Labor Shortage Risk
Mitigation
Energy Construction Forum
Galveston
March 3-4
Harry Harrison, Wood Group Mustang
Brian Stamper, CURT/CLMA
Leading Global EPCM Provider
•  Founded 1987 in Houston, Texas
•  Joined Wood Group in 2000
•  Rebranded to Wood Group Mustang in 2012
•  More than 11,000 projects for 350 clients
•  Consistently ranked as a Top Workplace
•  Approximately 8,500 employees worldwide
•  Core services:
–  Project management
–  Engineering
–  Procurement
–  Construction management
Our Core Values
Industry’s Challenge
www.myCLMA.com
The Problem
Ø  Skilled labor demand far
exceeds skilled labor supply
Ø  Labor shortages equals high
risk, painful cost escalation
Ø Industry has lacked an
effective, dynamic way to
understand labor risk & plan
The Challenge
Ø  What and where are the
challenges
Ø  Which industry sectors?
Ø  Which crafts
Ø  Short-term or long-term?
Supply/Demand Gap
www.myCLMA.com
The	
  past	
  year	
  saw	
  an	
  increase	
  of…	
  
	
  ≈	
  200k	
  in	
  skilled	
  labor	
  demand	
  
	
  	
  	
  ≈	
  150k	
  entered/re-­‐entered	
  labor	
  force	
  	
  	
  
Supply/Demand Gap
www.myCLMA.com
The	
  Industrial	
  Market	
  
•  Peak	
  Demand	
  of	
  over	
  1.2m	
  CraC	
  
	
  
Demand	
  by	
  industrial	
  markets	
  
•  30%	
  Power	
  GeneraGon	
  ≈	
  360k	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  –	
  Q1	
  2018	
  
•  25%	
  Manufacturing	
  ≈	
  300k	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  -­‐	
  Q2	
  2016	
  
•  23%	
  Process	
  ≈	
  275k	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  -­‐	
  Q1	
  2017	
  
•  15%	
  Chemical	
  ≈	
  180K	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  -­‐	
  Q1	
  2017	
  
•  5%	
  	
  	
  Refinery	
  ≈	
  61k	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  -­‐	
  Q2	
  2017	
  
•  2%	
  	
  	
  Other	
  ≈	
  24k	
  in	
  skilled	
  labor	
  demand	
  
•  Peaks	
  –	
  Q2	
  2015	
  	
  
www.myCLMA.com
Market Pressures (Age Demographics)
An	
  es6mated	
  17%	
  of	
  
the	
  construc6on	
  
workforce	
  will	
  re6re	
  
in	
  the	
  next	
  decade	
  or	
  
so,	
  represen6ng	
  
aBri6on	
  of	
  about	
  
800,000	
  skilled	
  
workers.	
  The	
  
percentage	
  for	
  
supervision	
  is	
  much	
  
higher.	
  
24.9%	
  
15.5%	
  
3.9%	
  
www.myCLMA.com
Market Pressures (Gas Plays)
•  Energy
•  Natural gas prices
•  Made in America resurgence
•  Labor cost increases overseas
•  NG construction past 5 years ≈ 46% ▲
Source:	
  Associated	
  General	
  Contractors	
  of	
  America	
  
www.myCLMA.com
Gulf Coast Base-to-Peak
www.myCLMA.com
Sophisticated. Not Complicated.
Owners	

Contractors	

Unions	

Governments	

Underwriters	

Suppliers	

Brokers	

Consultants	

A/E Firms	

Industrial & Non-
Industrial Projects	

(Demand)	

Worker data input
by contractors &
unions (Supply)	

 ü 	
  Secure	
  
ü 	
  ConfidenGal	
  
ü 	
  AnG-­‐Trust	
  Protected	
  
ü 	
  90-­‐Day	
  Updates	
  
www.myCLMA.com
•  More	
  than	
  4M	
  projects	
  
•  Value	
  of	
  projects	
  ≈	
  $4.25T	
  
•  Over	
  70%	
  of	
  U.S.	
  non-­‐residenGal	
  construcGon	
  
•  Over	
  76%	
  Industrial	
  construcGon	
  
•  About	
  68%	
  Non-­‐Industrial	
  construcGon	
  
•  Tracks	
  49	
  craC	
  disciplines	
  	
  
•  Now	
  tracking	
  14	
  management	
  /	
  supervisor	
  posiGons	
  	
  
	
