Krzysztof Zamasz
President of the Board
Warsaw, 27 August 2014
Dalida Gepfert
Vice-President of the Board for Financial Affairs
We consistently implement
the goals included in the strategy
Q2, H1 2014
Paweł Orlof
Vice-President of the Board for Corporate Affairs
Grzegorz Kinelski
Vice-President of the Board for Commercial Affairs
2
Agenda
Energy market and key operating data
ENEA CG's results in Q2 and H2 2014
Key projects implemented in H1 2014
New power unit in Kozienice
Grzegorz Kinelski
Vice-President of the Board for Commercial Affairs
ENEA CG is monitoring the market
situation on a continuous basis
4
• Higher average price of baseload
by 9.5% yoy
• SPOT market was affected by: energy
generation from wind sources, situation on
the European carbon market, changes in
the methods of settlements for
the operating power reserve and higher
volume of losses in the generating capacity
• In H1 2014 prices of energy on the futures
market were characterised with
the increasing sideways trend supported by
the prices from the European carbon market
and price levels from the SPOT market
of electricity
• Explicit strengthening of quotations
in the second half of June
In H1 2014 we observed growths in prices on the energy market
130
140
150
160
170
180
190
200
210
220
230
I II III IV V VI VII VIII IX X XI XII
PLN/kWh
Average electricity prices on SPOT market on PPE
Baseload - 2012 Baseload - 2013 Baseload - 2014
140
146
152
158
164
170
176
182
188
194
200
0
20
40
60
80
100
120
140
160
180
200
04/10/2012 21/05/2013 05/09/2013 26/11/2013 18/02/2014 23/04/2014 30/06/2014
PLN/MWh
MW
Transaction prices and volumes - baseload for 2015
trade volumes weighted average price
5
• Low prices of coal on foreign
markets
• Prices of coal in Q2 2014 were
maintained on the level reached
as a result of drops in Q1 2014,
comparable to prices from
the period of June to August 2013
• The market of allowances for
emissions of CO2 was strongly
dependant on political decisions
in EU
• Great surplus of EUA in EU ETS
In H1 2014 prices of coal maintained on a low level
0
2
4
6
8
10
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII I II III IV V VI
2012 2013 2014
EUR/t
EUA and CER quotations - closing prices on SPOT market
EUA 2 Phase CER EUA 3 Phase
70
80
90
100
110
120
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII I II III IV V VI
2012 2013 2014
USD/t
Monthly indices of coal prices (globalCOAL)
Richards Bay (RPA) Newcastle (Australia) Amsterdam-Rotterdam-Antwerpia
6
[GWh] Q2 2013 Q2 2014 Change % H1 2013 H1 2014 Change %
Total generation of
energy, including:
2 938,6 2 972.6 1.2% √ 5 977.7 6 114.2 2.3% √
Conventional
generation
2 734.6 2 718.5 -0.6% 5 537.1 5 584.5 0.9% √
Generation from RES 204.0 254.1 24.6% √ 440.6 529.7 20.2% √
Higher energy production in ENEA CG
ENEA CG in H1 2014 increased energy production
both form conventional sources and RES
7
Agenda
Energy market and key operating data
ENEA CG's results in Q2 and H1 2014
Key projects implemented in H1 2014
New power unit in Kozienice
Dalida Gepfert
Vice-President of the Board for Financial Affairs
ENEA CG generated
good results in H1 2014
9
[PLN mln] Q2 2013 Q2 2014 Change % H1 2013 H1 2014 Change %
Net sales revenues 2 215.3 2 466.5 11.3% 4 595.6 4 840.2 5.3% √
EBITDA 387.7 642.0 65.6% 937.6 1 103,5 17.7% √
Net profit 158.0 415.6 163.1% 454.8 624.9 37.4% √
Net debt/EBITDA -0.9 -0.2 0.7 -0.9 -0.2 0.7
Financial results of ENEA CG above market expectations
10
EBITDA in Q2 2014 demonstrates better results yoy
in the segment of generation and distribution
2.4% 43.5% 32.2% 8.5% 26.0%17.5%[PLN mln]
196.4
492.2
191.3
-2.9
67.4
200.6
-3.7
13.9
149.8
0,0
100,0
200,0
300,0
400,0
500,0
600,0
700,0
EBITDA Q2 2013 Trade Distribution Generation Other activity Exclusions* EBITDA Q2 2014
387.7
642.0
-41.6%27.4%-50.0% 173.0%
* Includes undistributed expenses
of the whole Group and exclusions
EBIT
Amortisation/
depreciation
Growth in segment
Drop in segment
Change in segment yoy [%]
EBITDA margin [%]
11
[PLN mln] Q2 2013 Q2 2014 Change %
Generation 116.0 316.6 173.0%
[PLN mln] Q2 2013 Q2 2014 Change %
Trade 47.8 23.9 -50.0%
EBITDA in Q2 2014 demonstrates better results yoy
in the segment of generation and distribution
Segment of trade
Drop of EBITDA by PLN 23.9 mln (-50.0%)
• lower average purchase price of energy
by 12.4% √
• higher volumes of sales by 630 GWh √
• lower average selling price by 17.3%
Segment of distribution
Higher EBITDA by PLN 67.4 mln (27.4%) √
• lower average price and lower volumes of
electricity purchases for covering book-tax
difference √
• lower provisions relating to grid assets √
Segment of generation
Higher EBITDA by PLN 200.6 mln (173.0%) √
• higher revenues from compensation
for recovery of stranded costs by PLN 258 mln √
• lower margin on generation of electricity
by PLN 18 mln
• loss of EBITDA due to failure of unit No. 9
by PLN 18 mln
