Project Manager
Interview Questions
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
✓ Project Managers are the main catalysts of a project.
✓ They are responsible for driving a project through various phases
of Project Management in a controlled manner.
✓ The various phases of Project Management include planning, executing,
monitoring, controlling and closing projects.
✓ They also shoulder the responsibility of the entire project scope, project
team management, risk estimation along with the various resources
needed in the project.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager Salary Trend
Project Manager Salary (US)
Project Manager Salary (IND)
Source: PayScale
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager Job Openings Based on Salary
Source: PayScale
$65,000
$80,000
$90,000
$1,00,000
$1,10,000
Salary Offered
Project Manager
Interview Questions
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatisyourunderstanding about
ProjectManagement?
Question 1
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 1
Whatisyourunderstanding about
ProjectManagement?
Project management is the discipline that helps you in
implementing various processes, methods, knowledge, skills,
and experience for achieving the objectives of a unique project.
erformanceProjectPoorPreventsPlanningProperP
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatisthedifference between
Project,ProgramandPortfolio?
Question 2
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatisthedifference between
Project,ProgramandPortfolio?
Question 2
A collection of projects and operations which are managed
under one group in order to achieve a strategic goal
A group of interrelated projects that are managed together
A temporary endeavour undertaken to produce an unique
product or solution
Project
Program
Portfolio
2
3
1
Project
Program
Portfolio
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
ElaborateProjectManagementLife
Cycleprocess?
Question 3
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 3
ElaborateProjectManagementLife
Cycleprocess?
The Project Life Cycle is a series of various activities/tasks that are
crucial for accomplishing project objectives or targets
INITIATING PLANNING
EXECUTING,
MONITORING &
CONTROLLING
CLOSURE
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatarethemostimportantskills
thataProjectManagershould
possess?
Question 4
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 4
Whatarethemostimportantskills
thataProjectManagershould
possess?
Communication Leadership Team Management
Negotiation Power Personal Organization Risk Management
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Howwillyoustartyourjobasanew
projectmanager?
Question 5
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 5
Howwillyoustartyourjobasanew
projectmanager?
1. Listen, observe and learn
2. Understand your clients needs and wants
3. Know your team and their personalities
4. Take the opportunity to learn some new skills
5. Help out around the workplace
6. Try to master the tools your company possesses
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Howwillprioritizetasksinyour
project?
Question 6
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 6
1. List down the tasks and responsibilities
2. Distinguish between urgent and important
3. Assess the value of each task
4. Order the tasks by estimated efforts
5. Stay flexible and ready to adapt
6. Know when to say NO
Howwillprioritizetasksinyour
project?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatisyourleadershipstyle?
Question 7
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 7
Whatisyourleadershipstyle?
Supportive
“We Talk, You Decide”
[High Relationship – Low Task]
Coaching
“We Talk, I Decide”
[High Relationship – High Task]
Delegate
“You Decide”
[Low Relationship – Low Task]
Directing
“I Tell”
[Low Relationship – High Task]
Relationship
Task
Your leadership style should be situational, depending on the type
of team your are working with and the importance of the tasks
involved in the project.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatisyouridealproject?
Question 8
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 8
Whatisyouridealproject?
Before answering this question you must consider the below questions:
• What type of work do you enjoy the most?
• How much you want to and are allowed to show your creativity?
• Under what type of deadlines do you work best?
• How comfortable are you with trying new things on a project?
• Do you prefer to always receive full credit for your work?
• Are you okay with working as part of a team, or do you prefer to work
alone?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatareprocessesandprocess
groupsintheprojectmanagement
framework?
Question 9
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 9
Whataretheprocessesand
processgroupsintheproject
managementframework?
• A process is a defined way of doing tasks involved in the project
• It defines the actions to be taken along with their sequence
• Process Groups are a collection of processes that are applicable
to various stages of a project.
• In project management framework there are 5 process groups in
which 10 knowledge areas and 49 processes are mapped
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whatareknowledgeareasandhow
relevantaretheyinaproject?
Question 10
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 10
• Knowledge Areas are the core technical subject matter, which are
