Integration of the Public Transport
System in Madrid Region
Antonio García Pastor
Head of Planning Department, Consorcio
Regional de Transportes de Madrid (CRTM)
Presented at Transforming Transportation 2015
2
Integration of the public transport system
in Madrid Region
Transforming Transportation
Washington, 16 January 2015
Antonio García Pastor
Head of the Planning Department
Consorcio Regional de Transportes de Madrid (CRTM)
3
Contents
1. Madrid region and its Public transport system
2. Integration Model of Madrid Public Transport System
3. Objectives of Madrid PTA
4. Challenges and lessons lernt
4
1. Madrid region and its Public transport system
5
Madrid is one of 17 autonomous regions of Spain, formed up by 179
municipalities, with almost 6.5 million inhabitants in an area of 8,028.5
km2.
MADRID REGION
1. Madrid region and its PT system
Town size number of
municipalities
Population
01.01.2014
up to 100 9 653
101-500 20 5,290
501-1000 18 12,751
1001-5,000 51 122,845
5,001-10,000 32 232,331
10,001-50,000 29 670,400
50,001-100,000 10 748,113
100,001-250,000 9 1,496,822
more than 250,001 1 3,165,235
Total 179 6,454,440
6
Metro (underground) system Metro Madrid: Public company owned by Madrid
Region (100%), plus 2 sections under concession.
Madrid city urban buses system EMT: Public company owned by Madrid municipality
Suburban railway system Cercanías Renfe: Public company owned by National
Government
Metropolitan and regional buses:
Interurban buses
26 private companies operating 29 concessions
Urban buses in other municipalities 36 municipalities: Public and private companies, 7
concessions, 2 public municipal services and rest
integrated in the interurban concession
Light rail system 3 concessions by private operators
Big bus interchanges 5 concessions (construction and operation) by
private operators
PUBLIC TRANSPORT MODES AND OPERATORS
1. Madrid region and its PT system
7
2. Integration Model of Public Transport System
8
Administrative Integration: With the creation of the
Consorcio Regional de Transportes de Madrid (CRTM), as
unique public transport authority, gathering responsibilities
of the Madrid Region and the adhered local governments.
Fare Integration: With the implementation of the Travel
Pass, which is presently used in more than 70% of public
transport journeys.
Modal Integration: Assuming that different transport
modes are complementary, coordinating networks and
services, being intermodality a key issue.
Technological Integration: Integration of data,
formats, protocols and processes between operators
customers and authorities.
FOUR PILLARS OF INTEGRATION IN MADRID
2. Integration model of Madrid PT system
9
INSTITUTIONAL FRAMEWORK BEFORE THE CREATION OF CRTM
2. Integration model of Madrid PT system
10
INSTITUTIONAL FRAMEWORK
2. Integration model of Madrid PT system
11
MEMBERS OF THE CRTM BOARD
Board - 20 members, under the principle one seat one vote:
• 7 members: Madrid Regional Government
• 3 members: Madrid city council (municipality)
• 3 members: Other municipalities of the region
• 2 members: National Government
• 2 members: Private operators association
• 2 members: Trade unions
• 1 member: Association of Consumers
President of CRTM: the Regional Minister of Transport, he/she
nominates the General Manager
Vice-president: Madrid city councillor of Transport
Executive board: 6 members
2. Integration model of Madrid PT system
12
3. Objectives of Madrid PTA
13
MAIN OBJECTIVES AND FUNCTIONS OF CRTM
 PT Infrastructure planning in the region of Madrid.
 Establishment of an integrated fare system for all Public transport
in the region of Madrid.
 Definition of a stable and clear financing framework of the whole PT
system.
 Planning of services and definition of coordinated operational
programmes for all transport modes.
 Development of a policy of economic control and management of
the transport system.
 Creation of a unique and global image of the PT system, where
CRTM holds the external relations with users.
These functions of CRTM are those of a transport authority which acts in
both strategic y tactical fields, leaving to operators the operational area.
3. Objectives of Madrid PTA
