with Competitive Landscape par Shivaji Dutta
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
Shivaji Dutta737 vues

Similaire à Environmental Impact Assessment(EIA)

Environmental impact assessment and importance of effective application in ba... par
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
196 vues33 diapositives
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment... par
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...AbdirahmanYusufAli1
9 vues65 diapositives
EIA presentation.pptx par
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptxNikhilGautam68
45 vues18 diapositives
Environment impact Assessment (EIA) in Uganda par
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
4.1K vues44 diapositives
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx par
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxSubhajitNandi15
23 vues20 diapositives
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... par
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
226 vues27 diapositives

Similaire à Environmental Impact Assessment(EIA)(20)

Environmental impact assessment and importance of effective application in ba... par MdHaque78
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
MdHaque78196 vues
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment... par AbdirahmanYusufAli1
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
Environment impact Assessment (EIA) in Uganda par kayondo alex
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
kayondo alex4.1K vues
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx par SubhajitNandi15
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
SubhajitNandi1523 vues
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... par Abraham Ncunge
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
Abraham Ncunge226 vues
Environment impact assessment par Bimal Antony
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Bimal Antony35.1K vues
Envirornment Impact Assessment par RJ
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact Assessment
RJ525 vues
What is an Environmental Clearance Certificate and How to Obtain It.pdf par PranshuSharma18498
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
Environment Impact Assessment: Significance, Process And Problems par inventionjournals
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problems
environmental impact assesment par Nisha Jindal
environmental impact assesment environmental impact assesment
environmental impact assesment
Nisha Jindal2K vues
Environment Impact Assessment par Istiak Asif
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
Istiak Asif1.5K vues
Environmental Impact Evaluation of Mining par ijtsrd
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Mining
ijtsrd172 vues
Environmental Impact Assessment, Initial Environmental Examination par Nabin Lamichhane
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor... par Mr.Allah Dad Khan
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Mr.Allah Dad Khan1.8K vues

Plus de Deepika Verma

lift and escalator.pdf par
lift and escalator.pdflift and escalator.pdf
lift and escalator.pdfDeepika Verma
91 vues24 diapositives
Common Wealth Games Village Housing.pdf par
Common Wealth Games Village Housing.pdfCommon Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdfDeepika Verma
13 vues21 diapositives
ACOUSTICS.pdf par
ACOUSTICS.pdfACOUSTICS.pdf
ACOUSTICS.pdfDeepika Verma
58 vues35 diapositives
Sustainable Architecture_Literature Study.pdf par
Sustainable Architecture_Literature Study.pdfSustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdfDeepika Verma
28 vues206 diapositives
Teri university case study par
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
3.9K vues31 diapositives
Waste to energy par
Waste to energyWaste to energy
Waste to energyDeepika Verma
1.6K vues32 diapositives

Plus de Deepika Verma(14)

Common Wealth Games Village Housing.pdf par Deepika Verma
Common Wealth Games Village Housing.pdfCommon Wealth Games Village Housing.pdf
Common Wealth Games Village Housing.pdf
Deepika Verma13 vues
Sustainable Architecture_Literature Study.pdf par Deepika Verma
Sustainable Architecture_Literature Study.pdfSustainable Architecture_Literature Study.pdf
Sustainable Architecture_Literature Study.pdf
Deepika Verma28 vues
Teri university case study par Deepika Verma
Teri university case studyTeri university case study
Teri university case study
Deepika Verma3.9K vues
Sustainable building design par Deepika Verma
Sustainable building designSustainable building design
Sustainable building design
Deepika Verma2.5K vues
NATIONAL INSTITUTE OF SOLAR ENERGY par Deepika Verma
NATIONAL INSTITUTE OF SOLAR ENERGYNATIONAL INSTITUTE OF SOLAR ENERGY
NATIONAL INSTITUTE OF SOLAR ENERGY
Deepika Verma848 vues
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.) par Deepika Verma
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Brutalism Architecture (EXPLORING VERSATALITY OF R.C.C.)
Deepika Verma4.3K vues
Griha avoided post construction landfill par Deepika Verma
Griha avoided post construction landfillGriha avoided post construction landfill
Griha avoided post construction landfill
Deepika Verma337 vues
Griha design to mitigate urban heat island effect par Deepika Verma
Griha design to mitigate urban heat island effectGriha design to mitigate urban heat island effect
Griha design to mitigate urban heat island effect
Deepika Verma4K vues

