SlideShare une entreprise Scribd logo
1  sur  31
Télécharger pour lire hors ligne
© 2011 Bentley Systems, Incorporated

SACS Offshore Solutions
V3 20120322
1 | WWW.BENTLEY.COM
47 of the top 50 International
ENR Design Firms
use Bentley software

Bentley is a Global Leader in:
 Structural analysis
 Construction simulation
 Road and Rail
 Infrastructure asset operations
 Process plant operations  Collaboration servers

Global Business:
• Nearly 3,000 colleagues in 45 countries
• $500 million in annual revenues
2 | WWW.BENTLEY.COM

 Now leading in Offshore solutions

© 2011 Bentley Systems, Incorporated

About Bentley

Engineering software for information modeling by way of
integrated projects to support intelligent infrastructure
3 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Some Bentley Users:
4 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

SACS – Design & Analysis Software
for Offshore Structures
SACS has applications for all types of offshore structures:

Structural Analysis

Structural Analysis

Topsides & Jacket

Topsides

Fixed Platform

TLP’s

Compliant Tower

Semi-submersibles
Spars
FPSO’s

5 | WWW.BENTLEY.COM

Motions & Stability*
FPSO
Semi-submersible
* Coming in Q4 2012

© 2011 Bentley Systems, Incorporated

Introduction
© 2011 Bentley Systems, Incorporated

Life Cycle Applications

INSTALLATION

FABRICATION
6 | WWW.BENTLEY.COM

INPLACE
Static Analysis with PSI
Code Check Design
Fatigue Analysis
Earthquake Analysis
Safety Case Design

7 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Inplace Analysis
Airy’s Linear
Cnoidal
Solitary Wave
Stokes 5th Order
Stream Function

8 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Wave Load Theories
9 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Wind Load Design for Topsides
10 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Deck Installation – Lift Analysis
Spectral
Time History

11 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Earthquake Analysis
POST:

12 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Member Code Checks
DYNAMIC RESPONSE / COLLAPSE:

13 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Non-Linear Dropped Object Analysis
- Minimize risk to personnel, facilities and environment from
accidental explosions.
14 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Non-Linear Dynamic Blast Analysis
DYNAMIC RESPONSE / COLLAPSE:

15 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Non-Linear Dynamic Blast Analysis
Loading on Structure
Wind Spectrum

Dynamic
Response of
Structure

Wave Spectrum

16 | WWW.BENTLEY.COM

Von Karman
Harris
Kaimal
User Defined

Pierson-Moskowitz
JONSWAP
Ochi-Hubble
User defined

© 2011 Bentley Systems, Incorporated

Wind Turbine Fatigue Analysis
Fatigue Analysis
Stress Cycle Counting

Rainflow counting approach to predict the stress cycles resulting from
a time history analysis

Interface to Turbine Analysis
GH Bladed
FAST

17 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Wind Turbine Fatigue Analysis
18 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Ship Impact Analysis
• Intact and damage stability of any floating structure or vessel

19 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Platform & Vessel Stability (coming in Q4 2012)
• Motions prediction of platforms and vessels

20 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Platform & Vessel Motions (coming in Q4 2012)
Static Analysis with Non-Linear
Gap Elements

21 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Loadout Analysis
Bent Roll Up construction
Sling force calculations

22 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Analysis during Fabrication
Tow Analysis
Static Analysis with Non Linear Gap Elements
Sea fastener Design

23 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Transportation Analysis
Design Structure for Lift Forces
Design Lift Pad Eyes

24 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Lift Analysis
Jacket & Barge Motions
Hydrodynamic Forces
User defined drag areas

25 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Launch Time History Analysis
Stability and Upending Analysis

Dual Hook Capabilities
Buoyancy Tanks, Valves, User Defined Buoyancy

26 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Flotation and Upending Analysis
API P-Y / T-Z Soil
API Adhesion Soil
User Defined P-Y / T –Z Soil
User Defined Adhesion Soil

Mudline

Pile

27 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Pile-Soil Interaction (PSI) Analysis
Spectral
Time History
Deterministic
Interactive design and re-design

28 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Fatigue Analysis
Generalized Force Spectrum : Harris Spectrum
Wind Speed Distribution : Weibull Distribution

29 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

Spectral Wind Fatigue Analysis
30 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

SACS – Design & Analysis Software
for Offshore Structures
• For more information
– Web www.bentley.com/SACS
– Email
http://www.bentley.com/bentleywebsite/tools/sales_contact.aspx

