INTEGRATING LEAN
SUPPLY WITH
WORK PLAN & VE
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
LEAN CONSTRUCTION
 Lean construction main objective
is to maximizes value and reduces
waste.
 It applies specific techniques in an
innovative project delivery
approach.
 It including:
1. supply chain management,
2. Just-In-Time techniques.
LEAN CONSTRUCTION
LEAN CONSTRUCTION
As well as the open sharing of
information between all the parties
involved in the production process.
Lean manufacturing is an
outgrowth of the Toyota Production
system.
Developed by Taichii Ohno in
Toyota in the 1950s.
LEAN CONSTRUCTION
Ohno identified several
wastes in mass production
systems in car industry such
as:
1. overproducing
2. waiting time
3. transporting
LEAN CONSTRUCTION
also, in other areas such as:
1. processing methods;
2. unnecessary stock on hand;
3. unnecessary motion;
4. defective goods;
5. failure to meet customers’ needs;
6. high waste through out the process.
LEAN CONSTRUCTION
Womack and Jones (1996) suggested that
there are five key principles that need to be
monitored when lean construction systems
are applied in construction. Those are:
Value-clarifying the customer’s needs;
the supply chain involvement in all stages,
from inception to completion;
By clarifying activities or products
that signify value.
LEAN CONSTRUCTION
Value stream: By mapping the
whole value stream
establishing cooperation between
all parties involved;
identifying and eliminating waste;
From taking such steps the
construction process can be
improved.
LEAN CONSTRUCTION
WORK PLAN
 Construction Planning is a
fundamental and challenging activity
in the management and execution of
construction projects
It involves:
1. Managerial
2. Technological
3. Social factors.
WORK PLAN
 A good construction plan is the basis for
developing the budget and the schedule for
work.
 Developing the construction plan is a critical
task in the management of construction.
 In developing a construction plan, it is
common to adopt a primary emphasis on
either cost control or on schedule control.
WORK PLAN
WORK PLAN
A database program called
WorkPlan has been developed to
systematically provide weekly work
plans.
WorkPlan adopts the Last Planner
methodology, which implements a
number of lean construction
techniques.
WORK PLAN
 A week before the actual work starts
WorkPlan guides the management
team step by step through the process
of producing work packages in order to
identify issues such:
 checking constraint
 resolving constraints
 Sending out work packages
 allocating resources
WORK PLAN
Then at the end of the week,
collecting site progress data such
as:
reasons for cost overrun
reason for time overrun
reason for delays
Disruptions
etc
WORK PLAN
This well planned and systematic
approach helps the management
team to create quality work plans.
They learn from any failure
a good WorkPlan is a weekly work
plan
based lean construction
production scheduling
WORK PLAN
 screening
 work package
 Constraint
 percentage of planned completed
(PPC)
 Scheduling of construction work is often
done with the help of computer tools
 It implement the critical-path method
(CPM)
WORK PLAN
 based on activities of given duration
and unit resources allocated to them
 as well as predecessor relationships
between activities
 for different parties involved in a
construction project to communicate
with one another whom should be doing
what work and when.
WORK PLAN
The application of lean production
techniques in construction has
been triggered by its success in
manufacturing (Womack and Jones
1996).
Weekly work plans can be
developed as valuable tools for
production planning and control.
WORK PLAN
This is possible through the
application of lean construction
techniques.
In the application weekly work
plans are generated using a
database (Choo, Tommelein,
Ballard, and Zabelle -1998).
Value Engineering-Constructability
 VALUE ENGINEERING
 Value Engineering (VE) has been defined as:
 the systematic effort directed at analyzing the
functional requirements of:
 systems
 equipment
 facilities
 procedures
 and supplies for the purpose of achieving the
essential function at the lowest total (life-cycle)
cost.
Value Engineering-Constructability
 Also, all the efforts are focused on meeting
needed issues such as:
 Performance;
 Reliability;
 quality, maintainability;
 aesthetics,
 Safety;
 fire resistance;
 while, at the same time, achieving lowest life-
cycle cost.
Value Engineering-Constructability
 Constructability implementation can
act as a predecessor to value
engineering.
 Providing information through
constructor input and lessons
learned from past projects such
that value engineering may be
more effective.
Value Engineering
Implementation of value engineering involves
several steps:
1. Information;
2. functional analysis;
3. creative mind;
4. Evaluation;
5. planning & proposal;
6. Implementation;
7. follow-up.
Value Engineering
The creative step involves a
brainstorming session where life-
cycle cost alternatives, for design
components are considered.
Value engineering may be performed
in two ways:
(1) Proactively
(2) Reactively
Value Engineering(Value Analysis)
What Is Value Engineering?
 Value Engineering (V.E.), also known as Value Analysis,
 is a systematic and function-based approach to
improving the value of products, projects, or processes.
 VE involves a group of people following a structured
process.
 The process helps team members communicate better
across boundaries.
 understand different perspectives,
 innovate, and analyze.
Value Engineering
What does Value Engineering do?
 Value Engineering improves value.
 On a major road development, improvements
to value might include:
 reducing the life cycle cost of an interchange,
enhancing safety in a design;
 or reducing impacts to the public by
shortening the duration of a construction
project.
Value Engineering
 Value Engineering uses a combination of
creative and analytical techniques to identify
alternative ways to achieve objectives.
 The use of Function Analysis differentiates
Value Engineering from other problem solving
approaches.
 VE focuses on delivering the product or service
at the best price.
 This is achieved by incorporating those value
characteristics deemed most important by the
customer.
Value Engineering
How does V.E. work?
 V.E. follows a structured thought process
to evaluate options.
 Every V.E. session goes through a
number of steps:
 Gather information -What is being done
now?
 Measure Performance -How will the
alternatives be measured?
Value Engineering
 Analyse Functions -What must be done?
What does it Cost?
 Generate Ideas (Brainstorming) -What else
will do the job?
 Evaluate and Rank Ideas -Which Ideas are
the best?
 Develop and Expand Ideas -What are the
impacts? What is the cost? What is the
performance?
 Present Ideas Sell Alternatives
This is not helpdesk figure (different source)
Value Engineering
There are four important steps most be taken in
modified VE job plan. They are as follow:
Value Engineering
INTEGRATING LEAN SUPPLY WITH WORK
PLAN & VE