[PLN mln] Q2 2013 Q2 2014 Change %
Distribution 245.7 313.1 27.4%
12
In H1 2014 ENEA CG improved EBITDA result by 18%
551.7
758.9
385.9
-7.1
72.8
160.9
-4.6
11.9
344.6
0,0
200,0
400,0
600,0
800,0
1000,0
1200,0
EBITDA H1 2013 Trade Distribution Generation Other activity Exclusions* EBITDA H1 2014
-47.7% 13.7% 57.6%
937.6
1 103.5
[PLN mln]
-26.5%
20.4% 40.3% 24.5% 11.1% 22.8%4.1%
* Includes undistributed expenses
of the whole Group and exclusions
EBIT
Amortisation/
depreciation
Growth in segment
Drop in segment
Change in segment yoy [%]
EBITDA margin [%]
13
[PLN mln] H1 2013 H1 2014 Change %
Generation 279.4 440.3 57.6%
[PLN mln] H1 2013 H1 2014 Change %
Distribution 532.9 605.7 13.7%
In H1 2014 ENEA CG improved EBITDA result by 18%
Segment of trade
Drop of EBITDA by PLN 75.1 mln (-47.7%)
• lower average purchase price of energy
by 11.4% √
• higher sale volumes by 1,174 GWh √
• entry into force of the cogeneration obligation
- inflow in the amount of PLN 16 mln
Segment of distribution
Increase of EBITDA by PLN 72.8 mln (13.7%) √
• lower average price and lower volumes
of electricity purchases for covering
book-tax difference √
• lower provisions relating to grid assets √
Segment of generation
Higher EBITDA by PLN 160.9 mln (57.6%) √
• higher revenues from compensation for
recovery of stranded costs by PLN 258 mln √
• lower margin on generation of electricity
by PLN 83 mln
• loss of EBITDA due to failure of unit No. 9
by PLN 23 mln
[PLN mln] H1 2013 H1 2014 Change %
Trade 157.4 82.3 -47.7%
14
Cash balance of the Group as at the end of June 2014
amounted to PLN 1.3 bln
818
1 573
625
345
-424
-258
-1 043
525
-69
1 274
500
1 000
1 500
2 000
2 500
3 000
Cash
1.01.2014
Net profit Amortization/
depreciation
Working
capital*
Receviables
from Long-
term
agreement
CAPEX External
funding
Other Cash
30.06.2014
[PLN mln]
* excluding the receivables from compensation for covering stranded costs (Long-term Agreements)
15
Cost regime and optimum use of the resources allowed ENEA CG
to generate good financial results
In Q2 revenues were recognised from Long-term Agreements which
added to the result of the segment of generation
ENEA CG implements the projects anticipated
in the corporate strategy consistently and in a timely fashion
Financial results of ENEA CG are above market expectations
Intense development of ENEA CG - CAPEX in H1 2014 higher
by PLN 186 mln with a favourable value of net debt/EBITDA ratio -0.2
PLN 75 mln cost savings after H1 2014
16
Agenda
Energy market and key operating data
ENEA CG's results in Q2 and H1 2014
Key projects implemented in H1 2014
New power unit in Kozienice
Krzysztof Zamasz
President of the Board
We efficiently implement the projects
specified in the strategy
18
Generation: The main task of ENEA Wytwarzanie is building
a competitive generating portfolio
1. Purchase of a block of shares of MPEC Sp. z o.o.
in Białystok
2. Exclusiveness in negotiations for the purchase
of a block of shares of ECO S.A. till 15
September 2014
3. Construction of a 1,075 MW unit
4. RES development: participation in acquisition
processes and own projects
5. Replacement modernisation of generating
equipment
6. Realisation of the environment investments
and other modernisation investments
7. Implementation of projects relating to a better
efficiency and optimum use of the
organisational potential in ENEA CG
Generation
2014
2015
2016-
2017
2018
2019-
2020H1 H2
√
√
√
√
√
√
√
Segment of Heat:
Purchase of a block of
shares of
MPEC Białystok
Segment of System
Power Plants:
35% progress of works
on the construction of
1,075 MW unit
19
Distribution: ENEA Operator prepares for the introduction
of the quality tariff in 2016
1. Better condition of the power grid - investments
in its development and modernisation
(better reliability ratios)
2. Better Customer service, especially within
connecting to the grid (shorter time of issuing
connection conditions and shorter time of
realisation of connection agreements)
3. Cooperation with the President of ERO and other
operators of distribution systems within the
preparation of companies to the introduction of
the quality tariff
4. Intensification of activities within smart grid and
smart metering (preparation of the AMI
application test in 3 localisations and preparation
to the commencement of the balancing meters
installation)
5. Operating costs optimisation
6. Closer cooperation with ENEA CG companies:
ENEA Centrum and companies comprising the
distribution area: ENERGOBUD and
ENERGOMIAR - transfer to ENEA Centrum of
some functions from within IT, Finance and
Accounting and part of the Customer service
Distribution
2014
2015 2016
2017-
2018
2019-
2020H1 H2
PLN 3 bln - investments in
the extension and
modernisation of the grid
during 2011-2013
PLN 4.2 bln - investments
during 2014-2019
Shorter time for issuing
connection conditions from
30 to 15 days
√
√
√
√
√
√
20
