Agenda
 Electrical Safety
Our Network and MV Substation (Overview)
 Transformers
 Switchgears (OCB, VCB,SF6 Circuit Breakers)
 Battery Bank
ELECTRICAL SAFETY MATERIALS
Safety is first in any operation!
Not only mine We are responsible for everyone!
SAFETY ELECTRICAL OPERATIONS, MAINTENANCE
• Visual Inspection prior to any decision (Please read signs every time)
• Discuss with Supervisors (Respected parties)
• Conduct operation with instruction provided.
• Follow lockout procedures either communication procedures
• Be responsible
VISION AND CORE VALUES
Zero Harm,
Zero Waste,
Self Satisfaction
Employer Satisfaction
…Always
OUR VISION
OUR CORE VALUES
Care
Customer Focus
Valuing People
Integrity
Commitment
Innovation
Competitiveness
Unity
OUR NETWORK & MV SUBSTATION (OVERVIEW)
Transformers
Power Transformers
From 3MVA up to 550MVA and 400kV
Distribution Transformers
From 16 kVA up to 5000kVA and 72kV
CONDITION MONITORING AND REGULAR INSPECTIONS
Regular Inspections
• Transformer Oil Level
• Direct Winding Temperature
Measurement
• Check for Transformer Oil Leaks
(Visual)
• Check Transformer Cooling Systems
• Silica Gel Colour
• Transformer Noise
If you notice anything abnormal, Please inform your Technical head
immediately to prevent any damages.
How these will look like??
Transformer Oil Level Indicator
Temperature Gauge Silica gel Breather
Transformer Annual Maintenance and
Testings and Special Supervision.
Diagnostic testing of oil, gas and other
insulating materials using in HV Equipment
• Transformers
• Tap Changers
• Circuit Breakers
• Ring Main Units
Transformer Maintenances
• Transformer Winding Insulation Resistance
• Transformer Life Span Tests
• Transformer HT and LT bushing inspection and
maintenance.
• Transformer oil purification
Contact Specialize Technical teams for Maintenances.
WE DO NOT WANT ANY OF THIS… !
According to international rules, there are only two voltage levels:
• Low voltage: up to and including 1kV AC (or 1,500V DC).
• High voltage: above 1kV AC (or 1,500V DC).
Operation of Circuit breakers:
Make and break all currents within the scope of their ratings, from small
inductive and capacitive load currents up to the full short circuit current, and
this under all fault conditions in the power supply system, such as earth
faults, phase opposition, and so on.
The following stress can occur during making and breaking:
No-load switching
Breaking of operating currents
Breaking of short circuit currents
MV Switchgears (OCB, VCB and SF6)
CONDITION MONITORING AND REGULAR INSPECTIONS
Regular Inspections
• Indications Lights
• Function meters (Voltage,
Current)
• SF6 Gas Pressure
• Protection Relays
• Operating Noises
• Operating Counter
If you notice anything abnormal, Please inform your
Technical head immediately to prevent any damages.
How these will look like??
SF6 Gas Pressure Voltmeters and Ammeters Fault Indicators (Flags)
Protection Relay
THIS IS HOW IT LOOKS LIKE WHEN THERE IS NO REGULAR
INSPECTIONS AND ANNUAL MAINTENANCES
Battery Bank (Control Power, Backup Power)
Battery Charger and Panel Nickel Cadmium Alkaline Batteries
CONDITION MONITORING AND REGULAR INSPECTIONS
Regular Inspections
• Battery Voltage
• Output Current
• Battery Bank Cooling
System
• Battery Cells
• Battery Water Level
If you notice anything abnormal, Please inform your
Technical head immediately to prevent any damages.
How these will look like??
Voltage
Output Current
Operation/Fault Indicators
Battery Water Level (Max, Min)
QUESTIONS??????

Contenu connexe

Tendances

Triac Based Automatic Voltage Stabilizer
Triac Based Automatic Voltage StabilizerTriac Based Automatic Voltage Stabilizer
Triac Based Automatic Voltage StabilizerWaqas Riaz
 
Protection Relay Testing | Protective Relays Equipment
Protection Relay Testing | Protective Relays EquipmentProtection Relay Testing | Protective Relays Equipment
Protection Relay Testing | Protective Relays EquipmentSystem Protection
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenancedwessin
 
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...System Protection
 
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3Mark Platten
 
Microcontroller based voltage stabilizer
Microcontroller based voltage stabilizerMicrocontroller based voltage stabilizer
Microcontroller based voltage stabilizerSabrina Chowdhury
 
Knife switch
Knife switchKnife switch
Knife switchjaincolab
 
Wtau safe load indicator system for crawler crane
Wtau safe load indicator system for crawler craneWtau safe load indicator system for crawler crane
Wtau safe load indicator system for crawler craneLMITan
 
