OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
3
1. Introduction
1.1 Application, effect, function
 Application:
Connecting balcony slabs, beams, projecting parapets, other projecting
construction elements as well as full storey-high projecting walls
 Effect:
Thermal separation avoids condensation and the formation of moulds; it
also reduces heat losses and its associated CO2 emissions
 Function:
Thermally separated reinforcement system for connecting detached
reinforced concrete components to the building
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
4
1. Introduction
1.2 State of technology
 According to recent technical standards, the junctions between balconies
and buildings have to be thermally separated. The intention is to interrupt
the flow of heat from the inside to the outside. This is achieved by inserting
insulation between the two components.
“…thermally separated
construction should be used…”
DIN 4108 Supplement 2:2006-01
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
5
1. Introduction
1.2 State of technology
Our solution
Halfen – Insulated – ElemenT → HIT
“A reinforcement element for providing a thermally insulated
connection between reinforced concrete elements and concrete.”
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
6
OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
7
2. Applications
2.1 Application examples
Examples:
cantilevered
balcony
outside corner
balcony
HIT-HP MV HIT-HP MV
HIT-HP MV HIT-HP MV
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
8
2. Applications
2.1 Application examples
Examples:
HIT-BD HIT-BDHIT-BD
HIT-BQ
Supported balcony
Loggia
Loggia
HIT-BD
HIT-BQ
HIT-BQ
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
9
OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
10
Naming Concept
HALFEN HIT HP
HALFEN HIT SP Insulation thickness : 120 mmInsulation thickness : 120 mm
Insulation thickness : 80 mmInsulation thickness : 80 mm
Superior PerformanceSuperior Performance
Compression Shear BearingCompression Shear Bearing
High PerformanceHigh Performance
3. Product overview
3.1 The HIT of the 2nd Generation
10
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
11
HIT-HP MV-1008-20-100-35
ProductdProductd
M=MomentM=Moment
V=ShearforcV=Shearforc
No.oftenNo.oftens
NumberofCSNumberofCS
Height[cm]Height[cm]
Width[cm]Width[cm]
ConcretConcret
HP:80mHP:80m
3. Product overview
3.1 The HIT of the 2nd Generation
Naming concept
11
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
12
 Stainless steel compression bearings and shear bars
 Unequal thermal insulation regarding fire protection
requirements
Balcony Ceiling
HIT (1. Generation)
 Compression shear bearings (CSB) made of ultra-highstrength fibre-reinforced mortar
 Equal thermal insulation due to rock wool
HIT-HP/SP (2. Generation)
12
Balcony
Ceiling
3. Product overview
3.1 The HIT of the 2nd Generation
Support Support
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
13
Flash-butt-welded tensionFlash-butt-welded tension
Compression shear bearing
(CSB)
made of ultra-high strength
fibre-reinforced mortar
Compression shear bearing
(CSB)
made of ultra-high strength
fibre-reinforced mortar
Casing for TB
made of plastic
material
Casing for TB
made of plastic
material
Mineral wool as
insulation against fire and
low temperature
Mineral wool as
insulation against fire and
low temperature
Assembly
13
Concrete steel
Stainless blank steel
with fixing ring
End Cap
Concrete steel
Stainless blank steel
with fixing ring
End Cap
Eligible for 80 mm and 120 mm
3. Product overview
3.1 The HIT of the 2nd Generation
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
1414
Bild einführen
3. Product overview
3.1 The HIT of the 2nd Generation
HIT-HP MV, B=100cm, B=50cm, B=25cm
 For cantilevering balcony slabs
 Transfers bending moments and shear forces
 Most frequent application case
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
15
3. Product overview
3.1 Products
HIT-BX±Q, HIT-BF±Q
The new HIT-HP-MD / HIT-SP-MD
 For cantilevering balcony slabs
 Transfer of shear forces in positive
and negative direction
 Suitable for precast concrete works (two-part
element with upper and lower part  HIT-BF±Q)
 Can also be supplied in a smaller version known
as “HIT module” (HIT-BX±Q-MOD)
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
16
3. Product overview
3.1 Products
HIT-HP/-SP MV-OD
 For cantilevering balcony slabs with stepped level
 Balcony slab is lower than the floor slab
 Transfer of bending moments and shear forces
 Suitable for element slabs (ES-Version)
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
17
3. Product overview
3.1 Products
HIT-HP/-SP MV-OU
 For cantilevering balcony slabs with stepped level
 Balcony slab is higher than the floor slab
 Transfer of bending moments and shear forces
 Suitable for element slabs (ES-Version)
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
18
3. Product overview
3.1 Products
HIT-HP/-SP MV-OU
 For cantilevering balcony slabs supported by a wall
with a upward connection
 Transfer of bending moments and shear forces
 Suitable for element slabs (ES-Version)
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
19
3. Product overview
3.1 Products
HIT-HP/-SP MV-OD
 For cantilevering balcony slabs supported by a
wall with an downward connection
 Transfer of bending moments and shear forces
 Suitable for element slabs (ES-Version)
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
20
3. Product overview
3.1 Products
HIT-HP/-SP MV
 For cantilevering balconies at external corners
 Use of standard elements, no special element required
 Transfer of bending moments and shear forces
via external corner
