SlideShare une entreprise Scribd logo
1  sur  2
ALI MOHAMED METWALI EL-MAZALI
Electric Power & Machine Control Engineer
Address:-SEF-ELNASR, ST, ELBETASH, ALEXANDRIA
Tel:- +2- 01221414897
Tel:- +2-01002149523
E-mail:- eng.ali_amme@yahoo.com
OBJECTIVE
I'm looking for a job to improve my practical experience so, I can add a lot of useful things to each place
I work in and add in the field of Electric Engineer.
PERSONAL INFORMATION
Date of Birth: 23 Jan 1988
Marital Status: Married
Nationality: Egyptian
Military Service: Exempted
OBJECTIVE
I'm looking for a job to improve my practical experience so, I can add a lot of useful things to each place
I work in and add in the field of Electric Engineer.
EXPERIENCE
Work for Alexandria Container and Cargo Handling Co. as
Electrical Shift Maintenance Engineer.
for STS cranes,
Zpmc cranes , Liebheur cranes , ceretti tanfani cranes , Noell Cranes
Work for Abo ElhassanforElectric construction As Site Engineer
–Installation of the Electrical Systems in Projects.
– Ensure the Execution of the Installation and the Material’s Submitting are according to the
Specifications and the Electrical Codes.
– Electrical Distribution Design, Load schedule, Cable sizing, Voltage drop.
– Site Management (Technicians & Materials) on All Electrical Installations
– Installation of the Low Current Systems (Fire Alarm, MATV, CCTV and Security systems ).
– Installation of the Medium voltage Network and the Transformers Termination.
– Installation of the Electrical and Communication Underground Utilities.
–Quantity surveying of the Electrical Materials including (PVC, EMT and IMC)Conduits, Cable Tray,
Cable trunking, Electrical Panel Boards, Control Devices & Panels, Wiring Devices, Cables & Wires,
Underground Utilities and the Medium Voltage Network etc.
– BOQ Take off Materials, Offers Requesting and issuing the Purchase Orders.
– Design and Implement the Control Systems Circuits and familiar to control components such the AC
Motors & Pumps, all types of Contactors & Relays, all types of Sensors & Limit- switches Inverters,
Motors Starters and the Push buttons etc.
– Raising the IR, MIR, SAM and RFIs with the Recommendation in order to solve the Conflicts.
–Prepare the Shop Drawing & As-Built Drawing Submittals for the Consultant’s Approval.
–Achieve the Co-ordination between the Electrical works and the other Trade
Projects
 Residential building Hard Rock
The Project Scope was Supply and Installation
Medium Voltage Net Work Five Ring Main Unit Five Transformer (4*1+1*1.5)
Low Voltage Net Work Low Voltage Panels The Lighting System
The Power System The Sound System The CCTV System
The Fire Alarm System.
COMMUNITY MEMBERSHIPS
IEEE Member Since 2009
LANGUAGES
Arabic (Native).
English (Very good).
 Al Wataniya ForPoultry Slaughterhouses
The Project Scopewas Supply and Installation
◘ Electrical system at slaughter house.
Medium voltage net works at slaughter house. Low voltage net works at slaughter house.
Installation of transformers and generators. Installation of medium voltage panels.
Installation of low voltage panels.
◘ Central workshop project. ◘ Ventilation store project.
◘ Office buildings project. ◘ Project of residential buildings.
Work for El-Fath for Contracting and Construction
AS Site Engineer
Projects
 E-Med for Industrialization factory, Badr City
Installation of Electrical system
Lighting System Power System Fire alarm System
Telephone System CCTV System Cable try for low voltage cable
 Insulation the electrical all electrical system form villa and landscape
CERTIFICATIONS
Auto CAD(2D) with grade Excellent from (IBI) July2007
PLC Advanced Course (level-1) with general grad Excellent August 2007
Training program START PROFESSIONAL that covered:
Personal Effectiveness, Presentation Skills ,CV Writing ,Team Building and Time
Management
March 2009
International Computer Driving License (ICDL) August 2009
P.T.I check for REF. containers April 2012
S7 PLC Basic and Practical Applications January 2013
Technical Software
Good dealing with electrical software like:-Simatic manager Step 7, Proteus, Matlab, Eagle, AutoCAD,
Dialux, Code vision AVR, Calculux
Other Skills
Control systems implementation with microcontrollers (Atmel, AVR and PIC), classic control (relay
control) and PLC’s.
Practical dealing with sensors, actuators
Electrical safety for explosive gas atmospheres according to IEC.
COMPUTER SKILLS
Microsoft (Word, Excel, PowerPoint, Access, FrontPage (.
Internet search
Operating system ( windows )

