Scheme for Allocation of Solar Power Projects to Land Owning Farmers.
Hon’ble Prime Minister of India has vision of 100 gigawatt (GW) solar energy by 2022, which
was reflected in the budget speech of the Hon’ble Finance Minister of India, based on which
Ministry of New and Renewable Energy, Govt. Of India has increased its target to 100GW.
Its benefits would stretch beyond energy security and environmental protection. It could
create a million green jobs in India, where large scale unemployment is one of the top socio-
economic issues. As part of the National programme, Punjab plans to achieve Solar Cap.
5400 MW by 2022.
As provided in the NRSE Policy-2012 and subsequent amendment, this scheme is
introduced for allocation of Solar Power Projects to the land owning farmers of the state of
Punjab.
The Government of Punjab endeavors to promote solar energy projects by land owning
farmers with a minimum capacity of 1MWp to a maximum capacity of 2.5 MWp (per land
owning farmer) in the state for sale of power to Punjab State Power Corporation Ltd.
(PSPCL) at applicable generic tariff determined by Punjab State Electricity Regulatory
Commission (PSERC) on annual basis. With Solar Power Projects located closer to the
agriculture loads in distribution / transmission network, distribution losses will be reduced
considerably and voltage drop at peak day time load will be minimized along with power
supply and power factor improvement . These small solar PV systems shall act as a micro
distributed utility at farm level. The solar power generation shall be available for enabling the
agriculture pump-sets loads to be operated during the daytime, thereby allowing the utility to
dispatch the power so saved from their central generating station to other area.
Nodal Agency
PEDA shall be the nodal agency for implementation of this special scheme. Project
application processing & allocation shall be with PEDA while administration of Power
Purchase Agreements (PPA) shall be with PSPCL. PEDA will also facilitate the farmers
regarding documentation for the projects.s
Capacity Target
The cumulative capacity under this scheme shall be 500MW.
Evacuation facilities
Govt. of Punjab (GoP) shall facilitate purchase of energy generated under this scheme by
PSPCL through power purchase agreements of 25 years duration. PSPCL shall be
responsible for providing connectivity of the solar PV power generating station at the nearest
grid sub-station with the grid and provide interconnectivity from the last H pole/tower of the
11 KV/66KV evacuation line inside the Grid sub/station and 11 KV/66KV switchgear along
with metering system in the grid. All works including construction of bay/providing
breakers/metering system inside the PSPCL grid sub station shall be carried out by PSPCL
at their own cost. The farmer shall bear the total cost of the 11 KV /66KV line for evacuation
of power from the Out Door Yard of the project to the nearest 66KV sub-station which can be
got constructed by the farmer from PSPCL on deposit job work basis.
Eligibility, Terms & Conditions
1. Farmer holding agriculture land in their name having valid & duly certified enters in
Jamabandi for the last three years from date of issue of this scheme shall be eligible
for allocation of projects If the land is transferred on succession / will basis then the
time of holding of the land of the person from whom land has been transferred on
account of succession / Will shall be counted towards eligibility of three year time
period of the applicant.
2. Farmer / Group of Farmers can also form a company for applying and or
implementation of the project.
3. The minimum capacity that can be allocated is 1MWp and maximum is 2.5 MWp for
each farmer/Company, formed by the farmers.
4. The existing land use as per revenue records should be for Agriculture/Horticulture/
Farming including irrigated & non-irrigated area.
5. The applicant has to furnish the certified copy of the land ownership documents as
proof of land holding of the total required land for the applied capacity. The minimum
land required is 4.5 acres for 1MWp proportionately of higher capacity.
6. If the land holding is held jointly each of the joint holder is individually also eligible to
apply for minimum 1MW to maximum 2.5 MW depending upon the extent of required
land. Provided that Husband &Wife will be individually or jointly eligible to apply for
max 2.5 MW only.
7. The following committee will scrutinize the application and verify the original
documents before short listing of eligible applicants and final allottees: -
- Director PEDA, Joint Director PEDA, Senior Manager Finance, Representatives
of Revenue Department (Not below the rank of DRO.) Representatives of
Finance Department (not below the rank of Deputy. Secretary),
Representatives of PSPCL (not below the rank of Deputy Chief Engineer).
8. The application fee of Rs.50,000/- (Non refundable) shall be submitted through Draft
with the printed application along with the certified copy of the ownership documents.
The farmer has also to furnish a processing fee of Rs. 2,00,000/- per MW to PEDA
along with application in the shape of separate demand draft. In case the farmer
does not gets the allotment, the processing fee shall be refunded.
9. Allotment shall be made by the project allotment committee notified in the NRSE
policy 2012. On the basis of discount given on the generic tariff announced by