Indirect support
Direct support
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
21
3. Product overview
3.1 Products
HIT-BQ
The new HIT-HP-ZV / HIT-SP-ZV
• For balcony slabs with non-restrained bearing
on uprights
• Transfer of shear forces
• Available in 1 m length and shorter (30/40/50 cm)
• 12 load groups
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
22
3. Product overview
3.1 Products
HIT-BD
The new HIT-HP-DD / HIT-SP-DD
• For balcony slabs projecting from floor slab fields
(continuous slabs)
• Transfer of positive and negative moments
and shear forces
• 3 load groups
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
23
3. Product overview
3.1 Products
HIT-FT
(The new planned)
 Insulation between front-mounted parapet and
floor/ceiling slab
 Short pieces (30 cm) for point application
 1 load group
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
24
3. Product overview
3.1 Products
HIT-OT
(The new planned)
 Insulation between console and ceiling slab
 Short pieces (30 cm) for point application
 1 load group
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
25
3. Product overview
3.1 Products
HIT-AT
(The new planned)
 Insulation between parapet and ceiling slab
 Short pieces (30 cm) for point application
 1 load group
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
26
3. Product overview
3.1 Products
HIT-ST
 Insulation between consoles/cantilever beam and wall
 Point transfer of high bending moments and
shear forces
 Variations require many non-standard designs
 4 load groups
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
27
3. Product overview
3.1 Products
HIT-WT
 Insulation of projecting walls with full
storey-height
 Point transfer of bending moments and
shear forces, mainly in vertical direction
 Variations require many non-standard designs
 4 load groups
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
28
OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
29
1. Step
Finding the
necessary shearforce
4. Structural calculations
4.1 Structural safety
Procedure for component configuration
29
Requirements for above shown example:
 h = 180 mm
cv = 35 mm
concrete C25/30
 MEd = 35 kNm/m
VEd = 60 kN/m
 Component 1 m
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
30
2. Step:
Search for theconcrete cover!
3. Step:
Search for theslab thickness!
4. Step:
Search for thenecessary
moment!
5. Step
Identify the
necessary
element!
4. Structural calculations
4.1 Structural safety
Procedure for component configuration
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
3131
The HIT of the 2nd Generation
The abbreviation REI has the following meaning :
 R The structural safety of the connection is ensured for the specified
duration
 E The room-separating effect of the connection is ensured for the
specified duration
 I The thermal insulating ability of the connection is ensured for the
specified duration
 120 The functions above mentioned are ensured for 120 minutes of
fire exposure in compliance with the standard time/temperature
curve
4. Structural calculations
4.2 Fire protection
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
3232
The temperature field in the cross-section (shown as isotherms) illustrates the
advantages of the HALFEN HIT Insulated connection for the required minimum
thermal insulation
4. Structural calculations
4.3 Thermal protection
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
3333
For normal load ranges of the slab connections the thermal transmission
coefficient and the temperature factor are listed in tables.
4. Structural calculations
4.3 Thermal protection
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
34
4. Structural calculations
4.4 Sound insulation
With balconies and access balconies, vibration is transferred into the main
structure of the building and distributed into adjacent rooms as airborne sound.
DIN 4109 specifies the maximum level of airborne sound pressure level, which
penetrates to the adjacent units of the building and which is measured with a
standardized tapping machine.
erf. L´n,W = 53 dB
The standard versions of HALFEN HIT insulated connections can fulfill the
sound insulation requirements for balconies.
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
35
4. Structural calculations
4.4 Sound insulation
Basis: laboratory tests
From laboratory measurements, the difference
in the impact sound pressure level ΔL was
examined on a balcony slab made with units in
comparison to a continuous
floor slab.
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
36
4. Structural calculations
4.6 Software
 current version: HIT 7.20
 used intuitively
 12 languages
 11 calculation codes
 manual customisation
 facility for optimisation
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
37
OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
38
5. Competition & market
5.2 Competition
Schöck Isokorb H-Bau Isopro Plakabeton IsotecEGCO Egcobox
www.schoeck.com www.h-bau.de www.egco.info www.plakabeton.com
AVI Thermokorb SFS Isolan Aschwanden ArboBasys Basycon
HALFEN HIT
www.avi.at www.sfslocher.biz www.basys.ch www.aschwanden.ch
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
39
OverviewOverview
1. Introduction
2. Applications
3. Product overview
4. Structural calculations
5. Competition & market
6. Advantages
7. Distribution
8. Technical literature & contacts
9. Summary
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
40
8. Technical literature & contacts
8.2 Installation instructions
Multilingual assembly instruction
HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION
41
Kontaktai
Stanislavas Puodžiūnas
e: info@denia.lt
m: +370 655 78565
w: www.denia.lt