Contenu connexe

Tendances

Tendances (20)

Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
A Greaves CV 2015
A Greaves CV 2015A Greaves CV 2015
A Greaves CV 2015
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Resume
ResumeResume
Resume
 
ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916
 
Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
CV - Syed Mujtaba Hussain
CV - Syed Mujtaba HussainCV - Syed Mujtaba Hussain
CV - Syed Mujtaba Hussain
 
Aldrin 2014
Aldrin 2014Aldrin 2014
Aldrin 2014
 
GERARDO A. QUIZON CV
GERARDO A. QUIZON CVGERARDO A. QUIZON CV
GERARDO A. QUIZON CV
 
CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3
 
Mohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical EngineerMohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical Engineer
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineering
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
hossam 2017
hossam 2017hossam 2017
hossam 2017
 
C.V -updated
C.V -updatedC.V -updated
C.V -updated
 

En vedette (13)

Construction CV 2015- May Revised
Construction CV 2015- May RevisedConstruction CV 2015- May Revised
Construction CV 2015- May Revised
 
Example skills based CV
Example skills based CVExample skills based CV
Example skills based CV
 
Example Skill Based CV
Example Skill Based CVExample Skill Based CV
Example Skill Based CV
 
Emad CV Revised (1)
Emad CV Revised (1)Emad CV Revised (1)
Emad CV Revised (1)
 
Misbah
MisbahMisbah
Misbah
 
Asad-cv-1 (cRCT)
Asad-cv-1 (cRCT)Asad-cv-1 (cRCT)
Asad-cv-1 (cRCT)
 
Parvez cv
Parvez cvParvez cv
Parvez cv
 
CV-Sarmid_Shakir_Abdulsattar_(Last_up-to_-date) (2)
CV-Sarmid_Shakir_Abdulsattar_(Last_up-to_-date) (2)CV-Sarmid_Shakir_Abdulsattar_(Last_up-to_-date) (2)
CV-Sarmid_Shakir_Abdulsattar_(Last_up-to_-date) (2)
 
raza_kaleem-1_1_ (1)
raza_kaleem-1_1_ (1)raza_kaleem-1_1_ (1)
raza_kaleem-1_1_ (1)
 
MAX JOURDAN CV JULY 2015
MAX JOURDAN CV JULY 2015MAX JOURDAN CV JULY 2015
MAX JOURDAN CV JULY 2015
 
CV_Naeem_Sayyed
CV_Naeem_SayyedCV_Naeem_Sayyed
CV_Naeem_Sayyed
 
CV Naeem Ahmed Khan
CV Naeem Ahmed KhanCV Naeem Ahmed Khan
CV Naeem Ahmed Khan
 
gul sher cv
gul sher cvgul sher cv
gul sher cv
 

Similaire à ENG-ALI CV construction (20)

ENG-ALI CV M
ENG-ALI CV MENG-ALI CV M
ENG-ALI CV M
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
 
cv 2016
cv 2016cv 2016
cv 2016
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORM
 
Mohamed Aly
Mohamed AlyMohamed Aly
Mohamed Aly
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineer
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1
 
Bridge electrical engineering work1
Bridge electrical engineering work1Bridge electrical engineering work1
Bridge electrical engineering work1
 
M. Helmy
M. HelmyM. Helmy
M. Helmy
 
ehab mohamed
ehab mohamedehab mohamed
ehab mohamed
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
Electric Engineer mohamed hemeda
Electric Engineer mohamed hemedaElectric Engineer mohamed hemeda
Electric Engineer mohamed hemeda
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
Mohamed rabee cv
Mohamed rabee cvMohamed rabee cv
Mohamed rabee cv
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Nizar Maddah CV
Nizar Maddah CVNizar Maddah CV
Nizar Maddah CV
 
mohamed abdallah CV_Old1
mohamed abdallah CV_Old1mohamed abdallah CV_Old1
mohamed abdallah CV_Old1
 
