Design Check List - Section VIII, Division 1
Inspector: Remarks OK / Not OK
1 Drawing + bill of material (BOM)
1.1 drawing no./rev. (revision used in the calculation?/in compliance with Quality Manual?)
1.2 reference on the drawing to other required documents, e.g. welding doc., BOM etc.
1.3 ASME Code Edition /Code Cases
1.4 units: SI/U.S. Customary/local customary units U-4
1.5 design data: internal / external pr./ MAWP / design temperature / MDMT / test pressure etc. UG-20 , 21
1.6 corrosion / erosion allowance UG-25
1.7 materials (for all pressure parts: all permitted?/additional requirements, e.g. UT, PT, MT?) UG-4 thru UG-15,
1.8 dimensions (ID, t, OD etc.) UG-16
1.9 loads (use separate checklist as well) UG-22 (a) to (j)
1.10 service restrictions (unfired steam boiler, cyclic, lethal, compressed air, steam, water service) UW-2, UG-16
1.11 joint identification on the drw. /assignment of WPS to joints/ref. to the ext. welding doc.
1.12 name plate UG-115, 116, 118, 119
2 Tolerances / Dimensions U-5, UG-16(c)
2.1 minimum thickness, plate and pipe tolerances UG-16
2.2 misalignment UW-33
2.3 tapered transitions UW-9
2.4 staggered longitudinal joints UW-9
2.5 out-of-roundness for internal pressure UG-80(a)
2.6 out-of-roundness for external pressure UG-80(b)
2.7 head skirt length UG-32-33,UW-13
2.8 tolerance for formed heads UG-81
2.9 exposed inside edges chamfered or rounded UG-76(c)
3 Calculation
3.1 computer program verification incl. evidence of alternate calculation per method applied Foreword
3.2 allowable stress values used in the calculation UG-23, Sec.II
3.3 external (stiffening rings if appl.) / internal pressure calculation for all pressure bearing parts UG-27 ff
3.4 joint efficiencies E UW-11, 12
3.5 corrosion allowance / static head considered in the calculation? UG-16, 21
3.6 required thickness values >= minimum wall thickness (UG-16) + corrosion allowance UG-16, 25
3.7 any external loadings considered: e.g. ex. nozzle loads, seismic, wind, ... UG-22
3.8 extreme fibre elongation
3.9 fittings considered? UG-44, Table U-3
3.10 Flanges ASME B16.5: PT Rating @ Tdes >= design pressure (incl. static head) UG-44
3.11 non-standard: App.2, App.Y
3.12 material: bar? / hubbed flanges from rolled plate? UG-14, 2-2(d)(2)
3.13 bolt requirements UG-12, 2-2(e)
3.14 Nozzles size: ligaments, if any ---> ligament efficiency considered UG-53
3.15 small openings, if any ---> no reinforcement calculation needed UG-36(c)(3)
3.16 reinforcement calculation needed ---> for shells / dished heads UG-37, App.1-9,10 (shell)
3.17 for flat heads UG-39
3.18 for large openings App. 1-7, App.1-10
3.19 limits of reinforcement, overlapping areas of reinforcement UG-37, 40
3.20 multiple openings UG-42
3.21 openings in or adjacent to welds UG-37, UW-14
3.22 split/ segmental reinf. plates considered UG-37
3.23 nozzle weld strength calculation UG-41, UW-15
3.24 minimum nozzle neck thickness UG-45
3.25 telltale holes in nozzle reinf. plates UG-37(g)
3.26 Studded openings reinforcement calculation available? UG-37
3.27 threaded connection UG-12,UG-43(e),(g), UG-46(i)