PSERC for 2015-16 along with the application. Higher the discount higher shall be
the merit position of the applicant for project allotment.
10. In case, two or more applicants are offering the same tariff of more capacity then the
balance left over capacity, then the selection shall be based on technical capability,
understanding or knowledge of the project, resource position, qualification &
experience, performance of the applicant during the interview and social support if
any extended to the village & its residents. This selection shall be done by the
following committee headed by the
- Chief Secretary, and comprising Principal Secretary to CM, Principal Secretary
Power, Principal Secretary NRSE, Principal Secretary Finance, CMD PSPCL,
Chief Executive PEDA (Convener).
11. A List of all eligible applicants and allottees will be displayed on the website of
PEDA.
12. In Case the allottee is not given technical feasibility clearance by PSPCL/
Transmission line laying constraints or due to other reasons which are beyond the
control of the allottee, then the project allotment committee under NRSE policy 2012
can consider to allow allotted Farmer to implement the project at a new site in the
state through a joint venture with other farmers.
13. The farmer can also form a company after project allocation but before signing of the
IA to implement the project. The farmer allotted the project will have to continuously
hold 51% equity/share/ownership/stake in the project till 7 years from the date of
signing of the PPA.
14. The allottee shall enter into PPA for a period of 25 years (effective from the date of
commissioning of the project) at the net availed tariff arrived after giving discount on
the Generic tariff for solar PV projects as determined by PSERC applicable for that
year of allocation of the project. The signing of IA shall be completed in 45 days and
thereafter signing of PPA will be completed in 60 days from the date of allotment.
15. The allottee shall furnish the financial closure documents, technical feasibility
clearance and final technology selection documents within 120 days of signing of
PPA.
16. PEDA and Punjab Bureau of Investment Promotion shall facilitate the grant of
statutory clearances to the projects.
17. PEDA will forward the proposals as and when received to MNRE, GoI, for extending
Excise & Customs duty benefits etc. as applicable.
18. The allottee must complete the project within the stipulated time as mentioned in the
allotment letter, However extension can be sought for 30 days in the first instance on
a payment of a fee of Rs. 5000/day/MW. Another extension may be granted for
another period of maximum 60 days but not later than 31 March on a payment of a
fee of Rs.10,000/day/MW. After which no further extension shall be given and the
PPA shall stand canceled as the tariff control period expires as per CERC/ PSERC
Regulations. However incase the PSERC extends the applicability of tariff or derives
a new tariff for the next control period the PPA will be extended accordingly on a
case to case basis.
19. The Change of Land use allowed for Agriculture/ Horticulture land for installation of
SPV shall revert back to Agriculture / Horticulture on completion of the Project period
or in the event the Project is removed from the site.
20. Canal water connection and supply schedule shall remain as it is in the name of the
farmer.
21. In case two or more applicants setup the project in adjoining lands then the power
can be evacuated through double circuit 11KV Transmission Lines.
22. Farmer who are successful in getting project allotments shall also have the option to
jointly setup a SPV company before signing of IA with controlling share holding of
51% to be held by the allottees in the same proportion as the project allotment
capacity. In such case a single IA shall be signed with PEDA and a single PPA shall
be signed with PSPCL by the SPV company for a maximum capacity of 25MW.
Power can be evacuated from this project through a 66KV transmission line to the
nearest technically feasible PSPCL sub-station. The power evacuation and
transmission shall be subject to technical feasibility clearance by PSPCL.
23. Allottees who have projects in the same village or adjoining villages shall also have
the option to setup a common 66KV pooling sub-station for evacuation of power from
their independent projects through a common 66KV transmission line to the nearest
technically feasible PSPCL sub-station. Energy accounting and metering shall
happen on the HT side of the pooling sub-station as per applicable regulations.
24. Farmers may also operate their agriculture pumps (Both DC or AC pumps) by taking
power from these solar PV Power Plants, which shall be treated as auxiliary power.
25. PEDA shall give information about the scheme through print & electronic media and
will also hold interactive meets with farmers to sensitize them about the scheme.
26. All applicable CERC/PSERC regulations and applicable guidelines etc. of PSPCL
shall have to be adhered to by the allottee.
27. Other general terms and conditions will be as per NRSE Policy 2012. In case of any
conflict, NRSE Policy 2012 shall prevail.
28. Govt. of Punjab, Deptt. Of New & Renewable Energy can amend/relax/make
addition/interpret provisions under this scheme with due approval of Chief Minister.

