1. AMBROSE C. ELUGBE
No 3, Charles Amu Avenue, Seaside Estate, Phone: 0806-751-6896
Badore, Ajah, Nigeria Email: elugbe.ambrose@yahoo.com
INSTRUMENTATION & CONTROL SYSTEMS ENGINEER
A highly skilled and experienced Instrumentation & Control Systems Engineer, with strong proficiency in instruments and
control systems specifications. This I have been doing for about six (6) years in the oil & gas sector. I also have a good practical
background in electrical engineering services and design. I have maintained a proven track record of continued successes, as
well as realizing concurrent professional growth. Acknowledged team player with an analytical goal oriented personality and
work ethic; has an innate ability to influence others positively to produce dynamic and long lasting results. Self-motivation,
education, diverse experience and loyal dedication have helped me deliver in several projects. Deliverables delivered includes
but not limited to logic diagrams and control panel specifications, flow meter/element, control valve and relief valve sizing
calculations, datasheets, fire and gas systems layout and specification e.t.c. expertise in maximizing finances and other resources.
Advanced knowledge and proficiency in computer applications such as Microsoft Suite, AutoCAD, InstruCALC, Fisher
Specification Manager, Pentair Sizing Software and Honeywell Process Knowledge Systems (PKS). I also have a basic knowledge
of Smart Plant Instrumentation (INtools) Engineering software.
AREAS OF EXPERTISE
P&ID Development
Instrument
Specification/Selection
Instrument Sizing Calculations
Fire & Gas Systems
Tank Farm Instrumentation
Systems Integration
PLC, DCS and SCADA Systems
HMI Web Display Builder
(Graphics Design)
Site Survey & Data Acquisition
Electrical Engineering Services
Project Management
Strategic Planning/Analysis
Vendor Consultations
Excellent Communication
Multi-tasking Skills
Team-Oriented
Fast Learning Skills
PROFESSIONALEXPERIENCE
CAKASA NIGERIA COMPANY LTD MARCH 2011 – DATE
INTERMEDIATE INSTRUMENTATION ENGINEER
Fully involved in P&IDs development, prepare/review Instrument location diagrams, hook‐up drawings, cable schedules, loop
drawings, E&I Interconnection drawings, instruments and control systems specifications, instrument datasheet for all field
instrumentation, Control Philosophy’s, Cause and Effect Charts, SAFE Charts, logic diagrams and control panel specifications.
Execute control valve, flow meter and relief valve calculations. Adept at control applications utilizing PLC or DCS and SCADA
Systems. Actively take part in site survey/visit and data gathering, HAZOPS and Systems Commissioning.
Efficiently and effectively perform contractor’s design basis/scope deliverables in compliance with project requirements as
per regulatory, quality and technical standards such as API, ISA, NEMA, API, ISA, IEC, CNL Specs, Shell DEPs, Elf-Total
Standards, MPN specifications. etc.
PROJECTS WORKED ONINCLUDE:
Project Title: Abiteye Non Associated Gas (NAG) development Project, FEED & DED (Currently)
Client: CHEVRON NIGERIA LIMITED
Brief Project Description:
This Project involvds the delivery of additional volume of gas to Escravos Lagos Pipeline System (ELPS) and the existing Escravos
Gas Plant. It involves a facility upgrade with two additional wells.
Project Title: Sonam Pipeline and Okan PRP Project, Sonam and Okan 30E NAG Development Project – Systems Commissioning.
(2015 - 2016)
Client: CHEVRON NIGERIA LIMITED
Brief Project Description:
This project involved the sourcing of gas from the Sonam field which required one 12-slot Sonam Non Associated Gas (NAG)
Wellhead Platform (NWP) in the offshore shelf area near Escravos. It was successfully executed and Systems Commissioning
procedures was produced for the project.
Project Title: Engineering of Flow Station Metering System for OML30A, (2015)
Client: NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC)
2. AMBROSE C. ELUGBE
No 3, Charles Amu Avenue, Seaside Estate, Phone: 0806-751-6896
Badore, Ajah, Nigeria Email: elugbe.ambrose@yahoo.com
Brief Project Description:
This project involved the design and installation of a master meter (PD) in the metering skid to prove the existing PD meters.
Project Title: Okan GGCP Debottlenecking Project (2014)
Client: CHEVRON NIGERIA LIMITED
Brief Project Description:
The project involved debottlenecking of the Okan Gas gathering compression platform to increase Non Associated Gas handling
capacity from 128MMSCFD to 200 MMSCFD and to sustain gas supply to Nigerian Gas Company.
Project Title: OSO RH Gas Lift Project (2014)
Client: MOBIL PRODUCING NIGERIA UNLIMITED
Brief Project Description:
This Project involved providing Gas lift facilities for OSO RH wellhead platform with the aim of increasing crude Oil Production
through gas lifting operations on the wellhead platform
Project Title: Engineering Design of Gas Pipeline and Tie-In of Valves & Accessories Project (2013)
Client: SEPLAT PETROLEUM DEVELOPMENT COMPANY
Brief Project Description:
This project involved the gathering and distribution of gas streams from a number of marginal fields in the Amukpe-Sapele area
of Delta state.