necessary for effective project management.
❑ Project Integration Management
❑ Project Scope Management
❑ Project Schedule Management
❑ Project Cost Management
❑ Project Quality Management
❑ Project Resource Management
❑ Project Communications Management
❑ Project Risk Management
❑ Project Procurement Management
❑ Project Stakeholder Management
Whatareknowledgeareasandhow
relevantaretheyinaproject?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Howwouldyouhandleadifficult
stakeholderinvolvedinyour
project?
Question 11
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 11
• Accept their authority without fighting
• Remove all the negative emotions
• Understand their issue
• Ask for advice and listen to them
• Be tactful and honest with your decisions
• Praise them and try to establish the connection
• Tailor your communication
Howwouldyouhandleadifficult
stakeholderinvolvedinyour
project?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
WhatisRAIDinProject
Management?
Question 12
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 12
Risk
Assumptions
Issue
Dependencies
WhatisRAIDinProject
Management?
R
A
I
D
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Whenyouconsiderthatyour
projectisofftrackandwhatwillbe
yourstepsensurethatitfinishes
withinthegiventimeline?
Question 13
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 13
Check for below pointers to know whether the project is on track or not:
• Budget is under control or not
• Consuming too much time
• Project scope keeps changing
• Original goals are no longer present
Whenyouconsiderthatyour
projectisofftrackandwhatwillbe
yourstepsensurethatitfinishes
withinthegiventimeline?
What can be done to bring it back on track:
• Discover the root cause
• Put in more time and efforts to catch up
• Try to follow the original goal/vision
• Re-adjust the resource management
• Keep open communication with client and stakeholders
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 14
Whichprojectmanagement
methodologydoyouprefer
followinginyourprojects?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 14
Before you choose your project management methodology, you must
consider the below factors:
• Organizational strategic goals and core values
• Key business drivers
• Constraints
• Stakeholders
• Risks
• Complexity
• Project size and cost
Whichprojectmanagement
methodologydoyouprefer
followinginyourprojects?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 15
Whatarethetoolsmostlyusedfor
improvingtheprocessactivities?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 15
Majorly used tools in the industry:
❑ Comparing and Baselining a Process
❑ Flow-charting
❑ Value-Stream Mapping
❑ Cause and Effect Analysis
❑ Hypothesis Testing
Whatarethetoolsmostlyusedfor
improvingtheprocessactivities?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 16
Howwillyoumanagetheteam
memberswhoarenotworkingto
theirfullpotential?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 16 ❑ Avoid any type of emotional confrontation
❑ Encourage them to think and act in natural ways
❑ Help in developing their decision-making abilities
❑ Expand their performance tolerance threshold
❑ Strengthen potential by surrounding it with those even stronger
❑ Understand what motivates your employees
❑ Show where they fit in the company mission
❑ Arrange a follow up process
❑ Reward and appreciate their improvement
❑ Be ready to let them go
Howwillyoumanagetheteam
memberswhoarenotworkingto
theirfullpotential?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 17
Beingaprojectmanagerhowwill
yougainyourteamagreementfor
results?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 17
❑ Keep your expectations clear from the beginning
❑ Build achievable milestones
❑ Collaborate and maintain team trust
❑ Agree on the terms with the team
❑ Schedule frequent accountability meetings
❑ Establish outcome results and consequences
❑ Clear out any conflicts as soon as possible
Beingaprojectmanagerhowwill
yougainyourteamagreementfor
results?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 18
ExplainIshikawa/Fishbone
diagrams.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 18
❑ A fishbone diagram, also called a cause and effect diagram or
Ishikawa diagram
❑ It is a visualization tool used for categorizing the potential causes
of a problem in order to identify its root causes
ExplainIshikawa/Fishbone
diagrams.
Problems
Categories
Causes
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 19
Explain theentireteamforming
processyoufollowforyourteam.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 19
Developmental stages of team generally consists of:
❑ Forming
❑ Storming
❑ Norming
❑ Performing
❑ Adjourning
Explain theentireteamforming
processyoufollowforyourteam.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 20
Whatistheprocessofcalculation
ofthreepointestimatingmethod?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 20 There are 2 formulas to calculate 3 point estimation.
1) Triangular Distribution
E = (P+M+O)/3 ;
2) Beta or PERT Distribution
E = (P+4M+O)/6 ;
where:
P = pessimist
O = Optimist
M = most likely
Whatistheprocessofcalculation
ofthreepointestimatingmethod?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 21
ExplaintheWorkBreakdown
Structure(WBD)anditseffecton
theworkestimatesof
tasks/activities?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 21
❑ Work breakdown structure defines the work activities that are required for