31 | WWW.BENTLEY.COM

© 2011 Bentley Systems, Incorporated

SACS – Design & Analysis Software
for Offshore Structures

Contenu connexe

Tendances

Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
Nitish Anand
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
calir2lune
 
Presentasi Tugas Besar Bangunan Lepas Pantai
Presentasi Tugas Besar Bangunan Lepas PantaiPresentasi Tugas Besar Bangunan Lepas Pantai
Presentasi Tugas Besar Bangunan Lepas Pantai
Faisal Purnawarman
 

Tendances (20)

Basic load out methodologies introduction
Basic load out methodologies introductionBasic load out methodologies introduction
Basic load out methodologies introduction
 
Design recomendation for storage tank
Design recomendation for storage tankDesign recomendation for storage tank
Design recomendation for storage tank
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 
Wind provisions
Wind provisionsWind provisions
Wind provisions
 
41914644 storage-tank-design-calculations-seismic-design-overturning-moment-b...
41914644 storage-tank-design-calculations-seismic-design-overturning-moment-b...41914644 storage-tank-design-calculations-seismic-design-overturning-moment-b...
41914644 storage-tank-design-calculations-seismic-design-overturning-moment-b...
 
Ppt report on offshore Platform Designs
Ppt report on offshore Platform DesignsPpt report on offshore Platform Designs
Ppt report on offshore Platform Designs
 
ASCE/SEI 7-10
ASCE/SEI 7-10ASCE/SEI 7-10
ASCE/SEI 7-10
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Steel building design worked example
Steel building design worked exampleSteel building design worked example
Steel building design worked example
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
Offshore 187
Offshore 187Offshore 187
Offshore 187
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Level 3 assessment as per api 579 1 asme ffs-1 for pressure vessel general me...
Level 3 assessment as per api 579 1 asme ffs-1 for pressure vessel general me...Level 3 assessment as per api 579 1 asme ffs-1 for pressure vessel general me...
Level 3 assessment as per api 579 1 asme ffs-1 for pressure vessel general me...
 
Final ppt of ts
Final ppt of tsFinal ppt of ts
Final ppt of ts
 
Presentasi Tugas Besar Bangunan Lepas Pantai
Presentasi Tugas Besar Bangunan Lepas PantaiPresentasi Tugas Besar Bangunan Lepas Pantai
Presentasi Tugas Besar Bangunan Lepas Pantai
 

En vedette

Pad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standartPad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standart
suchit arivu
 
Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculation
adiq1901
 
FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015
Raja Muazzam
 
Sosialisasi IT Sekolah se-Jawa Barat
Sosialisasi IT Sekolah se-Jawa BaratSosialisasi IT Sekolah se-Jawa Barat
Sosialisasi IT Sekolah se-Jawa Barat
Faisal Purnawarman
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
Emeka Ngwobia
 

En vedette (20)

Pad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standartPad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standart
 
Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculation
 
Padeye calculation example
Padeye calculation examplePadeye calculation example
Padeye calculation example
 
FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015
 
ApresentaçãO1
ApresentaçãO1ApresentaçãO1
ApresentaçãO1
 
Bentley Systems Environment 1
Bentley  Systems  Environment 1Bentley  Systems  Environment 1
Bentley Systems Environment 1
 
Indonesia Offshore Decommissioning Research
Indonesia Offshore Decommissioning ResearchIndonesia Offshore Decommissioning Research
Indonesia Offshore Decommissioning Research
 
Sosialisasi IT Sekolah se-Jawa Barat
Sosialisasi IT Sekolah se-Jawa BaratSosialisasi IT Sekolah se-Jawa Barat
Sosialisasi IT Sekolah se-Jawa Barat
 
Bentley Systems Colleagues Celebrate Engineers Week 2017
Bentley Systems Colleagues Celebrate Engineers Week 2017 Bentley Systems Colleagues Celebrate Engineers Week 2017
Bentley Systems Colleagues Celebrate Engineers Week 2017
 
Sewer cad 10
Sewer cad 10Sewer cad 10
Sewer cad 10
 
Possible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NYPossible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NY
 
KL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology ChangeKL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology Change
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
Chen sacs 2014 descending cases presentation compressed
Chen sacs 2014 descending cases presentation   compressedChen sacs 2014 descending cases presentation   compressed
Chen sacs 2014 descending cases presentation compressed
 
SACS Readiness Week: Jackson State University's Re-Accreditation Process
SACS Readiness Week: Jackson State University's Re-Accreditation ProcessSACS Readiness Week: Jackson State University's Re-Accreditation Process
SACS Readiness Week: Jackson State University's Re-Accreditation Process
 