Project Title: Parabe Pp to Meren 1 Pigging Facilities Upgrade (2013)
Client: CHEVRON NIGERIA LIMITED
Brief Project Description:
This project involved the upgrade of Parabe-Meren Pigging facility.
Project: Egbaoma To Oben Gas Pipeline Project - Detailed engineering (2012)
Client: SEPLAT PETROLEUM DEVELOPMENT COMPANY NIGERIA LTD.
Brief Project Description:
This project involved the gathering and distribution of gas streams from a number of marginal fields in the Umutu area of Delta
state.
Project Title: QIT Asset Field- Wide As -Built Documentation Project (2012)
Client: MOBIL PRODUCING NIGERIA UNLIMITED.
Brief Project Description:
This Project involved extensive facility walk through of QIT and As-Built verification and modifications were necessary. Loop
Drawings were generated from existing Schematic drawings. Red lined mark-ups were back drafted into AutoCAD.
Project Title: OML 99, Oil Water Treatment Upgrade. (2011)
Client: TOTAL E & P NIGERIA LIMITED.
Brief Project Description:
This Project involved carrying out upgrade to the oily water treatment facility.
Project Title: OML58 (Obagi / Obite) Cluster 15 infill wells Project - Basic engineering (2011)
Client: TOTAL E&P NIGERIA LIMITED.
Brief Project Description:
This Project involved carrying out basic Engineering for hooking up seven out of ten infill wells to the Ogbogu flow station
production facility.
TANK FARM PROJECTS:
Detailed Engineering Design of
Proposed Petroleum Product
Depot, Ijegun, Lagos State.
Detailed Design of Tomaro Bulk
Storage and Oil Terminal Project
Upgrade of Apapa Terminal 1 for
OANDO Nig PLC
Additional 25000BBLs Tank
Project at Izombe Flow Station
for Addax Petroleum.
Wabeco Petroleum Depot for
Wabeco Petroleum Ltd
JUHI-2 Aviation Depot for
FAAN
SEME Field Development
Project for SAPETRO Ltd
Samon Petroleum Product
Depot
Petroleum Products Tank Farm
for First Deep Water Discovery
Ltd
3. AMBROSE C. ELUGBE
No 3, Charles Amu Avenue, Seaside Estate, Phone: 0806-751-6896
Badore, Ajah, Nigeria Email: elugbe.ambrose@yahoo.com
Brief Tank Farm Project Description:
These Tank Farm Projects involved providing a Detailed Engineering for Petroleum Depots. Instrumentation and controls scope
on these projects was to provide the tanks with full Automatic Tank Gauging System, Automatic Overfill Protection System
(AOPS) and full Instrumentation for the loading gantries.
Storage tanks (for Crude, PMS, DPK, Bitumen, AGO and fire water) were of different types depending on the project. The types
included fixed roof, internal floating roof and external floating roof tanks.
The Programmable Logic Controller (PLC) was deployed as part of Controls and Shutdown Strategy in some of the projects.
OTHEREXPERIENCE
Project/Design Engineer (Freelance) (2010)
Responsibilities:
Designing of Electrical layouts for buildings
Sound Systems Engineering & Instrumentation.
Supervision of Electrical installations for residential buildings.
Power System Design (Sizing of Transformers, Distribution
Boards, Circuit Breakers and electrical cables)
Guinness Nig. PLC, Benin (Industrial Attachment) (2007)
Responsibilities:
Electrical Engineering Services
(installation & maintenance)
Instrumentation,
Controls/Automation Services
Installation and maintenance of Control, Shutdown valves & accessories,
Transmitters, Gauges, Flow Meters and Air Supply System.
Assisted in Instrument programming and troubleshooting using the Simatic
Manager. Also assisted in Instrument Calibration.
EDUCATION
University of Benin
B.Eng. Electrical/Electronic Engineering (Second Class Honors Upper Division) (2010)
CONFERENCES,TRAININGSAND CERTIFICATIONS
Experion Process Knowledge System (PKS) 50R410 by Honeywell Automation College, Diagem, Belgium.
(Sept – Oct 2013)
Cisco Certified Network Associates by Mikon Institute of Information Technology, Benin City. (Aug 2010 – Feb 2011)
Instrumentation and Controls seminar/workshop by Endress & Hauser, Emerson Process Management and Honeywell
Automation.
Safety Induction by Mobil Producing Nigeria and Guinness Nig. PLC.
AutoCAD & Basic Piping Engineering.
Engineering reviews and risk identification/Hazard Analysis, HAZOP.
Basic Engineering Design Training Programme by Cakasa (Nigeria) Company.
General HSE and unsafe Acts by Cakasa (Nigeria) Company.
PROFESSIONALMEMBERSHIP
Council for the Regulation of Engineering in
Nigeria (COREN) ( Reg No. in view)
NSE Corporate Membership 13086
Occupational Safety and Health Administration (OSHA)
International Project Management Professional (IPMP)
Institute of Electrical Electronics Engineers (IEEE)
HOBBIES:
Swimming, Reading, Traveling, Driving, Football.
REFEREES:
To be provided on request.