Agenda Diskusi
 Anatomi Proyek Pertambangan
 Hal umum berkaitan dengan contract
drafting
 Ketentuan Umum dalam perjanjian jual
beli dan jasa kontraktor
Anatomi Proyek Pertambangan
Anatomi Proyek Pertambangan
Loan
Agt
Asuransi Co
Pembeli
Operator and
Manager
Pemerintah
Sponsors
BANK / Non-Bank
Fin Inst
Perusahaan
Pemegang IUP
Penyedia ListrikShareholders
Agt
Direct
Agreement
Share
Mortgage
Agt
Security
Documents
Perusahaan
UJP
Kontrak Jasa
Pertambangan
O & M
Agreement
Insurance
Policy
Offtake
PPA
Direct
Agreement
Direct
Agreement
Licensing Matters
Fuel Supplier Fuel Supply
Agreement
Direct
Agreement
Equipment
Supplier
Equipment Supply
Agreement
Direct
Agreement
HAL UMUM BERKAITAN
DENGAN CONTRACT DRAFTING
 Suatu perjanjian adalah suatu perbuatan dengan mana satu orang atau lebih
mengikatkan dirinya terhadap satu orang lain atau lebih.
(Pasal 1313 Kitab Undang-undang Hukum Perdata (“KUHPer”)
 Syarat sahnya kontrak:
 Sepakat antara para pihak
 Cakap untuk membuat kontrak
 Suatu hal tertentu
 Sebab yang halal
(Pasal 1320 KUHPer)
 Pasal 1338 KUHPer: Semua perjanjian yang dibuat secara sah berlaku sebagai
undang-undang bagi mereka yang membuatnya.
HAL UMUM BERKAITAN
DENGAN CONTRACT DRAFTING
 Sepakat antara para pihak
 Tidak ada kekhilafan
 Tidak ada paksaan (Pasal 1324 BW)
 Tidak ada kebohongan atau tipu muslihat (Pasal 1328 BW)
 Cakap untuk membuat kontrak
 Dewasa
 Tidak dalam pengampuan
 Tidak dilarang oleh UU
HAL UMUM BERKAITAN
DENGAN CONTRACT DRAFTING
 Suatu hal tertentu
 Harus menentukan objek perjanjian
 Hanya barang yang dapat diperdagangkan (1332 BW)
 barang-barang yang baru akan ada di kemudian hari dapat menjadi obyek
perjanjian kecuali jika dilarang oleh undang-undang secara tegas (1334 BW)
 Sebab yang halal
Isi dari perjanjian harus mempunyai sebab dan tujuan yang diperboleh
oleh UU, kesusilaan dan ketertiban umum
PRE-DRAFTING CONSIDERATIONS
 Kepentingan siapa yang diwakili
 Memahami kandungan komersial dalam sebuah transaksi
 Lakukan limited legal due diligence
 Kumpulkan semua findings dalam LDD
 Cari precedence agreement
 File / transaksi terdahulu
 Sharing files
 Draft provider
 Sumber lain yang valid
 Fokus dalam drafting
POST-DRAFTING CONSIDERATIONS
 Test Drive Perjanjian
 Apakah bisa efektif dan workable dalam prakteknya?
 Apakah cukup fleksible untuk mencover permasalahan yang
muncul yang tidak diprediksi sebelumnya?
 Ditest dengan permasalahan yang aktual (e.g. Delay dalam
pengiriman, harga solar naik, air sungai surut, suspensi ekspr
dari pemerintah, kewajiban DMO) dan bagaimanakah kontrak
tersebut merespon permasalahan
POST-DRAFTING CONSIDERATIONS
 Hindari “semangat kekeluargaan” dalam drafting
 Kontrak harus komprehensif dan pasti
 Kontrak merupakan dokumen final dan tunggal
 Hindari keinginan enginer untuk mencantumkan email / MoM
yang panjang lebar
 Cantumkan dokumen teknis dalam lampiran
 Proof reading
KONTRAK JUAL BELI BATUBARA
Penjual Konsumen
Trader/
Pedagang
Perantara
Para Pelaku
KONTRAK JUAL BELI BATUBARA
 Pemegang IUP Operasi Produksi
 Pemegang IUPK Operasi Produksi
 Pemegang IUP Eksplorasi yang mendapatkan izin
sementara untuk melakukan pengangkutan dan
penjualan yang diberikan oleh Menteri,
Gubernur atau Bupati/Walikota sesuai dengan
kewenangannya. (Pasal 43 ayat 2 dan Pasal 44
UU 4/2009)
 Pemegang IUPK Eksplorasi yang mendapatkan
izin sementara untuk melakukan pengangkutan
dan penjualan yang diberikan oleh Menteri.
(Pasal 81 UU 4/2009)
 Pemegang IUP Operasi Produksi Penjualan bagi
Perusahaan yang tidak bergerak pada usaha
pertambangan. (Pasal 105 ayat 1 UU 4/2009)
Penjual
 PLN
 Industri Pembangkit
 Industri Kertas
 Industri Semen
 Dll
Konsumen
Trader/
Pedagang
Antara
 Bertindak sebagai pembeli batubara
tetapi bukan konsumen
 Bertindak sebagai penghubung murni
KONTRAK JUAL BELI BATUBARA
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
Jadwal Pengiriman
Coal Specification
Cara pembayaran
Nominasi barge / vessel
Jumlah batubara
Resiko
Harga
Rejection
Boiler Plates Clauses
 Jadwal Pengiriman
The Purchaser and Supplier shall agree on a regular
delivery schedules for the delivery of Cargo to the
Loading Point as mentioned in Appendix I.
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Coal Specification
 The coal sold under this Agreement shall have the following typical specifications
and rejections level…