Contenu connexe

Tendances

Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
Josue Tandoum Waffo
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
sanjeev jain
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
Gurparvesh kaur
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
Bakul Haria
 

Tendances (20)

Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in ChhattisgarhRFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in Chhattisgarh
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
 
REAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdfREAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdf
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
 
Ultra mega power projects
Ultra mega power projectsUltra mega power projects
Ultra mega power projects
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Nl energy oct 3 - oct 9, 2015
Nl energy oct 3 - oct 9, 2015Nl energy oct 3 - oct 9, 2015
Nl energy oct 3 - oct 9, 2015
 
Incentives for Solar Developers:Generation Based Incentives
Incentives for Solar Developers:Generation Based IncentivesIncentives for Solar Developers:Generation Based Incentives
Incentives for Solar Developers:Generation Based Incentives
 

En vedette

RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
Harish Sharma
 
S4 oman wind energy potential anemometers 2016
S4 oman wind energy potential   anemometers 2016S4 oman wind energy potential   anemometers 2016
S4 oman wind energy potential anemometers 2016
CETN
 

En vedette (20)

2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
 
Build a solar panel at home
Build a solar panel at homeBuild a solar panel at home
Build a solar panel at home
 
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersTransforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
Solar Panel
Solar PanelSolar Panel
Solar Panel
 
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
 
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
 
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentation
 
S4 oman wind energy potential anemometers 2016
S4 oman wind energy potential   anemometers 2016S4 oman wind energy potential   anemometers 2016
S4 oman wind energy potential anemometers 2016
 
Solar energy sources
Solar energy sourcesSolar energy sources
Solar energy sources
 
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
 
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
FICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar EnergyFICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar Energy
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
 

Similaire à Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab

Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
Spark Network
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
Sanman Rajput
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
Sanman Rajput
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015
Anil Khadka
 

Similaire à Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab (20)

PM_kusum_yojna.pdf
PM_kusum_yojna.pdfPM_kusum_yojna.pdf
PM_kusum_yojna.pdf
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
 
Solar industry in iran
Solar industry in iranSolar industry in iran
Solar industry in iran
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
 

Plus de Harish Sharma

Plus de Harish Sharma (18)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDA
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 
150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015
 

Dernier

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Dernier (20)

Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 

Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab

  • 1. Scheme for Allocation of Solar Power Projects to Land Owning Farmers. Hon’ble Prime Minister of India has vision of 100 gigawatt (GW) solar energy by 2022, which was reflected in the budget speech of the Hon’ble Finance Minister of India, based on which Ministry of New and Renewable Energy, Govt. Of India has increased its target to 100GW. Its benefits would stretch beyond energy security and environmental protection. It could create a million green jobs in India, where large scale unemployment is one of the top socio- economic issues. As part of the National programme, Punjab plans to achieve Solar Cap. 5400 MW by 2022. As provided in the NRSE Policy-2012 and subsequent amendment, this scheme is introduced for allocation of Solar Power Projects to the land owning farmers of the state of Punjab. The Government of Punjab endeavors to promote solar energy projects by land owning farmers with a minimum capacity of 1MWp to a maximum capacity of 2.5 MWp (per land owning farmer) in the state for sale of power to Punjab State Power Corporation Ltd. (PSPCL) at applicable generic tariff determined by Punjab State Electricity Regulatory Commission (PSERC) on annual basis. With Solar Power Projects located closer to the agriculture loads in distribution / transmission network, distribution losses will be reduced considerably and voltage drop at peak day time load will be minimized along with power supply and power factor improvement . These small solar PV systems shall act as a micro distributed utility at farm level. The solar power generation shall be available for enabling the agriculture pump-sets loads to be operated during the daytime, thereby allowing the utility to dispatch the power so saved from their central generating station to other area. Nodal Agency PEDA shall be the nodal agency for implementation of this special scheme. Project application processing & allocation shall be with PEDA while administration of Power Purchase Agreements (PPA) shall be with PSPCL. PEDA will also facilitate the farmers regarding documentation for the projects.s Capacity Target The cumulative capacity under this scheme shall be 500MW. Evacuation facilities Govt. of Punjab (GoP) shall facilitate purchase of energy generated under this scheme by PSPCL through power purchase agreements of 25 years duration. PSPCL shall be responsible for providing connectivity of the solar PV power generating station at the nearest grid sub-station with the grid and provide interconnectivity from the last H pole/tower of the 11 KV/66KV evacuation line inside the Grid sub/station and 11 KV/66KV switchgear along with metering system in the grid. All works including construction of bay/providing
  • 2. breakers/metering system inside the PSPCL grid sub station shall be carried out by PSPCL at their own cost. The farmer shall bear the total cost of the 11 KV /66KV line for evacuation of power from the Out Door Yard of the project to the nearest 66KV sub-station which can be got constructed by the farmer from PSPCL on deposit job work basis. Eligibility, Terms & Conditions 1. Farmer holding agriculture land in their name having valid & duly certified enters in Jamabandi for the last three years from date of issue of this scheme shall be eligible for allocation of projects If the land is transferred on succession / will basis then the time of holding of the land of the person from whom land has been transferred on account of succession / Will shall be counted towards eligibility of three year time period of the applicant. 2. Farmer / Group of Farmers can also form a company for applying and or implementation of the project. 3. The minimum capacity that can be allocated is 1MWp and maximum is 2.5 MWp for each farmer/Company, formed by the farmers. 4. The existing land use as per revenue records should be for Agriculture/Horticulture/ Farming including irrigated & non-irrigated area. 5. The applicant has to furnish the certified copy of the land ownership documents as proof of land holding of the total required land for the applied capacity. The minimum land required is 4.5 acres for 1MWp proportionately of higher capacity. 6. If the land holding is held jointly each of the joint holder is individually also eligible to apply for minimum 1MW to maximum 2.5 MW depending upon the extent of required land. Provided that Husband &Wife will be individually or jointly eligible to apply for max 2.5 MW only. 7. The following committee will scrutinize the application and verify the original documents before short listing of eligible applicants and final allottees: - - Director PEDA, Joint Director PEDA, Senior Manager Finance, Representatives of Revenue Department (Not below the rank of DRO.) Representatives of Finance Department (not below the rank of Deputy. Secretary), Representatives of PSPCL (not below the rank of Deputy Chief Engineer). 8. The application fee of Rs.50,000/- (Non refundable) shall be submitted through Draft with the printed application along with the certified copy of the ownership documents. The farmer has also to furnish a processing fee of Rs. 2,00,000/- per MW to PEDA along with application in the shape of separate demand draft. In case the farmer does not gets the allotment, the processing fee shall be refunded. 9. Allotment shall be made by the project allotment committee notified in the NRSE policy 2012. On the basis of discount given on the generic tariff announced by