Trade: We focus on building long-term relations with Customers
1. 63,689 - the number of new Customers who
trusted ENEA in H1 2014
2. Higher sales of electricity in the segment
of strategic Customers by 1 TWh
3. Development of sales in the whole of Poland -
introduction of a Poland wide sales structure
4. Launching sales realised by Contact Centre
5. Introduction of a dual-fuel offer
6. "Energy with an account" - development of
a common offer with Getin Bank for individual
Clients
7. Launching new products: Fixed price,
Strike the raise, Always cheaper +
Trade
2014
H1
√
√
√
√
√
√
√
Higher sales of
electricity by 1.82 TWh
21
SSC: 60% functions were centralised in SSC in H1 2014
SSC
2014
2015
H1 H2
√
√
√
√
√
The works were
completed relating to
the centralisation
of 3 functions:
Finance and Accounting
Customer Service
IT
1. Completion of the construction of the Mass
Communication Centre - centralisation
of the area of printing and delivery
of mass communications
2. Extension of the scope of issues which
customers may realise remotely through
the Contact Centre and increasing the number
of matters realised on first contact (FCR ratio)
3. Finalisation of activities within the development
of SAP business concept in ENEA CG
4. Completion of the concept stage for a new billing
system - conclusion of the implementation
agreement
5. Start-up of design works within the centralisation
of the subsequent 3 functions:
Human Resources, Logistics and Legal Area
22
After H1 cost reduction in ENEA CG amounted to PLN 75 mln
1. Generation
2. Distribution
3. Sales
4. SSC
5. Other companies
TOTAL
Cost savings [PLN mln] H1 2014
Prognosis of initiative
realisation in 2014
56 137
13 39
3 5
1 5
2 3
75 189
Undertaken activities
will enable to reduce
costs by ca. PLN 500 mln
by 2016
23
Agenda
Energy market and key operating data
ENEA CG's results in Q2 and H1 2014
Key projects implemented in H1 2014
New power unit in Kozienice
Paweł Orlof
Vice-President of the Board for Corporate Affairs
Construction of unit No. 11
is on the schedule
25
In H1 2014 ENEA CG implemented actions relating
to the construction of 1,075 MW unit
65%
35%
Performance of the lower foundation slab
with poles of the load bearing structure
of the turbine set
Performance of a reinforced concrete structure
of the cooling tower jacket to the level of 40 m
Concreting the upper foundation slab
of the boiler house
Performance of a steel load bearing structure
of the boiler to the level of 44 m
Completion of reinforced concrete works
of communication pylons
Completion of concreting the cooling water
piping along the engine room building2012 – H1 2014 H2 2014 2015
0%
20%
40%
60%
80%
Scope of works to be performed in 2014
We consistently implement
the goals included in the strategy
Q2, H1 2014
gielda@enea.pl
Additional information
28
116.0
316.6206.7
-5.2 -0.8
0
50
100
150
200
250
300
350
EBITDA Q2 2013 Segment of System Power
Plants
Segment of Heat Segment of RES EBITDA Q2 2014
Growth
Drop
[PLN mln]
Generation – EBITDA Q4 2014 bridge
Attachment 1 – Higher EBITDA in the segment of generation results from the recognition
in Q2 2014 of revenues from compensation for recovery of stranded costs
29
47.8
23.99.4
-3.6 -2.7
0
10
20
30
40
50
60
EBITDA
Q2 2013
First contribution margin Cost of sales Other factors EBITDA
Q2 2014
Trade – EBITDA Q4 2014 bridge
Attachment 2 – Lower first contribution margin impaired the results
of the segment of trade in Q2 2014
Growth
Drop
[PLN mln]
30
245.7
313.1
39.9
40.5
-1.4
-2.7
0
50
100
150
200
250
300
350
EBITDA
Q2 2013
Regulation Gird assets Organisation Other factors EBITDA
Q2 2014
Attachment 3 - In Q2 2014 in the segment of distribution lower costs were reported of
establishment of provisions relating to the grid assets and employee benefit provisions
Distribution – EBITDA Q2 2014 bridge
Growth
Drop
[PLN mln]
31
279.4
440.3
149.8
9.6 1.5
0
100
200
300
400
500
EBITDA
H1 2013
Segment of System Power
Plants
Segment of Heat Segment of RES EBITDA
H1 2014
Attachment 4 - Recognition in H1 2014 revenues from compensation for recovery of
stranded costs impacted the growth of EBITDA in the segment of generation
Generation – EBITDA H1 2014 bridge
Growth
Drop
[PLN mln]
32
15.4
82.30.6
-70.5 -5.3
0
20
40
60
80
100
120
140
160
180
EBITDA
H1 2013
First contribution margin Cost of sales Other factors EBITDA
H1 2014
Attachment 5 – Lower first contribution margin charged the results
of the segment of trade in H1 2014
Trade – EBITDA H1 2014 bridge
Growth
Drop
[PLN mln]
33
532.9
605.7
5.0
40.9
32.1
-5.1
0
100
200
300
400
500
600
700
EBITDA
H1 2013
Regulation Gird assets Organisation Other factors EBITDA
H1 2014
Attachment 6 - In H1 2014 in the segment of distribution lower costs of energy purchases
were reported for covering the book-tax difference and costs of establishment of reserves
Distribution – EBITDA H1 2014 bridge
Growth
Drop
[PLN mln]