  
The CLMA® Database
www.myCLMA.com
Easy Project Input
Project Name: 	

Enter a unique project name/
code	

Project Class:	

•  New Construction	

•  Maintenance/ Shutdown	

Project Type:	

•  Capital 	

•  Annual Capital Program 	

•  Maintenance 	

•  Ongoing Maintenance	

Industry Type:	

Choose from 99 industrial and
non-industrial industry types.
If the industry type you need
isn’t there, we’ll customize
one for you.
www.myCLMA.com
Easy Project Input
Project Status: 	

Select your project status
from 11 options ranging from
Conceptual Planning (pre-FEL)
to Construction Completed
or On-Hold	

Probability: 	

Enter the % likely that the
project will commence	

Time Units: 	

Indicate your preference for
tracking labor utilization –
Daily,Weekly, Monthly	

Total Project Cost: 	

Enter the total installed cost
of the project
www.myCLMA.com
Easy Project Input
Start / End Date: 	

Indicate the estimated date
construction will begin and
the estimated construction
completion date	

Zip Code: 	

Input the project zip code	

Project Notes: 	

Enter any relevant notes 	

Bundled Projects: 	

Bundle multiple small projects
with the same zip code and
similar start/end dates, and list
them here
www.myCLMA.com
Sample Project
Project	
  Descrip6on	
   Chemical	
  LA	
  
Project	
  Type	
   New	
  ConstrucGon	
  
Project	
  Loca6on	
   Baton	
  Rouge,	
  LA	
  
Industry	
  Type	
   Chemical	
  
Project	
  Status	
   Early	
  FEL	
  1	
  
Project	
  Cost	
   $1.35B	
  
PLF® Identifies Project Labor Needs
Quickly understand your
skilled labor requirements on
a craft-by-craft basis, along
with peak headcount overall
and by craft.	

Chemical	
  Project	
  Louisiana	
  	
  
www.myCLMA.com
1,251	
  
Click the Risk Indicator & find
mitigation options that
correlate to the CURT®
Skilled Labor Shortage Risk
Mitigation white paper. 	

Visualize Risk. Take Action.
Chemical	
  Project	
  Louisiana	
  	
  
www.myCLMA.com
Customize Risk Profile
Chemical	
  Project	
  Louisiana	
  	
  
www.myCLMA.com
www.myCLMA.com
Analyze Competition for Crafts
Analyze	
  project	
  labor	
  
challenges	
  and	
  risk	
  
dynamically	

Visualize your project’s
competition for skilled labor
on a craft-by-craft basis	

Chemical	
  Project	
  Louisiana	
  	
  
Labor Supply – U.S. Sample
Sample	
  
Data	
  for	
  
Demo	
  
www.myCLMA.com
Labor Supply – TX Sample
www.myCLMA.com
Sample	
  
Data	
  for	
  
Demo	
  
Labor Supply – TX Sample
Sample	
  
Data	
  for	
  
Demo	
  
www.myCLMA.com
www.myCLMA.com
Market Demand (TX Sample)
5% Growth	

Age 60 Attrition	

Visualize age attrition over time
& required replacement of
crafts to meet demand
www.myCLMA.com
Market Pressures (Today’s Issues)
Project	
  cancella6ons	
  