Contenu connexe

Tendances

02 wireline
02 wireline02 wireline
02 wireline
Johan RC
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
Bladimir R
 
Alfa_laval Plate Excanger
Alfa_laval Plate ExcangerAlfa_laval Plate Excanger
Alfa_laval Plate Excanger
Mehmet Tuncer
 

Tendances (20)

Expansion Joint Catalogue
Expansion Joint CatalogueExpansion Joint Catalogue
Expansion Joint Catalogue
 
02 wireline
02 wireline02 wireline
02 wireline
 
Industrial Linear Electric Actuators for Valves
Industrial Linear Electric Actuators for ValvesIndustrial Linear Electric Actuators for Valves
Industrial Linear Electric Actuators for Valves
 
Atomac Lined Ball Valves
Atomac Lined Ball ValvesAtomac Lined Ball Valves
Atomac Lined Ball Valves
 
Combining Rupture Discs and Safety Relief Valves
Combining Rupture Discs and Safety Relief ValvesCombining Rupture Discs and Safety Relief Valves
Combining Rupture Discs and Safety Relief Valves
 
Industrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless SteelIndustrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless Steel
 
ACT Tools
ACT Tools ACT Tools
ACT Tools
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Industrial Bimetallic Thermometers: 3 and 5 Inch Adjustable Angle
Industrial Bimetallic Thermometers: 3 and 5 Inch Adjustable AngleIndustrial Bimetallic Thermometers: 3 and 5 Inch Adjustable Angle
Industrial Bimetallic Thermometers: 3 and 5 Inch Adjustable Angle
 
Kammer Severe Service Valves For Industry
Kammer Severe Service Valves For IndustryKammer Severe Service Valves For Industry
Kammer Severe Service Valves For Industry
 
6A CAT-M.PDF
6A CAT-M.PDF6A CAT-M.PDF
6A CAT-M.PDF
 
Vibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level SwitchVibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level Switch
 
Product guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. GaugeProduct guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. Gauge
 
Continental Disc HPX Rupture Disc Family
Continental Disc HPX Rupture Disc FamilyContinental Disc HPX Rupture Disc Family
Continental Disc HPX Rupture Disc Family
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Group
 
Pneumatic Actuators For Industrial Valves
Pneumatic Actuators For Industrial ValvesPneumatic Actuators For Industrial Valves
Pneumatic Actuators For Industrial Valves
 
Sanitary Ball Valves for Biotech and Pharma Applications
Sanitary Ball Valves for Biotech and Pharma ApplicationsSanitary Ball Valves for Biotech and Pharma Applications
Sanitary Ball Valves for Biotech and Pharma Applications
 
BOP
BOPBOP
BOP
 
Alfa_laval Plate Excanger
Alfa_laval Plate ExcangerAlfa_laval Plate Excanger
Alfa_laval Plate Excanger
 
Severe Service Control & Isolation Valves in the Refining Industry
Severe Service Control & Isolation Valves in the Refining IndustrySevere Service Control & Isolation Valves in the Refining Industry
Severe Service Control & Isolation Valves in the Refining Industry
 

Similaire à Balokoniniai armavimo elemetai HALFEN HIT

2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation
Qipei Mei
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
Aashish Soin
 

Similaire à Balokoniniai armavimo elemetai HALFEN HIT (20)

2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation
 
Low-Alpha Technology: The innovative refractory solution for steel devices su...
Low-Alpha Technology: The innovative refractory solution for steel devices su...Low-Alpha Technology: The innovative refractory solution for steel devices su...
Low-Alpha Technology: The innovative refractory solution for steel devices su...
 
