SlideShare une entreprise Scribd logo
1  sur  7
FROM SAMPLING LINES OF STEAM -WATER
CYCLE
BY DILIP KUMAR
NTPC Ltd.
SAMPLING LINES OF STEAM WATER CYCLE
1. DM MAKEUP WATER
2. CONDENSATE WATER
3. CPU OUTLET WATER
4. FEED WATER
5. BOILER DRUM WATER
6. SATURATED STEAM WATER
7. MAIN STEAM WATER
8. DEAERATOR OUTLET WATER
DM WATER REDUCTION FROM SAMPLING LINES
Each sampling line having average flow 0.5
liters/min
Total water reduction from steam water
cycle/unit/min is 8 × 0.5 = 4.0 liters
Total water reduction / unit/hour = 60 × 4
=240 L
Total water reduction / unit/day = 240 × 24
=5760 L
Total water reduction / unit/month = 5760 ×
30 =172800 L
Total water reduction /month from stage-II =
172800 × 3 =518400 L =518.400 M3
Total water reduction /year from stage-II =
518.400 × 12 =6220.8 m3
DM WATER WASTE FROM SWAS STAGE-II
TOTAL SAMPLING LINES AT SWAS PANEL = 27
TOTAL SAMPLING LINES EXCEPT BOILER & CONDENSE
COOLING WATER= 21
No. OF LOCAL SAMPLING LINES=12
TOTAL SAMPLING LINES= 33
AVERAGE FLOW OF EACH SAMPLING LINES=0.5 L/MIN
TOTAL DM WATER WASTAGE =
0.5×33×60×24×30=712800L/MONTH
= 712.8 M3/MONTH
DM WATER WASTE FROM SWAS STAGE-I
TOTAL SAMPLING LINES AT SWAS PANEL = 29
TOTAL SAMPLING LINES EXCEPT BOILER = 25
No. OF LOCAL SAMPLING LINES=12
TOTAL SAMPLING LINES= 37
AVERAGE FLOW OF EACH SAMPLING LINES=0.5
L/MIN
TOTAL DM WATER WASTAGE =
0.5×37×60×24×30=799200 L/MONTH
= 799.2 M3/MONTH
DM WATER WASTE FROM SWAS STAGE-I&II
TOTAL DM WATER WASTAGE FROM STAGE-I
= 0.5×37×60×24×30=799200 L/MONTH
= 799.2 M3/MONTH
TOTAL DM WATER WASTAGE FROM STAGE-II
=0.5×33×60×24×30=712800L/MONTH
= 712.8 M3/MONTH
TOTAL AVERAGE DM WATER WASTE FROM KhSTPS
= 1512.0 M3/MONTH
ADVANTAGE OF CONSERVATION OF DM WATER
1.LOW AMMONIA CONSUMPTION DURING FEED OF CONSERVED DM
WATER
2.REDUCTION IN HCl CONSUMPTION (3.72 M3/MONTH)
3.REDUCTION IN NaOH CONSUMPTION (615 Kg/MONTH)
4.REDUCTION IN EFFLUENT FROM DM PLANT DURING
REGENERATION OF DM STREAMS (750M3/MONTH)
5.REDUCTION OF MAIN PLANT EFFLUENTS (1500M3/MONTH)
6.TIME SAVING IN THE REGENERATION AND SERVICE (24 HOURS)

Contenu connexe

Tendances

Power plant chemistry internal water treatment
Power plant chemistry internal water treatmentPower plant chemistry internal water treatment
Power plant chemistry internal water treatment
umar farooq
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plants
teddy tavares
 
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
Dilip Kumar
 

Tendances (20)

Dm plant
Dm plantDm plant
Dm plant
 
Condensate Polishing Unit - CPU
Condensate Polishing Unit - CPUCondensate Polishing Unit - CPU
Condensate Polishing Unit - CPU
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Essentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programEssentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment program
 
Power plant chemistry internal water treatment
Power plant chemistry internal water treatmentPower plant chemistry internal water treatment
Power plant chemistry internal water treatment
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plants
 