 Buyer has the right to reject the cargo if the actual analysis result of any
shipment is above/below the levels indicated as rejection...
 The specifications may vary on a case by case basis where Seller and Purchaser
agree on specific coal specifications for nominated shipments.
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Harga
 The price for all Coals delivered under this Contract shall be
followings.
 For the first year of the Agreement Term: USD 80/tonne.
 For the next year (second year) until the end of Term (tenth
year), the price shall be adjusted accordingly to ICI price, with
fixed price quarterly.
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Cara Pembayaran
 Invocing
Supplier shall deliver to Purchaser an invoice for each Delivered Cargo equal to the
relevant Invoice Amount for such Delivered Cargo as it is loaded at the Loading Point
onto the relevant vessels (each, an “Invoice”).
 Payment
Within thirty (30) days following the receipt of each Invoice (including all documents
listed in Article 6.1.2) and subject to the terms of this Contract, Purchaser shall pay the
applicable Invoice Amount to Supplier. Each such payment shall be made by wire
transfer of immediately available funds by Purchaser to Supplier’s nominated account.
All bank charges, fees and costs incurred at Supplier’s account bank shall be for the
account of Supplier.
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Nominasi Barge / vessel
 …The Purchaser will nominate the performing vessel together with details
of the vessel within…prior to the commencement of the delivery days
agreed for the shipment.
 …after completion of loading, the Seller will telex or facsimile the
Purchaser…
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Coal Quantity
 The quantity of coal agreed to be delivered by the Seller to the Purchaser
under this Agreement shall be up to 3 million tones…
 Indicative dates for delivery of shipments shall be provided by the Buyer to
the Seller 15 (fifteen) days before the shipment…
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Risiko
 Title to and all risk of loss or damage to all Coal delivered by Supplier under this
Contract shall remain with Supplier until such Coal passes the relevant vessel’s
railing at Loading Point.
 The Seller must, subject to the provision of B5, bear all risks of loss of or damage
to the goods until such time as they have passed the ship’s rail at the port of
shipment.
 Incoterms 2000 (Part A5 of CIF Section) for FoB Price
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
 Price Adjustment
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
Adjusted price = Contract price x
Actual Gross Calorific Value (ADB)
6,500 Kcal/kg
 Boiler Plates Provisions
 Force Majeure
 Choice of Law
 Choice of Forum
 Assignment
 Default and termination
 Severability
 Confidentiality
 Notices
 Entire contract
KONTRAK JUAL BELI BATUBARA
Klausul-klausul pokok
Ketentuan Pokok Kontrak Jasa Pertambangan
 Apa itu Kontrak Jasa Pertambangan?
Pengertian dasar
 Mengontrakan pada pihak ke-3
 Pekerjaan berkaitan dengan kegiatan
pertambangan (dan penambangan)
 Kepada pihak lain dengan alasan komersial
 Kenapa Mengkontrakan?
Alternatif dalam industri manapun
Pertimbangan tidak berbeda dengan “in-
house” vs “external counsel”
 Biaya
 Skil dan pengalaman
 Alokasi resiko
 Kualifikasi dan sertifikasi
Ketentuan Pokok Kontrak Jasa Pertambangan
Tipe Perjanjian Jasa Pertambangan
 Perjanjian Eksklusif - SPK
 Pemegang izin hanya bertanggung jawab pada
licensing matters, sisanya akan dikerjakan oleh
kontraktor, termasuk pada penjualan
 Opsi investasi asing di KP (pra UU Minerba)
 Renumeration:
 Simple structure
- Service fee = all proceeds less X%
- Royalty Basis
 Profit Sharing structure
Profit (to be shared) = all proceed less total cost
Tipe Perjanjian Jasa Pertambangan
 Perjanjian Jasa Pertambangan (Tradisional)
 Lump sum atau rate ditentukan berdasarkan lingkup
kerja
 Kombinasi
 Kontraktor menyediakan alat dan operator
 Owner menyediakan BBM
 Berdasarkan volumen
 OB
 Coal getting
 Fee = hourly rate atau volume
 price certainty vs relative inflexibility
Ruang Lingkup perjanjian
Eksklusifitas
Perizinan dan Informasi
Kepemilikan atas properti
Hak dan Kewajiban Para Pihak
Biaya
KONTRAK JASA PERTAMBANGAN
Klausul-klausul pokok
Thanks!