14
REASONS FOR A MUNICIPALITY TO JOIN CRTM
Two main reasons:
 The region of Madrid through CRTM pays 50% of subsidy of urban
transport
 The integrated transport tickets (seasonal pass) can be also used in
urban transport
But there are other important reasons:
 Technical level of municipalities in transport is low, and CRTM can
support them with its technical staff.
 Bus stops and shelters cannot be paid in medium-small size
municipalities. CRTM invests in shelters and stops.
 Local information such as transport maps.
 Support in development of mobility policies such as SUMPs.
 Close contact and work with municipalities.
3. Objectives of MadridPTA
15
 1986 creation of CRTM
 1987- 1993 introduction of first Monthly passes
 1995-1999 First Metro extension plan
 1999-2003 Second Metro extension plan
 2003-2007 Third Metro extension plan
 2003-2009 Interchange plan
 2009 Modernization plan in suburban buses
 2012 Introduction of the smart contactless card
 2012 Integrated PT control centre
 2013 ........
FARESYSTEM
INFRASTRUCTURES
TECHNOLOGIES
It is important to progress step by step, through coordination and with a
sound technical basis. There are always new challenges and
developments to make
EVOLUTION IN THE INTEGRATION PROCESS
ADMINISTRTIVE
3. Objectives of a PTA in Madrid
16
4. Challenges and lessons lernt
17
 To adjust the supply to the demand level under budget restrictions
 Increase ticketing options and new technology, implementation of
contactless card and future NFC payment devices
 New Transport Control Centre integrating all public transport
operators and infrastructures under CRTM: CITRAM and providing
real time information to the customer
 Progress in mode integration (Cercanías) and taking further
functions i(taxis, bicycles, car sharing, parking policy, etc.)
 Modernization Plan for Interurban Buses under EU PSO, with
quality indicators (bonus – malus)
 To enhance sustainable mobility plans in our cities and review new
land development plans in order to achieve a better integration
between public transport and urban planning
 To promote the corporate social responsibility (CSR) towards our
customer and give them benefits. Importance of a common image
Future challenges
4. Challenges and lessons lernt
18
 Creation of a coordinating authority is not easy and must be made
gradually
 It is important to establish functions and products that no other
authority can do, in order to settle down the body and to prevent
its disappearing
 Fare integration is one of the first tasks to develop since it fulfils
the previous point and it is well appreciated by citizens
 Legal and administrative issues can be an obstacle to create the
authority, but there must be a legal coverage with a clear sharing
of responsibilities. Important to think the best approach to
development (in Madrid municipalities adhered voluntarily)
 A sound financing framework has to be achieved, with participation
of ideally all parties involved
 The board, technical committees and technical assistance are also
means to create a common and useful entity for stakeholders
Lessons lernt
4. Challenges and lessons lernt
19
Feasibility study and design of the PTA
Ideally the “strongest” administration must launch it, but with
the rest of stakeholders participating. Based on existing situation
and functions of the future authority based in:
1.Assigned functions
2.Institutional insertion and governance
3.Organization and staff
4.Needed legal framework for creation and development
5.Needed economic framework
Discussion of the first model with the different administrations and
proposal for implementation.
Implementation
1.Development of legal framework
2.Information, communication and adaptation of the institutional
framework.
3.Staff contracting and training (bringing people from admins,
but contracting new and fresh staff.
 Operation start up
First assignments: integrated service and mobility plan in the
region. Definition of the integrated fare structure
4. Challenges and lessons lernt
Possible route sheet for creating an authority
20
Thank you very much for your attention
www.crtm.es
Antonio García Pastor
antonio.garcia@crtm.es