3.28 remaining wall thickness underneath tapped holes UG-43(d)
3.29 Stayed surfaces UG-47
3.30 Staybolts UG-14, 48-50, UG-83, UW-19
3.31 Vessel support calculation (lugs, legs, saddles…) UG-4(b), UG-22, UG-54,55
4 Drains UG-25(f)
5 Telltale holes for corrosion UG-25(e)
Reference Paragraph
UCS-79, UG-79,
UHA-44, UNF-79
Project/Order:Manufacturer:
Drawing No. / Rev.: Place / Date:
v
v
Design Check List/ASME Sec.VIII, Div 1, Ed.2013, Rev.0 Page 1
Design Check List - Section VIII, Division 1
6 Studs & bolts
7 Inspection openings UG-46
8 Flued openings UG-38
9 Heat exchangers UHX, App. A, UW-20
10 Dimpled and embossed assemblies App.17
11 Electric immersion heater support plates App.41
12 Bellow joints App.26, App.5
13 Rectangular vessels App.13
14 Clamp connections App.24
15 Quick-actuating closures UG-35.2
16 Jacketed vessels App. 9, UG-27(f), 28(i), 47
17 Miniature pressure vessel - check the constraints! U-1(j), UG-116
18 Mass production of pressure vessels App. 35
19 Welds
19.1 Joint categories UW-3
19.2 Nozzle attachment to the shell or head UW-16
19.3 Attachment of flat heads + covers to cylinders UW-13, UG-34,
19.4 Corner joints UW-13(e), UG-93(d)(3)-(4)
19.5 Fillet welds from one side only UW-8,13, UG-34
19.6 Flange attachment to the nozzle Fig. 2-4 App. 2
19.7 Tubesheet to shell welds UW-13.2
19.8 Tube to tubesheet welds UW-20, App. A
19.9 Plug welds UW-17, 37
19.10 Fillet welds UW-18
19.11 Welded stays UW-19
19.12 B16.5 SO and socket flange welds UW-21
20 Heat treatment requirements UG-85
20.1 PWHT carbon and low alloy steels UCS-56
20.2 high alloy steels UHA-32
20.3 nonferrous materials UNF-56
20.4 HT after forming due to straining UCS-79, UHA-44, UNF-79
21 Impact Test Requirements UG-84, UW-48
21.1 carbon and low alloy steels UG-20(f), UCS-66-67
21.2 high alloy steels UHA-51
21.3 nonferrous materials UNF-65
22 NDE UW-11, App.6, App.8
22.1 RT: carbon and low alloy steels UCS-57, UNF-57
22.2 high alloy steels UHA-33
22.3 nonferrous materials UNF-57
22.4 radiographic technique UW-51, 52
22.5 ultrasonic examination UW-53, App.12
22.6 selection and location of "spots" UW-52
22.7 hubs machined from plate App.20
22.8 PT / MT mandatory UHA-34,UW-13(b)(4),UNF-58
22.9 NDE (PT/MT) on corner joints UG-93(d), UW-13(e)
23 Test pressure Hydrostatic Test UG-99
23.1 based on MAWP UG-99(b)
23.2 based on calculated pressure UG-99(c)
23.3 Pneumatic Test UG-100
24 Overpressure Protection UG-125-140, App.11, App.M
25 Referenced Standards Table U-3
26 Proof Test UG-101
27 Marking and Stamping / Name plate location UG-115, 116, 118-119
28 NB registration number
29 Canadian registration number
30 Partial Data Report / Data Report UG-120
31 Comments/Additional Notes
This check list has been prepared by CIS GmbH. It refers to vessels made of carbon, low alloy, high alloy steels and nonferrous metals. For other types of constuction see the Code. However, this check list is intended to be used as a
help and guidance only, it cannot replace profound knowledge of the Code.
UG-12, UCS-10, UNF-
12, UHA-12, 2-2(e)
Design Check List/ASME Sec.VIII, Div 1, Ed.2013, Rev.0 Page 2