Contenu connexe

Similaire à EMLI Training-Drafting Perjanjian di Bidang Pertambangan (Kontrak Jual Bali Batubara dan Perjanjian Jasa Pertambangan)

1831a_Dokumen_Kontrak_2020.pdf
1831a_Dokumen_Kontrak_2020.pdf1831a_Dokumen_Kontrak_2020.pdf
1831a_Dokumen_Kontrak_2020.pdfssuser6f5f19
 
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptxDrAbdulKadirJaelaniS
 
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...Kanaidi ken
 
11906451.ppt
11906451.ppt11906451.ppt
11906451.pptluthfiars
 
SALES CONTRACT.pptx
SALES CONTRACT.pptxSALES CONTRACT.pptx
SALES CONTRACT.pptxdimas409003
 
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxDraft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxGLC
 
Perjanjian Sewa Menyewa
Perjanjian Sewa MenyewaPerjanjian Sewa Menyewa
Perjanjian Sewa MenyewaLeks&Co
 
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrakPaket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrakMuhammad Yahya
 
pengadaan barang dan jasa pemerintah
pengadaan barang dan jasa pemerintahpengadaan barang dan jasa pemerintah
pengadaan barang dan jasa pemerintahIdaYanti30
 
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timur
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa TimurTOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timur
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timursuhariyanto st
 
Kontrak konruksi presentasi
Kontrak konruksi presentasiKontrak konruksi presentasi
Kontrak konruksi presentasigazalba zaedar
 
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdf
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdfPENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdf
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdfHeraGunandar
 
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptx
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptxAKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptx
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptxLiza_1004
 

Similaire à EMLI Training-Drafting Perjanjian di Bidang Pertambangan (Kontrak Jual Bali Batubara dan Perjanjian Jasa Pertambangan) (20)

Rancangan Kontrak
Rancangan KontrakRancangan Kontrak
Rancangan Kontrak
 
1831a_Dokumen_Kontrak_2020.pdf
1831a_Dokumen_Kontrak_2020.pdf1831a_Dokumen_Kontrak_2020.pdf
1831a_Dokumen_Kontrak_2020.pdf
 
Rancangan Kontrak
Rancangan KontrakRancangan Kontrak
Rancangan Kontrak
 
Prinsip Konstruksi.pptx
Prinsip Konstruksi.pptxPrinsip Konstruksi.pptx
Prinsip Konstruksi.pptx
 
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx
289e8_Modul_4_Dokumen_Kontrak_Kerja_Konstruksi.pptx
 
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...
Kontrak Pengadaan Barang & Jasa bagi Penyedia Training "Upaya MEMENANGKAN Ten...
 