Contenu connexe

Tendances

Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand viharSneha Lata
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.ArchTuhina Chatterjee
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309Avtansh Ghai
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUttipec Dda
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design AnalysisDanish Ryan
 
Transbay Transit Center
Transbay Transit CenterTransbay Transit Center
Transbay Transit CenterCordoba Corp
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMThe King
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Satyam Rai
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented developmentPalak Khandelwal
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railwaySneha Lata
 
Curitiba 3
Curitiba 3Curitiba 3
Curitiba 3ce4710
 
Mumbai metro - Planning
Mumbai metro - PlanningMumbai metro - Planning
Mumbai metro - PlanningRADHIKASARDA8
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Piyush KumAr
 
Planning Chicago: An Historical Perspective on our Present-Day Problems
Planning Chicago: An Historical Perspective on our Present-Day ProblemsPlanning Chicago: An Historical Perspective on our Present-Day Problems
Planning Chicago: An Historical Perspective on our Present-Day ProblemsTom Tresser
 
Revised Developement Plan, Ahmedabad 2013 - 2021
Revised Developement Plan, Ahmedabad 2013 - 2021Revised Developement Plan, Ahmedabad 2013 - 2021
Revised Developement Plan, Ahmedabad 2013 - 2021Manaan Choksi
 

Tendances (20)

Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
Transbay Transit Center
Transbay Transit CenterTransbay Transit Center
Transbay Transit Center
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railway
 
Barcelona
BarcelonaBarcelona
Barcelona
 
Curitiba 3
Curitiba 3Curitiba 3
Curitiba 3
 
Radburn City
Radburn CityRadburn City
Radburn City
 
Mumbai metro - Planning
Mumbai metro - PlanningMumbai metro - Planning
Mumbai metro - Planning
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
Planning Chicago: An Historical Perspective on our Present-Day Problems
Planning Chicago: An Historical Perspective on our Present-Day ProblemsPlanning Chicago: An Historical Perspective on our Present-Day Problems
Planning Chicago: An Historical Perspective on our Present-Day Problems
 
Revised Developement Plan, Ahmedabad 2013 - 2021
Revised Developement Plan, Ahmedabad 2013 - 2021Revised Developement Plan, Ahmedabad 2013 - 2021
Revised Developement Plan, Ahmedabad 2013 - 2021
 

Similaire à Integration of the Public Transport System in Madrid Region - Antonio García Pastor - Consorcio Regional de Transportes de Madrid - Transforming Transportation 2015

eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...
eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...
eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...Dejan Majkic
 
CIPTEC project presentation at EU Mobility event 2016
CIPTEC project presentation at EU Mobility event 2016CIPTEC project presentation at EU Mobility event 2016
CIPTEC project presentation at EU Mobility event 2016CIPTEC
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkTexxi Global
 
WPL-Briefing-Nottingham(2)
WPL-Briefing-Nottingham(2)WPL-Briefing-Nottingham(2)
WPL-Briefing-Nottingham(2)Sue Flack
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteWRI Ross Center for Sustainable Cities
 
20140221 c.lassalle la rochelle site nantes tan
20140221 c.lassalle la rochelle site nantes  tan20140221 c.lassalle la rochelle site nantes  tan
20140221 c.lassalle la rochelle site nantes tanVéronique SEEL (Michaut)
 
MaaS - Tekes
MaaS - TekesMaaS - Tekes
MaaS - Tekesinsam
 
Smart Cities - Global Case Studies - Part - 5
Smart Cities - Global Case Studies - Part - 5Smart Cities - Global Case Studies - Part - 5
Smart Cities - Global Case Studies - Part - 5Resurgent India
 
[Urban transportation policy program]city paper presentation rio de janeiro
[Urban transportation policy program]city paper presentation rio de janeiro[Urban transportation policy program]city paper presentation rio de janeiro
[Urban transportation policy program]city paper presentation rio de janeiroshrdcinfo
 
MobiWallet - Curent Status & Achievements
MobiWallet - Curent Status & AchievementsMobiWallet - Curent Status & Achievements
MobiWallet - Curent Status & AchievementsMobiWallet
 