Dernier

A study of the causes of climate change - a master’s thesis in philosophy of ... par
A study of the causes of climate change - a master’s thesis in philosophy of ...A study of the causes of climate change - a master’s thesis in philosophy of ...
A study of the causes of climate change - a master’s thesis in philosophy of ...Piotr Gawlicki
7 vues34 diapositives
Healthcare Waste Management par
Healthcare Waste ManagementHealthcare Waste Management
Healthcare Waste ManagementDr. Salem Baidas
6 vues25 diapositives
ORAL_PRESENTATION.pdf par
ORAL_PRESENTATION.pdfORAL_PRESENTATION.pdf
ORAL_PRESENTATION.pdfahmadalfalasim
5 vues5 diapositives
Hydrology Project-Shiundu (Soft-copy ready).pdf par
Hydrology Project-Shiundu (Soft-copy ready).pdfHydrology Project-Shiundu (Soft-copy ready).pdf
Hydrology Project-Shiundu (Soft-copy ready).pdfIgnatius Shiundu
20 vues59 diapositives
Climate Equality Report OXFAM par
Climate Equality Report OXFAMClimate Equality Report OXFAM
Climate Equality Report OXFAMQuotidiano Piemontese
16 vues136 diapositives
MẪU TỦ ĐIỆN.pdf par
MẪU TỦ ĐIỆN.pdfMẪU TỦ ĐIỆN.pdf
MẪU TỦ ĐIỆN.pdfnlinhchi877
5 vues20 diapositives

Dernier(20)

A study of the causes of climate change - a master’s thesis in philosophy of ... par Piotr Gawlicki
A study of the causes of climate change - a master’s thesis in philosophy of ...A study of the causes of climate change - a master’s thesis in philosophy of ...
A study of the causes of climate change - a master’s thesis in philosophy of ...
Hydrology Project-Shiundu (Soft-copy ready).pdf par Ignatius Shiundu
Hydrology Project-Shiundu (Soft-copy ready).pdfHydrology Project-Shiundu (Soft-copy ready).pdf
Hydrology Project-Shiundu (Soft-copy ready).pdf
Plantation Festival - Photo Journey.pdf par Anil G
Plantation Festival - Photo Journey.pdfPlantation Festival - Photo Journey.pdf
Plantation Festival - Photo Journey.pdf
Anil G5 vues
Towards a just and regenerative aquaculture system par Martin Koehring
Towards a just and regenerative aquaculture systemTowards a just and regenerative aquaculture system
Towards a just and regenerative aquaculture system
Martin Koehring10 vues
Citizen science of the Great Barrier Reef and Coral Sea Expedition par Dr Adam Smith
Citizen science of the Great Barrier Reef and Coral Sea ExpeditionCitizen science of the Great Barrier Reef and Coral Sea Expedition
Citizen science of the Great Barrier Reef and Coral Sea Expedition
Dr Adam Smith40 vues
Impact of Climate Change on Groundwater Resources par C. P. Kumar
Impact of Climate Change on Groundwater ResourcesImpact of Climate Change on Groundwater Resources
Impact of Climate Change on Groundwater Resources
C. P. Kumar15 vues
Urban Design for a Greener & Healthier City Antipolo City.pdf par PeraltaSheena1
Urban Design for a Greener & Healthier City Antipolo City.pdfUrban Design for a Greener & Healthier City Antipolo City.pdf
Urban Design for a Greener & Healthier City Antipolo City.pdf

Environmental Impact Assessment(EIA)