D naiyer resume
D naiyer resumeD naiyer resume
D naiyer resume
 

ENG-ALI CV construction

  • 1. ALI MOHAMED METWALI EL-MAZALI Electric Power & Machine Control Engineer Address:-SEF-ELNASR, ST, ELBETASH, ALEXANDRIA Tel:- +2- 01221414897 Tel:- +2-01002149523 E-mail:- eng.ali_amme@yahoo.com OBJECTIVE I'm looking for a job to improve my practical experience so, I can add a lot of useful things to each place I work in and add in the field of Electric Engineer. PERSONAL INFORMATION Date of Birth: 23 Jan 1988 Marital Status: Married Nationality: Egyptian Military Service: Exempted OBJECTIVE I'm looking for a job to improve my practical experience so, I can add a lot of useful things to each place I work in and add in the field of Electric Engineer. EXPERIENCE Work for Alexandria Container and Cargo Handling Co. as Electrical Shift Maintenance Engineer. for STS cranes, Zpmc cranes , Liebheur cranes , ceretti tanfani cranes , Noell Cranes Work for Abo ElhassanforElectric construction As Site Engineer –Installation of the Electrical Systems in Projects. – Ensure the Execution of the Installation and the Material’s Submitting are according to the Specifications and the Electrical Codes. – Electrical Distribution Design, Load schedule, Cable sizing, Voltage drop. – Site Management (Technicians & Materials) on All Electrical Installations – Installation of the Low Current Systems (Fire Alarm, MATV, CCTV and Security systems ). – Installation of the Medium voltage Network and the Transformers Termination. – Installation of the Electrical and Communication Underground Utilities. –Quantity surveying of the Electrical Materials including (PVC, EMT and IMC)Conduits, Cable Tray, Cable trunking, Electrical Panel Boards, Control Devices & Panels, Wiring Devices, Cables & Wires, Underground Utilities and the Medium Voltage Network etc. – BOQ Take off Materials, Offers Requesting and issuing the Purchase Orders. – Design and Implement the Control Systems Circuits and familiar to control components such the AC Motors & Pumps, all types of Contactors & Relays, all types of Sensors & Limit- switches Inverters, Motors Starters and the Push buttons etc. – Raising the IR, MIR, SAM and RFIs with the Recommendation in order to solve the Conflicts. –Prepare the Shop Drawing & As-Built Drawing Submittals for the Consultant’s Approval. –Achieve the Co-ordination between the Electrical works and the other Trade Projects  Residential building Hard Rock The Project Scope was Supply and Installation Medium Voltage Net Work Five Ring Main Unit Five Transformer (4*1+1*1.5) Low Voltage Net Work Low Voltage Panels The Lighting System The Power System The Sound System The CCTV System The Fire Alarm System.
  • 2. COMMUNITY MEMBERSHIPS IEEE Member Since 2009 LANGUAGES Arabic (Native). English (Very good).  Al Wataniya ForPoultry Slaughterhouses The Project Scopewas Supply and Installation ◘ Electrical system at slaughter house. Medium voltage net works at slaughter house. Low voltage net works at slaughter house. Installation of transformers and generators. Installation of medium voltage panels. Installation of low voltage panels. ◘ Central workshop project. ◘ Ventilation store project. ◘ Office buildings project. ◘ Project of residential buildings. Work for El-Fath for Contracting and Construction AS Site Engineer Projects  E-Med for Industrialization factory, Badr City Installation of Electrical system Lighting System Power System Fire alarm System Telephone System CCTV System Cable try for low voltage cable  Insulation the electrical all electrical system form villa and landscape CERTIFICATIONS Auto CAD(2D) with grade Excellent from (IBI) July2007 PLC Advanced Course (level-1) with general grad Excellent August 2007 Training program START PROFESSIONAL that covered: Personal Effectiveness, Presentation Skills ,CV Writing ,Team Building and Time Management March 2009 International Computer Driving License (ICDL) August 2009 P.T.I check for REF. containers April 2012 S7 PLC Basic and Practical Applications January 2013 Technical Software Good dealing with electrical software like:-Simatic manager Step 7, Proteus, Matlab, Eagle, AutoCAD, Dialux, Code vision AVR, Calculux Other Skills Control systems implementation with microcontrollers (Atmel, AVR and PIC), classic control (relay control) and PLC’s. Practical dealing with sensors, actuators Electrical safety for explosive gas atmospheres according to IEC. COMPUTER SKILLS Microsoft (Word, Excel, PowerPoint, Access, FrontPage (. Internet search Operating system ( windows )