2. 1. Who is EWB‐USA?
2. Where is EWB‐USA working?
3. Typical EWB Projects
4. Three Bridge Project Examples
a. El Estor, Guatemala
b. Armenta, Honduras
c. Canchias, Honduras
5. Current Water Project &
Opportunity for you to be
involved
192. Distribution
N Network
Our
Community
12,000 gal
Water Tank Bridge
Neighboring
Community
Transmission
Line
Armenta River
Sediment Tank
Intake Dam Water Tank
193. 1. Confirmed Water Source Adequate for Project Needs
Quantity
Quality
2. Identified New Path for Larger New Water Line
Surveyed Existing Line
Determined New Pipe Requirements, Design Needs
and Construction Challenges
3. Surveyed Community and Tested Water
Determined Water Demand
Determined Quality at Source and Point of Use
Investigated Ways to Conserve Water Prior to Planned
Project Implementation in 2013
221. New Design Elements New Distribution
N Network
Our
Community
2 New 55,000 Gal
Water Storage Tanks
Neighboring
Community
Armenta River
New Sediment Tank New 6” Dia
Transmission
Line
Raise Intake
Dam
222. $ 112,000 PVC and GI Piping, Valves and Connections
$ 30,000 2 – 55,000 Gallon Water Storage Tanks
$ 3,000 Raising Low Head Water Collection Dam
$ 1,000 New Water Sedimentation Tank
$ 21,000 Multiple Pipe Bridges
$ 6,000 Pipe Supports (primarily along mountainside)
$ 3,000 Equipment to Purchase
$ 3,000 Expendables (Safety gear, blades, bits, fuel, etc)
$ 3,000 Equipment and Small Truck to Rent (10 week rental)
$ 7,000 Hired Skilled Labors & Night Watchmen
$ 8,000 Material Delivery
$ 26,000 Contingency on Materials (15 %)
$223,000 Total On‐Site Project Costs
224. Baker USCOE Cotter
Albin Carlson & Co. DuPage
Cook County County
Hwy Dept
Mactec
HNTB
Sargent
PB World & Lundy
EN Engineering
Stanley Autumn
LONCO URS
Quandel Construction
CH2M Hill Civiltech
Superior Engineering Duane Morris