  • 1. Submitted by: DEEPIKA VERMA (15001506003) HIMANSHI BAGGA (15001506004) SHIVANI GOEL (15001506013) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of Science & Technology, Murthal
  • 2. • Environmental Impact Assessment(EIA)- INTRODUCTION • Impacts : • Evolution of EIA • Benefits of EIA • The process of EIA • Contents of EIA Report • List of projects requiring EIA • EXTERNALITIES OF EIA • Conclusions Contents:
  • 3. INTRODUCTION Environmental Impact Assessment (EIA) refers to the evaluation of the environmental impacts likely to raise from a major project significantly affecting the environment. Environmental Impact Assessment (EIA) is a process which ensures that all environmental matters are taken into account quite early in the project at planning process itself. It takes into consideration not only technical and economic considerations but also, traditional aspects like impact on local people, biodiversity etc. • A tool used to identify the environmental, social and economic impacts of a project prior to decision-making. • It aims to predict environmental impacts at an early stage in project planning and design, find ways and means to reduce adverse impacts, shape projects to suit the local environment and present the predictions and options to decision-makers. • By using EIA both environmental and economic benefits can be achieved, such as reduced cost and time of project implementation and design, avoided treatment/clean-up costs and impacts of laws and regulations.
  • 4. TYPES OF IMPACTS IMPACTS • The impact of an activity is a deviation (a change) from the baseline situation that is caused by the activity. • The baseline situation is the existing environmental situation or condition in the absence of the activity. Ecological Impact Fisheries, forests, plantation, eutrophication Physico-chemical Impact Erosion and Siltation, drainage congestion /water logging, regional hydrology/flooding, obstruction to waste water flow, dust /noise pollution Impact on Human Interest Loss of agricultural lands, generation of employment opportunities, navigation and boat communication, commercial and service facilities, industrial activities, irrigation facilities Environmental impacts: 1. Depletion of natural resources. 2. Destruction of habitats. 3. Change in ph, oxygen level, toxicity of water. 4. Increase in toxicity of air. 5. Global warming. 6. Ozone depletion.
  • 5. EIA is one of the successful policy innovations of the 20th Century for environmental conservation. Thirty-seven years ago, there was no EIA but today, it is a formal process in many countries and is currently practiced in more than 100 countries. EIA as a mandatory regulatory procedure originated in the early 1970s, with the implementation of the National Environment Policy Act (NEPA) 1969 in the US. A large part of the initial development took place in a few high-income countries, like Canada, Australia, and New Zealand (1973-74). However, there were some developing countries as well, which introduced EIA relatively early - Columbia (1974), Philippines (1978). The EIA process really took off after the mid-1980s. In 1989, the World Bank adopted EIA for major development projects, in which a borrower country had to undertake an EIA under the Bank's supervision EVOLUTION OF EIA
  • 6. BENEFITS OF EIA Lower project costs in the long-term Increased project acceptance Improved project design Informed decision making Environmentally sensitive decisions Increased accountability and transparency Reduced environmental damage Improved integration of projects into their environmental and social settings
  • 8. PROCESS OF EIA EIA process includes following steps: † Screening † Scoping † Impact analysis † Impact mitigation † Reporting † Review † Decision making † Monitoring
  • 9. PROCESS OF EIA † Screening: to determine which projects or developments require a full or partial impact assessment study; † Scoping: to identify which potential impacts are relevant to assess (based on legislative requirements, international conventions, expert knowledge and public involvement), to identify alternative solutions that avoid, mitigate or compensate adverse impacts on biodiversity (including the option of not proceeding with the development, finding alternative designs or sites which avoid the impacts, incorporating safeguards in the design of the project, or providing compensation for adverse impacts), and finally to derive terms of reference for the impact assessment;
  • 10. †Assessment and evaluation of impacts and development of alternatives, to predict and identify the likely environmental impacts of a proposed project or development, including the detailed elaboration of alternatives; †Reporting the Environmental Impact Statement (EIS) or EIA report, including an environmental management plan (EMP), and a non-technical summary for the general audience. †Review of the Environmental Impact Statement (EIS), based on the terms of reference (scoping) and public (including authority) participation. †Decision-making on whether to approve the project or not, and under what conditions; and †Monitoring, compliance, enforcement and environmental auditing. Monitor whether the predicted impacts and proposed mitigation measures occur as defined in the EMP. Verify the compliance of proponent with the EMP, to ensure that unpredicted impacts or failed mitigation measures are identified and addressed in a timely fashion.
