1. Dharmeshkumar
Ghatalia
Saudi Arabia.
E-Mail:
dharmeshg74@yahoo.co.in
contact no: +966537153443
_______________________________________________________________________________________
Seeking an assignment with reputed and progressive organization provides challenging opportunity to
work
_______________________________________________________________________________________
Professional Synopsis:
Experience summary: Total 19.8 years.
Sadara Chemicals, Al-Jubail, Saudi Arabia (Jan 2014 – Till date).
Reliance Industries Limited, India (Feb 1996 – Jan 2014).
Qualification:
Master of Science (Organic Chemistry), 1996.
Bachelor of Science (Chemistry), 1994.
Technical skills:
Hands on experience of DCS & field operations.
Shift management, PTW coordination, Production analysis.
Pre-commissioning, commissioning, startup, shutdown.
Turn around, Trouble shooting, Equipment handover & take over.
Technical writing for operation procedures, test procedures, operating manuals.
Hands on experience of various operations support activities like Coordination, reporting.
Performed pre-commissioning, commissioning, startup, shutdown, trouble shooting of units.
Handled various process equipment operations, isolation, and de-isolation, and handover, takeover.
Process Units:
Hands on experience in Aromatics, Hydrogenation.
Hydrogen Compressors, Extractive distillation, Reactive distillation,
MTBE-Butene-1, Butadiene,
Page 1 of 4
2. Major Equipment Handled:
Multi-component Fractionation Tower, Extractive distillation tower, Reactive distillation tower,
Hydrogenation Reactor, Natural Draft Furnaces, Recycle Gas Compressor,
Centrifugal and Reciprocating compressors, Turbine, Steam Generators, Centrifugal pumps,
Reciprocating Pumps, Oil- Gas separators, Heat exchangers, Burners, Condensers, Flare system.
, De-Butanizer,, Fractionator,
Storage tanks, Spheres etc.
Employment Scan: Starting from current,
Sadara Chemicals, Al-Jubail, Saudi Arabia. (Jan 2014 - till date)
As Console operator, C6-C8 cut process Unit having Hydrogenation Liquid phase Reactor and vapor phase
Reactor, Tank farm, Fuel gas fired heaters, Hydrogen compressors, Utilities and Effluent treatment units,
implementing assigned tasks within company’s ISO standards, procedures, schedules, rules & regulations.
Responsibilities:
During pre-commissioning and early commissioning phase I performed,
Redefine systems for early production (red marked P&ID’s) and partial start-up of unit.
Redefine pre-commissioning and commissioning plan accordingly.
Participate to punching of systems and checking for reinstatement of systems.
Use of Win PCS software for turn over system.
During Commissioning phase I have been assigned following tasks:
Developing and preparation of pre-commissioning systems and detailed procedures for flushing, blowing,
lube oil systems flushing, chemical cleaning/pickling of process lines of compressors, leak test according to
client standards and comments; submission for review, comments & approval.
Developing and prepare inspection and test reports for pre-commissioning activities and forwarding forCommissioning Manager’s review/comments,
Coordinating approval and integration in QA&QC plan for pre-commissioning and commissioning.
DCS, ESD and PLC testing, coordinating a team of 2 operators, one instrument/vendor’s representatives for packages.
Weekly operations preparedness and progress report.
Participating in daily project activities meeting.
Monitor equipment erection, testing plan in coordination with project and maintenance departments.
Performing of dry out of heaters, testing of compressors (surge tests of compressors).
Start-up performance test and tuning of controllers.
Organizing, assigning and supervising in collaboration with Process & Utilities Superintendents along with a team of 2supervisors and 3operators.
Review and update pre commissioning plan accordingly with QA&QC system and required standards.
Daily planning and execution of flushing, air blowing, test activities.
Preparation and updating plant system files, preparing units simplified drawing.
Isometric drawing checks, hydrostatic test, pneumatic test, inspection and final Box-up vessels.
Punch point generation, categorization, and resolution.
Page 2 of 4
3. Involved in equipment’s functionality tests.
Managing and client organization; Reinstatement procedure for system,
Planning and scheduling of activities in collaboration with Process Superintendents, estimation of manpower in eachtask and equipment.
Reliance Industries Limited, Hazira, India. (Feb 1996 – Jan 2014)
A/Shift Field Engineer and Panel Executive, performed pre-commissioning, commissioning and startup of
Gasoline Hydrotreater, Hydrogenation of Benzene, Gas Compression, Steam generation, MTBE, Naphtha
Furnaces.
Operated DCS system ABB Windows800XA.
Operated Programmable Logic Control (PLC) and Dynamic Matrix Control (DMC-Plus).
Handled F & G system, supplied by Zellweger Analytics (Sieger) Ltd, UK.
FAT analysis for DCS graphics at ABB-Bengaluru, India during plant pre commissioning phase.
Carried out step test and commissioning, trouble shooting of Advance Process Control (APC).
Operated control systems efficiently as per plant design parameters and operating procedure.
Assigned duties and activities to plant operators.
Monitored and logging consumptions of chemicals and utilities usages intermittently.
Reviewed log sheets for completeness and problem indicators
Analyzed data trends and make improvement recommendations to supervisor.
Identified need for new trend analysis.
Maintained unplanned shutdown work list and initiate work as opportunity allows
Ensured items on routine job list are done on time and correctly.
Carried out safe, environmentally compliant and reliable process operations.
Been compliant with standing instructions, plan and procedures on routine/non-routine activities.
Communicated and coordinated within the units and with offsite facility.
Developed operating procedure, emergency procedures, simplified sketches, PFD, P&ID.
Assisted and ensure quick resolution to abnormal operational situations.
Take appropriate action according to situation to control emergency & hazards in area.
Identified needs and imparting training to operators.
Assisted Shift Supervisor in preparing shift schedules, training, leave coverage etc.
Participated in daily job planning & prioritizing meeting, safety audits.
Involved in review the P&ID’s / PFDs, control philosophy related to the unit.
Ensured that all hand over certificates and documentation for the project is put in place.
Ensured dispatching of information related to notifications to various disciplines during the project.
Prepared operating manuals, operating procedures, simplified sketches, P & ID review.
Page 3 of 4
4. .
IT Forte:
Ø
MS Office Automation & Internet Applications, Aspen Tech, Visio Professional, SAP R3.
Achievements:
Degree level Program in Chemical Eng. From SV National Institute of Technology-Surat.
03 years in house course for Chemical Engineering program, Conducted by NIT campus.
Achieved 132credits out of 132, Achieved CPI :7.34
Winner of “Best Kaizen Suggestion Award”, continuous two years.
Winner of “Best STOP Card reporting”.
Winner of “Best Near miss reporting”.
Nominated as coach of trainee operators.
Personal attributes:
Adaptable, positive, resilient, patient risk-taker, open to new ideas.
Dependable, responsible and contributor, committed to excellence.
Conscientious go-getter to organize dedicated, committed to work.
Resourceful team player and excellent communicator excelling at building trustworthy relationships.
Good analytical thinker for identifying, improving and streamlining complex work processes.
Culturally sensitive and able to build rapport with a diverse workforce
Date of Birth: 23rd
September 1974
Page 4 of 4