the project and the sub activities of each of the work requirement.
❑ It has a hierarchical structure in which concrete, main activities are divided
into logical sub-activities. There are two approaches:
1. Top-down approach
2. Bottom-up approach
ExplaintheWorkBreakdown
Structure(WBD)anditseffecton
theworkestimatesof
tasks/activities?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 22
Differentiate betweenRiskand
Issues.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 22
Issues
❑ Present focused
❑ Always negative
❑ Documented in “Issue register”
❑ Response will be “Issue work- around”
Differentiate betweenRiskand
Issues. Risks
❑ Future focused
❑ Can be positive (or) negative
❑ Documented in “Risk register”
❑ Response will be done based on “risk response planning”
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 23
WhydoesaProjectManagerneed
tobeproactive?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 23 ❑ Proactive Managers have higher chances of finding risks and
implementing solutions to minimize them
❑ They have more control over their project tasks and resources
❑ Keeps a track of all tasks and issues and work towards making small
changes and improvements for higher productivity and efficiency
❑ Organizes frequent meetings for developers to talk about their problems,
brainstorm solutions, share best practices etc.
❑ Compares the actual costs and time spent on tasks on a weekly basis with
the planned numbers
WhydoesaProjectManagerneed
tobeproactive?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 24
Whatisthedifferencebetween
RiskImpactandRiskProbability?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 24
Whatisthedifferencebetween
RiskImpactandRiskProbability?
Risk Probability is the chance that a risk will occur whereas
Risk Impact is the cost when a risk does occur.
Low Impact – Low Probability Low Impact – High Probability
High Impact – High ProbabilityHigh Impact – Low Probability
RiskProbability
Risk ImpactLow High
High
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 25
Whichcommunicationstyledoyou
preferusinginyourprojects?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 25
Whichcommunicationstyledoyou
preferusinginyourprojects?
Type of communication you use in your project will depend on the
type of project you are working on and the type of team you have.
Types of Communication styles that project manager use:
1. Written
2. Electronic
3. Face-to-Face
4. Responsive
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 26
Whatdoyouunderstandbytime&
materialcontract?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 26
❑ It is a type of contract that is a hybrid contractual arrangement
containing aspects of both cost-reimbursable and fixed price
contracts
❑ Time and material contracts resemble the cost-reimbursable type
arrangements where they have no definitive end
❑ This contract is generally used in projects whose accurate project size
can’t be estimated or when it is expected that the project
requirements would most likely change
Whatdoyouunderstandbytime&
materialcontract?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 27
Whatwillyoudo ifanyofthe
customerisnothappywiththe
qualityorresultsoftheproductby
theendoftheproject?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 27
❑ Show the customers that you value them
❑ Understand why they are not happy
❑ Figure out what modifications they want
❑ Try to incorporate the modifications if possible
❑ If not possible try to convince and explain to the customer that the
project fits in with the agreed scope
Whatwillyoudo ifanyofthe
customerisnothappywiththe
qualityorresultsoftheproductby
theendoftheproject?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 28
WhatisParetoprincipleanalysis?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 28
❑ Pareto Analysis is a statistical technique in decision-making
❑ It is basically used for the selection of a limited number of tasks which
can bring the significant overall effect
❑ This principle follows the Pareto Principle (also known as the 80/20
rule) and states that 80% of the results come from 20% of the actions
❑ It helps in prioritizing the work especially in large projects with number
of small tasks
WhatisParetoprincipleanalysis?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 29
Explainthetripleconstraint
triangleinprojectmanagement.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 29
❑ Triple Constraint Triangle is a combination of three key
components which acts as the most significant restrictions on
any project.
❑ Following are the three constraints in this model:
1. Time
2. Cost
3. Scope
❑ Each of the constraints forms the vertices of the triangle with
quality as the central factor
Explainthetripleconstraint
triangleinprojectmanagement.
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 30
Whatarethevarioustypesofrisks
youmightencounterinaproject
andhowyouwillbehandlingthem?
www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING
Project Manager
Interview Questions
Question 30
Most common types of Project Risks are:
✓ Cost Risk
✓ Schedule Risk
✓ Performance Risk
✓ Resource Risk
✓ Technology Risk
✓ Market Risk
✓ Legal Risk
✓ Strategic Risk
✓ Governance Risk
✓ Operational Risk
✓ External Risk
Whatarethevarioustypesofrisks
youmightencounterinaproject
andhowyouwillbehandlingthem?
Top 30 Project Manager Interview Questions and Answers | PMP Certification Training | Edureka