  • 11. CONTENT OF EIA REPORT A description of the project An outline of the main alternatives studied by the developer, and an indication of the main reasons for this choice A description of the aspects of the environment likely to be significantly affected by the proposed project A description of the likely significant environmental effects of the proposed project Measures to prevent, reduce and possibly offset adverse environmental effects A non-technical summary An indication of any difficulties (technical deficiencies or lack of know-how) encountered while compiling the required information
  • 12. MOST DEFINITIONS RECOGNIZE THE FOLLOWING FOUR BASIC PRINCIPLES I. Procedural principle; EIA establishes a systematic method for incorporating environmental considerations into decision-making; II. Informational principle; EIA provides the necessary elements to make an informed decision; III. Preventive principle; EIA should be applied at the earliest opportunity within the decision-making process to allow the anticipation and avoidance of environmental impacts wherever possible; and IV. Iterative principle; the information generated by EIA is made available to interested parties to elicit a response which in turn should be fed back into EIA process.
  • 13. DATA REQUIREMENTS • PROJECT • Type • Size • Location • AREA OF POTENTIAL IMPACT » Physical resources » Biological resources » Economic development resources » Quality of life » Other existing and planned projects
  • 14. The Environmental Impact Assessment (EIA) should be prepared on the basis of the existing background pollution levels vis-a-vis contributions of pollutants from the proposed plant. The EIA should address some of the basic factors listed below: • Meteorology and air quality Ambient levels of pollutants such as Sulphur Dioxide, oxides of nitrogen, carbon monoxide, suspended particulate matters, should be determined at the center and at 3 other locations on a radius of 10 km with 120 degrees angle between stations. Additional contribution of pollutants at the locations are required to be predicted after taking into account the emission rates of the pollutants from the stacks of the proposed plant, under different meteorological conditions prevailing in the area. • Hydrology and water quality • Site and its surroundings • Occupational safety and health • Details of the treatment and disposal of effluentS(liquid,air and solid) and the methods of alternative uses • Transportation of raw material and details of material handling • Control equipment and measures proposed to be adopted
  • 15. SOCIAL IMPACT ASSESSMENT (SIA) • Social Impact Assessment (SIA) includes the processes of analysing, monitoring and managing the intended and unintended social consequences, both positive and negative, of planned interventions and any social change processes invoked by those interventions (Vanclay, 1999). • The analysis should include the use of land, culture, the main economic activities e.g. tourism, agriculture, employment levels and impact on service provision e.g. education, water use, traffic, energy use etc. • Its primary purpose is to bring about a more sustainable and equitable biophysical and human environment. • Social Impact Assessment assumes that social, economic and biophysical impacts are interconnected. • Social Impact Assessment (SIA) is therefore done to ensure that there is no mismatch between the development and socio-cultural and economic of the project area. EIA RELATED STUDIES
  • 16. HEALTH IMPACT ASSESSMENT (HIA) • Health is a state of complete physical, mental and social well-being and not merely absence of disease or infirmity (WHO, 1946). • In most EIAs, HIA is usually included under SIA. HIA is now emerging as a key component of EIA because health is determined by a multiplicity of factors including socio-economic and environmental factors. • There is no clear definition about where health concerns end and where environmental or social concerns begin. • HIA is a broad concept that may be interpreted in different ways by a range of different users but all imply an interest in the safeguarding and enhancement of human health and a concern that human activities and decisions, in the form of development projects, plans, programs and policies can affect human health in both positive and negative ways. STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) SEA is undertaken much earlier in the decision-making process than EIA - it is therefore seen as a key tool for sustainable development. „Strategic Environmental Assessment aims to incorporate environmental and sustainability considerations into strategic decision making processes, such as the formulation of policies, plans and programs.‟ EIA RELATED STUDIES
  • 17. LIST OF PROJECTS REQUIRING AN EIA (A) Energy 1. Hydroelectric power generation over 50 MW. 2. Thermal power generation over 200 MW. 3. Transmission lines (11 KV and above) and grid stations. 4. Nuclear Power plants. 5. Petroleum refineries. (B) Manufacturing and Processing 1. Cement Plants. 2. Chemicals projects. 3. Fertilizers plants. 4. Food processing industries including sugar mills, beverages, milk and dairy products with total cost of Rs. 100 Million and above. 5. Industrial Estates (including export processing zones)