11906451.ppt
11906451.ppt11906451.ppt
11906451.ppt
 
SALES CONTRACT.pptx
SALES CONTRACT.pptxSALES CONTRACT.pptx
SALES CONTRACT.pptx
 
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxDraft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
 
Perjanjian Sewa Menyewa
Perjanjian Sewa MenyewaPerjanjian Sewa Menyewa
Perjanjian Sewa Menyewa
 
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrakPaket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
Paket 1 perencanaan teknis jalan dan jembatan prov. sulbar draft kontrak
 
pengadaan barang dan jasa pemerintah
pengadaan barang dan jasa pemerintahpengadaan barang dan jasa pemerintah
pengadaan barang dan jasa pemerintah
 
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timur
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa TimurTOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timur
TOT Bidang Gedung Bagi Guru SMK di Kota Malang Propinsi Jawa Timur
 
penyusunan dokumen pengadaan
penyusunan dokumen pengadaanpenyusunan dokumen pengadaan
penyusunan dokumen pengadaan
 
Penyusunan Dokumen Pengadaan
Penyusunan Dokumen PengadaanPenyusunan Dokumen Pengadaan
Penyusunan Dokumen Pengadaan
 
Kontrak konruksi presentasi
Kontrak konruksi presentasiKontrak konruksi presentasi
Kontrak konruksi presentasi
 
4dokumen-kontrak.ppt
4dokumen-kontrak.ppt4dokumen-kontrak.ppt
4dokumen-kontrak.ppt
 
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdf
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdfPENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdf
PENGENDALIAN KONTRAK JASA KONSTRUKSI (UP DATE).pdf
 
Kelompok 9 (istishna)
Kelompok 9 (istishna)Kelompok 9 (istishna)
Kelompok 9 (istishna)
 
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptx
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptxAKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptx
AKUNTANSI PAJAK ATAS SEWA GUNA USAHA DAN JASA KUNSTRUKSI.pptx
 

Plus de EMLI Indonesia

persiapan penanganan perkara perdata di pengadilan 230417
persiapan penanganan perkara perdata di pengadilan 230417persiapan penanganan perkara perdata di pengadilan 230417
persiapan penanganan perkara perdata di pengadilan 230417EMLI Indonesia
 
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.EMLI Indonesia
 
Sengketa di dalam pelaksanaan perjanjian epc dendi adisuryo 27072017 (4)
Sengketa di dalam pelaksanaan perjanjian epc   dendi adisuryo 27072017 (4)Sengketa di dalam pelaksanaan perjanjian epc   dendi adisuryo 27072017 (4)
Sengketa di dalam pelaksanaan perjanjian epc dendi adisuryo 27072017 (4)EMLI Indonesia
 
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksi
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksiUndang undang nomor 2 tahun 2017 tentang Jasa konstruksi
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksiEMLI Indonesia
 
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu Migas
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu MigasPP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu Migas
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu MigasEMLI Indonesia
 
Manajemen NPL (Non Performing Loan) dan Strategy Asset Recovery
Manajemen NPL (Non Performing Loan) dan Strategy Asset RecoveryManajemen NPL (Non Performing Loan) dan Strategy Asset Recovery
Manajemen NPL (Non Performing Loan) dan Strategy Asset RecoveryEMLI Indonesia
 
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...EMLI Indonesia
 
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...EMLI Indonesia
 
EMLI Training-Hukum Jaminan
EMLI Training-Hukum JaminanEMLI Training-Hukum Jaminan
EMLI Training-Hukum JaminanEMLI Indonesia
 
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at Law
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at LawDendi adi suryo, S.H. - Partner at ADCO Attorneys at Law
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at LawEMLI Indonesia
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Indonesia
 
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.EMLI Indonesia
 
EMLI Training-Presentasi Sengketa Dalam Usaha Pertambangan
EMLI Training-Presentasi Sengketa Dalam Usaha PertambanganEMLI Training-Presentasi Sengketa Dalam Usaha Pertambangan
EMLI Training-Presentasi Sengketa Dalam Usaha PertambanganEMLI Indonesia
 
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project Pertambangan
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project PertambanganEMLI Training-Presentasi Restrukturisasi Hutang Dalam Project Pertambangan
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project PertambanganEMLI Indonesia
 
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Indonesia
 
Legal Due Diligence (LDD) - EMLI Training
Legal Due Diligence (LDD) - EMLI TrainingLegal Due Diligence (LDD) - EMLI Training
Legal Due Diligence (LDD) - EMLI TrainingEMLI Indonesia
 
Introduction to Commercial Contract Drafting
Introduction to Commercial Contract DraftingIntroduction to Commercial Contract Drafting
Introduction to Commercial Contract DraftingEMLI Indonesia
 

Plus de EMLI Indonesia (17)

persiapan penanganan perkara perdata di pengadilan 230417
persiapan penanganan perkara perdata di pengadilan 230417persiapan penanganan perkara perdata di pengadilan 230417
persiapan penanganan perkara perdata di pengadilan 230417
 
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.
EMLI Training-COAL BUSINESS DISPUTE SETTLEMENT By Dendi Adisuryo, S.H.
 