Contenu connexe

Tendances

Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updatedFarhana Rehman
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineeringajithsrc
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringGowsick Subramaniam
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner systemAnshi Verma
 
Last planner system
Last planner systemLast planner system
Last planner systemAnshi Verma
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsMohamed El-Mehalawi
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approachJames (JD) Dimas
 

Tendances (19)

Spm chapter 1
Spm chapter 1Spm chapter 1
Spm chapter 1
 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
 
Concurrent Virtual Engineering
Concurrent Virtual EngineeringConcurrent Virtual Engineering
Concurrent Virtual Engineering
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineering
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner system
 
Project Management
Project ManagementProject Management
Project Management
 
Last planner system
Last planner systemLast planner system
Last planner system
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project Controls
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 

En vedette

Peace Education Manual-UNAC
Peace Education Manual-UNACPeace Education Manual-UNAC
Peace Education Manual-UNACLauren Brunner
 
Restriction fragment length polymorphism (rflp)
Restriction fragment length polymorphism (rflp)Restriction fragment length polymorphism (rflp)
Restriction fragment length polymorphism (rflp)Baikie Reoko
 
Miriam Ramirez updated Resume 2
Miriam Ramirez updated Resume 2Miriam Ramirez updated Resume 2
Miriam Ramirez updated Resume 2Miriam Ramirez
 
Customer Value e Supply Chain
Customer Value e Supply Chain Customer Value e Supply Chain
Customer Value e Supply Chain Manager.it
 
Managing Workplace Stress - Presented to IOSH National Conference, June 2015
Managing Workplace Stress - Presented to IOSH National Conference, June 2015Managing Workplace Stress - Presented to IOSH National Conference, June 2015
Managing Workplace Stress - Presented to IOSH National Conference, June 2015EEF
 
Se7en Studio's Final annotated lyircs
Se7en Studio's Final annotated lyircsSe7en Studio's Final annotated lyircs
Se7en Studio's Final annotated lyircsrhsmediastudies
 
Safety 101 for Construction Workers
Safety 101 for Construction WorkersSafety 101 for Construction Workers
Safety 101 for Construction WorkersDumebi Kachikwu
 
любельский
любельскийлюбельский
любельскийolsemenova
 
Agricultura Sustentável
Agricultura Sustentável Agricultura Sustentável
Agricultura Sustentável 2016arqmiriam
 
захист ман у теребовлянському нвк
захист ман у теребовлянському нвкзахист ман у теребовлянському нвк
захист ман у теребовлянському нвкsemyurihor
 
євроклуб
євроклубєвроклуб
євроклубsemyurihor
 
Easy & basic seo for word press
Easy & basic seo for word pressEasy & basic seo for word press
Easy & basic seo for word pressEllie McFarlane
 
Estrategias de la publicidad y la mercadotecnia.
Estrategias de la publicidad y la mercadotecnia.Estrategias de la publicidad y la mercadotecnia.
Estrategias de la publicidad y la mercadotecnia.Miguel I. Robles Rico
 
New ways to engage with research - André Tomlin
New ways to engage with research - André TomlinNew ways to engage with research - André Tomlin
New ways to engage with research - André TomlinAndré Tomlin
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Murali Naidu
 