Wtau safe load system indicator catalog for port and shipbuilding
Wtau safe load system indicator catalog for port and shipbuildingWtau safe load system indicator catalog for port and shipbuilding
Wtau safe load system indicator catalog for port and shipbuildingLMITan
 
A vibration presentation
A vibration presentation A vibration presentation
A vibration presentation SisayKetema2
 
Power system protection_lecture_notes
Power system protection_lecture_notesPower system protection_lecture_notes
Power system protection_lecture_noteslcm3766l
 
Lsvr lt step voltage regulator
Lsvr lt step voltage regulatorLsvr lt step voltage regulator
Lsvr lt step voltage regulatorJoeChueng
 
1.9 protection of power system
1.9 protection of power system1.9 protection of power system
1.9 protection of power systemW3Edify
 

Tendances (20)

Triac Based Automatic Voltage Stabilizer
Triac Based Automatic Voltage StabilizerTriac Based Automatic Voltage Stabilizer
Triac Based Automatic Voltage Stabilizer
 
Protection Relay Testing | Protective Relays Equipment
Protection Relay Testing | Protective Relays EquipmentProtection Relay Testing | Protective Relays Equipment
Protection Relay Testing | Protective Relays Equipment
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
 
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...
Circuit Breaker Testing | Repair | Retrofit Services in India | System Protec...
 
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
 
Microcontroller based voltage stabilizer
Microcontroller based voltage stabilizerMicrocontroller based voltage stabilizer
Microcontroller based voltage stabilizer
 
Knife switch
Knife switchKnife switch
Knife switch
 
7SR10 Overcurrent Relay
7SR10 Overcurrent Relay7SR10 Overcurrent Relay
7SR10 Overcurrent Relay
 
Wtau safe load indicator system for crawler crane
Wtau safe load indicator system for crawler craneWtau safe load indicator system for crawler crane
Wtau safe load indicator system for crawler crane
 
Wtau safe load system indicator catalog for port and shipbuilding
Wtau safe load system indicator catalog for port and shipbuildingWtau safe load system indicator catalog for port and shipbuilding
Wtau safe load system indicator catalog for port and shipbuilding
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
Catalogue siemens lightning and overvoltage protection devices
Catalogue siemens lightning and overvoltage protection devicesCatalogue siemens lightning and overvoltage protection devices
Catalogue siemens lightning and overvoltage protection devices
 
A vibration presentation
A vibration presentation A vibration presentation
A vibration presentation
 
Al tech cvt
Al tech cvtAl tech cvt
Al tech cvt
 
Surge Protection
Surge ProtectionSurge Protection
Surge Protection
 
Power system protection_lecture_notes
Power system protection_lecture_notesPower system protection_lecture_notes
Power system protection_lecture_notes
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Lsvr lt step voltage regulator
Lsvr lt step voltage regulatorLsvr lt step voltage regulator
Lsvr lt step voltage regulator
 
Solid State Relay Exporter,Manufacturer,Bengaluru
Solid State Relay Exporter,Manufacturer,BengaluruSolid State Relay Exporter,Manufacturer,Bengaluru
Solid State Relay Exporter,Manufacturer,Bengaluru
 
1.9 protection of power system
1.9 protection of power system1.9 protection of power system
1.9 protection of power system
 

Similaire à Substation Occupation Health, Safety and Maintenances

Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfYogeshGairola2
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
Lightning and Surge Protection Strategy for Instrumentation
Lightning and Surge Protection Strategy for InstrumentationLightning and Surge Protection Strategy for Instrumentation
Lightning and Surge Protection Strategy for InstrumentationRekaNext Capital
 
Lecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearLecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearAliRaza1718
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2R.K. Mathuria
 
A Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment StandardsA Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment Standardsmichaeljmack
 
Surge Protection for your Application
Surge Protection for your ApplicationSurge Protection for your Application
Surge Protection for your ApplicationR. J. McRep
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2Himmelstern
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecionHimmelstern
 
4 david schepers certification process safety relay modules for machinery app...
4 david schepers certification process safety relay modules for machinery app...4 david schepers certification process safety relay modules for machinery app...
4 david schepers certification process safety relay modules for machinery app...Luiz Fernando Moraes
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERRitesh Kumawat
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
Tools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV SystemsTools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV SystemsTranscat
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020nacetwincities
 

Similaire à Substation Occupation Health, Safety and Maintenances (20)

Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdf
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
Lightning and Surge Protection Strategy for Instrumentation
Lightning and Surge Protection Strategy for InstrumentationLightning and Surge Protection Strategy for Instrumentation
Lightning and Surge Protection Strategy for Instrumentation
 
Lecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgearLecture 2-intro-to-switchgear
Lecture 2-intro-to-switchgear
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
 
A Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment StandardsA Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment Standards
 
Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)
 