Contenu connexe

Tendances

Tendances (18)

Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014Elringklinger - Conference Call Q2 2014
Elringklinger - Conference Call Q2 2014
 
Klöckner & Co SE Interim Report HY 1 2014
Klöckner & Co SE Interim Report HY 1 2014Klöckner & Co SE Interim Report HY 1 2014
Klöckner & Co SE Interim Report HY 1 2014
 
Analyst presentation Q1 2015
Analyst presentation Q1 2015Analyst presentation Q1 2015
Analyst presentation Q1 2015
 
Gruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business planGruppo Hera 2014-2018 business plan
Gruppo Hera 2014-2018 business plan
 
Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english) Enea 2015 H1 - financial results (english)
Enea 2015 H1 - financial results (english)
 
Electrolux Q2 interim report 2019: Good price momentum and focus on innovatio...
Electrolux Q2 interim report 2019: Good price momentum and focus on innovatio...Electrolux Q2 interim report 2019: Good price momentum and focus on innovatio...
Electrolux Q2 interim report 2019: Good price momentum and focus on innovatio...
 
FLSmidth 2nd Quarter Report 2014
FLSmidth 2nd Quarter Report 2014FLSmidth 2nd Quarter Report 2014
FLSmidth 2nd Quarter Report 2014
 
Stora enso financial result q2 2014
Stora enso financial result  q2 2014Stora enso financial result  q2 2014
Stora enso financial result q2 2014
 
Result presentation 2020
Result presentation 2020Result presentation 2020
Result presentation 2020
 
Electrolux Interim Report Q3 2016 - Presentation
Electrolux Interim Report Q3 2016 - PresentationElectrolux Interim Report Q3 2016 - Presentation
Electrolux Interim Report Q3 2016 - Presentation
 
Electrolux - Interim Report Q3 2017 - Presentation
Electrolux - Interim Report Q3 2017 - PresentationElectrolux - Interim Report Q3 2017 - Presentation
Electrolux - Interim Report Q3 2017 - Presentation
 
Electrolux Interim Report Q3 2012 Presentation
Electrolux Interim Report Q3 2012 PresentationElectrolux Interim Report Q3 2012 Presentation
Electrolux Interim Report Q3 2012 Presentation
 
Electrolux Interim Report Q2 2017 - Presentation
Electrolux Interim Report Q2 2017 - PresentationElectrolux Interim Report Q2 2017 - Presentation
Electrolux Interim Report Q2 2017 - Presentation
 
Electrolux Interim Report Q2 2016 - Presentation
Electrolux Interim Report Q2 2016 - PresentationElectrolux Interim Report Q2 2016 - Presentation
Electrolux Interim Report Q2 2016 - Presentation
 
Kemira's January-June 2013 Interim Report result presentation
Kemira's January-June 2013 Interim Report result presentationKemira's January-June 2013 Interim Report result presentation
Kemira's January-June 2013 Interim Report result presentation
 
Result presentation Q3 2020
Result presentation Q3 2020Result presentation Q3 2020
Result presentation Q3 2020
 
Electrolux Consolidated Results 2015 - Presentation
Electrolux Consolidated Results 2015 - PresentationElectrolux Consolidated Results 2015 - Presentation
Electrolux Consolidated Results 2015 - Presentation
 
Stora enso financial result q3 2014
Stora enso financial result  q3 2014Stora enso financial result  q3 2014
Stora enso financial result q3 2014
 

Similaire à Enea 2014 H1

Similaire à Enea 2014 H1 (20)

Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014
Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014
Kloeckner & Co Analysts and Investor Presentation 3rd Quarter results 2014
 
Q3
Q3Q3
Q3
 
Valmet Financial Statements Review 2014
Valmet Financial Statements Review 2014Valmet Financial Statements Review 2014
Valmet Financial Statements Review 2014
 
Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)Enea 2017 H1 - financial results (english)
Enea 2017 H1 - financial results (english)
 
AkzoNobel Q2 2014 Media presentation
AkzoNobel Q2 2014 Media presentationAkzoNobel Q2 2014 Media presentation
AkzoNobel Q2 2014 Media presentation
 
Enea 2015 Q1
Enea 2015 Q1Enea 2015 Q1
Enea 2015 Q1
 
Valmet's Interim Review January-September 2014
Valmet's Interim Review January-September 2014Valmet's Interim Review January-September 2014
Valmet's Interim Review January-September 2014
 
CIECH - Financial results for 2015FY
CIECH - Financial results for 2015FYCIECH - Financial results for 2015FY
CIECH - Financial results for 2015FY
 
Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)Enea 2016 Q1 - financial results (english)
Enea 2016 Q1 - financial results (english)
 
AkzoNobel Investor Update Q2 2014 results
AkzoNobel Investor Update Q2 2014 resultsAkzoNobel Investor Update Q2 2014 results
AkzoNobel Investor Update Q2 2014 results
 
HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014HeidelbergCement: Annual Results 2014
HeidelbergCement: Annual Results 2014
 
AkzoNobel Investor Update Q1 2014 results
AkzoNobel Investor Update Q1 2014 resultsAkzoNobel Investor Update Q1 2014 results
AkzoNobel Investor Update Q1 2014 results
 