Contenu connexe

Tendances

Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaEdureka!
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMOSyed Raashid
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of ExcellenceProject Management CoE
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionMnbianchi
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio ManagementAnand Subramaniam
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardJavid Hamdard
 
Scaling Agile With SAFe (Scaled Agile Framework)
Scaling Agile With SAFe (Scaled Agile Framework)Scaling Agile With SAFe (Scaled Agile Framework)
Scaling Agile With SAFe (Scaled Agile Framework)Andreano Lanusse
 
Gestão de projetos baseada no estudo de casos
Gestão de projetos baseada no estudo de casosGestão de projetos baseada no estudo de casos
Gestão de projetos baseada no estudo de casosEduardo Longo
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project ManagementKamuran Koçak
 
project Scope management
project Scope management project Scope management
project Scope management Mohamed , PMP
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
A new way of demand management: Lean-Agile Journey
A new way of demand management: Lean-Agile JourneyA new way of demand management: Lean-Agile Journey
A new way of demand management: Lean-Agile JourneyJoël Krapf
 
SCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamSCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamAxon Active Vietnam
 

Tendances (20)

Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
AXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - FoundationAXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - Foundation
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th Edition
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Establishing an effective EPMO
Establishing an effective EPMOEstablishing an effective EPMO
Establishing an effective EPMO
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
Scaling Agile With SAFe (Scaled Agile Framework)
Scaling Agile With SAFe (Scaled Agile Framework)Scaling Agile With SAFe (Scaled Agile Framework)
Scaling Agile With SAFe (Scaled Agile Framework)
 
Gestão de projetos baseada no estudo de casos
Gestão de projetos baseada no estudo de casosGestão de projetos baseada no estudo de casos
Gestão de projetos baseada no estudo de casos
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Agile & Lean PMO
Agile & Lean PMOAgile & Lean PMO
Agile & Lean PMO
 
project Scope management
project Scope management project Scope management
project Scope management
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
A new way of demand management: Lean-Agile Journey
A new way of demand management: Lean-Agile JourneyA new way of demand management: Lean-Agile Journey
A new way of demand management: Lean-Agile Journey
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
SCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamSCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active Vietnam
 

Similaire à Top 30 Project Manager Interview Questions and Answers | PMP Certification Training | Edureka

Session 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM CertificationsSession 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...Edureka!
 
Project Management Career Seminar
Project Management Career SeminarProject Management Career Seminar
Project Management Career SeminarOjiugo Ajunwa
 
Project management career seminar
Project management career seminarProject management career seminar
Project management career seminarOjiugo Ajunwa
 
Project Management Fundamentals Training Brochure.pdf.pptx
Project Management Fundamentals Training Brochure.pdf.pptxProject Management Fundamentals Training Brochure.pdf.pptx
Project Management Fundamentals Training Brochure.pdf.pptxSpoclearn Inc.
 
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...Edureka!
 
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...Edureka!
 
Session 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSession 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
PRINCE2 Training Melbourne
PRINCE2 Training MelbournePRINCE2 Training Melbourne
PRINCE2 Training MelbourneSalim Karim
 
PMP Refresher Course
PMP Refresher CoursePMP Refresher Course
PMP Refresher CourseEdureka!
 
Session 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM CertificationsSession 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
PMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - SpoclearnPMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - Spoclearninfoeducationspoc
 
How to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdfHow to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdfDivya Malik
 
PMP Certification Training in Cologne
PMP Certification Training in ColognePMP Certification Training in Cologne
PMP Certification Training in Cologneunichroneltd
 

Similaire à Top 30 Project Manager Interview Questions and Answers | PMP Certification Training | Edureka (20)

Session 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM CertificationsSession 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM Certifications
 
Pmp
PmpPmp
Pmp
 
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
 
Project Management Career Seminar
Project Management Career SeminarProject Management Career Seminar
Project Management Career Seminar
 
Project management career seminar
Project management career seminarProject management career seminar
Project management career seminar
 
Project Management Fundamentals Training Brochure.pdf.pptx
Project Management Fundamentals Training Brochure.pdf.pptxProject Management Fundamentals Training Brochure.pdf.pptx
Project Management Fundamentals Training Brochure.pdf.pptx
 
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
 
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...
PMP® Exam Questions and Answers 2019 | PMP Exam Preparation | PMP® Exam Train...
 