Power Plant Water Treatment
 Power Plant Water Treatment Power Plant Water Treatment
Power Plant Water Treatment
 
Phosphate hide out in subcritical boiler
Phosphate hide out in subcritical boilerPhosphate hide out in subcritical boiler
Phosphate hide out in subcritical boiler
 
De-mineralization of Water
De-mineralization of WaterDe-mineralization of Water
De-mineralization of Water
 
Bwt
BwtBwt
Bwt
 
flare system design.pdf
flare system design.pdfflare system design.pdf
flare system design.pdf
 
Chemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantChemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power Plant
 
DEMINERALIZATION WATER TREATMENT PLANT
DEMINERALIZATION WATER TREATMENT PLANTDEMINERALIZATION WATER TREATMENT PLANT
DEMINERALIZATION WATER TREATMENT PLANT
 
Water treatment of steam boilers
Water treatment of steam boilersWater treatment of steam boilers
Water treatment of steam boilers
 
Cooling water treatment
Cooling water treatmentCooling water treatment
Cooling water treatment
 
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.Boiler Water Chemistry for Large PF Fired Boilers in TPS.
Boiler Water Chemistry for Large PF Fired Boilers in TPS.
 
SOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxSOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptx
 
Fired Heater Operation and Trouble Shooting.pdf
Fired Heater  Operation and Trouble Shooting.pdfFired Heater  Operation and Trouble Shooting.pdf
Fired Heater Operation and Trouble Shooting.pdf
 
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
 
Ro plant working
Ro plant workingRo plant working
Ro plant working
 

En vedette

Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Living Online
 

En vedette (20)

Generator protection
Generator protectionGenerator protection
Generator protection
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
Water treatment process by RO UF
Water treatment process by RO UFWater treatment process by RO UF
Water treatment process by RO UF
 
progress in civil engg by aatif sadiq
progress in  civil engg by aatif sadiqprogress in  civil engg by aatif sadiq
progress in civil engg by aatif sadiq
 
Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
BASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERINGBASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERING
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
 
Reverse osmosis (ro) plant an overview-saeed
Reverse osmosis (ro) plant  an overview-saeedReverse osmosis (ro) plant  an overview-saeed
Reverse osmosis (ro) plant an overview-saeed
 
Reverse Osmosis System Basics
Reverse Osmosis System BasicsReverse Osmosis System Basics
Reverse Osmosis System Basics
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)
 
Ro plant training and research center
Ro plant training and research centerRo plant training and research center
Ro plant training and research center
 
The Theory of Reverse Osmosis (RO)
The Theory of Reverse Osmosis (RO)The Theory of Reverse Osmosis (RO)
The Theory of Reverse Osmosis (RO)
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 

Similaire à DM water conservation

Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress
Krzysztof (Kris) Palka
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
Jill Watkins
 

Similaire à DM water conservation (9)

Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress
 
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
 
Water Treatment Plant Design by Damora, Waite, Yu, Maroofian
Water Treatment Plant Design by Damora, Waite, Yu, MaroofianWater Treatment Plant Design by Damora, Waite, Yu, Maroofian
Water Treatment Plant Design by Damora, Waite, Yu, Maroofian
 
Water supply
Water supplyWater supply
Water supply
 
FILTRATION UNIT 2.pptx
FILTRATION UNIT 2.pptxFILTRATION UNIT 2.pptx
FILTRATION UNIT 2.pptx
 
Lswtppt
LswtpptLswtppt
Lswtppt
 
Water Audit.pptx
Water Audit.pptxWater Audit.pptx
Water Audit.pptx
 
106 pareshkumar
106 pareshkumar106 pareshkumar
106 pareshkumar
 

Plus de Dilip Kumar (10)

U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.
 
COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016
 
AFTER CATION CONDUCTIVITY
AFTER CATION CONDUCTIVITYAFTER CATION CONDUCTIVITY
AFTER CATION CONDUCTIVITY
 
SIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERSSIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERS
 
Dm water conservation
Dm water conservationDm water conservation
Dm water conservation
 
Pretreatment of water
Pretreatment of waterPretreatment of water
Pretreatment of water
 
CHEMICAL SAFETY
CHEMICAL SAFETYCHEMICAL SAFETY
CHEMICAL SAFETY
 
POWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYPOWER PLANT CHEMISTRY
POWER PLANT CHEMISTRY
 
PRETREATMENT OF WATER
PRETREATMENT OF WATERPRETREATMENT OF WATER
PRETREATMENT OF WATER
 
demineralization
demineralizationdemineralization
demineralization
 

DM water conservation

  • 1. FROM SAMPLING LINES OF STEAM -WATER CYCLE BY DILIP KUMAR NTPC Ltd.
  • 2. SAMPLING LINES OF STEAM WATER CYCLE 1. DM MAKEUP WATER 2. CONDENSATE WATER 3. CPU OUTLET WATER 4. FEED WATER 5. BOILER DRUM WATER 6. SATURATED STEAM WATER 7. MAIN STEAM WATER 8. DEAERATOR OUTLET WATER
  • 3. DM WATER REDUCTION FROM SAMPLING LINES Each sampling line having average flow 0.5 liters/min Total water reduction from steam water cycle/unit/min is 8 × 0.5 = 4.0 liters Total water reduction / unit/hour = 60 × 4 =240 L Total water reduction / unit/day = 240 × 24 =5760 L Total water reduction / unit/month = 5760 × 30 =172800 L Total water reduction /month from stage-II = 172800 × 3 =518400 L =518.400 M3 Total water reduction /year from stage-II = 518.400 × 12 =6220.8 m3
  • 4. DM WATER WASTE FROM SWAS STAGE-II TOTAL SAMPLING LINES AT SWAS PANEL = 27 TOTAL SAMPLING LINES EXCEPT BOILER & CONDENSE COOLING WATER= 21 No. OF LOCAL SAMPLING LINES=12 TOTAL SAMPLING LINES= 33 AVERAGE FLOW OF EACH SAMPLING LINES=0.5 L/MIN TOTAL DM WATER WASTAGE = 0.5×33×60×24×30=712800L/MONTH = 712.8 M3/MONTH
  • 5. DM WATER WASTE FROM SWAS STAGE-I TOTAL SAMPLING LINES AT SWAS PANEL = 29 TOTAL SAMPLING LINES EXCEPT BOILER = 25 No. OF LOCAL SAMPLING LINES=12 TOTAL SAMPLING LINES= 37 AVERAGE FLOW OF EACH SAMPLING LINES=0.5 L/MIN TOTAL DM WATER WASTAGE = 0.5×37×60×24×30=799200 L/MONTH = 799.2 M3/MONTH
  • 6. DM WATER WASTE FROM SWAS STAGE-I&II TOTAL DM WATER WASTAGE FROM STAGE-I = 0.5×37×60×24×30=799200 L/MONTH = 799.2 M3/MONTH TOTAL DM WATER WASTAGE FROM STAGE-II =0.5×33×60×24×30=712800L/MONTH = 712.8 M3/MONTH TOTAL AVERAGE DM WATER WASTE FROM KhSTPS = 1512.0 M3/MONTH
  • 7. ADVANTAGE OF CONSERVATION OF DM WATER 1.LOW AMMONIA CONSUMPTION DURING FEED OF CONSERVED DM WATER 2.REDUCTION IN HCl CONSUMPTION (3.72 M3/MONTH) 3.REDUCTION IN NaOH CONSUMPTION (615 Kg/MONTH) 4.REDUCTION IN EFFLUENT FROM DM PLANT DURING REGENERATION OF DM STREAMS (750M3/MONTH) 5.REDUCTION OF MAIN PLANT EFFLUENTS (1500M3/MONTH) 6.TIME SAVING IN THE REGENERATION AND SERVICE (24 HOURS)