Sengketa di dalam pelaksanaan perjanjian epc dendi adisuryo 27072017 (4)
Sengketa di dalam pelaksanaan perjanjian epc   dendi adisuryo 27072017 (4)Sengketa di dalam pelaksanaan perjanjian epc   dendi adisuryo 27072017 (4)
Sengketa di dalam pelaksanaan perjanjian epc dendi adisuryo 27072017 (4)
 
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksi
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksiUndang undang nomor 2 tahun 2017 tentang Jasa konstruksi
Undang undang nomor 2 tahun 2017 tentang Jasa konstruksi
 
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu Migas
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu MigasPP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu Migas
PP Nomor 27 Tahun 2017 Tentang Pajak Pengasilan Hulu Migas
 
Manajemen NPL (Non Performing Loan) dan Strategy Asset Recovery
Manajemen NPL (Non Performing Loan) dan Strategy Asset RecoveryManajemen NPL (Non Performing Loan) dan Strategy Asset Recovery
Manajemen NPL (Non Performing Loan) dan Strategy Asset Recovery
 
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...
EMLI Training-Hak Pemegang Jaminan dalam Kepailitan dan Pembubaran-Presented ...
 
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...
EMLI Training-Default and Bankcruptcy-By: Rizky Dwinanto, S.H., M.H.-Partner ...
 
EMLI Training-Hukum Jaminan
EMLI Training-Hukum JaminanEMLI Training-Hukum Jaminan
EMLI Training-Hukum Jaminan
 
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at Law
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at LawDendi adi suryo, S.H. - Partner at ADCO Attorneys at Law
Dendi adi suryo, S.H. - Partner at ADCO Attorneys at Law
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
 
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.
EMLI Training-Biografi Rizky Dwinanto, S.H., M.H.
 
EMLI Training-Presentasi Sengketa Dalam Usaha Pertambangan
EMLI Training-Presentasi Sengketa Dalam Usaha PertambanganEMLI Training-Presentasi Sengketa Dalam Usaha Pertambangan
EMLI Training-Presentasi Sengketa Dalam Usaha Pertambangan
 
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project Pertambangan
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project PertambanganEMLI Training-Presentasi Restrukturisasi Hutang Dalam Project Pertambangan
EMLI Training-Presentasi Restrukturisasi Hutang Dalam Project Pertambangan
 
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
 
Legal Due Diligence (LDD) - EMLI Training
Legal Due Diligence (LDD) - EMLI TrainingLegal Due Diligence (LDD) - EMLI Training
Legal Due Diligence (LDD) - EMLI Training
 
Introduction to Commercial Contract Drafting
Introduction to Commercial Contract DraftingIntroduction to Commercial Contract Drafting
Introduction to Commercial Contract Drafting
 

Dernier

Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBD
Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBDPermendagri No 15 Tahun 2023 Pedoman Penyusunan APBD
Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBDSumardi Arahbani
 
Naskah Akademik Tentang Desa Adat Tahun 2023
Naskah Akademik Tentang Desa Adat Tahun 2023Naskah Akademik Tentang Desa Adat Tahun 2023
Naskah Akademik Tentang Desa Adat Tahun 2023Sumardi Arahbani
 
Potensi Pelanggaran pemilu 2024 kesiapan
Potensi Pelanggaran pemilu 2024 kesiapanPotensi Pelanggaran pemilu 2024 kesiapan
Potensi Pelanggaran pemilu 2024 kesiapanDIVISIPENCEGAHAN
 
interpretasi literal and purposive .pptx
interpretasi literal and purposive .pptxinterpretasi literal and purposive .pptx
interpretasi literal and purposive .pptxekahariansyah96
 
pilihan hukum dan perjanjian internasional dan pilihan forum
pilihan hukum dan perjanjian internasional dan pilihan forumpilihan hukum dan perjanjian internasional dan pilihan forum
pilihan hukum dan perjanjian internasional dan pilihan forumekahariansyah96
 