Surge Protection for your Application
Surge Protection for your ApplicationSurge Protection for your Application
Surge Protection for your Application
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Recognizing Sales Opportunities in Protective Relaying
Recognizing Sales Opportunities in Protective RelayingRecognizing Sales Opportunities in Protective Relaying
Recognizing Sales Opportunities in Protective Relaying
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecion
 
4 david schepers certification process safety relay modules for machinery app...
4 david schepers certification process safety relay modules for machinery app...4 david schepers certification process safety relay modules for machinery app...
4 david schepers certification process safety relay modules for machinery app...
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Tools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV SystemsTools and Techniques for Commissioning and Maintaining PV Systems
Tools and Techniques for Commissioning and Maintaining PV Systems
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
 

Dernier

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 

Dernier (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 

Substation Occupation Health, Safety and Maintenances

  • 1. POWER LOGIC ENGINEERS (PRIVATE) LIMITED SAFETY AND SCHEDULE INSPECTIONS FOR MV SUBSTATION AUTHOR: ENG. DILEESH C. WELLALA © Copyright Power Logic Engineers Pvt Ltd (PLE). This document contains proprietary information, and remains the property of PLE. It shall not be copied, nor shall the information herein be divulged to any third party, without written permission from PLE.
  • 2. Agenda  Electrical Safety Our Network and MV Substation (Overview)  Transformers  Switchgears (OCB, VCB,SF6 Circuit Breakers)  Battery Bank
  • 3. ELECTRICAL SAFETY MATERIALS Safety is first in any operation! Not only mine We are responsible for everyone!
  • 4. SAFETY ELECTRICAL OPERATIONS, MAINTENANCE • Visual Inspection prior to any decision (Please read signs every time) • Discuss with Supervisors (Respected parties) • Conduct operation with instruction provided. • Follow lockout procedures either communication procedures • Be responsible
  • 5. VISION AND CORE VALUES Zero Harm, Zero Waste, Self Satisfaction Employer Satisfaction …Always OUR VISION OUR CORE VALUES Care Customer Focus Valuing People Integrity Commitment Innovation Competitiveness Unity
  • 6. OUR NETWORK & MV SUBSTATION (OVERVIEW)
  • 7. Transformers Power Transformers From 3MVA up to 550MVA and 400kV Distribution Transformers From 16 kVA up to 5000kVA and 72kV
  • 8. CONDITION MONITORING AND REGULAR INSPECTIONS Regular Inspections • Transformer Oil Level • Direct Winding Temperature Measurement • Check for Transformer Oil Leaks (Visual) • Check Transformer Cooling Systems • Silica Gel Colour • Transformer Noise If you notice anything abnormal, Please inform your Technical head immediately to prevent any damages.
  • 9. How these will look like?? Transformer Oil Level Indicator Temperature Gauge Silica gel Breather
  • 10. Transformer Annual Maintenance and Testings and Special Supervision. Diagnostic testing of oil, gas and other insulating materials using in HV Equipment • Transformers • Tap Changers • Circuit Breakers • Ring Main Units Transformer Maintenances • Transformer Winding Insulation Resistance • Transformer Life Span Tests • Transformer HT and LT bushing inspection and maintenance. • Transformer oil purification Contact Specialize Technical teams for Maintenances.
  • 11. WE DO NOT WANT ANY OF THIS… !
  • 12. According to international rules, there are only two voltage levels: • Low voltage: up to and including 1kV AC (or 1,500V DC). • High voltage: above 1kV AC (or 1,500V DC). Operation of Circuit breakers: Make and break all currents within the scope of their ratings, from small inductive and capacitive load currents up to the full short circuit current, and this under all fault conditions in the power supply system, such as earth faults, phase opposition, and so on. The following stress can occur during making and breaking: No-load switching Breaking of operating currents Breaking of short circuit currents MV Switchgears (OCB, VCB and SF6)
  • 13. CONDITION MONITORING AND REGULAR INSPECTIONS Regular Inspections • Indications Lights • Function meters (Voltage, Current) • SF6 Gas Pressure • Protection Relays • Operating Noises • Operating Counter If you notice anything abnormal, Please inform your Technical head immediately to prevent any damages.
  • 14. How these will look like?? SF6 Gas Pressure Voltmeters and Ammeters Fault Indicators (Flags) Protection Relay
  • 15. THIS IS HOW IT LOOKS LIKE WHEN THERE IS NO REGULAR INSPECTIONS AND ANNUAL MAINTENANCES
  • 16. Battery Bank (Control Power, Backup Power) Battery Charger and Panel Nickel Cadmium Alkaline Batteries
  • 17. CONDITION MONITORING AND REGULAR INSPECTIONS Regular Inspections • Battery Voltage • Output Current • Battery Bank Cooling System • Battery Cells • Battery Water Level If you notice anything abnormal, Please inform your Technical head immediately to prevent any damages.
  • 18. How these will look like?? Voltage Output Current Operation/Fault Indicators Battery Water Level (Max, Min)