SlideShare une entreprise Scribd logo
1  sur  12
Télécharger pour lire hors ligne
We reinforce mining
Instandsetzungsservice
Bergbau Hydraulik
Informationsbroschüre
HeyTec 1000 ®
DURACHROM ®
HeyTec 1000 ®
DURACHROM ®
Service for renewal and corrective maintenance of
Mining Hydraulics
Information Brochure
We reinforce mining
HeyTec 1000® / DURACHROM®
Soaring prices and long delivery times of the materials
necessary in tubes production have made it our business
to work out a solution to this situation.
With our patented procedures: HeyTec 1000® und
Durachrom®
we are now able to refurbish your high-quality rams and
cylinders classified as not repairable into almost like new
condition, offering even better quality than newly
manufactured parts.
The procedures offered to our customers constitute a major
reorientation in a cost-saving planning of hydraulic plungers
and cylinders.
We reinforce mining
HeyTec 1000®
is a machining-procedure, developed and patented by
us, where high quality, worn out parts, such as ram
stages, are completely refurbished in a cost-saving
fashion. With this machining the refurbished parts will
have a better corrosion protection and better gliding
attributes than their brand new counterparts.
We reinforce mining
-Processes of corrective maintenance for parts of rams -
During this process the defective parts of rams will be lathed
inside and outside and subsequently welded on with aluminium
bronze.
After the machining the refurbished parts retain their original
dimensions while, at the same time, feature a wear resistant and
ductile surface.
Such surfaces are completely corrosion-resistant and offer major
advantages due to their layer thickness, even in comparison with
the thin electroplated coating.
During the process of surface mounting the parts are not
modified. By means of cooling of the tube wall the temperature
of the materials never exceeds 200 C and with this procedure
there are no changes in the structure or the stability of the
material.
The section modulus of the tube is identical with the original
values and the original elastic limit is preserved.
In our security calculations the welded on material does not
belong to the tube material, and for that reason our calculations
are based on the values before the corrective maintenance of the
lathed tubes.
Only if the values of these calculations fully coincide with the
original values, the corrective maintenance may be carried out.
We reinforce mining
-Auditing procedures for HeyTec 1000 -
For the protection of our comprehensive warranty-obligation
we have checked extensively on our test stand the inside
and outside coated component parts.
Identical samples of our coated tubes and uncoated ones
were analyzed and checked by the company GLP –
Germanischer Lloyd Prüflabor GmbH under the check
number 4 10 662 HE. The elastic limit and expansion of the
coated tubes were identical with the values of the uncoated
tubes. The coating process doesn’t change the materials and
stability. The bending-checks according to EN ISO 7438 with
an angle of 180 C were carried out and defects of the coated
surfaces were recorded.
We reinforce mining
Coating on the inside after quality checking
Coating surfaces of a
ram
Coating on the inside after quality checked
rams with 30.000 load alternations
Bending tests of the outer layer
According to EN ISO 7038 with 180°
before e.g. middle stage after
OuterContactsurface/Outer-/InnerContactsurface/InnerContactsurface
Bronze restoration
Re-welding of bronze for rams and
cylinders
HeyTec 1000
As corrosion protection and wear-resistant coating
Qualified for production and
all maintenance
before e.g. external stage after
Coating surfaces of a
Telescopic ram
We reinforce mining
DURACHROM ®
A more preferable alternative is the machining process
“DURACHROM”. This machining process can only be used
for outside coating. Refurbished 3 TS ram outside surface,
DURACHROM inside surface HeyTec 1000
We reinforce mining
The DOZUT - TAGOR PLC has been rendering
services in the field of DURACHROM protective
coats applied to external working surfaces of