Project	
  start	
  delays	
  
No	
  impact	
  
Re-­‐work	
  
Overall	
  project	
  budget	
  
Safety	
  
Absenteeism	
  
Schedule	
  
Turnover	
  
Quality	
  
Produc6vity	
  
Cost	
  of	
  labor	
  
7%	
  
15%	
  
19%	
  
23%	
  
25%	
  
27%	
  
28%	
  
35%	
  
36%	
  
45%	
  
49%	
  
52%	
  
Na6onal	
  survey	
  of	
  531	
  construc6on	
  industry	
  leaders	
  
www.myCLMA.com
Market Pressures (Today’s Issues)
Na6onal	
  survey	
  of	
  100	
  construc6on	
  industry	
  leaders	
  
www.myCLMA.com
Finding Labor Issues (Today’s Issues)
Na6onal	
  survey	
  of	
  100	
  construc6on	
  industry	
  leaders	
  
79%	
  
21%	
  
Yes	
  
No	
  
www.myCLMA.com
Safety Issues (Today’s Issues)
Na6onal	
  survey	
  of	
  100	
  construc6on	
  industry	
  leaders	
  
65%	
  
35%	
  
Yes	
  
No	
  
www.mustangeng.com	
  

Contenu connexe

En vedette

Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Mook NP
 
Construction Risk Summit "benefit and pits of Construction Risk Management"
Construction Risk Summit   "benefit and pits of Construction Risk Management"Construction Risk Summit   "benefit and pits of Construction Risk Management"
Construction Risk Summit "benefit and pits of Construction Risk Management"bfriday
 
PPT on Bangladesh Labor Setor & Oikko
PPT on Bangladesh Labor Setor & OikkoPPT on Bangladesh Labor Setor & Oikko
PPT on Bangladesh Labor Setor & OikkoJhuma Halder
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2Anand Bobade
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk managementIQPC
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Caterpillar Case Study Presentation
Caterpillar Case Study PresentationCaterpillar Case Study Presentation
Caterpillar Case Study PresentationAman Agrawal
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5pankajsh10
 

En vedette (13)

Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007
 
Construction Risk Summit "benefit and pits of Construction Risk Management"
Construction Risk Summit   "benefit and pits of Construction Risk Management"Construction Risk Summit   "benefit and pits of Construction Risk Management"
Construction Risk Summit "benefit and pits of Construction Risk Management"
 
PPT on Bangladesh Labor Setor & Oikko
PPT on Bangladesh Labor Setor & OikkoPPT on Bangladesh Labor Setor & Oikko
PPT on Bangladesh Labor Setor & Oikko
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Caterpillar Case Study Presentation
Caterpillar Case Study PresentationCaterpillar Case Study Presentation
Caterpillar Case Study Presentation
 
PMP_Project Risk Management
PMP_Project Risk ManagementPMP_Project Risk Management
PMP_Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
The Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk ManagementThe Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk Management
 
Introduction to Risk Management
Introduction to Risk ManagementIntroduction to Risk Management
Introduction to Risk Management
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 

Similaire à Workforce Labor Demands, Studies & Forecasts - PART 3

Automotive & aerospace business opportunities in mexico 1
Automotive & aerospace business opportunities in mexico 1Automotive & aerospace business opportunities in mexico 1
Automotive & aerospace business opportunities in mexico 1American Industries Group
 
Automotive & autoparts business opportunities in mexico
Automotive & autoparts business opportunities in mexicoAutomotive & autoparts business opportunities in mexico
Automotive & autoparts business opportunities in mexicoAmerican Industries Group
 
Monster Construction Hiring Outlook
Monster Construction Hiring OutlookMonster Construction Hiring Outlook
Monster Construction Hiring OutlookThomas Eskridge
 
The Offshore Group Value Proposition
The Offshore Group Value PropositionThe Offshore Group Value Proposition
The Offshore Group Value PropositionThe Offshore Group
 
Manufacturing in Mexico with The Offshore Group
Manufacturing in Mexico with The Offshore GroupManufacturing in Mexico with The Offshore Group
Manufacturing in Mexico with The Offshore GroupThe Offshore Group
 
Afton Chemical & Scott Miller: The Renaissance in U.S. Manufacturing
Afton Chemical & Scott Miller: The Renaissance in U.S. ManufacturingAfton Chemical & Scott Miller: The Renaissance in U.S. Manufacturing
Afton Chemical & Scott Miller: The Renaissance in U.S. ManufacturingAfton Chemical
 