Jungčių sitemos CLT konstrukcijoms
Jungčių sitemos CLT konstrukcijomsJungčių sitemos CLT konstrukcijoms
Jungčių sitemos CLT konstrukcijoms
 
L3 Vertical Structure Pt1 1
L3  Vertical  Structure  Pt1 1L3  Vertical  Structure  Pt1 1
L3 Vertical Structure Pt1 1
 
Pipe Shields Catalog
Pipe Shields CatalogPipe Shields Catalog
Pipe Shields Catalog
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
 
Smoke & Industrial ventilation
Smoke & Industrial ventilationSmoke & Industrial ventilation
Smoke & Industrial ventilation
 
DEVI Enterprises Industrial ventilation
DEVI Enterprises Industrial ventilationDEVI Enterprises Industrial ventilation
DEVI Enterprises Industrial ventilation
 
Industrial ventilation roda
Industrial ventilation rodaIndustrial ventilation roda
Industrial ventilation roda
 
The Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFThe Advanced Facade Technology – CCF
The Advanced Facade Technology – CCF
 
Expansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth WebinarExpansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth Webinar
 
Semixicon machining parts for semiconductor industry
Semixicon machining parts for semiconductor industrySemixicon machining parts for semiconductor industry
Semixicon machining parts for semiconductor industry
 
Powertech1
Powertech1Powertech1
Powertech1
 
HVLS Fan BladeTec - Tawada CleanTech Indonesia
HVLS Fan BladeTec - Tawada CleanTech IndonesiaHVLS Fan BladeTec - Tawada CleanTech Indonesia
HVLS Fan BladeTec - Tawada CleanTech Indonesia
 
Reducing Shipping Vibration of Compressors in Roof Top Air-conditioning Units...
Reducing Shipping Vibration of Compressors in Roof Top Air-conditioning Units...Reducing Shipping Vibration of Compressors in Roof Top Air-conditioning Units...
Reducing Shipping Vibration of Compressors in Roof Top Air-conditioning Units...
 
Roof trusses
Roof trussesRoof trusses
Roof trusses
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
 
Ppt
PptPpt
Ppt
 
Transpower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical ProductsTranspower Switchgear Industries, Mumbai, Electrical Products
Transpower Switchgear Industries, Mumbai, Electrical Products
 
Pipe shields inc
Pipe shields incPipe shields inc
Pipe shields inc
 

Dernier

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Dernier (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 

