New SAG Mill Risk Assessment
Background
NB Copper mine is one of the biggest copper and gold mine company in Indonesia. Since the
first year of their production, NB produced more than 750.000 ton per annum copper concentrate
and kept growing over time. Furthermore, NB Copper Company targeted to reach 1million ton
copper concentrate in 2019. In order to reach their goal, NB plan to leverage their mill capacity
by add more SAG mill with capacity 750 tph in their processing plant. Previously, they have 2
SAG Mill with capacity 850 tph each.
Context
NB Copper mine company commit to implement good mining practice concept in their
operation, they commit to provide their employee, contractors, guest and everyone working in
their area with safe and convenient environment. Currently, they use OHSAS 18000 as their
safety and environment guidance. Adding new SAG Mill consequently changes their
management particularly in processing unit. Therefore, re-assessment risk is needed in order to
get maximum and effective production target and safety environment.
Objective
This risk assessment has several purposes, those are:
 To assess and identify potential risk in new SAG mining area
 To control potential risk probably occur based on risk identification
 To create safety and convenient environment in mining area particularly processing plant
Scope
This risk assessment focus to identify potential risk which relates to safety and environment
issues. This assessment will identify, evaluate risk probably occur in area of new SAG mill and
formulate control plan.
Risk Assessment Methods:
This risk assessment would like to use 2 risk assessment method, those are:
WRAC, is used because is easiest way to communicate and formulate risk in different aspect
with various people background.
Bow tie, using Bow Tie method is one of the most simple to communicate the risk assessment
with various background people and this method is the easiest way to get helicopter view of risk
description.
In addition, 5 by 5 matrix is used to calculate risk rank.
The Team
 Consultant team to facilitate the assessment risk
 Electrical Engineer to identify potential electrical risk
 Mill Operator to identify potential operation risk
 Superintendent Health, Safety and Environmental Department, to identify potential safety
risk
 Superintendent Processing Plant to identify operation risk in helicopter view
 Production superintendent to identify operation risk relate to crusher operation.
Time and Venue:
In order to get maximum and effective result, the risk assessment project will be held 2 days
from 3-4 may 2017. The first day all of team will visit the area of new SAG mill in processing
plant to get the data of concentrate supply from crusher, condition of the area, SAG Mill
electricity supply and sources, the distance between SAG mill and others equipment and objects.
The second day the team will do a meeting in processing plant workshop room.
Expected Output and Risk assessment feedback
The expected output in this project is a document which contains risk assessment result.
Therefore, the related division can do some action regarding those risks.
This assessment risk will give to all parties to get feedback. Risk assessment is the last process
but iterative process, so feedback is very important to make this risk assessment more
comprehensive.
Potential Risk List
Potential
Incident
Probability Consequence Risk Rank Recommended Control
Noise Hearing lost
(exposure to
excessive noise)
5 (Almost
Certain)
4 (High) 23 (High) Physical barrier, noise area warning,
using PPE.
Heat Excessive hot
from the
machine
5 (Almost certain) 4 (High) 23 (High) Hot area warning, PPE (Personal
Protection equipment), ventilation,
shield.
Electricity Exposure to
electricity flow
3 (possible) 5 (major) 22 (high) Use PPE, warning information about
restricted area.
Water Slip when rainy 3 (possible) 4 (high) 18 (significant) Make safety SOP when rainy, prohibit
to pass the area when rainy.
Others Jammed when
doing daily
maintenance
3 (possible) 5 (major) 22 (high) Do daily maintenance when the mill is
stopping

Contenu connexe

Similaire à Risk assesment in sag mill

CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
S.M. Jakir Hossain
 
TGS Reservoir-Petroleum Africa - The value of PRM
TGS Reservoir-Petroleum Africa - The value of PRM TGS Reservoir-Petroleum Africa - The value of PRM
TGS Reservoir-Petroleum Africa - The value of PRM
TGS
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
Zahir Patel
 
DEL HSE C.V updated
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updated
Eid Mohamed
 
NAVI SHO CV 2017
NAVI SHO CV 2017 NAVI SHO CV 2017
NAVI SHO CV 2017
Navi SHO
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
Saiful Amin
 
EDEAGHE ONOSABUNA GABRIEL CV (1)
EDEAGHE ONOSABUNA GABRIEL CV (1)EDEAGHE ONOSABUNA GABRIEL CV (1)
EDEAGHE ONOSABUNA GABRIEL CV (1)
Gabriel Edeaghe
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
Arijit Karmakar
 
Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CV
Rahul Shinde
 

Similaire à Risk assesment in sag mill (20)

CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
 
TGS Reservoir-Petroleum Africa - The value of PRM
TGS Reservoir-Petroleum Africa - The value of PRM TGS Reservoir-Petroleum Africa - The value of PRM
TGS Reservoir-Petroleum Africa - The value of PRM
 
WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
DEL HSE C.V updated
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updated
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
NAVI SHO CV 2017
NAVI SHO CV 2017 NAVI SHO CV 2017
NAVI SHO CV 2017
 
HSE Engineer
HSE EngineerHSE Engineer
HSE Engineer
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
SAP
SAPSAP
SAP
 
EDEAGHE ONOSABUNA GABRIEL CV (1)
EDEAGHE ONOSABUNA GABRIEL CV (1)EDEAGHE ONOSABUNA GABRIEL CV (1)
EDEAGHE ONOSABUNA GABRIEL CV (1)
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
 
Knock-Out drums
Knock-Out drumsKnock-Out drums
Knock-Out drums
 
Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CV
 
Project work jay pee balaji cement palnt
Project work jay pee balaji cement palntProject work jay pee balaji cement palnt
Project work jay pee balaji cement palnt
 
MUKESH SHARMA NEW
MUKESH SHARMA NEWMUKESH SHARMA NEW
MUKESH SHARMA NEW
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process Safety
 
RADIATION PROTECTION: ROLE OF DESIGN IN 500 MWE PROTOTYPE FAST BREEDER REACTO...
RADIATION PROTECTION: ROLE OF DESIGN IN 500 MWE PROTOTYPE FAST BREEDER REACTO...RADIATION PROTECTION: ROLE OF DESIGN IN 500 MWE PROTOTYPE FAST BREEDER REACTO...
RADIATION PROTECTION: ROLE OF DESIGN IN 500 MWE PROTOTYPE FAST BREEDER REACTO...
 

Dernier

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Risk assesment in sag mill

  • 1. New SAG Mill Risk Assessment Background NB Copper mine is one of the biggest copper and gold mine company in Indonesia. Since the first year of their production, NB produced more than 750.000 ton per annum copper concentrate and kept growing over time. Furthermore, NB Copper Company targeted to reach 1million ton copper concentrate in 2019. In order to reach their goal, NB plan to leverage their mill capacity by add more SAG mill with capacity 750 tph in their processing plant. Previously, they have 2 SAG Mill with capacity 850 tph each. Context NB Copper mine company commit to implement good mining practice concept in their operation, they commit to provide their employee, contractors, guest and everyone working in their area with safe and convenient environment. Currently, they use OHSAS 18000 as their safety and environment guidance. Adding new SAG Mill consequently changes their management particularly in processing unit. Therefore, re-assessment risk is needed in order to get maximum and effective production target and safety environment. Objective This risk assessment has several purposes, those are:  To assess and identify potential risk in new SAG mining area  To control potential risk probably occur based on risk identification  To create safety and convenient environment in mining area particularly processing plant Scope This risk assessment focus to identify potential risk which relates to safety and environment issues. This assessment will identify, evaluate risk probably occur in area of new SAG mill and formulate control plan. Risk Assessment Methods: This risk assessment would like to use 2 risk assessment method, those are: WRAC, is used because is easiest way to communicate and formulate risk in different aspect with various people background. Bow tie, using Bow Tie method is one of the most simple to communicate the risk assessment with various background people and this method is the easiest way to get helicopter view of risk description.
  • 2. In addition, 5 by 5 matrix is used to calculate risk rank. The Team  Consultant team to facilitate the assessment risk  Electrical Engineer to identify potential electrical risk  Mill Operator to identify potential operation risk  Superintendent Health, Safety and Environmental Department, to identify potential safety risk  Superintendent Processing Plant to identify operation risk in helicopter view  Production superintendent to identify operation risk relate to crusher operation. Time and Venue: In order to get maximum and effective result, the risk assessment project will be held 2 days from 3-4 may 2017. The first day all of team will visit the area of new SAG mill in processing plant to get the data of concentrate supply from crusher, condition of the area, SAG Mill electricity supply and sources, the distance between SAG mill and others equipment and objects. The second day the team will do a meeting in processing plant workshop room. Expected Output and Risk assessment feedback The expected output in this project is a document which contains risk assessment result. Therefore, the related division can do some action regarding those risks. This assessment risk will give to all parties to get feedback. Risk assessment is the last process but iterative process, so feedback is very important to make this risk assessment more comprehensive.
  • 3. Potential Risk List Potential Incident Probability Consequence Risk Rank Recommended Control Noise Hearing lost (exposure to excessive noise) 5 (Almost Certain) 4 (High) 23 (High) Physical barrier, noise area warning, using PPE. Heat Excessive hot from the machine 5 (Almost certain) 4 (High) 23 (High) Hot area warning, PPE (Personal Protection equipment), ventilation, shield. Electricity Exposure to electricity flow 3 (possible) 5 (major) 22 (high) Use PPE, warning information about restricted area. Water Slip when rainy 3 (possible) 4 (high) 18 (significant) Make safety SOP when rainy, prohibit to pass the area when rainy. Others Jammed when doing daily maintenance 3 (possible) 5 (major) 22 (high) Do daily maintenance when the mill is stopping