This document summarizes presentations from Harry Harrison of Wood Group Mustang and Brian Stamper of CURT/CLMA on labor shortage risks and mitigation strategies in the energy construction industry. It outlines the current skilled labor shortage problem, noting demand exceeds supply. It then provides details on current and projected skilled labor demand and shortages across different industrial sectors and crafts. Finally, it describes tools from CURT/CLMA that help analyze project-specific labor needs, risks, and availability to help mitigate risks from labor shortages.
2. Leading Global EPCM Provider
• Founded 1987 in Houston, Texas
• Joined Wood Group in 2000
• Rebranded to Wood Group Mustang in 2012
• More than 11,000 projects for 350 clients
• Consistently ranked as a Top Workplace
• Approximately 8,500 employees worldwide
• Core services:
– Project management
– Engineering
– Procurement
– Construction management
4. Industry’s Challenge
www.myCLMA.com
The Problem
Ø Skilled labor demand far
exceeds skilled labor supply
Ø Labor shortages equals high
risk, painful cost escalation
Ø Industry has lacked an
effective, dynamic way to
understand labor risk & plan
The Challenge
Ø What and where are the
challenges
Ø Which industry sectors?
Ø Which crafts
Ø Short-term or long-term?
6. Supply/Demand Gap
www.myCLMA.com
The
Industrial
Market
• Peak
Demand
of
over
1.2m
CraC
Demand
by
industrial
markets
• 30%
Power
GeneraGon
≈
360k
in
skilled
labor
demand
• Peaks
–
Q1
2018
• 25%
Manufacturing
≈
300k
in
skilled
labor
demand
• Peaks
-‐
Q2
2016
• 23%
Process
≈
275k
in
skilled
labor
demand
• Peaks
-‐
Q1
2017
• 15%
Chemical
≈
180K
in
skilled
labor
demand
• Peaks
-‐
Q1
2017
• 5%
Refinery
≈
61k
in
skilled
labor
demand
• Peaks
-‐
Q2
2017
• 2%
Other
≈
24k
in
skilled
labor
demand
• Peaks
–
Q2
2015
7. www.myCLMA.com
Market Pressures (Age Demographics)
An
es6mated
17%
of
the
construc6on
workforce
will
re6re
in
the
next
decade
or
so,
represen6ng
aBri6on
of
about
800,000
skilled
workers.
The
percentage
for
supervision
is
much
higher.
24.9%
15.5%
3.9%
8. www.myCLMA.com
Market Pressures (Gas Plays)
• Energy
• Natural gas prices
• Made in America resurgence
• Labor cost increases overseas
• NG construction past 5 years ≈ 46% ▲
Source:
Associated
General
Contractors
of
America
11. www.myCLMA.com
• More
than
4M
projects
• Value
of
projects
≈
$4.25T
• Over
70%
of
U.S.
non-‐residenGal
construcGon
• Over
76%
Industrial
construcGon
• About
68%
Non-‐Industrial
construcGon
• Tracks
49
craC
disciplines
• Now
tracking
14
management
/
supervisor
posiGons
The CLMA® Database
12. www.myCLMA.com
Easy Project Input
Project Name:
Enter a unique project name/
code
Project Class:
• New Construction
• Maintenance/ Shutdown
Project Type:
• Capital
• Annual Capital Program
• Maintenance
• Ongoing Maintenance
Industry Type:
Choose from 99 industrial and
non-industrial industry types.
If the industry type you need
isn’t there, we’ll customize
one for you.
13. www.myCLMA.com
Easy Project Input
Project Status:
Select your project status
from 11 options ranging from
Conceptual Planning (pre-FEL)
to Construction Completed
or On-Hold
Probability:
Enter the % likely that the
project will commence
Time Units:
Indicate your preference for
tracking labor utilization –
Daily,Weekly, Monthly
Total Project Cost:
Enter the total installed cost
of the project
14. www.myCLMA.com
Easy Project Input
Start / End Date:
Indicate the estimated date
construction will begin and
the estimated construction
completion date
Zip Code:
Input the project zip code
Project Notes:
Enter any relevant notes
Bundled Projects:
Bundle multiple small projects
with the same zip code and
similar start/end dates, and list
them here
16. PLF® Identifies Project Labor Needs
Quickly understand your
skilled labor requirements on
a craft-by-craft basis, along
with peak headcount overall
and by craft.
Chemical
Project
Louisiana
www.myCLMA.com
1,251
17. Click the Risk Indicator & find
mitigation options that
correlate to the CURT®
Skilled Labor Shortage Risk
Mitigation white paper.
Visualize Risk. Take Action.
Chemical
Project
Louisiana
www.myCLMA.com
19. www.myCLMA.com
Analyze Competition for Crafts
Analyze
project
labor
challenges
and
risk
dynamically
Visualize your project’s
competition for skilled labor
on a craft-by-craft basis
Chemical
Project
Louisiana
20. Labor Supply – U.S. Sample
Sample
Data
for
Demo
www.myCLMA.com
21. Labor Supply – TX Sample
www.myCLMA.com
Sample
Data
for
Demo
22. Labor Supply – TX Sample
Sample
Data
for
Demo
www.myCLMA.com
23. www.myCLMA.com
Market Demand (TX Sample)
5% Growth
Age 60 Attrition
Visualize age attrition over time
& required replacement of
crafts to meet demand