Balokoniniai armavimo elemetai HALFEN HIT

  • 1. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 1 BALKONINIAI ARMAVIMO ELEMENTAI
  • 2. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 2 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 3. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 3 1. Introduction 1.1 Application, effect, function  Application: Connecting balcony slabs, beams, projecting parapets, other projecting construction elements as well as full storey-high projecting walls  Effect: Thermal separation avoids condensation and the formation of moulds; it also reduces heat losses and its associated CO2 emissions  Function: Thermally separated reinforcement system for connecting detached reinforced concrete components to the building
  • 4. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 4 1. Introduction 1.2 State of technology  According to recent technical standards, the junctions between balconies and buildings have to be thermally separated. The intention is to interrupt the flow of heat from the inside to the outside. This is achieved by inserting insulation between the two components. “…thermally separated construction should be used…” DIN 4108 Supplement 2:2006-01
  • 5. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 5 1. Introduction 1.2 State of technology Our solution Halfen – Insulated – ElemenT → HIT “A reinforcement element for providing a thermally insulated connection between reinforced concrete elements and concrete.”
  • 6. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 6 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 7. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 7 2. Applications 2.1 Application examples Examples: cantilevered balcony outside corner balcony HIT-HP MV HIT-HP MV HIT-HP MV HIT-HP MV
  • 8. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 8 2. Applications 2.1 Application examples Examples: HIT-BD HIT-BDHIT-BD HIT-BQ Supported balcony Loggia Loggia HIT-BD HIT-BQ HIT-BQ
  • 9. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 9 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 10. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 10 Naming Concept HALFEN HIT HP HALFEN HIT SP Insulation thickness : 120 mmInsulation thickness : 120 mm Insulation thickness : 80 mmInsulation thickness : 80 mm Superior PerformanceSuperior Performance Compression Shear BearingCompression Shear Bearing High PerformanceHigh Performance 3. Product overview 3.1 The HIT of the 2nd Generation 10
  • 11. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 11 HIT-HP MV-1008-20-100-35 ProductdProductd M=MomentM=Moment V=ShearforcV=Shearforc No.oftenNo.oftens NumberofCSNumberofCS Height[cm]Height[cm] Width[cm]Width[cm] ConcretConcret HP:80mHP:80m 3. Product overview 3.1 The HIT of the 2nd Generation Naming concept 11
  • 12. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 12  Stainless steel compression bearings and shear bars  Unequal thermal insulation regarding fire protection requirements Balcony Ceiling HIT (1. Generation)  Compression shear bearings (CSB) made of ultra-highstrength fibre-reinforced mortar  Equal thermal insulation due to rock wool HIT-HP/SP (2. Generation) 12 Balcony Ceiling 3. Product overview 3.1 The HIT of the 2nd Generation Support Support
  • 13. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 13 Flash-butt-welded tensionFlash-butt-welded tension Compression shear bearing (CSB) made of ultra-high strength fibre-reinforced mortar Compression shear bearing (CSB) made of ultra-high strength fibre-reinforced mortar Casing for TB made of plastic material Casing for TB made of plastic material Mineral wool as insulation against fire and low temperature Mineral wool as insulation against fire and low temperature Assembly 13 Concrete steel Stainless blank steel with fixing ring End Cap Concrete steel Stainless blank steel with fixing ring End Cap Eligible for 80 mm and 120 mm 3. Product overview 3.1 The HIT of the 2nd Generation
  • 14. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 1414 Bild einführen 3. Product overview 3.1 The HIT of the 2nd Generation HIT-HP MV, B=100cm, B=50cm, B=25cm  For cantilevering balcony slabs  Transfers bending moments and shear forces  Most frequent application case
  • 15. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 15 3. Product overview 3.1 Products HIT-BX±Q, HIT-BF±Q The new HIT-HP-MD / HIT-SP-MD  For cantilevering balcony slabs  Transfer of shear forces in positive and negative direction  Suitable for precast concrete works (two-part element with upper and lower part  HIT-BF±Q)  Can also be supplied in a smaller version known as “HIT module” (HIT-BX±Q-MOD)
  • 16. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 16 3. Product overview 3.1 Products HIT-HP/-SP MV-OD  For cantilevering balcony slabs with stepped level  Balcony slab is lower than the floor slab  Transfer of bending moments and shear forces  Suitable for element slabs (ES-Version)
  • 17. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 17 3. Product overview 3.1 Products HIT-HP/-SP MV-OU  For cantilevering balcony slabs with stepped level  Balcony slab is higher than the floor slab  Transfer of bending moments and shear forces  Suitable for element slabs (ES-Version)
  • 18. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 18 3. Product overview 3.1 Products HIT-HP/-SP MV-OU  For cantilevering balcony slabs supported by a wall with a upward connection  Transfer of bending moments and shear forces  Suitable for element slabs (ES-Version)
  • 19. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 19 3. Product overview 3.1 Products HIT-HP/-SP MV-OD  For cantilevering balcony slabs supported by a wall with an downward connection  Transfer of bending moments and shear forces  Suitable for element slabs (ES-Version)
  • 20. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 20 3. Product overview 3.1 Products HIT-HP/-SP MV  For cantilevering balconies at external corners  Use of standard elements, no special element required  Transfer of bending moments and shear forces via external corner Indirect support Direct support