Contenu connexe

Tendances

Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
ZULKAR NAIN
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
ledzung
 

Tendances (20)

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
ASME RT y Eficiencias de Juntas parte 3
ASME RT y Eficiencias de Juntas parte 3ASME RT y Eficiencias de Juntas parte 3
ASME RT y Eficiencias de Juntas parte 3
 
ASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.pptASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.ppt
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
 
calculo de tanque
calculo de tanque calculo de tanque
calculo de tanque
 
Asme rt y eficiencias de juntas parte 2
Asme rt y eficiencias de juntas parte 2Asme rt y eficiencias de juntas parte 2
Asme rt y eficiencias de juntas parte 2
 
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesStatic and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
 
Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
Catalogo completo soportes_tuberia
Catalogo completo soportes_tuberiaCatalogo completo soportes_tuberia
Catalogo completo soportes_tuberia
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
pipe shedule chart
pipe shedule chartpipe shedule chart
pipe shedule chart
 
Codigo asme seccion VIII division 1
Codigo asme seccion VIII division 1Codigo asme seccion VIII division 1
Codigo asme seccion VIII division 1
 
Types of Flange.pdf
Types of Flange.pdfTypes of Flange.pdf
Types of Flange.pdf
 
Tank design - word
Tank design - wordTank design - word
Tank design - word
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
 

Similaire à Design check list viii 1 rev0

ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
Thorne & Derrick UK
 
2015 1 tech-presentation_ball
2015 1 tech-presentation_ball2015 1 tech-presentation_ball
2015 1 tech-presentation_ball
AbdulHadiAhmed2
 
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
Hassan Alwaely
 
05 multiple control stations
05 multiple control stations05 multiple control stations
05 multiple control stations
Hai Pham
 

Similaire à Design check list viii 1 rev0 (20)

Lethal service quick guide
Lethal service   quick guideLethal service   quick guide
Lethal service quick guide
 
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
 
MITSUBISHI ELECTRIC SPLIT-TYPE
MITSUBISHI ELECTRIC SPLIT-TYPEMITSUBISHI ELECTRIC SPLIT-TYPE
MITSUBISHI ELECTRIC SPLIT-TYPE
 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
 
Sample
Sample Sample
Sample
 
2019 Key Changes Section VIII-1 Rev1.pdf
2019 Key Changes Section VIII-1 Rev1.pdf2019 Key Changes Section VIII-1 Rev1.pdf
2019 Key Changes Section VIII-1 Rev1.pdf
 
Siemens Sitrans F VA 250
Siemens Sitrans F VA 250 Siemens Sitrans F VA 250
Siemens Sitrans F VA 250
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
Cost Optimization of a Tubular Steel Truss Using Limit State Method of Design
Cost Optimization of a Tubular Steel Truss Using Limit State Method of DesignCost Optimization of a Tubular Steel Truss Using Limit State Method of Design
Cost Optimization of a Tubular Steel Truss Using Limit State Method of Design
 
2015 1 tech-presentation_ball
2015 1 tech-presentation_ball2015 1 tech-presentation_ball
2015 1 tech-presentation_ball
 
181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-email181015 muna-fichas nebulizada-email
181015 muna-fichas nebulizada-email
 
FEAM Lighting - Hazardous Area & Explosion Proof Lighting
FEAM Lighting - Hazardous Area & Explosion Proof Lighting FEAM Lighting - Hazardous Area & Explosion Proof Lighting
FEAM Lighting - Hazardous Area & Explosion Proof Lighting
 
Applications Engineering-en.ppt
Applications Engineering-en.pptApplications Engineering-en.ppt
Applications Engineering-en.ppt
 
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
Designing, Fabricating, and Controlling of Shaped Metal Deposition System in ...
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
 
Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20
 
Numerically and CFD studies on shell and tube heat exchangers
Numerically and CFD studies on shell and tube heat exchangersNumerically and CFD studies on shell and tube heat exchangers
Numerically and CFD studies on shell and tube heat exchangers
 
Finite Element Analysis of Skirt to Dished junction in a Pressure Vessel
Finite Element Analysis of Skirt to Dished junction in a Pressure VesselFinite Element Analysis of Skirt to Dished junction in a Pressure Vessel
Finite Element Analysis of Skirt to Dished junction in a Pressure Vessel
 