Session 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSession 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM Certifications
 
PRINCE2 Training Melbourne
PRINCE2 Training MelbournePRINCE2 Training Melbourne
PRINCE2 Training Melbourne
 
PMP Refresher Course
PMP Refresher CoursePMP Refresher Course
PMP Refresher Course
 
Session 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM CertificationsSession 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM Certifications
 
PMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - SpoclearnPMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - Spoclearn
 
PM SimulationConsulting v2.4
PM SimulationConsulting v2.4PM SimulationConsulting v2.4
PM SimulationConsulting v2.4
 
T353 Web
T353 WebT353 Web
T353 Web
 
T353 Web
T353 WebT353 Web
T353 Web
 
T353 Web
T353 WebT353 Web
T353 Web
 
T353 Web
T353 WebT353 Web
T353 Web
 
How to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdfHow to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdf
 
PMP Certification Training in Cologne
PMP Certification Training in ColognePMP Certification Training in Cologne
PMP Certification Training in Cologne
 

Plus de Edureka!

What to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaWhat to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaEdureka!
 
Top 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaTop 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaEdureka!
 
Top 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaTop 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaEdureka!
 
Tableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaTableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaEdureka!
 
Python Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaPython Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaEdureka!
 
Top 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaTop 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaEdureka!
 
Top Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaTop Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaEdureka!
 
Linux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaLinux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaEdureka!
 
How to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaHow to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaEdureka!
 
Importance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaImportance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaEdureka!
 
RPA in 2020 | Edureka
RPA in 2020 | EdurekaRPA in 2020 | Edureka
RPA in 2020 | EdurekaEdureka!
 
Email Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEmail Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEdureka!
 
EA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEdureka!
 
Cognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaCognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaEdureka!
 
AWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaAWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaEdureka!
 
Blue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaBlue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaEdureka!
 
Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Edureka!
 
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaA star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaEdureka!
 
Kubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaKubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaEdureka!
 
Introduction to DevOps | Edureka
Introduction to DevOps | EdurekaIntroduction to DevOps | Edureka
Introduction to DevOps | EdurekaEdureka!
 

Plus de Edureka! (20)

What to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaWhat to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | Edureka
 
Top 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaTop 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | Edureka
 
Top 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaTop 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | Edureka
 
Tableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaTableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | Edureka
 
Python Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaPython Programming Tutorial | Edureka
Python Programming Tutorial | Edureka
 
Top 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaTop 5 PMP Certifications | Edureka
Top 5 PMP Certifications | Edureka
 
Top Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaTop Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | Edureka
 
Linux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaLinux Mint Tutorial | Edureka
Linux Mint Tutorial | Edureka
 
How to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaHow to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| Edureka
 
Importance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaImportance of Digital Marketing | Edureka
Importance of Digital Marketing | Edureka
 
RPA in 2020 | Edureka
RPA in 2020 | EdurekaRPA in 2020 | Edureka
RPA in 2020 | Edureka
 
Email Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEmail Notifications in Jenkins | Edureka
Email Notifications in Jenkins | Edureka
 
EA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | Edureka
 
Cognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaCognitive AI Tutorial | Edureka
Cognitive AI Tutorial | Edureka
 
AWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaAWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | Edureka
 
Blue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaBlue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | Edureka
 
Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka
 
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaA star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
 
Kubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaKubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | Edureka
 
Introduction to DevOps | Edureka
Introduction to DevOps | EdurekaIntroduction to DevOps | Edureka
Introduction to DevOps | Edureka
 

Dernier

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Dernier (20)

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

Top 30 Project Manager Interview Questions and Answers | PMP Certification Training | Edureka