hydraulic cylinders (rams) for several years.
•How many DURACHROM - Z coats have been made?
Within 5 years (2000 - 2005) 20 thousand hydraulic cylinders (rams)
were coated. As there were two-stage legs among those cylinders
the number of coats made amounted in total to 25 thousand.
•Where has the DURACHROM - Z coat been utilised?
The DURACHROM coat has successfully been applied in coal mines
where very arduous conditions of operation exist. The DURACHROM
coat also finds its application in copper-ore mines and agricultural
machines.
•What parameters characterize DURACHROM- Z coat?
In view of the fact that DURACHROM coats have been developed
relatively not long ago, the DOZUT - TAGOR PLC in their work aimed
at perfectioning the production technology and the improvement of
the coat itself. There are some parameters which provide adequate
characteristic of the DURACHROM coats.
These are: - Mechanical strength Rm = 750 MPa - Hardness 230 ...
250 HB
Thickness of protective layer g = 0. 75 - 1. 2 mm
•How much does the DURACHROM - Z coat cost?
In spite of high labour-intensity of the manufacturing process the
cost of the DURACHROM coat is comparable to or even lower than
the cost of overhaul carried out with the use of electroplated coats.
•Is the DURACHROM - Z coat “approved for use”?
The DURACHROM coats have been subjected to repeated tests in
accredited Laboratories for Certification.
The DURACHROM coat has gained a certificate of approval for
application in highly saline medium and in sea water.
-The rams will be subjected to prototype tests and certified by DIN
PN-EN 1804-2:2004
We reinforce mining
Coating surfaces of a
Telescopic ram
OutercontactsurfaceOutercontactsurface
DURACHROM ®
High-grade steel covering for rams and cylinders
As corrosion protection and wear-resistant
coating
Layer thickness 1000µm
Tensile strength Rm 800 N/mm2
Elongation at break A5 15 %
Brinell-hardness HB 10/1000 250
Suitable for new products and all maintenance
Coating surfaces of a
Telescopic ram before e.g. middle stage after
We reinforce mining
The technological cutout for the lining of the mines
DURACHROM ®
New DURACHROM linings are used world-wide e.g. the
mining-fair in Katowice in the year 2005. The managing
director Henryk Malyska (on the right), Kamex Z.o.o.
presents his rams in the lining of Tagor.
We reinforce mining
The safest way Complete corrective maintenance
Over the last years we have greatly influenced the market for corrective
maintenance. You can gain the most financially once you endow us with
your defective cylinders for complete corrective maintenance. They must
equal at least €3000,00 as per new product. The refurbished rams and
cylinders comply with and exceed the requirements of newly manufactured
products.
You will save more than 40% of the price for new products and you will
obviously get an estimate of the costs for the corrective maintenance for
each cylinder after we have checked the degree of wear and tear of the
delivered products.
Then you have to decide: Corrective maintenance yes or no!
We offer a test order as a way to convince you!
We reinforce mining
B. Heynck GmbH
Ruenhorst 31
46395 Bocholt (Germany)
Telefon: +49 (0) 2871 - 72 46
Fax: +49 (0) 2871 - 184 222
www.heynck-hydraulics.com
E-Mail:info@heynck-hydraulics.comGerd Peters
marketing & sales
Bernhard Heynck
production
Our clients give feedback…
Reference letter to the product „hey Tec 1000 „
In the Year 2004 the rams in our coal mines
failed after a short operating time due to
corrosion. We searched for a solution to this
problem and found one presented by the
company Heynck. The company Heynck offered
the coating in bronze inside the rams.
First units have been refurbished in this
manner. After that we tested the refurbished
units in the coal mine.
The result of this solution was more than
satisfactory. The rams regained their original
operating time and didn’t have to scrapped
prematurely.
The bronze welding
solution Hey Tec 1000
offered by Heynck
saved our Company
a lot of rams’ failures
as well as high
maintenance costs.
Yours sincerely,
DSK Antrahzit
Ibbenbüren GmbH