05 multiple control stations
05 multiple control stations05 multiple control stations
05 multiple control stations
 

Dernier

Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Dernier (20)

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 

Design check list viii 1 rev0

  • 1. Design Check List - Section VIII, Division 1 Inspector: Remarks OK / Not OK 1 Drawing + bill of material (BOM) 1.1 drawing no./rev. (revision used in the calculation?/in compliance with Quality Manual?) 1.2 reference on the drawing to other required documents, e.g. welding doc., BOM etc. 1.3 ASME Code Edition /Code Cases 1.4 units: SI/U.S. Customary/local customary units U-4 1.5 design data: internal / external pr./ MAWP / design temperature / MDMT / test pressure etc. UG-20 , 21 1.6 corrosion / erosion allowance UG-25 1.7 materials (for all pressure parts: all permitted?/additional requirements, e.g. UT, PT, MT?) UG-4 thru UG-15, 1.8 dimensions (ID, t, OD etc.) UG-16 1.9 loads (use separate checklist as well) UG-22 (a) to (j) 1.10 service restrictions (unfired steam boiler, cyclic, lethal, compressed air, steam, water service) UW-2, UG-16 1.11 joint identification on the drw. /assignment of WPS to joints/ref. to the ext. welding doc. 1.12 name plate UG-115, 116, 118, 119 2 Tolerances / Dimensions U-5, UG-16(c) 2.1 minimum thickness, plate and pipe tolerances UG-16 2.2 misalignment UW-33 2.3 tapered transitions UW-9 2.4 staggered longitudinal joints UW-9 2.5 out-of-roundness for internal pressure UG-80(a) 2.6 out-of-roundness for external pressure UG-80(b) 2.7 head skirt length UG-32-33,UW-13 2.8 tolerance for formed heads UG-81 2.9 exposed inside edges chamfered or rounded UG-76(c) 3 Calculation 3.1 computer program verification incl. evidence of alternate calculation per method applied Foreword 3.2 allowable stress values used in the calculation UG-23, Sec.II 3.3 external (stiffening rings if appl.) / internal pressure calculation for all pressure bearing parts UG-27 ff 3.4 joint efficiencies E UW-11, 12 3.5 corrosion allowance / static head considered in the calculation? UG-16, 21 3.6 required thickness values >= minimum wall thickness (UG-16) + corrosion allowance UG-16, 25 3.7 any external loadings considered: e.g. ex. nozzle loads, seismic, wind, ... UG-22 3.8 extreme fibre elongation 3.9 fittings considered? UG-44, Table U-3 3.10 Flanges ASME B16.5: PT Rating @ Tdes >= design pressure (incl. static head) UG-44 3.11 non-standard: App.2, App.Y 3.12 material: bar? / hubbed flanges from rolled plate? UG-14, 2-2(d)(2) 3.13 bolt requirements UG-12, 2-2(e) 3.14 Nozzles size: ligaments, if any ---> ligament efficiency considered UG-53 3.15 small openings, if any ---> no reinforcement calculation needed UG-36(c)(3) 3.16 reinforcement calculation needed ---> for shells / dished heads UG-37, App.1-9,10 (shell) 3.17 for flat heads UG-39 3.18 for large openings App. 1-7, App.1-10 3.19 limits of reinforcement, overlapping areas of reinforcement UG-37, 40 3.20 multiple openings UG-42 3.21 openings in or adjacent to welds UG-37, UW-14 3.22 split/ segmental reinf. plates considered UG-37 3.23 nozzle weld strength calculation UG-41, UW-15 3.24 minimum nozzle neck thickness UG-45 3.25 telltale holes in nozzle reinf. plates