E govermentinlocalandregionaladministrations onlineversionpdf
E govermentinlocalandregionaladministrations onlineversionpdfE govermentinlocalandregionaladministrations onlineversionpdf
E govermentinlocalandregionaladministrations onlineversionpdfprojecte doscinczero1
 
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Sį Susisiekimo Paslaugos
 
eGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UCeGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UCStéphane VINCENT
 
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...Experiences and Challenges in the Transport Integrated Net of Curitiba and th...
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...WRI Ross Center for Sustainable Cities
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...European Commission
 
The Next Big Thing in London Luton Taxi Service
The Next Big Thing in London Luton Taxi ServiceThe Next Big Thing in London Luton Taxi Service
The Next Big Thing in London Luton Taxi ServiceAirportTransfer4
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMVirginia Fernandez
 

Similaire à Integration of the Public Transport System in Madrid Region - Antonio García Pastor - Consorcio Regional de Transportes de Madrid - Transforming Transportation 2015 (20)

eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...
eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...
eGovernment Action Plan 2016 2020 accelerating the digital transformation of ...
 
CIPTEC project presentation at EU Mobility event 2016
CIPTEC project presentation at EU Mobility event 2016CIPTEC project presentation at EU Mobility event 2016
CIPTEC project presentation at EU Mobility event 2016
 
2019 04-08 ralf-willenbrock_tsystems
2019 04-08 ralf-willenbrock_tsystems2019 04-08 ralf-willenbrock_tsystems
2019 04-08 ralf-willenbrock_tsystems
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing Work
 
WPL-Briefing-Nottingham(2)
WPL-Briefing-Nottingham(2)WPL-Briefing-Nottingham(2)
WPL-Briefing-Nottingham(2)
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
20140221 c.lassalle la rochelle site nantes tan
20140221 c.lassalle la rochelle site nantes  tan20140221 c.lassalle la rochelle site nantes  tan
20140221 c.lassalle la rochelle site nantes tan
 
MaaS - Tekes
MaaS - TekesMaaS - Tekes
MaaS - Tekes
 
Smart Cities - Global Case Studies - Part - 5
Smart Cities - Global Case Studies - Part - 5Smart Cities - Global Case Studies - Part - 5
Smart Cities - Global Case Studies - Part - 5
 
[Urban transportation policy program]city paper presentation rio de janeiro
[Urban transportation policy program]city paper presentation rio de janeiro[Urban transportation policy program]city paper presentation rio de janeiro
[Urban transportation policy program]city paper presentation rio de janeiro
 
Special purpose vehicle (SPV)
Special purpose vehicle (SPV)Special purpose vehicle (SPV)
Special purpose vehicle (SPV)
 
MobiWallet - Curent Status & Achievements
MobiWallet - Curent Status & AchievementsMobiWallet - Curent Status & Achievements
MobiWallet - Curent Status & Achievements
 
E govermentinlocalandregionaladministrations onlineversionpdf
E govermentinlocalandregionaladministrations onlineversionpdfE govermentinlocalandregionaladministrations onlineversionpdf
E govermentinlocalandregionaladministrations onlineversionpdf
 
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
 
Birmingham, a smart city
Birmingham, a smart cityBirmingham, a smart city
Birmingham, a smart city
 
eGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UCeGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UC
 
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...Experiences and Challenges in the Transport Integrated Net of Curitiba and th...
Experiences and Challenges in the Transport Integrated Net of Curitiba and th...
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...
 