Contenu connexe

Tendances

Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...Confindustria Emilia-Romagna Ricerca
 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...Blastline Institute
 
Fundamental of Pipe / Pipeline used in Process Piping.
Fundamental of Pipe / Pipeline used in Process Piping.Fundamental of Pipe / Pipeline used in Process Piping.
Fundamental of Pipe / Pipeline used in Process Piping.Varun Patel
 
Anchor Channel Technical Catalog
Anchor Channel Technical CatalogAnchor Channel Technical Catalog
Anchor Channel Technical CatalogHazMetal
 
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valvesPiston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valvesGUICHON VALVES
 
Drop forging hammer anvil block
Drop forging hammer anvil blockDrop forging hammer anvil block
Drop forging hammer anvil blockIris Han
 
Hs metal profile
Hs metal profileHs metal profile
Hs metal profilePeter L
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummiesIvan Garcia
 
Pipeline weld inspection
Pipeline weld inspectionPipeline weld inspection
Pipeline weld inspectionDavid Gray
 
AWS Schafer Profile 2015 EN Gesamt (1)
AWS Schafer Profile 2015 EN Gesamt (1)AWS Schafer Profile 2015 EN Gesamt (1)
AWS Schafer Profile 2015 EN Gesamt (1)AWS Schaefer Iran
 
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerVarun Patel
 
Grooved Couplings - The Fastest Way to Connect Pipes
Grooved Couplings - The Fastest Way to Connect PipesGrooved Couplings - The Fastest Way to Connect Pipes
Grooved Couplings - The Fastest Way to Connect PipesSSudhaVelan
 
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes Piping Technology & Products, Inc.
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 

Tendances (20)

Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberplex bem-34-132 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...
Filling machine reduced laminar flow tunnel assembled by adhesive bonding and...
 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
 
Fundamental of Pipe / Pipeline used in Process Piping.
Fundamental of Pipe / Pipeline used in Process Piping.Fundamental of Pipe / Pipeline used in Process Piping.
Fundamental of Pipe / Pipeline used in Process Piping.
 
Anchor Channel Technical Catalog
Anchor Channel Technical CatalogAnchor Channel Technical Catalog
Anchor Channel Technical Catalog
 
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valvesPiston valve radial sealing-welded design-engineered valve-605n-Guichon valves
Piston valve radial sealing-welded design-engineered valve-605n-Guichon valves
 
AWS Profile EN IR
AWS Profile EN IRAWS Profile EN IR
AWS Profile EN IR
 
Drop forging hammer anvil block
Drop forging hammer anvil blockDrop forging hammer anvil block
Drop forging hammer anvil block
 
Hs metal profile
Hs metal profileHs metal profile
Hs metal profile
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummies
 
Pipeline weld inspection
Pipeline weld inspectionPipeline weld inspection
Pipeline weld inspection
 
Cooling tower spare parts
Cooling tower spare partsCooling tower spare parts
Cooling tower spare parts
 
AWS Schafer Profile 2015 EN Gesamt (1)
AWS Schafer Profile 2015 EN Gesamt (1)AWS Schafer Profile 2015 EN Gesamt (1)
AWS Schafer Profile 2015 EN Gesamt (1)
 
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas EngineerPiping Components Handbook (Piping Training Material) for Oil & Gas Engineer
Piping Components Handbook (Piping Training Material) for Oil & Gas Engineer
 
Complete Presentation
Complete PresentationComplete Presentation
Complete Presentation
 
Grooved Couplings - The Fastest Way to Connect Pipes
Grooved Couplings - The Fastest Way to Connect PipesGrooved Couplings - The Fastest Way to Connect Pipes
Grooved Couplings - The Fastest Way to Connect Pipes
 
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes
Pre-Insulated Pipe Supports Featuring Cryogenic and High Temperature Pipe Shoes
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Conexões e tubulaçães - Alfa Laval
Conexões e tubulaçães - Alfa LavalConexões e tubulaçães - Alfa Laval
Conexões e tubulaçães - Alfa Laval
 

En vedette

Correcção de cor em vídeo
Correcção de cor em vídeoCorrecção de cor em vídeo
Correcção de cor em vídeoLeonardo Pereira
 
Automatisierte Bilderkennung
Automatisierte BilderkennungAutomatisierte Bilderkennung
Automatisierte BilderkennungÜmit Sari
 
презентация Dagrsol
презентация Dagrsolпрезентация Dagrsol
презентация Dagrsoldagrsol
 
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...Juan Báez Leva
 
Technical Info 15 wrestplank replacement
Technical Info  15  wrestplank replacementTechnical Info  15  wrestplank replacement
Technical Info 15 wrestplank replacementDavid Boyce
 
Colorado Coach Connection September 20, 2011
Colorado Coach Connection September 20, 2011Colorado Coach Connection September 20, 2011
Colorado Coach Connection September 20, 2011ICF Colorado
 
Sintesis informativa 18 de mayo 2016
Sintesis informativa 18 de mayo 2016Sintesis informativa 18 de mayo 2016
Sintesis informativa 18 de mayo 2016megaradioexpress
 
Sevilla misterios y leyendas - fotos antiguas semana santa
Sevilla misterios y leyendas - fotos antiguas semana santaSevilla misterios y leyendas - fotos antiguas semana santa
Sevilla misterios y leyendas - fotos antiguas semana santaAntonio Camel
 