Day 1 june 20 morning and track 1
Day 1 june 20 morning and track 1Day 1 june 20 morning and track 1
Day 1 june 20 morning and track 1Nicole Green
 
Competing against Low Cost Producing Countries
Competing against Low Cost Producing CountriesCompeting against Low Cost Producing Countries
Competing against Low Cost Producing Countriespaul young cpa, cga
 
Failed Clean Energy Policies - Ontario - Wynne and McGuinty
Failed Clean Energy Policies -  Ontario - Wynne and McGuintyFailed Clean Energy Policies -  Ontario - Wynne and McGuinty
Failed Clean Energy Policies - Ontario - Wynne and McGuintypaul young cpa, cga
 
BoyarMiller "The Energy Industry 2016" eBook
BoyarMiller "The Energy Industry 2016" eBookBoyarMiller "The Energy Industry 2016" eBook
BoyarMiller "The Energy Industry 2016" eBookBoyarMiller
 
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019BoyarMiller
 
Slides_Chapter 1.pptx
Slides_Chapter 1.pptxSlides_Chapter 1.pptx
Slides_Chapter 1.pptxrygt7cp89y
 

Similaire à Workforce Labor Demands, Studies & Forecasts - PART 3 (20)

Automotive & aerospace business opportunities in mexico 1
Automotive & aerospace business opportunities in mexico 1Automotive & aerospace business opportunities in mexico 1
Automotive & aerospace business opportunities in mexico 1
 
Automotive & autoparts business opportunities in mexico
Automotive & autoparts business opportunities in mexicoAutomotive & autoparts business opportunities in mexico
Automotive & autoparts business opportunities in mexico
 
Ch03_Roth3e_Enhanced_PPT.pdf
Ch03_Roth3e_Enhanced_PPT.pdfCh03_Roth3e_Enhanced_PPT.pdf
Ch03_Roth3e_Enhanced_PPT.pdf
 
Monster Construction Hiring Outlook
Monster Construction Hiring OutlookMonster Construction Hiring Outlook
Monster Construction Hiring Outlook
 
Making Waves In Search By Virginia Tonning
Making Waves In Search By Virginia TonningMaking Waves In Search By Virginia Tonning
Making Waves In Search By Virginia Tonning
 
The Offshore Group Value Proposition
The Offshore Group Value PropositionThe Offshore Group Value Proposition
The Offshore Group Value Proposition
 
Manufacturing in Mexico with The Offshore Group
Manufacturing in Mexico with The Offshore GroupManufacturing in Mexico with The Offshore Group
Manufacturing in Mexico with The Offshore Group
 
Supply chain integration in mexico
Supply chain integration in mexicoSupply chain integration in mexico
Supply chain integration in mexico
 
Afton Chemical & Scott Miller: The Renaissance in U.S. Manufacturing
Afton Chemical & Scott Miller: The Renaissance in U.S. ManufacturingAfton Chemical & Scott Miller: The Renaissance in U.S. Manufacturing
Afton Chemical & Scott Miller: The Renaissance in U.S. Manufacturing
 
Day 1 june 20 morning and track 1
Day 1 june 20 morning and track 1Day 1 june 20 morning and track 1
Day 1 june 20 morning and track 1
 
Asc overview 7 8-13
Asc overview 7 8-13Asc overview 7 8-13
Asc overview 7 8-13
 
Competing against Low Cost Producing Countries
Competing against Low Cost Producing CountriesCompeting against Low Cost Producing Countries
Competing against Low Cost Producing Countries
 
CMA 2102: Reshoring Initiative
CMA 2102: Reshoring InitiativeCMA 2102: Reshoring Initiative
CMA 2102: Reshoring Initiative
 
Failed Clean Energy Policies - Ontario - Wynne and McGuinty
Failed Clean Energy Policies -  Ontario - Wynne and McGuintyFailed Clean Energy Policies -  Ontario - Wynne and McGuinty
Failed Clean Energy Policies - Ontario - Wynne and McGuinty
 
Industrial Report | Derek Mathis
Industrial Report | Derek MathisIndustrial Report | Derek Mathis
Industrial Report | Derek Mathis
 