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptx
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptxPPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptx
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptxmuhammadrezza14
 
aspek hukum ttg kepailitan, pkpu, pengadilan niaga
aspek hukum ttg kepailitan, pkpu, pengadilan niagaaspek hukum ttg kepailitan, pkpu, pengadilan niaga
aspek hukum ttg kepailitan, pkpu, pengadilan niagaastrinovianti699
 
materi hukum bisnis hukum persaingan usaha
materi hukum bisnis hukum persaingan usahamateri hukum bisnis hukum persaingan usaha
materi hukum bisnis hukum persaingan usahayunitahatmayantihafi
 
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdf
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdfUU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdf
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdfSumardi Arahbani
 

Dernier (9)

Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBD
Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBDPermendagri No 15 Tahun 2023 Pedoman Penyusunan APBD
Permendagri No 15 Tahun 2023 Pedoman Penyusunan APBD
 
Naskah Akademik Tentang Desa Adat Tahun 2023
Naskah Akademik Tentang Desa Adat Tahun 2023Naskah Akademik Tentang Desa Adat Tahun 2023
Naskah Akademik Tentang Desa Adat Tahun 2023
 
Potensi Pelanggaran pemilu 2024 kesiapan
Potensi Pelanggaran pemilu 2024 kesiapanPotensi Pelanggaran pemilu 2024 kesiapan
Potensi Pelanggaran pemilu 2024 kesiapan
 
interpretasi literal and purposive .pptx
interpretasi literal and purposive .pptxinterpretasi literal and purposive .pptx
interpretasi literal and purposive .pptx
 
pilihan hukum dan perjanjian internasional dan pilihan forum
pilihan hukum dan perjanjian internasional dan pilihan forumpilihan hukum dan perjanjian internasional dan pilihan forum
pilihan hukum dan perjanjian internasional dan pilihan forum
 
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptx
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptxPPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptx
PPT-UEU-Manajemen-Logistik-Pelayanan-Kesehatan-Pertemuan-5.pptx
 
aspek hukum ttg kepailitan, pkpu, pengadilan niaga
aspek hukum ttg kepailitan, pkpu, pengadilan niagaaspek hukum ttg kepailitan, pkpu, pengadilan niaga
aspek hukum ttg kepailitan, pkpu, pengadilan niaga
 
materi hukum bisnis hukum persaingan usaha
materi hukum bisnis hukum persaingan usahamateri hukum bisnis hukum persaingan usaha
materi hukum bisnis hukum persaingan usaha
 
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdf
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdfUU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdf
UU-HKPD-Bahan-Sosialisasi-UU-No-1-tahun-2022-HKPD.pdf
 

EMLI Training-Drafting Perjanjian di Bidang Pertambangan (Kontrak Jual Bali Batubara dan Perjanjian Jasa Pertambangan)