  • 2. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager ✓ Project Managers are the main catalysts of a project. ✓ They are responsible for driving a project through various phases of Project Management in a controlled manner. ✓ The various phases of Project Management include planning, executing, monitoring, controlling and closing projects. ✓ They also shoulder the responsibility of the entire project scope, project team management, risk estimation along with the various resources needed in the project.
  • 3. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Salary Trend Project Manager Salary (US) Project Manager Salary (IND) Source: PayScale
  • 4. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Job Openings Based on Salary Source: PayScale $65,000 $80,000 $90,000 $1,00,000 $1,10,000 Salary Offered
  • 6. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatisyourunderstanding about ProjectManagement? Question 1
  • 7. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 1 Whatisyourunderstanding about ProjectManagement? Project management is the discipline that helps you in implementing various processes, methods, knowledge, skills, and experience for achieving the objectives of a unique project. erformanceProjectPoorPreventsPlanningProperP
  • 8. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatisthedifference between Project,ProgramandPortfolio? Question 2
  • 9. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatisthedifference between Project,ProgramandPortfolio? Question 2 A collection of projects and operations which are managed under one group in order to achieve a strategic goal A group of interrelated projects that are managed together A temporary endeavour undertaken to produce an unique product or solution Project Program Portfolio 2 3 1 Project Program Portfolio
  • 10. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions ElaborateProjectManagementLife Cycleprocess? Question 3
  • 11. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 3 ElaborateProjectManagementLife Cycleprocess? The Project Life Cycle is a series of various activities/tasks that are crucial for accomplishing project objectives or targets INITIATING PLANNING EXECUTING, MONITORING & CONTROLLING CLOSURE
  • 12. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatarethemostimportantskills thataProjectManagershould possess? Question 4
  • 13. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 4 Whatarethemostimportantskills thataProjectManagershould possess? Communication Leadership Team Management Negotiation Power Personal Organization Risk Management
  • 14. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Howwillyoustartyourjobasanew projectmanager? Question 5
  • 15. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 5 Howwillyoustartyourjobasanew projectmanager? 1. Listen, observe and learn 2. Understand your clients needs and wants 3. Know your team and their personalities 4. Take the opportunity to learn some new skills 5. Help out around the workplace 6. Try to master the tools your company possesses
  • 16. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Howwillprioritizetasksinyour project? Question 6
  • 17. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 6 1. List down the tasks and responsibilities 2. Distinguish between urgent and important 3. Assess the value of each task 4. Order the tasks by estimated efforts 5. Stay flexible and ready to adapt 6. Know when to say NO Howwillprioritizetasksinyour project?
  • 18. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatisyourleadershipstyle? Question 7
  • 19. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 7 Whatisyourleadershipstyle? Supportive “We Talk, You Decide” [High Relationship – Low Task] Coaching “We Talk, I Decide” [High Relationship – High Task] Delegate “You Decide” [Low Relationship – Low Task] Directing “I Tell” [Low Relationship – High Task] Relationship Task Your leadership style should be situational, depending on the type of team your are working with and the importance of the tasks involved in the project.
  • 20. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatisyouridealproject? Question 8
  • 21. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 8 Whatisyouridealproject? Before answering this question you must consider the below questions: • What type of work do you enjoy the most? • How much you want to and are allowed to show your creativity? • Under what type of deadlines do you work best? • How comfortable are you with trying new things on a project? • Do you prefer to always receive full credit for your work? • Are you okay with working as part of a team, or do you prefer to work alone?
  • 22. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatareprocessesandprocess groupsintheprojectmanagement framework? Question 9
  • 23. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 9 Whataretheprocessesand processgroupsintheproject managementframework? • A process is a defined way of doing tasks involved in the project • It defines the actions to be taken along with their sequence • Process Groups are a collection of processes that are applicable to various stages of a project. • In project management framework there are 5 process groups in which 10 knowledge areas and 49 processes are mapped
  • 24. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whatareknowledgeareasandhow relevantaretheyinaproject? Question 10