Finmeccanica First Quarter 2015 Result Presentation
Finmeccanica First Quarter 2015 Result PresentationFinmeccanica First Quarter 2015 Result Presentation
Finmeccanica First Quarter 2015 Result Presentation
 
Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)Enea 2017 Q1 - financial results (english)
Enea 2017 Q1 - financial results (english)
 
Second Quarter 2015 Results
Second Quarter 2015 ResultsSecond Quarter 2015 Results
Second Quarter 2015 Results
 
TomTom Q1 2014 Financial Results
TomTom Q1 2014 Financial ResultsTomTom Q1 2014 Financial Results
TomTom Q1 2014 Financial Results
 
Q3 2015 Results presentation Husqvarna Group
Q3 2015 Results presentation Husqvarna GroupQ3 2015 Results presentation Husqvarna Group
Q3 2015 Results presentation Husqvarna Group
 
Rpc full yearpresentation2014
Rpc full yearpresentation2014Rpc full yearpresentation2014
Rpc full yearpresentation2014
 
AkzoNobel Q4 and full-year 2014 results Investor Update Presentation
AkzoNobel Q4 and full-year 2014 results Investor Update PresentationAkzoNobel Q4 and full-year 2014 results Investor Update Presentation
AkzoNobel Q4 and full-year 2014 results Investor Update Presentation
 
Wienerberger fy 2014_presentation
Wienerberger fy 2014_presentationWienerberger fy 2014_presentation
Wienerberger fy 2014_presentation
 

Plus de Enea

Plus de Enea (19)

Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)Enea 2017 Q3 - financial results (english)
Enea 2017 Q3 - financial results (english)
 
Enea 2017 3Q - wyniki finansowe (polish)
Enea 2017 3Q - wyniki finansowe (polish)Enea 2017 3Q - wyniki finansowe (polish)
Enea 2017 3Q - wyniki finansowe (polish)
 
Factsheet GK Enea (polish)
Factsheet GK Enea (polish)Factsheet GK Enea (polish)
Factsheet GK Enea (polish)
 
Factsheet Enea CG (english)
Factsheet Enea CG (english)Factsheet Enea CG (english)
Factsheet Enea CG (english)
 
Enea 2017 1H - wyniki finansowe (polish)
Enea 2017 1H - wyniki finansowe (polish)Enea 2017 1H - wyniki finansowe (polish)
Enea 2017 1H - wyniki finansowe (polish)
 
Enea 2017 1Q - wyniki finansowe (polish)
Enea 2017 1Q  - wyniki finansowe (polish)Enea 2017 1Q  - wyniki finansowe (polish)
Enea 2017 1Q - wyniki finansowe (polish)
 
Enea 2016 - financial results (english)
Enea 2016 - financial results (english)Enea 2016 - financial results (english)
Enea 2016 - financial results (english)
 
Enea 2016 - wyniki finansowe
Enea 2016 - wyniki finansoweEnea 2016 - wyniki finansowe
Enea 2016 - wyniki finansowe
 
Enea 2016 3Q - wyniki finansowe
Enea 2016 3Q - wyniki finansowe Enea 2016 3Q - wyniki finansowe
Enea 2016 3Q - wyniki finansowe
 
Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english) Enea 2016 Q3 - financial results (english)
Enea 2016 Q3 - financial results (english)
 
Enea CG’s development strategy until 2030 (english)
Enea CG’s development strategy until 2030 (english)Enea CG’s development strategy until 2030 (english)
Enea CG’s development strategy until 2030 (english)
 
Strategia rozwoju GK Enea w perspektywie do 2030 roku
Strategia rozwoju GK Enea w perspektywie do 2030 rokuStrategia rozwoju GK Enea w perspektywie do 2030 roku
Strategia rozwoju GK Enea w perspektywie do 2030 roku
 
Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english) Enea 2016 H1 - financial results (english)
Enea 2016 H1 - financial results (english)
 
Enea 2016 1H - wyniki finansowe
Enea 2016 1H - wyniki finansowe Enea 2016 1H - wyniki finansowe
Enea 2016 1H - wyniki finansowe
 
Enea 2016 1Q - wyniki finansowe
Enea 2016 1Q - wyniki finansoweEnea 2016 1Q - wyniki finansowe
Enea 2016 1Q - wyniki finansowe
 
Enea 2015 r. - wyniki finansowe
Enea 2015 r. - wyniki finansoweEnea 2015 r. - wyniki finansowe
Enea 2015 r. - wyniki finansowe
 
Enea 2015 3Q - wyniki finansowe
Enea 2015 3Q - wyniki finansoweEnea 2015 3Q - wyniki finansowe
Enea 2015 3Q - wyniki finansowe
 
Enea 2015 1H - wyniki finansowe
Enea 2015 1H - wyniki finansoweEnea 2015 1H - wyniki finansowe
Enea 2015 1H - wyniki finansowe
 
Enea 2015 1Q - Wyniki finansowe i operacyjne
Enea 2015 1Q - Wyniki finansowe i operacyjneEnea 2015 1Q - Wyniki finansowe i operacyjne
Enea 2015 1Q - Wyniki finansowe i operacyjne
 

Dernier

young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
anilsa9823
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
only4webmaster01
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
anilsa9823
 

Dernier (20)