  • 1. Drafting Perjanjian di Bidang Pertambangan (Kontrak Jual Bali Batubara dan Perjanjian Jasa Pertambangan) By: Dendi Adisuryo (ADCO Attorneys at Law)
  • 2. Agenda Diskusi  Anatomi Proyek Pertambangan  Hal umum berkaitan dengan contract drafting  Ketentuan Umum dalam perjanjian jual beli dan jasa kontraktor
  • 4. Anatomi Proyek Pertambangan Loan Agt Asuransi Co Pembeli Operator and Manager Pemerintah Sponsors BANK / Non-Bank Fin Inst Perusahaan Pemegang IUP Penyedia ListrikShareholders Agt Direct Agreement Share Mortgage Agt Security Documents Perusahaan UJP Kontrak Jasa Pertambangan O & M Agreement Insurance Policy Offtake PPA Direct Agreement Direct Agreement Licensing Matters Fuel Supplier Fuel Supply Agreement Direct Agreement Equipment Supplier Equipment Supply Agreement Direct Agreement
  • 5. HAL UMUM BERKAITAN DENGAN CONTRACT DRAFTING  Suatu perjanjian adalah suatu perbuatan dengan mana satu orang atau lebih mengikatkan dirinya terhadap satu orang lain atau lebih. (Pasal 1313 Kitab Undang-undang Hukum Perdata (“KUHPer”)  Syarat sahnya kontrak:  Sepakat antara para pihak  Cakap untuk membuat kontrak  Suatu hal tertentu  Sebab yang halal (Pasal 1320 KUHPer)  Pasal 1338 KUHPer: Semua perjanjian yang dibuat secara sah berlaku sebagai undang-undang bagi mereka yang membuatnya.
  • 6. HAL UMUM BERKAITAN DENGAN CONTRACT DRAFTING  Sepakat antara para pihak  Tidak ada kekhilafan  Tidak ada paksaan (Pasal 1324 BW)  Tidak ada kebohongan atau tipu muslihat (Pasal 1328 BW)  Cakap untuk membuat kontrak  Dewasa  Tidak dalam pengampuan  Tidak dilarang oleh UU
  • 7. HAL UMUM BERKAITAN DENGAN CONTRACT DRAFTING  Suatu hal tertentu  Harus menentukan objek perjanjian  Hanya barang yang dapat diperdagangkan (1332 BW)  barang-barang yang baru akan ada di kemudian hari dapat menjadi obyek perjanjian kecuali jika dilarang oleh undang-undang secara tegas (1334 BW)  Sebab yang halal Isi dari perjanjian harus mempunyai sebab dan tujuan yang diperboleh oleh UU, kesusilaan dan ketertiban umum
  • 8. PRE-DRAFTING CONSIDERATIONS  Kepentingan siapa yang diwakili  Memahami kandungan komersial dalam sebuah transaksi  Lakukan limited legal due diligence  Kumpulkan semua findings dalam LDD  Cari precedence agreement  File / transaksi terdahulu  Sharing files  Draft provider  Sumber lain yang valid  Fokus dalam drafting
  • 9. POST-DRAFTING CONSIDERATIONS  Test Drive Perjanjian  Apakah bisa efektif dan workable dalam prakteknya?  Apakah cukup fleksible untuk mencover permasalahan yang muncul yang tidak diprediksi sebelumnya?  Ditest dengan permasalahan yang aktual (e.g. Delay dalam pengiriman, harga solar naik, air sungai surut, suspensi ekspr dari pemerintah, kewajiban DMO) dan bagaimanakah kontrak tersebut merespon permasalahan
  • 10. POST-DRAFTING CONSIDERATIONS  Hindari “semangat kekeluargaan” dalam drafting  Kontrak harus komprehensif dan pasti  Kontrak merupakan dokumen final dan tunggal  Hindari keinginan enginer untuk mencantumkan email / MoM yang panjang lebar  Cantumkan dokumen teknis dalam lampiran  Proof reading
  • 11. KONTRAK JUAL BELI BATUBARA Penjual Konsumen Trader/ Pedagang Perantara Para Pelaku
  • 12. KONTRAK JUAL BELI BATUBARA  Pemegang IUP Operasi Produksi  Pemegang IUPK Operasi Produksi  Pemegang IUP Eksplorasi yang mendapatkan izin sementara untuk melakukan pengangkutan dan penjualan yang diberikan oleh Menteri, Gubernur atau Bupati/Walikota sesuai dengan kewenangannya. (Pasal 43 ayat 2 dan Pasal 44 UU 4/2009)  Pemegang IUPK Eksplorasi yang mendapatkan izin sementara untuk melakukan pengangkutan dan penjualan yang diberikan oleh Menteri. (Pasal 81 UU 4/2009)  Pemegang IUP Operasi Produksi Penjualan bagi Perusahaan yang tidak bergerak pada usaha pertambangan. (Pasal 105 ayat 1 UU 4/2009) Penjual
  • 13.  PLN  Industri Pembangkit  Industri Kertas  Industri Semen  Dll Konsumen Trader/ Pedagang Antara  Bertindak sebagai pembeli batubara tetapi bukan konsumen  Bertindak sebagai penghubung murni KONTRAK JUAL BELI BATUBARA
  • 14. KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok Jadwal Pengiriman Coal Specification Cara pembayaran Nominasi barge / vessel Jumlah batubara Resiko Harga Rejection Boiler Plates Clauses