En vedette (20)

scan0290
scan0290scan0290
scan0290
 
CV
CVCV
CV
 
Peace Education Manual-UNAC
Peace Education Manual-UNACPeace Education Manual-UNAC
Peace Education Manual-UNAC
 
Restriction fragment length polymorphism (rflp)
Restriction fragment length polymorphism (rflp)Restriction fragment length polymorphism (rflp)
Restriction fragment length polymorphism (rflp)
 
Miriam Ramirez updated Resume 2
Miriam Ramirez updated Resume 2Miriam Ramirez updated Resume 2
Miriam Ramirez updated Resume 2
 
Group script
Group scriptGroup script
Group script
 
Customer Value e Supply Chain
Customer Value e Supply Chain Customer Value e Supply Chain
Customer Value e Supply Chain
 
Managing Workplace Stress - Presented to IOSH National Conference, June 2015
Managing Workplace Stress - Presented to IOSH National Conference, June 2015Managing Workplace Stress - Presented to IOSH National Conference, June 2015
Managing Workplace Stress - Presented to IOSH National Conference, June 2015
 
Se7en Studio's Final annotated lyircs
Se7en Studio's Final annotated lyircsSe7en Studio's Final annotated lyircs
Se7en Studio's Final annotated lyircs
 
Nadine's MES moodboard
Nadine's MES moodboardNadine's MES moodboard
Nadine's MES moodboard
 
Safety 101 for Construction Workers
Safety 101 for Construction WorkersSafety 101 for Construction Workers
Safety 101 for Construction Workers
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 
любельский
любельскийлюбельский
любельский
 
Agricultura Sustentável
Agricultura Sustentável Agricultura Sustentável
Agricultura Sustentável
 
захист ман у теребовлянському нвк
захист ман у теребовлянському нвкзахист ман у теребовлянському нвк
захист ман у теребовлянському нвк
 
євроклуб
євроклубєвроклуб
євроклуб
 
Easy & basic seo for word press
Easy & basic seo for word pressEasy & basic seo for word press
Easy & basic seo for word press
 
Estrategias de la publicidad y la mercadotecnia.
Estrategias de la publicidad y la mercadotecnia.Estrategias de la publicidad y la mercadotecnia.
Estrategias de la publicidad y la mercadotecnia.
 
New ways to engage with research - André Tomlin
New ways to engage with research - André TomlinNew ways to engage with research - André Tomlin
New ways to engage with research - André Tomlin
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 

Similaire à 041 Integrating Lean Construction (PART 2)

050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructabilitydrdej19
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction Dr Fereidoun Dejahang
 
Value engineering in residential house construction
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house constructionIAEME Publication
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projectsnitinrane33
 
Unit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycleUnit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycleDhivyaa C.R
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
 
058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity Dr Fereidoun Dejahang
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)drdej19
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage SchedulingJessica Lopez
 
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET Journal
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET Journal
 

Similaire à 041 Integrating Lean Construction (PART 2) (20)

050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
 
concurrent engineering.pdf
concurrent engineering.pdfconcurrent engineering.pdf
concurrent engineering.pdf
 
Value engineering in residential house construction
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house construction
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
 
Unit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycleUnit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycle
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage Scheduling
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and Programs
 
Design Review Mini
Design Review MiniDesign Review Mini
Design Review Mini
 
Design Review Mini(2)
Design Review Mini(2)Design Review Mini(2)
Design Review Mini(2)
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
 

Plus de Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

Plus de Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Dernier

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 

Dernier (20)