(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 

Enea 2014 H1

  • 1. Krzysztof Zamasz President of the Board Warsaw, 27 August 2014 Dalida Gepfert Vice-President of the Board for Financial Affairs We consistently implement the goals included in the strategy Q2, H1 2014 Paweł Orlof Vice-President of the Board for Corporate Affairs Grzegorz Kinelski Vice-President of the Board for Commercial Affairs
  • 2. 2 Agenda Energy market and key operating data ENEA CG's results in Q2 and H2 2014 Key projects implemented in H1 2014 New power unit in Kozienice
  • 3. Grzegorz Kinelski Vice-President of the Board for Commercial Affairs ENEA CG is monitoring the market situation on a continuous basis
  • 4. 4 • Higher average price of baseload by 9.5% yoy • SPOT market was affected by: energy generation from wind sources, situation on the European carbon market, changes in the methods of settlements for the operating power reserve and higher volume of losses in the generating capacity • In H1 2014 prices of energy on the futures market were characterised with the increasing sideways trend supported by the prices from the European carbon market and price levels from the SPOT market of electricity • Explicit strengthening of quotations in the second half of June In H1 2014 we observed growths in prices on the energy market 130 140 150 160 170 180 190 200 210 220 230 I II III IV V VI VII VIII IX X XI XII PLN/kWh Average electricity prices on SPOT market on PPE Baseload - 2012 Baseload - 2013 Baseload - 2014 140 146 152 158 164 170 176 182 188 194 200 0 20 40 60 80 100 120 140 160 180 200 04/10/2012 21/05/2013 05/09/2013 26/11/2013 18/02/2014 23/04/2014 30/06/2014 PLN/MWh MW Transaction prices and volumes - baseload for 2015 trade volumes weighted average price
  • 5. 5 • Low prices of coal on foreign markets • Prices of coal in Q2 2014 were maintained on the level reached as a result of drops in Q1 2014, comparable to prices from the period of June to August 2013 • The market of allowances for emissions of CO2 was strongly dependant on political decisions in EU • Great surplus of EUA in EU ETS In H1 2014 prices of coal maintained on a low level 0 2 4 6 8 10 I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII I II III IV V VI 2012 2013 2014 EUR/t EUA and CER quotations - closing prices on SPOT market EUA 2 Phase CER EUA 3 Phase 70 80 90 100 110 120 I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII I II III IV V VI 2012 2013 2014 USD/t Monthly indices of coal prices (globalCOAL) Richards Bay (RPA) Newcastle (Australia) Amsterdam-Rotterdam-Antwerpia
  • 6. 6 [GWh] Q2 2013 Q2 2014 Change % H1 2013 H1 2014 Change % Total generation of energy, including: 2 938,6 2 972.6 1.2% √ 5 977.7 6 114.2 2.3% √ Conventional generation 2 734.6 2 718.5 -0.6% 5 537.1 5 584.5 0.9% √ Generation from RES 204.0 254.1 24.6% √ 440.6 529.7 20.2% √ Higher energy production in ENEA CG ENEA CG in H1 2014 increased energy production both form conventional sources and RES
  • 7. 7 Agenda Energy market and key operating data ENEA CG's results in Q2 and H1 2014 Key projects implemented in H1 2014 New power unit in Kozienice
  • 8. Dalida Gepfert Vice-President of the Board for Financial Affairs ENEA CG generated good results in H1 2014
  • 9. 9 [PLN mln] Q2 2013 Q2 2014 Change % H1 2013 H1 2014 Change % Net sales revenues 2 215.3 2 466.5 11.3% 4 595.6 4 840.2 5.3% √ EBITDA 387.7 642.0 65.6% 937.6 1 103,5 17.7% √ Net profit 158.0 415.6 163.1% 454.8 624.9 37.4% √ Net debt/EBITDA -0.9 -0.2 0.7 -0.9 -0.2 0.7 Financial results of ENEA CG above market expectations
  • 10. 10 EBITDA in Q2 2014 demonstrates better results yoy in the segment of generation and distribution 2.4% 43.5% 32.2% 8.5% 26.0%17.5%[PLN mln] 196.4 492.2 191.3 -2.9 67.4 200.6 -3.7 13.9 149.8 0,0 100,0 200,0 300,0 400,0 500,0 600,0 700,0 EBITDA Q2 2013 Trade Distribution Generation Other activity Exclusions* EBITDA Q2 2014 387.7 642.0 -41.6%27.4%-50.0% 173.0% * Includes undistributed expenses of the whole Group and exclusions EBIT Amortisation/ depreciation Growth in segment Drop in segment Change in segment yoy [%] EBITDA margin [%]
  • 11. 11 [PLN mln] Q2 2013 Q2 2014 Change % Generation 116.0 316.6 173.0% [PLN mln] Q2 2013 Q2 2014 Change % Trade 47.8 23.9 -50.0% EBITDA in Q2 2014 demonstrates better results yoy in the segment of generation and distribution Segment of trade Drop of EBITDA by PLN 23.9 mln (-50.0%) • lower average purchase price of energy by 12.4% √ • higher volumes of sales by 630 GWh √ • lower average selling price by 17.3% Segment of distribution Higher EBITDA by PLN 67.4 mln (27.4%) √ • lower average price and lower volumes of electricity purchases for covering book-tax difference √ • lower provisions relating to grid assets √ Segment of generation Higher EBITDA by PLN 200.6 mln (173.0%) √ • higher revenues from compensation for recovery of stranded costs by PLN 258 mln √ • lower margin on generation of electricity by PLN 18 mln • loss of EBITDA due to failure of unit No. 9 by PLN 18 mln [PLN mln] Q2 2013 Q2 2014 Change % Distribution 245.7 313.1 27.4%