  • 15.  Jadwal Pengiriman The Purchaser and Supplier shall agree on a regular delivery schedules for the delivery of Cargo to the Loading Point as mentioned in Appendix I. KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 16.  Coal Specification  The coal sold under this Agreement shall have the following typical specifications and rejections level…  Buyer has the right to reject the cargo if the actual analysis result of any shipment is above/below the levels indicated as rejection...  The specifications may vary on a case by case basis where Seller and Purchaser agree on specific coal specifications for nominated shipments. KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 17.  Harga  The price for all Coals delivered under this Contract shall be followings.  For the first year of the Agreement Term: USD 80/tonne.  For the next year (second year) until the end of Term (tenth year), the price shall be adjusted accordingly to ICI price, with fixed price quarterly. KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 18.  Cara Pembayaran  Invocing Supplier shall deliver to Purchaser an invoice for each Delivered Cargo equal to the relevant Invoice Amount for such Delivered Cargo as it is loaded at the Loading Point onto the relevant vessels (each, an “Invoice”).  Payment Within thirty (30) days following the receipt of each Invoice (including all documents listed in Article 6.1.2) and subject to the terms of this Contract, Purchaser shall pay the applicable Invoice Amount to Supplier. Each such payment shall be made by wire transfer of immediately available funds by Purchaser to Supplier’s nominated account. All bank charges, fees and costs incurred at Supplier’s account bank shall be for the account of Supplier. KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 19.  Nominasi Barge / vessel  …The Purchaser will nominate the performing vessel together with details of the vessel within…prior to the commencement of the delivery days agreed for the shipment.  …after completion of loading, the Seller will telex or facsimile the Purchaser… KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 20.  Coal Quantity  The quantity of coal agreed to be delivered by the Seller to the Purchaser under this Agreement shall be up to 3 million tones…  Indicative dates for delivery of shipments shall be provided by the Buyer to the Seller 15 (fifteen) days before the shipment… KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 21.  Risiko  Title to and all risk of loss or damage to all Coal delivered by Supplier under this Contract shall remain with Supplier until such Coal passes the relevant vessel’s railing at Loading Point.  The Seller must, subject to the provision of B5, bear all risks of loss of or damage to the goods until such time as they have passed the ship’s rail at the port of shipment.  Incoterms 2000 (Part A5 of CIF Section) for FoB Price KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 22.  Price Adjustment KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok Adjusted price = Contract price x Actual Gross Calorific Value (ADB) 6,500 Kcal/kg
  • 23.  Boiler Plates Provisions  Force Majeure  Choice of Law  Choice of Forum  Assignment  Default and termination  Severability  Confidentiality  Notices  Entire contract KONTRAK JUAL BELI BATUBARA Klausul-klausul pokok
  • 24. Ketentuan Pokok Kontrak Jasa Pertambangan  Apa itu Kontrak Jasa Pertambangan? Pengertian dasar  Mengontrakan pada pihak ke-3  Pekerjaan berkaitan dengan kegiatan pertambangan (dan penambangan)  Kepada pihak lain dengan alasan komersial
  • 25.  Kenapa Mengkontrakan? Alternatif dalam industri manapun Pertimbangan tidak berbeda dengan “in- house” vs “external counsel”  Biaya  Skil dan pengalaman  Alokasi resiko  Kualifikasi dan sertifikasi Ketentuan Pokok Kontrak Jasa Pertambangan
  • 26. Tipe Perjanjian Jasa Pertambangan  Perjanjian Eksklusif - SPK  Pemegang izin hanya bertanggung jawab pada licensing matters, sisanya akan dikerjakan oleh kontraktor, termasuk pada penjualan  Opsi investasi asing di KP (pra UU Minerba)  Renumeration:  Simple structure - Service fee = all proceeds less X% - Royalty Basis  Profit Sharing structure Profit (to be shared) = all proceed less total cost
  • 27. Tipe Perjanjian Jasa Pertambangan  Perjanjian Jasa Pertambangan (Tradisional)  Lump sum atau rate ditentukan berdasarkan lingkup kerja  Kombinasi  Kontraktor menyediakan alat dan operator  Owner menyediakan BBM  Berdasarkan volumen  OB  Coal getting  Fee = hourly rate atau volume  price certainty vs relative inflexibility
  • 28. Ruang Lingkup perjanjian Eksklusifitas Perizinan dan Informasi Kepemilikan atas properti Hak dan Kewajiban Para Pihak Biaya KONTRAK JASA PERTAMBANGAN Klausul-klausul pokok