BoyarMiller "The Energy Industry 2016" eBook
BoyarMiller "The Energy Industry 2016" eBookBoyarMiller "The Energy Industry 2016" eBook
BoyarMiller "The Energy Industry 2016" eBook
 
BusinessFall 2020.ppt
BusinessFall 2020.pptBusinessFall 2020.ppt
BusinessFall 2020.ppt
 
BA449 Chap003_Fall 2020.ppt
BA449 Chap003_Fall 2020.pptBA449 Chap003_Fall 2020.ppt
BA449 Chap003_Fall 2020.ppt
 
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019
BoyarMiller Breakfast Forum: Perspectives on the Energy Industry 2019
 
Slides_Chapter 1.pptx
Slides_Chapter 1.pptxSlides_Chapter 1.pptx
Slides_Chapter 1.pptx
 

Plus de Energy Construction Forum

Workforce Strategies, Tactics, and Best Practices
Workforce Strategies, Tactics, and Best PracticesWorkforce Strategies, Tactics, and Best Practices
Workforce Strategies, Tactics, and Best PracticesEnergy Construction Forum
 
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost Marketplace
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost MarketplaceWorkforce Labor Trends, Demands, and Forecasts in the Lower-Cost Marketplace
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost MarketplaceEnergy Construction Forum
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedEnergy Construction Forum
 
An Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeAn Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeEnergy Construction Forum
 
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some Respect
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some RespectUpstream Bust Meets Downstream Boom in Houston: The East Side Earns Some Respect
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some RespectEnergy Construction Forum
 
US Petrochemical Renaissance: Hype vs Reality
US Petrochemical Renaissance: Hype vs Reality US Petrochemical Renaissance: Hype vs Reality
US Petrochemical Renaissance: Hype vs Reality Energy Construction Forum
 
North America Crude Price Differentials: What do they Mean for Refiners and R...
North America Crude Price Differentials: What do they Mean for Refiners and R...North America Crude Price Differentials: What do they Mean for Refiners and R...
North America Crude Price Differentials: What do they Mean for Refiners and R...Energy Construction Forum
 
The Missing Key to Improved Project Efficiency
The Missing Key to Improved Project Efficiency The Missing Key to Improved Project Efficiency
The Missing Key to Improved Project Efficiency Energy Construction Forum
 
Managing with Certainty Through Unprecedented Construction Resource Shortage
Managing with Certainty Through Unprecedented Construction Resource Shortage Managing with Certainty Through Unprecedented Construction Resource Shortage
Managing with Certainty Through Unprecedented Construction Resource Shortage Energy Construction Forum
 
Next Generation of Front End Construction Driven Planning Provides Solutions ...
Next Generation of Front End Construction Driven Planning Provides Solutions ...Next Generation of Front End Construction Driven Planning Provides Solutions ...
Next Generation of Front End Construction Driven Planning Provides Solutions ...Energy Construction Forum
 
Keynote Address: How to Transform the Construction Industry for the 22nd Century
Keynote Address: How to Transform the Construction Industry for the 22nd CenturyKeynote Address: How to Transform the Construction Industry for the 22nd Century
Keynote Address: How to Transform the Construction Industry for the 22nd CenturyEnergy Construction Forum
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
 
Workforce Track: Technical & Engineering Talent Acquisition - PART 2
Workforce Track: Technical & Engineering Talent Acquisition - PART 2Workforce Track: Technical & Engineering Talent Acquisition - PART 2
Workforce Track: Technical & Engineering Talent Acquisition - PART 2Energy Construction Forum
 
Workforce Track: Technical & Engineering Talent Acquisition - PART 1
Workforce Track: Technical & Engineering Talent Acquisition - PART 1Workforce Track: Technical & Engineering Talent Acquisition - PART 1
Workforce Track: Technical & Engineering Talent Acquisition - PART 1Energy Construction Forum
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Energy Construction Forum
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Energy Construction Forum
 

Plus de Energy Construction Forum (20)