Introduction to Web Server Security
Introduction to Web Server SecurityIntroduction to Web Server Security
Introduction to Web Server SecurityJITENDRA KUMAR PATEL
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
Day 2: Trends in citizen input to the work of parliament, Ms. María Luisa So...
Day 2: Trends in citizen input to the work of parliament,  Ms. María Luisa So...Day 2: Trends in citizen input to the work of parliament,  Ms. María Luisa So...
Day 2: Trends in citizen input to the work of parliament, Ms. María Luisa So...wepc2016
 
Juguetes por edades
Juguetes por edadesJuguetes por edades
Juguetes por edadesGregorio5
 
Tratamientos aptos para el paciente complejo
Tratamientos aptos para el paciente complejoTratamientos aptos para el paciente complejo
Tratamientos aptos para el paciente complejoVictor Montori
 

En vedette (20)

Correcção de cor em vídeo
Correcção de cor em vídeoCorrecção de cor em vídeo
Correcção de cor em vídeo
 
Automatisierte Bilderkennung
Automatisierte BilderkennungAutomatisierte Bilderkennung
Automatisierte Bilderkennung
 
презентация Dagrsol
презентация Dagrsolпрезентация Dagrsol
презентация Dagrsol
 
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...
Análisis numérico de impacto no lineal en sistemas multicomponentes, con ANSY...
 
Direccion financiera
Direccion financieraDireccion financiera
Direccion financiera
 
Guion alexa
Guion  alexaGuion  alexa
Guion alexa
 
Technical Info 15 wrestplank replacement
Technical Info  15  wrestplank replacementTechnical Info  15  wrestplank replacement
Technical Info 15 wrestplank replacement
 
Colorado Coach Connection September 20, 2011
Colorado Coach Connection September 20, 2011Colorado Coach Connection September 20, 2011
Colorado Coach Connection September 20, 2011
 
Masnuriyah
Masnuriyah Masnuriyah
Masnuriyah
 
Seabee eCourier Jan 7 2016
Seabee eCourier Jan 7 2016Seabee eCourier Jan 7 2016
Seabee eCourier Jan 7 2016
 
Sintesis informativa 18 de mayo 2016
Sintesis informativa 18 de mayo 2016Sintesis informativa 18 de mayo 2016
Sintesis informativa 18 de mayo 2016
 
ACHA. ADVANCED CHANGE AGENT
ACHA. ADVANCED CHANGE AGENTACHA. ADVANCED CHANGE AGENT
ACHA. ADVANCED CHANGE AGENT
 
2015 c3 online learning part 1 & 2
2015 c3 online learning part 1 & 22015 c3 online learning part 1 & 2
2015 c3 online learning part 1 & 2
 
Resume_All
Resume_AllResume_All
Resume_All
 
Sevilla misterios y leyendas - fotos antiguas semana santa
Sevilla misterios y leyendas - fotos antiguas semana santaSevilla misterios y leyendas - fotos antiguas semana santa
Sevilla misterios y leyendas - fotos antiguas semana santa
 
Introduction to Web Server Security
Introduction to Web Server SecurityIntroduction to Web Server Security
Introduction to Web Server Security
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Day 2: Trends in citizen input to the work of parliament, Ms. María Luisa So...
Day 2: Trends in citizen input to the work of parliament,  Ms. María Luisa So...Day 2: Trends in citizen input to the work of parliament,  Ms. María Luisa So...
Day 2: Trends in citizen input to the work of parliament, Ms. María Luisa So...
 
Juguetes por edades
Juguetes por edadesJuguetes por edades
Juguetes por edades
 
Tratamientos aptos para el paciente complejo
Tratamientos aptos para el paciente complejoTratamientos aptos para el paciente complejo
Tratamientos aptos para el paciente complejo
 

Similaire à Heynck detail information brochure

Who are SpiralWeld?
Who are SpiralWeld?Who are SpiralWeld?
Who are SpiralWeld?Lee Russell
 
Mining hydraulics information brochure
Mining hydraulics information brochureMining hydraulics information brochure
Mining hydraulics information brochureSanket Kanada
 
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Sue Jones
 
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.com
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.comStabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.com
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
DivBrochure_Compressors_Aug2016
DivBrochure_Compressors_Aug2016DivBrochure_Compressors_Aug2016
DivBrochure_Compressors_Aug2016Arthur Huizer
 