  • 21. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 21 3. Product overview 3.1 Products HIT-BQ The new HIT-HP-ZV / HIT-SP-ZV • For balcony slabs with non-restrained bearing on uprights • Transfer of shear forces • Available in 1 m length and shorter (30/40/50 cm) • 12 load groups
  • 22. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 22 3. Product overview 3.1 Products HIT-BD The new HIT-HP-DD / HIT-SP-DD • For balcony slabs projecting from floor slab fields (continuous slabs) • Transfer of positive and negative moments and shear forces • 3 load groups
  • 23. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 23 3. Product overview 3.1 Products HIT-FT (The new planned)  Insulation between front-mounted parapet and floor/ceiling slab  Short pieces (30 cm) for point application  1 load group
  • 24. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 24 3. Product overview 3.1 Products HIT-OT (The new planned)  Insulation between console and ceiling slab  Short pieces (30 cm) for point application  1 load group
  • 25. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 25 3. Product overview 3.1 Products HIT-AT (The new planned)  Insulation between parapet and ceiling slab  Short pieces (30 cm) for point application  1 load group
  • 26. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 26 3. Product overview 3.1 Products HIT-ST  Insulation between consoles/cantilever beam and wall  Point transfer of high bending moments and shear forces  Variations require many non-standard designs  4 load groups
  • 27. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 27 3. Product overview 3.1 Products HIT-WT  Insulation of projecting walls with full storey-height  Point transfer of bending moments and shear forces, mainly in vertical direction  Variations require many non-standard designs  4 load groups
  • 28. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 28 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 29. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 29 1. Step Finding the necessary shearforce 4. Structural calculations 4.1 Structural safety Procedure for component configuration 29 Requirements for above shown example:  h = 180 mm cv = 35 mm concrete C25/30  MEd = 35 kNm/m VEd = 60 kN/m  Component 1 m
  • 30. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 30 2. Step: Search for theconcrete cover! 3. Step: Search for theslab thickness! 4. Step: Search for thenecessary moment! 5. Step Identify the necessary element! 4. Structural calculations 4.1 Structural safety Procedure for component configuration
  • 31. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 3131 The HIT of the 2nd Generation The abbreviation REI has the following meaning :  R The structural safety of the connection is ensured for the specified duration  E The room-separating effect of the connection is ensured for the specified duration  I The thermal insulating ability of the connection is ensured for the specified duration  120 The functions above mentioned are ensured for 120 minutes of fire exposure in compliance with the standard time/temperature curve 4. Structural calculations 4.2 Fire protection
  • 32. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 3232 The temperature field in the cross-section (shown as isotherms) illustrates the advantages of the HALFEN HIT Insulated connection for the required minimum thermal insulation 4. Structural calculations 4.3 Thermal protection
  • 33. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 3333 For normal load ranges of the slab connections the thermal transmission coefficient and the temperature factor are listed in tables. 4. Structural calculations 4.3 Thermal protection
  • 34. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 34 4. Structural calculations 4.4 Sound insulation With balconies and access balconies, vibration is transferred into the main structure of the building and distributed into adjacent rooms as airborne sound. DIN 4109 specifies the maximum level of airborne sound pressure level, which penetrates to the adjacent units of the building and which is measured with a standardized tapping machine. erf. L´n,W = 53 dB The standard versions of HALFEN HIT insulated connections can fulfill the sound insulation requirements for balconies.
  • 35. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 35 4. Structural calculations 4.4 Sound insulation Basis: laboratory tests From laboratory measurements, the difference in the impact sound pressure level ΔL was examined on a balcony slab made with units in comparison to a continuous floor slab.
  • 36. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 36 4. Structural calculations 4.6 Software  current version: HIT 7.20  used intuitively  12 languages  11 calculation codes  manual customisation  facility for optimisation
  • 37. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 37 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 38. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 38 5. Competition & market 5.2 Competition Schöck Isokorb H-Bau Isopro Plakabeton IsotecEGCO Egcobox www.schoeck.com www.h-bau.de www.egco.info www.plakabeton.com AVI Thermokorb SFS Isolan Aschwanden ArboBasys Basycon HALFEN HIT www.avi.at www.sfslocher.biz www.basys.ch www.aschwanden.ch
  • 39. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 39 OverviewOverview 1. Introduction 2. Applications 3. Product overview 4. Structural calculations 5. Competition & market 6. Advantages 7. Distribution 8. Technical literature & contacts 9. Summary
  • 40. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 40 8. Technical literature & contacts 8.2 Installation instructions Multilingual assembly instruction
  • 41. HALFEN HITHALFEN HIT INSULATED CONNECTIONINSULATED CONNECTION 41 Kontaktai Stanislavas Puodžiūnas e: info@denia.lt m: +370 655 78565 w: www.denia.lt