Workforce Strategies, Tactics, and Best Practices
Workforce Strategies, Tactics, and Best PracticesWorkforce Strategies, Tactics, and Best Practices
Workforce Strategies, Tactics, and Best Practices
 
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost Marketplace
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost MarketplaceWorkforce Labor Trends, Demands, and Forecasts in the Lower-Cost Marketplace
Workforce Labor Trends, Demands, and Forecasts in the Lower-Cost Marketplace
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
 
An Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeAn Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project Landscape
 
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some Respect
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some RespectUpstream Bust Meets Downstream Boom in Houston: The East Side Earns Some Respect
Upstream Bust Meets Downstream Boom in Houston: The East Side Earns Some Respect
 
US Petrochemical Renaissance: Hype vs Reality
US Petrochemical Renaissance: Hype vs Reality US Petrochemical Renaissance: Hype vs Reality
US Petrochemical Renaissance: Hype vs Reality
 
Cost Effective Debottleneck Expansions
Cost Effective Debottleneck Expansions Cost Effective Debottleneck Expansions
Cost Effective Debottleneck Expansions
 
North America Crude Price Differentials: What do they Mean for Refiners and R...
North America Crude Price Differentials: What do they Mean for Refiners and R...North America Crude Price Differentials: What do they Mean for Refiners and R...
North America Crude Price Differentials: What do they Mean for Refiners and R...
 
The Missing Key to Improved Project Efficiency
The Missing Key to Improved Project Efficiency The Missing Key to Improved Project Efficiency
The Missing Key to Improved Project Efficiency
 
Managing with Certainty Through Unprecedented Construction Resource Shortage
Managing with Certainty Through Unprecedented Construction Resource Shortage Managing with Certainty Through Unprecedented Construction Resource Shortage
Managing with Certainty Through Unprecedented Construction Resource Shortage
 
Next Generation of Front End Construction Driven Planning Provides Solutions ...
Next Generation of Front End Construction Driven Planning Provides Solutions ...Next Generation of Front End Construction Driven Planning Provides Solutions ...
Next Generation of Front End Construction Driven Planning Provides Solutions ...
 
Keynote Address: How to Transform the Construction Industry for the 22nd Century
Keynote Address: How to Transform the Construction Industry for the 22nd CenturyKeynote Address: How to Transform the Construction Industry for the 22nd Century
Keynote Address: How to Transform the Construction Industry for the 22nd Century
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
 
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
 
Workforce Track: Technical & Engineering Talent Acquisition - PART 2
Workforce Track: Technical & Engineering Talent Acquisition - PART 2Workforce Track: Technical & Engineering Talent Acquisition - PART 2
Workforce Track: Technical & Engineering Talent Acquisition - PART 2
 
Workforce Track: Technical & Engineering Talent Acquisition - PART 1
Workforce Track: Technical & Engineering Talent Acquisition - PART 1Workforce Track: Technical & Engineering Talent Acquisition - PART 1
Workforce Track: Technical & Engineering Talent Acquisition - PART 1
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
4 craig pirrong
4   craig pirrong4   craig pirrong
4 craig pirrong
 

Dernier

100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...hyt3577
 
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)Delhi Call girls
 
Cleared Job Fair Handbook | May 2, 2024
Cleared Job Fair Handbook  |  May 2, 2024Cleared Job Fair Handbook  |  May 2, 2024
Cleared Job Fair Handbook | May 2, 2024ClearedJobs.Net
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Mastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementMastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementBoundless HQ
 
HRM PPT on placement , induction and socialization
HRM PPT on placement , induction and socializationHRM PPT on placement , induction and socialization
HRM PPT on placement , induction and socializationRishik53
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsDavid Green
 
RecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceRecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceDavide Donghi
 
Webinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationWebinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationPayScale, Inc.
 