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

041 Integrating Lean Construction (PART 2)

  • 1. INTEGRATING LEAN SUPPLY WITH WORK PLAN & VE helpdesk@construction-productivity.co.uk htt://www.construction-productivity.co.uk
  • 2. LEAN CONSTRUCTION  Lean construction main objective is to maximizes value and reduces waste.  It applies specific techniques in an innovative project delivery approach.  It including: 1. supply chain management, 2. Just-In-Time techniques.
  • 4. LEAN CONSTRUCTION As well as the open sharing of information between all the parties involved in the production process. Lean manufacturing is an outgrowth of the Toyota Production system. Developed by Taichii Ohno in Toyota in the 1950s.
  • 5. LEAN CONSTRUCTION Ohno identified several wastes in mass production systems in car industry such as: 1. overproducing 2. waiting time 3. transporting
  • 6. LEAN CONSTRUCTION also, in other areas such as: 1. processing methods; 2. unnecessary stock on hand; 3. unnecessary motion; 4. defective goods; 5. failure to meet customers’ needs; 6. high waste through out the process.
  • 7. LEAN CONSTRUCTION Womack and Jones (1996) suggested that there are five key principles that need to be monitored when lean construction systems are applied in construction. Those are: Value-clarifying the customer’s needs; the supply chain involvement in all stages, from inception to completion; By clarifying activities or products that signify value.
  • 8. LEAN CONSTRUCTION Value stream: By mapping the whole value stream establishing cooperation between all parties involved; identifying and eliminating waste; From taking such steps the construction process can be improved.
  • 10. WORK PLAN  Construction Planning is a fundamental and challenging activity in the management and execution of construction projects It involves: 1. Managerial 2. Technological 3. Social factors.
  • 11. WORK PLAN  A good construction plan is the basis for developing the budget and the schedule for work.  Developing the construction plan is a critical task in the management of construction.  In developing a construction plan, it is common to adopt a primary emphasis on either cost control or on schedule control.
  • 13. WORK PLAN A database program called WorkPlan has been developed to systematically provide weekly work plans. WorkPlan adopts the Last Planner methodology, which implements a number of lean construction techniques.
  • 14. WORK PLAN  A week before the actual work starts WorkPlan guides the management team step by step through the process of producing work packages in order to identify issues such:  checking constraint  resolving constraints  Sending out work packages  allocating resources
  • 15. WORK PLAN Then at the end of the week, collecting site progress data such as: reasons for cost overrun reason for time overrun reason for delays Disruptions etc
  • 16. WORK PLAN This well planned and systematic approach helps the management team to create quality work plans. They learn from any failure a good WorkPlan is a weekly work plan based lean construction production scheduling
  • 17. WORK PLAN  screening  work package  Constraint  percentage of planned completed (PPC)  Scheduling of construction work is often done with the help of computer tools  It implement the critical-path method (CPM)
  • 18. WORK PLAN  based on activities of given duration and unit resources allocated to them  as well as predecessor relationships between activities  for different parties involved in a construction project to communicate with one another whom should be doing what work and when.
  • 19. WORK PLAN The application of lean production techniques in construction has been triggered by its success in manufacturing (Womack and Jones 1996). Weekly work plans can be developed as valuable tools for production planning and control.
  • 20. WORK PLAN This is possible through the application of lean construction techniques. In the application weekly work plans are generated using a database (Choo, Tommelein, Ballard, and Zabelle -1998).
  • 21. Value Engineering-Constructability  VALUE ENGINEERING  Value Engineering (VE) has been defined as:  the systematic effort directed at analyzing the functional requirements of:  systems  equipment  facilities  procedures  and supplies for the purpose of achieving the essential function at the lowest total (life-cycle) cost.
  • 22. Value Engineering-Constructability  Also, all the efforts are focused on meeting needed issues such as:  Performance;  Reliability;  quality, maintainability;  aesthetics,  Safety;  fire resistance;  while, at the same time, achieving lowest life- cycle cost.
  • 23. Value Engineering-Constructability  Constructability implementation can act as a predecessor to value engineering.  Providing information through constructor input and lessons learned from past projects such that value engineering may be more effective.
  • 24. Value Engineering Implementation of value engineering involves several steps: 1. Information; 2. functional analysis; 3. creative mind; 4. Evaluation; 5. planning & proposal; 6. Implementation; 7. follow-up.
  • 25. Value Engineering The creative step involves a brainstorming session where life- cycle cost alternatives, for design components are considered. Value engineering may be performed in two ways: (1) Proactively (2) Reactively
  • 26. Value Engineering(Value Analysis) What Is Value Engineering?  Value Engineering (V.E.), also known as Value Analysis,  is a systematic and function-based approach to improving the value of products, projects, or processes.  VE involves a group of people following a structured process.  The process helps team members communicate better across boundaries.  understand different perspectives,  innovate, and analyze.
  • 27. Value Engineering What does Value Engineering do?  Value Engineering improves value.  On a major road development, improvements to value might include:  reducing the life cycle cost of an interchange, enhancing safety in a design;  or reducing impacts to the public by shortening the duration of a construction project.
  • 28. Value Engineering  Value Engineering uses a combination of creative and analytical techniques to identify alternative ways to achieve objectives.  The use of Function Analysis differentiates Value Engineering from other problem solving approaches.  VE focuses on delivering the product or service at the best price.  This is achieved by incorporating those value characteristics deemed most important by the customer.
  • 29. Value Engineering How does V.E. work?  V.E. follows a structured thought process to evaluate options.  Every V.E. session goes through a number of steps:  Gather information -What is being done now?  Measure Performance -How will the alternatives be measured?
  • 30. Value Engineering  Analyse Functions -What must be done? What does it Cost?  Generate Ideas (Brainstorming) -What else will do the job?  Evaluate and Rank Ideas -Which Ideas are the best?  Develop and Expand Ideas -What are the impacts? What is the cost? What is the performance?  Present Ideas Sell Alternatives
  • 31. This is not helpdesk figure (different source)
  • 33. There are four important steps most be taken in modified VE job plan. They are as follow:
  • 35. INTEGRATING LEAN SUPPLY WITH WORK PLAN & VE