  • 25. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 10 • Knowledge Areas are the core technical subject matter, which are necessary for effective project management. ❑ Project Integration Management ❑ Project Scope Management ❑ Project Schedule Management ❑ Project Cost Management ❑ Project Quality Management ❑ Project Resource Management ❑ Project Communications Management ❑ Project Risk Management ❑ Project Procurement Management ❑ Project Stakeholder Management Whatareknowledgeareasandhow relevantaretheyinaproject?
  • 26. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Howwouldyouhandleadifficult stakeholderinvolvedinyour project? Question 11
  • 27. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 11 • Accept their authority without fighting • Remove all the negative emotions • Understand their issue • Ask for advice and listen to them • Be tactful and honest with your decisions • Praise them and try to establish the connection • Tailor your communication Howwouldyouhandleadifficult stakeholderinvolvedinyour project?
  • 28. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions WhatisRAIDinProject Management? Question 12
  • 29. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 12 Risk Assumptions Issue Dependencies WhatisRAIDinProject Management? R A I D
  • 30. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Whenyouconsiderthatyour projectisofftrackandwhatwillbe yourstepsensurethatitfinishes withinthegiventimeline? Question 13
  • 31. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 13 Check for below pointers to know whether the project is on track or not: • Budget is under control or not • Consuming too much time • Project scope keeps changing • Original goals are no longer present Whenyouconsiderthatyour projectisofftrackandwhatwillbe yourstepsensurethatitfinishes withinthegiventimeline? What can be done to bring it back on track: • Discover the root cause • Put in more time and efforts to catch up • Try to follow the original goal/vision • Re-adjust the resource management • Keep open communication with client and stakeholders
  • 32. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 14 Whichprojectmanagement methodologydoyouprefer followinginyourprojects?
  • 33. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 14 Before you choose your project management methodology, you must consider the below factors: • Organizational strategic goals and core values • Key business drivers • Constraints • Stakeholders • Risks • Complexity • Project size and cost Whichprojectmanagement methodologydoyouprefer followinginyourprojects?
  • 34. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 15 Whatarethetoolsmostlyusedfor improvingtheprocessactivities?
  • 35. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 15 Majorly used tools in the industry: ❑ Comparing and Baselining a Process ❑ Flow-charting ❑ Value-Stream Mapping ❑ Cause and Effect Analysis ❑ Hypothesis Testing Whatarethetoolsmostlyusedfor improvingtheprocessactivities?
  • 36. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 16 Howwillyoumanagetheteam memberswhoarenotworkingto theirfullpotential?
  • 37. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 16 ❑ Avoid any type of emotional confrontation ❑ Encourage them to think and act in natural ways ❑ Help in developing their decision-making abilities ❑ Expand their performance tolerance threshold ❑ Strengthen potential by surrounding it with those even stronger ❑ Understand what motivates your employees ❑ Show where they fit in the company mission ❑ Arrange a follow up process ❑ Reward and appreciate their improvement ❑ Be ready to let them go Howwillyoumanagetheteam memberswhoarenotworkingto theirfullpotential?
  • 38. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 17 Beingaprojectmanagerhowwill yougainyourteamagreementfor results?
  • 39. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 17 ❑ Keep your expectations clear from the beginning ❑ Build achievable milestones ❑ Collaborate and maintain team trust ❑ Agree on the terms with the team ❑ Schedule frequent accountability meetings ❑ Establish outcome results and consequences ❑ Clear out any conflicts as soon as possible Beingaprojectmanagerhowwill yougainyourteamagreementfor results?
  • 40. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 18 ExplainIshikawa/Fishbone diagrams.
  • 41. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 18 ❑ A fishbone diagram, also called a cause and effect diagram or Ishikawa diagram ❑ It is a visualization tool used for categorizing the potential causes of a problem in order to identify its root causes ExplainIshikawa/Fishbone diagrams. Problems Categories Causes
  • 42. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 19 Explain theentireteamforming processyoufollowforyourteam.
  • 43. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 19 Developmental stages of team generally consists of: ❑ Forming ❑ Storming ❑ Norming ❑ Performing ❑ Adjourning Explain theentireteamforming processyoufollowforyourteam.
  • 44. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 20 Whatistheprocessofcalculation ofthreepointestimatingmethod?
  • 45. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 20 There are 2 formulas to calculate 3 point estimation. 1) Triangular Distribution E = (P+M+O)/3 ; 2) Beta or PERT Distribution E = (P+4M+O)/6 ; where: P = pessimist O = Optimist M = most likely Whatistheprocessofcalculation ofthreepointestimatingmethod?
  • 46. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 21 ExplaintheWorkBreakdown Structure(WBD)anditseffecton theworkestimatesof tasks/activities?