  • 3. PSERC for 2015-16 along with the application. Higher the discount higher shall be the merit position of the applicant for project allotment. 10. In case, two or more applicants are offering the same tariff of more capacity then the balance left over capacity, then the selection shall be based on technical capability, understanding or knowledge of the project, resource position, qualification & experience, performance of the applicant during the interview and social support if any extended to the village & its residents. This selection shall be done by the following committee headed by the - Chief Secretary, and comprising Principal Secretary to CM, Principal Secretary Power, Principal Secretary NRSE, Principal Secretary Finance, CMD PSPCL, Chief Executive PEDA (Convener). 11. A List of all eligible applicants and allottees will be displayed on the website of PEDA. 12. In Case the allottee is not given technical feasibility clearance by PSPCL/ Transmission line laying constraints or due to other reasons which are beyond the control of the allottee, then the project allotment committee under NRSE policy 2012 can consider to allow allotted Farmer to implement the project at a new site in the state through a joint venture with other farmers. 13. The farmer can also form a company after project allocation but before signing of the IA to implement the project. The farmer allotted the project will have to continuously hold 51% equity/share/ownership/stake in the project till 7 years from the date of signing of the PPA. 14. The allottee shall enter into PPA for a period of 25 years (effective from the date of commissioning of the project) at the net availed tariff arrived after giving discount on the Generic tariff for solar PV projects as determined by PSERC applicable for that year of allocation of the project. The signing of IA shall be completed in 45 days and thereafter signing of PPA will be completed in 60 days from the date of allotment. 15. The allottee shall furnish the financial closure documents, technical feasibility clearance and final technology selection documents within 120 days of signing of PPA. 16. PEDA and Punjab Bureau of Investment Promotion shall facilitate the grant of statutory clearances to the projects. 17. PEDA will forward the proposals as and when received to MNRE, GoI, for extending Excise & Customs duty benefits etc. as applicable. 18. The allottee must complete the project within the stipulated time as mentioned in the allotment letter, However extension can be sought for 30 days in the first instance on a payment of a fee of Rs. 5000/day/MW. Another extension may be granted for
  • 4. another period of maximum 60 days but not later than 31 March on a payment of a fee of Rs.10,000/day/MW. After which no further extension shall be given and the PPA shall stand canceled as the tariff control period expires as per CERC/ PSERC Regulations. However incase the PSERC extends the applicability of tariff or derives a new tariff for the next control period the PPA will be extended accordingly on a case to case basis. 19. The Change of Land use allowed for Agriculture/ Horticulture land for installation of SPV shall revert back to Agriculture / Horticulture on completion of the Project period or in the event the Project is removed from the site. 20. Canal water connection and supply schedule shall remain as it is in the name of the farmer. 21. In case two or more applicants setup the project in adjoining lands then the power can be evacuated through double circuit 11KV Transmission Lines. 22. Farmer who are successful in getting project allotments shall also have the option to jointly setup a SPV company before signing of IA with controlling share holding of 51% to be held by the allottees in the same proportion as the project allotment capacity. In such case a single IA shall be signed with PEDA and a single PPA shall be signed with PSPCL by the SPV company for a maximum capacity of 25MW. Power can be evacuated from this project through a 66KV transmission line to the nearest technically feasible PSPCL sub-station. The power evacuation and transmission shall be subject to technical feasibility clearance by PSPCL. 23. Allottees who have projects in the same village or adjoining villages shall also have the option to setup a common 66KV pooling sub-station for evacuation of power from their independent projects through a common 66KV transmission line to the nearest technically feasible PSPCL sub-station. Energy accounting and metering shall happen on the HT side of the pooling sub-station as per applicable regulations. 24. Farmers may also operate their agriculture pumps (Both DC or AC pumps) by taking power from these solar PV Power Plants, which shall be treated as auxiliary power. 25. PEDA shall give information about the scheme through print & electronic media and will also hold interactive meets with farmers to sensitize them about the scheme. 26. All applicable CERC/PSERC regulations and applicable guidelines etc. of PSPCL shall have to be adhered to by the allottee. 27. Other general terms and conditions will be as per NRSE Policy 2012. In case of any conflict, NRSE Policy 2012 shall prevail. 28. Govt. of Punjab, Deptt. Of New & Renewable Energy can amend/relax/make addition/interpret provisions under this scheme with due approval of Chief Minister.