  • 12. 12 In H1 2014 ENEA CG improved EBITDA result by 18% 551.7 758.9 385.9 -7.1 72.8 160.9 -4.6 11.9 344.6 0,0 200,0 400,0 600,0 800,0 1000,0 1200,0 EBITDA H1 2013 Trade Distribution Generation Other activity Exclusions* EBITDA H1 2014 -47.7% 13.7% 57.6% 937.6 1 103.5 [PLN mln] -26.5% 20.4% 40.3% 24.5% 11.1% 22.8%4.1% * Includes undistributed expenses of the whole Group and exclusions EBIT Amortisation/ depreciation Growth in segment Drop in segment Change in segment yoy [%] EBITDA margin [%]
  • 13. 13 [PLN mln] H1 2013 H1 2014 Change % Generation 279.4 440.3 57.6% [PLN mln] H1 2013 H1 2014 Change % Distribution 532.9 605.7 13.7% In H1 2014 ENEA CG improved EBITDA result by 18% Segment of trade Drop of EBITDA by PLN 75.1 mln (-47.7%) • lower average purchase price of energy by 11.4% √ • higher sale volumes by 1,174 GWh √ • entry into force of the cogeneration obligation - inflow in the amount of PLN 16 mln Segment of distribution Increase of EBITDA by PLN 72.8 mln (13.7%) √ • lower average price and lower volumes of electricity purchases for covering book-tax difference √ • lower provisions relating to grid assets √ Segment of generation Higher EBITDA by PLN 160.9 mln (57.6%) √ • higher revenues from compensation for recovery of stranded costs by PLN 258 mln √ • lower margin on generation of electricity by PLN 83 mln • loss of EBITDA due to failure of unit No. 9 by PLN 23 mln [PLN mln] H1 2013 H1 2014 Change % Trade 157.4 82.3 -47.7%
  • 14. 14 Cash balance of the Group as at the end of June 2014 amounted to PLN 1.3 bln 818 1 573 625 345 -424 -258 -1 043 525 -69 1 274 500 1 000 1 500 2 000 2 500 3 000 Cash 1.01.2014 Net profit Amortization/ depreciation Working capital* Receviables from Long- term agreement CAPEX External funding Other Cash 30.06.2014 [PLN mln] * excluding the receivables from compensation for covering stranded costs (Long-term Agreements)
  • 15. 15 Cost regime and optimum use of the resources allowed ENEA CG to generate good financial results In Q2 revenues were recognised from Long-term Agreements which added to the result of the segment of generation ENEA CG implements the projects anticipated in the corporate strategy consistently and in a timely fashion Financial results of ENEA CG are above market expectations Intense development of ENEA CG - CAPEX in H1 2014 higher by PLN 186 mln with a favourable value of net debt/EBITDA ratio -0.2 PLN 75 mln cost savings after H1 2014
  • 16. 16 Agenda Energy market and key operating data ENEA CG's results in Q2 and H1 2014 Key projects implemented in H1 2014 New power unit in Kozienice
  • 17. Krzysztof Zamasz President of the Board We efficiently implement the projects specified in the strategy
  • 18. 18 Generation: The main task of ENEA Wytwarzanie is building a competitive generating portfolio 1. Purchase of a block of shares of MPEC Sp. z o.o. in Białystok 2. Exclusiveness in negotiations for the purchase of a block of shares of ECO S.A. till 15 September 2014 3. Construction of a 1,075 MW unit 4. RES development: participation in acquisition processes and own projects 5. Replacement modernisation of generating equipment 6. Realisation of the environment investments and other modernisation investments 7. Implementation of projects relating to a better efficiency and optimum use of the organisational potential in ENEA CG Generation 2014 2015 2016- 2017 2018 2019- 2020H1 H2 √ √ √ √ √ √ √ Segment of Heat: Purchase of a block of shares of MPEC Białystok Segment of System Power Plants: 35% progress of works on the construction of 1,075 MW unit
  • 19. 19 Distribution: ENEA Operator prepares for the introduction of the quality tariff in 2016 1. Better condition of the power grid - investments in its development and modernisation (better reliability ratios) 2. Better Customer service, especially within connecting to the grid (shorter time of issuing connection conditions and shorter time of realisation of connection agreements) 3. Cooperation with the President of ERO and other operators of distribution systems within the preparation of companies to the introduction of the quality tariff 4. Intensification of activities within smart grid and smart metering (preparation of the AMI application test in 3 localisations and preparation to the commencement of the balancing meters installation) 5. Operating costs optimisation 6. Closer cooperation with ENEA CG companies: ENEA Centrum and companies comprising the distribution area: ENERGOBUD and ENERGOMIAR - transfer to ENEA Centrum of some functions from within IT, Finance and Accounting and part of the Customer service Distribution 2014 2015 2016 2017- 2018 2019- 2020H1 H2 PLN 3 bln - investments in the extension and modernisation of the grid during 2011-2013 PLN 4.2 bln - investments during 2014-2019 Shorter time for issuing connection conditions from 30 to 15 days √ √ √ √ √ √