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjan
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In ArjanArjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjan
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjanparisharma5056
 
Mercer Global Talent Trends 2024 - Human Resources
Mercer Global Talent Trends 2024 - Human ResourcesMercer Global Talent Trends 2024 - Human Resources
Mercer Global Talent Trends 2024 - Human Resourcesmnavarrete3
 

Dernier (11)

100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
 
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
 
Cleared Job Fair Handbook | May 2, 2024
Cleared Job Fair Handbook  |  May 2, 2024Cleared Job Fair Handbook  |  May 2, 2024
Cleared Job Fair Handbook | May 2, 2024
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
 
Mastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementMastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership Management
 
HRM PPT on placement , induction and socialization
HRM PPT on placement , induction and socializationHRM PPT on placement , induction and socialization
HRM PPT on placement , induction and socialization
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People Analytics
 
RecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceRecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplace
 
Webinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationWebinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislation
 
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjan
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In ArjanArjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjan
Arjan Call Girl Service #$# O56521286O $#$ Call Girls In Arjan
 
Mercer Global Talent Trends 2024 - Human Resources
Mercer Global Talent Trends 2024 - Human ResourcesMercer Global Talent Trends 2024 - Human Resources
Mercer Global Talent Trends 2024 - Human Resources
 

Workforce Labor Demands, Studies & Forecasts - PART 3

  • 1. Labor Shortage Risk Mitigation Energy Construction Forum Galveston March 3-4 Harry Harrison, Wood Group Mustang Brian Stamper, CURT/CLMA
  • 2. Leading Global EPCM Provider •  Founded 1987 in Houston, Texas •  Joined Wood Group in 2000 •  Rebranded to Wood Group Mustang in 2012 •  More than 11,000 projects for 350 clients •  Consistently ranked as a Top Workplace •  Approximately 8,500 employees worldwide •  Core services: –  Project management –  Engineering –  Procurement –  Construction management
  • 4. Industry’s Challenge www.myCLMA.com The Problem Ø  Skilled labor demand far exceeds skilled labor supply Ø  Labor shortages equals high risk, painful cost escalation Ø Industry has lacked an effective, dynamic way to understand labor risk & plan The Challenge Ø  What and where are the challenges Ø  Which industry sectors? Ø  Which crafts Ø  Short-term or long-term?
  • 5. Supply/Demand Gap www.myCLMA.com The  past  year  saw  an  increase  of…    ≈  200k  in  skilled  labor  demand        ≈  150k  entered/re-­‐entered  labor  force      
  • 6. Supply/Demand Gap www.myCLMA.com The  Industrial  Market   •  Peak  Demand  of  over  1.2m  CraC     Demand  by  industrial  markets   •  30%  Power  GeneraGon  ≈  360k  in  skilled  labor  demand   •  Peaks  –  Q1  2018   •  25%  Manufacturing  ≈  300k  in  skilled  labor  demand   •  Peaks  -­‐  Q2  2016   •  23%  Process  ≈  275k  in  skilled  labor  demand   •  Peaks  -­‐  Q1  2017   •  15%  Chemical  ≈  180K  in  skilled  labor  demand   •  Peaks  -­‐  Q1  2017   •  5%      Refinery  ≈  61k  in  skilled  labor  demand   •  Peaks  -­‐  Q2  2017   •  2%      Other  ≈  24k  in  skilled  labor  demand   •  Peaks  –  Q2  2015    
  • 7. www.myCLMA.com Market Pressures (Age Demographics) An  es6mated  17%  of   the  construc6on   workforce  will  re6re   in  the  next  decade  or   so,  represen6ng   aBri6on  of  about   800,000  skilled   workers.  The   percentage  for   supervision  is  much   higher.   24.9%   15.5%   3.9%  