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Industry
 
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Service and Technologies for Process Industries
Service and Technologies for Process IndustriesService and Technologies for Process Industries
Service and Technologies for Process IndustriesJohn Crane
 
ZX Presentation. 20140110
ZX Presentation. 20140110ZX Presentation. 20140110
ZX Presentation. 20140110Jiang James
 
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.com
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.comIsoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.com
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.comĐỗ Bá Tùng
 
Removing metal fatigue for wind turnbine operators
Removing metal fatigue for wind turnbine operatorsRemoving metal fatigue for wind turnbine operators
Removing metal fatigue for wind turnbine operatorsDermott Reilly
 

Similaire à Heynck detail information brochure (20)

BORSIG_ValveTech__E_.pdf
BORSIG_ValveTech__E_.pdfBORSIG_ValveTech__E_.pdf
BORSIG_ValveTech__E_.pdf
 
Who are SpiralWeld?
Who are SpiralWeld?Who are SpiralWeld?
Who are SpiralWeld?
 
Mining hydraulics information brochure
Mining hydraulics information brochureMining hydraulics information brochure
Mining hydraulics information brochure
 
Motion Compensation Brochure
Motion Compensation BrochureMotion Compensation Brochure
Motion Compensation Brochure
 
Sealing compounds from Project Sales Corp
Sealing compounds from Project Sales CorpSealing compounds from Project Sales Corp
Sealing compounds from Project Sales Corp
 
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberquiet bqh-72-102 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08
 
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.com
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.comStabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.com
Stabutherm gh-461 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubersynth h2-c-2-260 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
DivBrochure_Compressors_Aug2016
DivBrochure_Compressors_Aug2016DivBrochure_Compressors_Aug2016
DivBrochure_Compressors_Aug2016
 
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberpaste hel-46-450 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Gas Purging
Gas PurgingGas Purging
Gas Purging
 
Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001Berr Process Equipment - 2018-001
Berr Process Equipment - 2018-001
 
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.comKluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-1501 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
PSC Sealing Compounds
PSC Sealing CompoundsPSC Sealing Compounds
PSC Sealing Compounds
 
Service and Technologies for Process Industries
Service and Technologies for Process IndustriesService and Technologies for Process Industries
Service and Technologies for Process Industries
 
ZX Presentation. 20140110
ZX Presentation. 20140110ZX Presentation. 20140110
ZX Presentation. 20140110
 
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.comKlubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.com
Klubertop tp-15-810 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.com
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.comIsoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.com
Isoflex nbu-15 Mr Tùng - 0987 988 407 | www.khodaumo.com
 
Removing metal fatigue for wind turnbine operators
Removing metal fatigue for wind turnbine operatorsRemoving metal fatigue for wind turnbine operators
Removing metal fatigue for wind turnbine operators
 

Dernier

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Dernier (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Heynck detail information brochure