The Next Big Thing in London Luton Taxi Service
The Next Big Thing in London Luton Taxi ServiceThe Next Big Thing in London Luton Taxi Service
The Next Big Thing in London Luton Taxi Service
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBM
 

Plus de WRI Ross Center for Sustainable Cities

Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesWRI Ross Center for Sustainable Cities
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureWRI Ross Center for Sustainable Cities
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectWRI Ross Center for Sustainable Cities
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningWRI Ross Center for Sustainable Cities
 

Plus de WRI Ross Center for Sustainable Cities (20)

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
 

Dernier

(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 

Dernier (20)

(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 

Integration of the Public Transport System in Madrid Region - Antonio García Pastor - Consorcio Regional de Transportes de Madrid - Transforming Transportation 2015

  • 1. www.TransformingTransportation.org Integration of the Public Transport System in Madrid Region Antonio García Pastor Head of Planning Department, Consorcio Regional de Transportes de Madrid (CRTM) Presented at Transforming Transportation 2015
  • 2. 2 Integration of the public transport system in Madrid Region Transforming Transportation Washington, 16 January 2015 Antonio García Pastor Head of the Planning Department Consorcio Regional de Transportes de Madrid (CRTM)
  • 3. 3 Contents 1. Madrid region and its Public transport system 2. Integration Model of Madrid Public Transport System 3. Objectives of Madrid PTA 4. Challenges and lessons lernt
  • 4. 4 1. Madrid region and its Public transport system
  • 5. 5 Madrid is one of 17 autonomous regions of Spain, formed up by 179 municipalities, with almost 6.5 million inhabitants in an area of 8,028.5 km2. MADRID REGION 1. Madrid region and its PT system Town size number of municipalities Population 01.01.2014 up to 100 9 653 101-500 20 5,290 501-1000 18 12,751 1001-5,000 51 122,845 5,001-10,000 32 232,331 10,001-50,000 29 670,400 50,001-100,000 10 748,113 100,001-250,000 9 1,496,822 more than 250,001 1 3,165,235 Total 179 6,454,440
  • 6. 6 Metro (underground) system Metro Madrid: Public company owned by Madrid Region (100%), plus 2 sections under concession. Madrid city urban buses system EMT: Public company owned by Madrid municipality Suburban railway system Cercanías Renfe: Public company owned by National Government Metropolitan and regional buses: Interurban buses 26 private companies operating 29 concessions Urban buses in other municipalities 36 municipalities: Public and private companies, 7 concessions, 2 public municipal services and rest integrated in the interurban concession Light rail system 3 concessions by private operators Big bus interchanges 5 concessions (construction and operation) by private operators PUBLIC TRANSPORT MODES AND OPERATORS 1. Madrid region and its PT system
  • 7. 7 2. Integration Model of Public Transport System
  • 8. 8 Administrative Integration: With the creation of the Consorcio Regional de Transportes de Madrid (CRTM), as unique public transport authority, gathering responsibilities of the Madrid Region and the adhered local governments. Fare Integration: With the implementation of the Travel Pass, which is presently used in more than 70% of public transport journeys. Modal Integration: Assuming that different transport modes are complementary, coordinating networks and services, being intermodality a key issue. Technological Integration: Integration of data, formats, protocols and processes between operators customers and authorities. FOUR PILLARS OF INTEGRATION IN MADRID 2. Integration model of Madrid PT system
  • 9. 9 INSTITUTIONAL FRAMEWORK BEFORE THE CREATION OF CRTM 2. Integration model of Madrid PT system
  • 10. 10 INSTITUTIONAL FRAMEWORK 2. Integration model of Madrid PT system
  • 11. 11 MEMBERS OF THE CRTM BOARD Board - 20 members, under the principle one seat one vote: • 7 members: Madrid Regional Government • 3 members: Madrid city council (municipality) • 3 members: Other municipalities of the region • 2 members: National Government • 2 members: Private operators association • 2 members: Trade unions • 1 member: Association of Consumers President of CRTM: the Regional Minister of Transport, he/she nominates the General Manager Vice-president: Madrid city councillor of Transport Executive board: 6 members 2. Integration model of Madrid PT system
  • 12. 12 3. Objectives of Madrid PTA