  • 8. www.myCLMA.com Market Pressures (Gas Plays) •  Energy •  Natural gas prices •  Made in America resurgence •  Labor cost increases overseas •  NG construction past 5 years ≈ 46% ▲ Source:  Associated  General  Contractors  of  America  
  • 10. www.myCLMA.com Sophisticated. Not Complicated. Owners Contractors Unions Governments Underwriters Suppliers Brokers Consultants A/E Firms Industrial & Non- Industrial Projects (Demand) Worker data input by contractors & unions (Supply) ü   Secure   ü   ConfidenGal   ü   AnG-­‐Trust  Protected   ü   90-­‐Day  Updates  
  • 11. www.myCLMA.com •  More  than  4M  projects   •  Value  of  projects  ≈  $4.25T   •  Over  70%  of  U.S.  non-­‐residenGal  construcGon   •  Over  76%  Industrial  construcGon   •  About  68%  Non-­‐Industrial  construcGon   •  Tracks  49  craC  disciplines     •  Now  tracking  14  management  /  supervisor  posiGons       The CLMA® Database
  • 12. www.myCLMA.com Easy Project Input Project Name: Enter a unique project name/ code Project Class: •  New Construction •  Maintenance/ Shutdown Project Type: •  Capital •  Annual Capital Program •  Maintenance •  Ongoing Maintenance Industry Type: Choose from 99 industrial and non-industrial industry types. If the industry type you need isn’t there, we’ll customize one for you.
  • 13. www.myCLMA.com Easy Project Input Project Status: Select your project status from 11 options ranging from Conceptual Planning (pre-FEL) to Construction Completed or On-Hold Probability: Enter the % likely that the project will commence Time Units: Indicate your preference for tracking labor utilization – Daily,Weekly, Monthly Total Project Cost: Enter the total installed cost of the project
  • 14. www.myCLMA.com Easy Project Input Start / End Date: Indicate the estimated date construction will begin and the estimated construction completion date Zip Code: Input the project zip code Project Notes: Enter any relevant notes Bundled Projects: Bundle multiple small projects with the same zip code and similar start/end dates, and list them here
  • 15. www.myCLMA.com Sample Project Project  Descrip6on   Chemical  LA   Project  Type   New  ConstrucGon   Project  Loca6on   Baton  Rouge,  LA   Industry  Type   Chemical   Project  Status   Early  FEL  1   Project  Cost   $1.35B  
  • 16. PLF® Identifies Project Labor Needs Quickly understand your skilled labor requirements on a craft-by-craft basis, along with peak headcount overall and by craft. Chemical  Project  Louisiana     www.myCLMA.com 1,251  
  • 17. Click the Risk Indicator & find mitigation options that correlate to the CURT® Skilled Labor Shortage Risk Mitigation white paper. Visualize Risk. Take Action. Chemical  Project  Louisiana     www.myCLMA.com
  • 18. Customize Risk Profile Chemical  Project  Louisiana     www.myCLMA.com
  • 19. www.myCLMA.com Analyze Competition for Crafts Analyze  project  labor   challenges  and  risk   dynamically Visualize your project’s competition for skilled labor on a craft-by-craft basis Chemical  Project  Louisiana    
  • 20. Labor Supply – U.S. Sample Sample   Data  for   Demo   www.myCLMA.com
  • 21. Labor Supply – TX Sample www.myCLMA.com Sample   Data  for   Demo  
  • 22. Labor Supply – TX Sample Sample   Data  for   Demo   www.myCLMA.com
  • 23. www.myCLMA.com Market Demand (TX Sample) 5% Growth Age 60 Attrition Visualize age attrition over time & required replacement of crafts to meet demand
  • 24. www.myCLMA.com Market Pressures (Today’s Issues) Project  cancella6ons   Project  start  delays   No  impact   Re-­‐work   Overall  project  budget   Safety   Absenteeism   Schedule   Turnover   Quality   Produc6vity   Cost  of  labor   7%   15%   19%   23%   25%   27%   28%   35%   36%   45%   49%   52%   Na6onal  survey  of  531  construc6on  industry  leaders  
  • 25. www.myCLMA.com Market Pressures (Today’s Issues) Na6onal  survey  of  100  construc6on  industry  leaders  
  • 26. www.myCLMA.com Finding Labor Issues (Today’s Issues) Na6onal  survey  of  100  construc6on  industry  leaders   79%   21%   Yes   No  
  • 27. www.myCLMA.com Safety Issues (Today’s Issues) Na6onal  survey  of  100  construc6on  industry  leaders   65%   35%   Yes   No