  • 20. 20 Trade: We focus on building long-term relations with Customers 1. 63,689 - the number of new Customers who trusted ENEA in H1 2014 2. Higher sales of electricity in the segment of strategic Customers by 1 TWh 3. Development of sales in the whole of Poland - introduction of a Poland wide sales structure 4. Launching sales realised by Contact Centre 5. Introduction of a dual-fuel offer 6. "Energy with an account" - development of a common offer with Getin Bank for individual Clients 7. Launching new products: Fixed price, Strike the raise, Always cheaper + Trade 2014 H1 √ √ √ √ √ √ √ Higher sales of electricity by 1.82 TWh
  • 21. 21 SSC: 60% functions were centralised in SSC in H1 2014 SSC 2014 2015 H1 H2 √ √ √ √ √ The works were completed relating to the centralisation of 3 functions: Finance and Accounting Customer Service IT 1. Completion of the construction of the Mass Communication Centre - centralisation of the area of printing and delivery of mass communications 2. Extension of the scope of issues which customers may realise remotely through the Contact Centre and increasing the number of matters realised on first contact (FCR ratio) 3. Finalisation of activities within the development of SAP business concept in ENEA CG 4. Completion of the concept stage for a new billing system - conclusion of the implementation agreement 5. Start-up of design works within the centralisation of the subsequent 3 functions: Human Resources, Logistics and Legal Area
  • 22. 22 After H1 cost reduction in ENEA CG amounted to PLN 75 mln 1. Generation 2. Distribution 3. Sales 4. SSC 5. Other companies TOTAL Cost savings [PLN mln] H1 2014 Prognosis of initiative realisation in 2014 56 137 13 39 3 5 1 5 2 3 75 189 Undertaken activities will enable to reduce costs by ca. PLN 500 mln by 2016
  • 23. 23 Agenda Energy market and key operating data ENEA CG's results in Q2 and H1 2014 Key projects implemented in H1 2014 New power unit in Kozienice
  • 24. Paweł Orlof Vice-President of the Board for Corporate Affairs Construction of unit No. 11 is on the schedule
  • 25. 25 In H1 2014 ENEA CG implemented actions relating to the construction of 1,075 MW unit 65% 35% Performance of the lower foundation slab with poles of the load bearing structure of the turbine set Performance of a reinforced concrete structure of the cooling tower jacket to the level of 40 m Concreting the upper foundation slab of the boiler house Performance of a steel load bearing structure of the boiler to the level of 44 m Completion of reinforced concrete works of communication pylons Completion of concreting the cooling water piping along the engine room building2012 – H1 2014 H2 2014 2015 0% 20% 40% 60% 80% Scope of works to be performed in 2014
  • 26. We consistently implement the goals included in the strategy Q2, H1 2014 gielda@enea.pl
  • 28. 28 116.0 316.6206.7 -5.2 -0.8 0 50 100 150 200 250 300 350 EBITDA Q2 2013 Segment of System Power Plants Segment of Heat Segment of RES EBITDA Q2 2014 Growth Drop [PLN mln] Generation – EBITDA Q4 2014 bridge Attachment 1 – Higher EBITDA in the segment of generation results from the recognition in Q2 2014 of revenues from compensation for recovery of stranded costs
  • 29. 29 47.8 23.99.4 -3.6 -2.7 0 10 20 30 40 50 60 EBITDA Q2 2013 First contribution margin Cost of sales Other factors EBITDA Q2 2014 Trade – EBITDA Q4 2014 bridge Attachment 2 – Lower first contribution margin impaired the results of the segment of trade in Q2 2014 Growth Drop [PLN mln]
  • 30. 30 245.7 313.1 39.9 40.5 -1.4 -2.7 0 50 100 150 200 250 300 350 EBITDA Q2 2013 Regulation Gird assets Organisation Other factors EBITDA Q2 2014 Attachment 3 - In Q2 2014 in the segment of distribution lower costs were reported of establishment of provisions relating to the grid assets and employee benefit provisions Distribution – EBITDA Q2 2014 bridge Growth Drop [PLN mln]
  • 31. 31 279.4 440.3 149.8 9.6 1.5 0 100 200 300 400 500 EBITDA H1 2013 Segment of System Power Plants Segment of Heat Segment of RES EBITDA H1 2014 Attachment 4 - Recognition in H1 2014 revenues from compensation for recovery of stranded costs impacted the growth of EBITDA in the segment of generation Generation – EBITDA H1 2014 bridge Growth Drop [PLN mln]
  • 32. 32 15.4 82.30.6 -70.5 -5.3 0 20 40 60 80 100 120 140 160 180 EBITDA H1 2013 First contribution margin Cost of sales Other factors EBITDA H1 2014 Attachment 5 – Lower first contribution margin charged the results of the segment of trade in H1 2014 Trade – EBITDA H1 2014 bridge Growth Drop [PLN mln]
  • 33. 33 532.9 605.7 5.0 40.9 32.1 -5.1 0 100 200 300 400 500 600 700 EBITDA H1 2013 Regulation Gird assets Organisation Other factors EBITDA H1 2014 Attachment 6 - In H1 2014 in the segment of distribution lower costs of energy purchases were reported for covering the book-tax difference and costs of establishment of reserves Distribution – EBITDA H1 2014 bridge Growth Drop [PLN mln]