Quickstart to SACS Accreditation Management System in SharePoint
Quickstart to SACS Accreditation Management System in SharePointQuickstart to SACS Accreditation Management System in SharePoint
Quickstart to SACS Accreditation Management System in SharePoint
 
How to Import a Sacs Model into GeniE
How to Import a Sacs Model into GeniE How to Import a Sacs Model into GeniE
How to Import a Sacs Model into GeniE
 
Hydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s AirportHydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s Airport
 
Is 4190.1984 lifting eye bolts
Is 4190.1984 lifting eye boltsIs 4190.1984 lifting eye bolts
Is 4190.1984 lifting eye bolts
 
Bently
BentlyBently
Bently
 

Similaire à Sacs otc 2012

Bentley offshore overview_2013
Bentley offshore overview_2013Bentley offshore overview_2013
Bentley offshore overview_2013
OFFSHORE VN
 
Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011
Rob_Skeleton
 
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libreDevelopment_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Srikanth Chadalavada
 
Technology standard ci_platforms
Technology standard ci_platformsTechnology standard ci_platforms
Technology standard ci_platforms
suleymanissiz
 
Technology standard ci_platforms
Technology standard ci_platformsTechnology standard ci_platforms
Technology standard ci_platforms
suleymanissiz
 

Similaire à Sacs otc 2012 (20)

SACS_OTC_2012.pdf
SACS_OTC_2012.pdfSACS_OTC_2012.pdf
SACS_OTC_2012.pdf
 
Bentley offshore overview_2013
Bentley offshore overview_2013Bentley offshore overview_2013
Bentley offshore overview_2013
 
Geosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedinGeosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedin
 
Npp operations, compliance and reliability en
Npp operations, compliance and reliability enNpp operations, compliance and reliability en
Npp operations, compliance and reliability en
 
Transformation to a digital city
Transformation to a digital city  Transformation to a digital city
Transformation to a digital city
 
ISO 15926 - Enabling a consumer view of data, Glen Worrall, Bentley Systems (...
ISO 15926 - Enabling a consumer view of data, Glen Worrall, Bentley Systems (...ISO 15926 - Enabling a consumer view of data, Glen Worrall, Bentley Systems (...
ISO 15926 - Enabling a consumer view of data, Glen Worrall, Bentley Systems (...
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
Thomas Hansen - information management
Thomas Hansen - information management Thomas Hansen - information management
Thomas Hansen - information management
 
SMART CITY CONTEXT AND ENGAGEMENT IN URBAN PLANNING
SMART CITY CONTEXT AND ENGAGEMENT IN URBAN PLANNINGSMART CITY CONTEXT AND ENGAGEMENT IN URBAN PLANNING
SMART CITY CONTEXT AND ENGAGEMENT IN URBAN PLANNING
 
Bentley commercial programs
Bentley commercial programsBentley commercial programs
Bentley commercial programs
 
Advancing BIM for Hot Firm Advantage
Advancing BIM for Hot Firm AdvantageAdvancing BIM for Hot Firm Advantage
Advancing BIM for Hot Firm Advantage
 
Bentley Information Mobility update - seminar in Estonia 9/2014
Bentley Information Mobility update - seminar in Estonia 9/2014Bentley Information Mobility update - seminar in Estonia 9/2014
Bentley Information Mobility update - seminar in Estonia 9/2014
 
Bentley presentation by Noah Eckhouse
Bentley presentation by Noah EckhouseBentley presentation by Noah Eckhouse
Bentley presentation by Noah Eckhouse
 
Modeling the grid for de centralized energy
Modeling the grid for de centralized energyModeling the grid for de centralized energy
Modeling the grid for de centralized energy
 
Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011
 
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libreDevelopment_of_Computer_Aided_Critical_Lift_Planning_Software-libre
Development_of_Computer_Aided_Critical_Lift_Planning_Software-libre
 
Intel: Industry Enablement of IO Technologies
Intel: Industry Enablement of IO TechnologiesIntel: Industry Enablement of IO Technologies
Intel: Industry Enablement of IO Technologies
 
Technology standard ci_platforms
Technology standard ci_platformsTechnology standard ci_platforms
Technology standard ci_platforms
 
Technology standard ci_platforms
Technology standard ci_platformsTechnology standard ci_platforms
Technology standard ci_platforms
 
Realize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptxRealize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptx
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Dernier (20)