UG-37(g) 3.26 Studded openings reinforcement calculation available? UG-37 3.27 threaded connection UG-12,UG-43(e),(g), UG-46(i) 3.28 remaining wall thickness underneath tapped holes UG-43(d) 3.29 Stayed surfaces UG-47 3.30 Staybolts UG-14, 48-50, UG-83, UW-19 3.31 Vessel support calculation (lugs, legs, saddles…) UG-4(b), UG-22, UG-54,55 4 Drains UG-25(f) 5 Telltale holes for corrosion UG-25(e) Reference Paragraph UCS-79, UG-79, UHA-44, UNF-79 Project/Order:Manufacturer: Drawing No. / Rev.: Place / Date: v v Design Check List/ASME Sec.VIII, Div 1, Ed.2013, Rev.0 Page 1
  • 2. Design Check List - Section VIII, Division 1 6 Studs & bolts 7 Inspection openings UG-46 8 Flued openings UG-38 9 Heat exchangers UHX, App. A, UW-20 10 Dimpled and embossed assemblies App.17 11 Electric immersion heater support plates App.41 12 Bellow joints App.26, App.5 13 Rectangular vessels App.13 14 Clamp connections App.24 15 Quick-actuating closures UG-35.2 16 Jacketed vessels App. 9, UG-27(f), 28(i), 47 17 Miniature pressure vessel - check the constraints! U-1(j), UG-116 18 Mass production of pressure vessels App. 35 19 Welds 19.1 Joint categories UW-3 19.2 Nozzle attachment to the shell or head UW-16 19.3 Attachment of flat heads + covers to cylinders UW-13, UG-34, 19.4 Corner joints UW-13(e), UG-93(d)(3)-(4) 19.5 Fillet welds from one side only UW-8,13, UG-34 19.6 Flange attachment to the nozzle Fig. 2-4 App. 2 19.7 Tubesheet to shell welds UW-13.2 19.8 Tube to tubesheet welds UW-20, App. A 19.9 Plug welds UW-17, 37 19.10 Fillet welds UW-18 19.11 Welded stays UW-19 19.12 B16.5 SO and socket flange welds UW-21 20 Heat treatment requirements UG-85 20.1 PWHT carbon and low alloy steels UCS-56 20.2 high alloy steels UHA-32 20.3 nonferrous materials UNF-56 20.4 HT after forming due to straining UCS-79, UHA-44, UNF-79 21 Impact Test Requirements UG-84, UW-48 21.1 carbon and low alloy steels UG-20(f), UCS-66-67 21.2 high alloy steels UHA-51 21.3 nonferrous materials UNF-65 22 NDE UW-11, App.6, App.8 22.1 RT: carbon and low alloy steels UCS-57, UNF-57 22.2 high alloy steels UHA-33 22.3 nonferrous materials UNF-57 22.4 radiographic technique UW-51, 52 22.5 ultrasonic examination UW-53, App.12 22.6 selection and location of "spots" UW-52 22.7 hubs machined from plate App.20 22.8 PT / MT mandatory UHA-34,UW-13(b)(4),UNF-58 22.9 NDE (PT/MT) on corner joints UG-93(d), UW-13(e) 23 Test pressure Hydrostatic Test UG-99 23.1 based on MAWP UG-99(b) 23.2 based on calculated pressure UG-99(c) 23.3 Pneumatic Test UG-100 24 Overpressure Protection UG-125-140, App.11, App.M 25 Referenced Standards Table U-3 26 Proof Test UG-101 27 Marking and Stamping / Name plate location UG-115, 116, 118-119 28 NB registration number 29 Canadian registration number 30 Partial Data Report / Data Report UG-120 31 Comments/Additional Notes This check list has been prepared by CIS GmbH. It refers to vessels made of carbon, low alloy, high alloy steels and nonferrous metals. For other types of constuction see the Code. However, this check list is intended to be used as a help and guidance only, it cannot replace profound knowledge of the Code. UG-12, UCS-10, UNF- 12, UHA-12, 2-2(e) Design Check List/ASME Sec.VIII, Div 1, Ed.2013, Rev.0 Page 2