  • 18. 6. Man-made fibers and resin projects with total cost of Rs. 100 Million and above. 7. Pesticides (manufacture or formulation). 8. Petrochemicals complex. 9. Synthetic resins, plastic and man-made fibers, paper and paperboard, paper pulping, plastic products, textile (except apparel), printing and publishing, paints and dyes, oils and fats and vegetable ghee projects with a total cost more than Rs. 10 Million. 10. Tanning and lather finishing projects. (C) Mining and Mineral Processing. 1. Mining and processing of coal, gold, copper, sulphur and precious stones. 2. Mining and processing of major non-ferrous metals, iron and steel rolling. 3. Smelting plants with total cost of Rs. 50 Million and above.
  • 19. (D)Transport 1. Airports. 2. Federal or provincial highways (except maintenance, rebuilding or reconstruction of existing roads) with total cost of Rs.50 million and above. 3. Ports and harbors development for ships 500 gross tons and above. 4. Railway works. (E)Water Management, Dams, Irrigation and Flood Protection.. 1. Dams and reservoirs with storage volume 50 million cubic meters and above or surface area of 08 square kilometers and above. 2. Irrigation and drainage projects serving 15,000 hectares and above. (F)Water supply schemes and treatment. Water supply schemes and treatment plants with total cost of Rs. 25 million and above
  • 20. (G) Waste Disposal 1. Waste disposal and / or storage of hazardous or toxic wastes (including land fill sites incineration of hospital toxic waste). 2. Waste disposal facility for domestic or industrial waste with annual capacity more than 10,000 cubic meters. (H)Urban development and tourism. 1. Land use studies and urban plans (large cities). 2. Large scale tourism development projects with total cost more than Rs. 50 million. (I)Environmentally Sensitive Areas. 1. All projects situated in environmentally sensitive areas.
  • 21. EXTERNALITIES OF EIA POSITIVE EXTERNALITIES: 1. New jobs generated, economic growth stimulated. 2. Growth of local business enterprises supported. 3. Development of supporting and complementary industries. 4. Influx of capital and disposable income.  NEGATIVE EXTERNALITIES: • Social impacts: 1. Impacts on health of local population. 2. Increase in crime and deviant behavior. 3. Additional pressure on the existing physical infrastructure (sewage, water supply ) 4. Decline in community cohesion. 5. Changed cultural values
  • 23. BENEFITS OF THE EIA PROCESS †Potentially screens out environmentally-unsound projects †Proposes modified designs to reduce environmental impacts †Identifies feasible alternatives †Predicts significant adverse impacts †Identifies mitigation measures to reduce, offset, or eliminate major impacts †Engages and informs potentially affected communities and individuals †Influences decision-making and the development of terms and conditions
  • 24. BENEFITS OF CONDUCTING EIA †Facilitates informed decision making by providing clear, well structured dispassionate analysis of the effect and consequences of proposed projects. †Pre-emption or early withdrawal of unsound proposals. †Assists in the selection of alternatives, including the selection of the best practicable and most environmentally friendly option. †Results in best practice prediction and mitigation of adverse effects of projects. †Influences both project selection and design by screening out environmentally unsound projects, as well as modifying feasible projects - Mitigation of negative environmental and social impacts. †Guides formal approval, including the establishment of terms and conditions of project implementation and follow-up. †Mitigation of negative environmental and social impacts. †Serves as an adaptive, organizational learning process, in which the lessons of experience are feedback into policy, institutional and project design - Enhancement of positive aspects.
  • 25. CONCLUSION †Environment Impact Assessment is a very beneficial step to check, whether the project is environment friendly or not. †Since economic development is result of interaction between natural resources and technology supported by designed for people, so all human activity should be economic, social and environment friendly. †EIA certainly has a crucial role to play in addressing environmental issues surrounding project development and especially power projects. †The integration of environment into development planning is the most important tool in achieving sustainable development. †Environmental protection and economic development must thus be dealt with in an integrated manner. †EIA process is necessary in providing an anticipatory and preventive mechanism for environmental management and protection in any development. †Several developing countries are still at the infancy stage of operationalization of their EIA processes. †The need for capacity building for quality EIA is also eminent in these countries. †Despite these small setbacks, environmental impact assessment has become an integral part of project planning one, which is continually being improved for posterity.