  • 47. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 21 ❑ Work breakdown structure defines the work activities that are required for the project and the sub activities of each of the work requirement. ❑ It has a hierarchical structure in which concrete, main activities are divided into logical sub-activities. There are two approaches: 1. Top-down approach 2. Bottom-up approach ExplaintheWorkBreakdown Structure(WBD)anditseffecton theworkestimatesof tasks/activities?
  • 48. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 22 Differentiate betweenRiskand Issues.
  • 49. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 22 Issues ❑ Present focused ❑ Always negative ❑ Documented in “Issue register” ❑ Response will be “Issue work- around” Differentiate betweenRiskand Issues. Risks ❑ Future focused ❑ Can be positive (or) negative ❑ Documented in “Risk register” ❑ Response will be done based on “risk response planning”
  • 50. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 23 WhydoesaProjectManagerneed tobeproactive?
  • 51. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 23 ❑ Proactive Managers have higher chances of finding risks and implementing solutions to minimize them ❑ They have more control over their project tasks and resources ❑ Keeps a track of all tasks and issues and work towards making small changes and improvements for higher productivity and efficiency ❑ Organizes frequent meetings for developers to talk about their problems, brainstorm solutions, share best practices etc. ❑ Compares the actual costs and time spent on tasks on a weekly basis with the planned numbers WhydoesaProjectManagerneed tobeproactive?
  • 52. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 24 Whatisthedifferencebetween RiskImpactandRiskProbability?
  • 53. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 24 Whatisthedifferencebetween RiskImpactandRiskProbability? Risk Probability is the chance that a risk will occur whereas Risk Impact is the cost when a risk does occur. Low Impact – Low Probability Low Impact – High Probability High Impact – High ProbabilityHigh Impact – Low Probability RiskProbability Risk ImpactLow High High
  • 54. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 25 Whichcommunicationstyledoyou preferusinginyourprojects?
  • 55. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 25 Whichcommunicationstyledoyou preferusinginyourprojects? Type of communication you use in your project will depend on the type of project you are working on and the type of team you have. Types of Communication styles that project manager use: 1. Written 2. Electronic 3. Face-to-Face 4. Responsive
  • 56. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 26 Whatdoyouunderstandbytime& materialcontract?
  • 57. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 26 ❑ It is a type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed price contracts ❑ Time and material contracts resemble the cost-reimbursable type arrangements where they have no definitive end ❑ This contract is generally used in projects whose accurate project size can’t be estimated or when it is expected that the project requirements would most likely change Whatdoyouunderstandbytime& materialcontract?
  • 58. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 27 Whatwillyoudo ifanyofthe customerisnothappywiththe qualityorresultsoftheproductby theendoftheproject?
  • 59. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 27 ❑ Show the customers that you value them ❑ Understand why they are not happy ❑ Figure out what modifications they want ❑ Try to incorporate the modifications if possible ❑ If not possible try to convince and explain to the customer that the project fits in with the agreed scope Whatwillyoudo ifanyofthe customerisnothappywiththe qualityorresultsoftheproductby theendoftheproject?
  • 60. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 28 WhatisParetoprincipleanalysis?
  • 61. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 28 ❑ Pareto Analysis is a statistical technique in decision-making ❑ It is basically used for the selection of a limited number of tasks which can bring the significant overall effect ❑ This principle follows the Pareto Principle (also known as the 80/20 rule) and states that 80% of the results come from 20% of the actions ❑ It helps in prioritizing the work especially in large projects with number of small tasks WhatisParetoprincipleanalysis?
  • 62. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 29 Explainthetripleconstraint triangleinprojectmanagement.
  • 63. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 29 ❑ Triple Constraint Triangle is a combination of three key components which acts as the most significant restrictions on any project. ❑ Following are the three constraints in this model: 1. Time 2. Cost 3. Scope ❑ Each of the constraints forms the vertices of the triangle with quality as the central factor Explainthetripleconstraint triangleinprojectmanagement.
  • 64. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 30 Whatarethevarioustypesofrisks youmightencounterinaproject andhowyouwillbehandlingthem?
  • 65. www.edureka.co/pmpPMP® CERTIFICATION EXAM TRAINING Project Manager Interview Questions Question 30 Most common types of Project Risks are: ✓ Cost Risk ✓ Schedule Risk ✓ Performance Risk ✓ Resource Risk ✓ Technology Risk ✓ Market Risk ✓ Legal Risk ✓ Strategic Risk ✓ Governance Risk ✓ Operational Risk ✓ External Risk Whatarethevarioustypesofrisks youmightencounterinaproject andhowyouwillbehandlingthem?