  • 13. 13 MAIN OBJECTIVES AND FUNCTIONS OF CRTM  PT Infrastructure planning in the region of Madrid.  Establishment of an integrated fare system for all Public transport in the region of Madrid.  Definition of a stable and clear financing framework of the whole PT system.  Planning of services and definition of coordinated operational programmes for all transport modes.  Development of a policy of economic control and management of the transport system.  Creation of a unique and global image of the PT system, where CRTM holds the external relations with users. These functions of CRTM are those of a transport authority which acts in both strategic y tactical fields, leaving to operators the operational area. 3. Objectives of Madrid PTA
  • 14. 14 REASONS FOR A MUNICIPALITY TO JOIN CRTM Two main reasons:  The region of Madrid through CRTM pays 50% of subsidy of urban transport  The integrated transport tickets (seasonal pass) can be also used in urban transport But there are other important reasons:  Technical level of municipalities in transport is low, and CRTM can support them with its technical staff.  Bus stops and shelters cannot be paid in medium-small size municipalities. CRTM invests in shelters and stops.  Local information such as transport maps.  Support in development of mobility policies such as SUMPs.  Close contact and work with municipalities. 3. Objectives of MadridPTA
  • 15. 15  1986 creation of CRTM  1987- 1993 introduction of first Monthly passes  1995-1999 First Metro extension plan  1999-2003 Second Metro extension plan  2003-2007 Third Metro extension plan  2003-2009 Interchange plan  2009 Modernization plan in suburban buses  2012 Introduction of the smart contactless card  2012 Integrated PT control centre  2013 ........ FARESYSTEM INFRASTRUCTURES TECHNOLOGIES It is important to progress step by step, through coordination and with a sound technical basis. There are always new challenges and developments to make EVOLUTION IN THE INTEGRATION PROCESS ADMINISTRTIVE 3. Objectives of a PTA in Madrid
  • 16. 16 4. Challenges and lessons lernt
  • 17. 17  To adjust the supply to the demand level under budget restrictions  Increase ticketing options and new technology, implementation of contactless card and future NFC payment devices  New Transport Control Centre integrating all public transport operators and infrastructures under CRTM: CITRAM and providing real time information to the customer  Progress in mode integration (Cercanías) and taking further functions i(taxis, bicycles, car sharing, parking policy, etc.)  Modernization Plan for Interurban Buses under EU PSO, with quality indicators (bonus – malus)  To enhance sustainable mobility plans in our cities and review new land development plans in order to achieve a better integration between public transport and urban planning  To promote the corporate social responsibility (CSR) towards our customer and give them benefits. Importance of a common image Future challenges 4. Challenges and lessons lernt
  • 18. 18  Creation of a coordinating authority is not easy and must be made gradually  It is important to establish functions and products that no other authority can do, in order to settle down the body and to prevent its disappearing  Fare integration is one of the first tasks to develop since it fulfils the previous point and it is well appreciated by citizens  Legal and administrative issues can be an obstacle to create the authority, but there must be a legal coverage with a clear sharing of responsibilities. Important to think the best approach to development (in Madrid municipalities adhered voluntarily)  A sound financing framework has to be achieved, with participation of ideally all parties involved  The board, technical committees and technical assistance are also means to create a common and useful entity for stakeholders Lessons lernt 4. Challenges and lessons lernt
  • 19. 19 Feasibility study and design of the PTA Ideally the “strongest” administration must launch it, but with the rest of stakeholders participating. Based on existing situation and functions of the future authority based in: 1.Assigned functions 2.Institutional insertion and governance 3.Organization and staff 4.Needed legal framework for creation and development 5.Needed economic framework Discussion of the first model with the different administrations and proposal for implementation. Implementation 1.Development of legal framework 2.Information, communication and adaptation of the institutional framework. 3.Staff contracting and training (bringing people from admins, but contracting new and fresh staff.  Operation start up First assignments: integrated service and mobility plan in the region. Definition of the integrated fare structure 4. Challenges and lessons lernt Possible route sheet for creating an authority
  • 20. 20 Thank you very much for your attention www.crtm.es Antonio García Pastor antonio.garcia@crtm.es