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Sacs otc 2012

  • 1. © 2011 Bentley Systems, Incorporated SACS Offshore Solutions V3 20120322 1 | WWW.BENTLEY.COM
  • 2. 47 of the top 50 International ENR Design Firms use Bentley software Bentley is a Global Leader in:  Structural analysis  Construction simulation  Road and Rail  Infrastructure asset operations  Process plant operations  Collaboration servers Global Business: • Nearly 3,000 colleagues in 45 countries • $500 million in annual revenues 2 | WWW.BENTLEY.COM  Now leading in Offshore solutions © 2011 Bentley Systems, Incorporated About Bentley Engineering software for information modeling by way of integrated projects to support intelligent infrastructure
  • 3. 3 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Some Bentley Users:
  • 4. 4 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated SACS – Design & Analysis Software for Offshore Structures
  • 5. SACS has applications for all types of offshore structures: Structural Analysis Structural Analysis Topsides & Jacket Topsides Fixed Platform TLP’s Compliant Tower Semi-submersibles Spars FPSO’s 5 | WWW.BENTLEY.COM Motions & Stability* FPSO Semi-submersible * Coming in Q4 2012 © 2011 Bentley Systems, Incorporated Introduction
  • 6. © 2011 Bentley Systems, Incorporated Life Cycle Applications INSTALLATION FABRICATION 6 | WWW.BENTLEY.COM INPLACE
  • 7. Static Analysis with PSI Code Check Design Fatigue Analysis Earthquake Analysis Safety Case Design 7 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Inplace Analysis
  • 8. Airy’s Linear Cnoidal Solitary Wave Stokes 5th Order Stream Function 8 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Wave Load Theories
  • 9. 9 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Wind Load Design for Topsides
  • 10. 10 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Deck Installation – Lift Analysis
  • 11. Spectral Time History 11 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Earthquake Analysis
  • 12. POST: 12 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Member Code Checks
  • 13. DYNAMIC RESPONSE / COLLAPSE: 13 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Non-Linear Dropped Object Analysis
  • 14. - Minimize risk to personnel, facilities and environment from accidental explosions. 14 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Non-Linear Dynamic Blast Analysis
  • 15. DYNAMIC RESPONSE / COLLAPSE: 15 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Non-Linear Dynamic Blast Analysis
  • 16. Loading on Structure Wind Spectrum Dynamic Response of Structure Wave Spectrum 16 | WWW.BENTLEY.COM Von Karman Harris Kaimal User Defined Pierson-Moskowitz JONSWAP Ochi-Hubble User defined © 2011 Bentley Systems, Incorporated Wind Turbine Fatigue Analysis
  • 17. Fatigue Analysis Stress Cycle Counting Rainflow counting approach to predict the stress cycles resulting from a time history analysis Interface to Turbine Analysis GH Bladed FAST 17 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Wind Turbine Fatigue Analysis
  • 18. 18 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Ship Impact Analysis
  • 19. • Intact and damage stability of any floating structure or vessel 19 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Platform & Vessel Stability (coming in Q4 2012)
  • 20. • Motions prediction of platforms and vessels 20 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Platform & Vessel Motions (coming in Q4 2012)
  • 21. Static Analysis with Non-Linear Gap Elements 21 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Loadout Analysis
  • 22. Bent Roll Up construction Sling force calculations 22 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Analysis during Fabrication
  • 23. Tow Analysis Static Analysis with Non Linear Gap Elements Sea fastener Design 23 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Transportation Analysis
  • 24. Design Structure for Lift Forces Design Lift Pad Eyes 24 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Lift Analysis
  • 25. Jacket & Barge Motions Hydrodynamic Forces User defined drag areas 25 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Launch Time History Analysis
  • 26. Stability and Upending Analysis Dual Hook Capabilities Buoyancy Tanks, Valves, User Defined Buoyancy 26 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Flotation and Upending Analysis
  • 27. API P-Y / T-Z Soil API Adhesion Soil User Defined P-Y / T –Z Soil User Defined Adhesion Soil Mudline Pile 27 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Pile-Soil Interaction (PSI) Analysis
  • 28. Spectral Time History Deterministic Interactive design and re-design 28 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Fatigue Analysis
  • 29. Generalized Force Spectrum : Harris Spectrum Wind Speed Distribution : Weibull Distribution 29 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated Spectral Wind Fatigue Analysis
  • 30. 30 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated SACS – Design & Analysis Software for Offshore Structures
  • 31. • For more information – Web www.bentley.com/SACS – Email http://www.bentley.com/bentleywebsite/tools/sales_contact.aspx 31 | WWW.BENTLEY.COM © 2011 Bentley Systems, Incorporated SACS – Design & Analysis Software for Offshore Structures