  • 1. We reinforce mining Instandsetzungsservice Bergbau Hydraulik Informationsbroschüre HeyTec 1000 ® DURACHROM ® HeyTec 1000 ® DURACHROM ® Service for renewal and corrective maintenance of Mining Hydraulics Information Brochure
  • 2. We reinforce mining HeyTec 1000® / DURACHROM® Soaring prices and long delivery times of the materials necessary in tubes production have made it our business to work out a solution to this situation. With our patented procedures: HeyTec 1000® und Durachrom® we are now able to refurbish your high-quality rams and cylinders classified as not repairable into almost like new condition, offering even better quality than newly manufactured parts. The procedures offered to our customers constitute a major reorientation in a cost-saving planning of hydraulic plungers and cylinders.
  • 3. We reinforce mining HeyTec 1000® is a machining-procedure, developed and patented by us, where high quality, worn out parts, such as ram stages, are completely refurbished in a cost-saving fashion. With this machining the refurbished parts will have a better corrosion protection and better gliding attributes than their brand new counterparts.
  • 4. We reinforce mining -Processes of corrective maintenance for parts of rams - During this process the defective parts of rams will be lathed inside and outside and subsequently welded on with aluminium bronze. After the machining the refurbished parts retain their original dimensions while, at the same time, feature a wear resistant and ductile surface. Such surfaces are completely corrosion-resistant and offer major advantages due to their layer thickness, even in comparison with the thin electroplated coating. During the process of surface mounting the parts are not modified. By means of cooling of the tube wall the temperature of the materials never exceeds 200 C and with this procedure there are no changes in the structure or the stability of the material. The section modulus of the tube is identical with the original values and the original elastic limit is preserved. In our security calculations the welded on material does not belong to the tube material, and for that reason our calculations are based on the values before the corrective maintenance of the lathed tubes. Only if the values of these calculations fully coincide with the original values, the corrective maintenance may be carried out.
  • 5. We reinforce mining -Auditing procedures for HeyTec 1000 - For the protection of our comprehensive warranty-obligation we have checked extensively on our test stand the inside and outside coated component parts. Identical samples of our coated tubes and uncoated ones were analyzed and checked by the company GLP – Germanischer Lloyd Prüflabor GmbH under the check number 4 10 662 HE. The elastic limit and expansion of the coated tubes were identical with the values of the uncoated tubes. The coating process doesn’t change the materials and stability. The bending-checks according to EN ISO 7438 with an angle of 180 C were carried out and defects of the coated surfaces were recorded.
  • 6. We reinforce mining Coating on the inside after quality checking Coating surfaces of a ram Coating on the inside after quality checked rams with 30.000 load alternations Bending tests of the outer layer According to EN ISO 7038 with 180° before e.g. middle stage after OuterContactsurface/Outer-/InnerContactsurface/InnerContactsurface Bronze restoration Re-welding of bronze for rams and cylinders HeyTec 1000 As corrosion protection and wear-resistant coating Qualified for production and all maintenance before e.g. external stage after Coating surfaces of a Telescopic ram
  • 7. We reinforce mining DURACHROM ® A more preferable alternative is the machining process “DURACHROM”. This machining process can only be used for outside coating. Refurbished 3 TS ram outside surface, DURACHROM inside surface HeyTec 1000
  • 8. We reinforce mining The DOZUT - TAGOR PLC has been rendering services in the field of DURACHROM protective coats applied to external working surfaces of hydraulic cylinders (rams) for several years. •How many DURACHROM - Z coats have been made? Within 5 years (2000 - 2005) 20 thousand hydraulic cylinders (rams) were coated. As there were two-stage legs among those cylinders the number of coats made amounted in total to 25 thousand. •Where has the DURACHROM - Z coat been utilised? The DURACHROM coat has successfully been applied in coal mines where very arduous conditions of operation exist. The DURACHROM coat also finds its application in copper-ore mines and agricultural machines. •What parameters characterize DURACHROM- Z coat? In view of the fact that DURACHROM coats have been developed relatively not long ago, the DOZUT - TAGOR PLC in their work aimed at perfectioning the production technology and the improvement of the coat itself. There are some parameters which provide adequate characteristic of the DURACHROM coats. These are: - Mechanical strength Rm = 750 MPa - Hardness 230 ... 250 HB Thickness of protective layer g = 0. 75 - 1. 2 mm •How much does the DURACHROM - Z coat cost? In spite of high labour-intensity of the manufacturing process the cost of the DURACHROM coat is comparable to or even lower than the cost of overhaul carried out with the use of electroplated coats. •Is the DURACHROM - Z coat “approved for use”? The DURACHROM coats have been subjected to repeated tests in accredited Laboratories for Certification. The DURACHROM coat has gained a certificate of approval for application in highly saline medium and in sea water. -The rams will be subjected to prototype tests and certified by DIN PN-EN 1804-2:2004
  • 9. We reinforce mining Coating surfaces of a Telescopic ram OutercontactsurfaceOutercontactsurface DURACHROM ® High-grade steel covering for rams and cylinders As corrosion protection and wear-resistant coating Layer thickness 1000µm Tensile strength Rm 800 N/mm2 Elongation at break A5 15 % Brinell-hardness HB 10/1000 250 Suitable for new products and all maintenance Coating surfaces of a Telescopic ram before e.g. middle stage after
  • 10. We reinforce mining The technological cutout for the lining of the mines DURACHROM ® New DURACHROM linings are used world-wide e.g. the mining-fair in Katowice in the year 2005. The managing director Henryk Malyska (on the right), Kamex Z.o.o. presents his rams in the lining of Tagor.
  • 11. We reinforce mining The safest way Complete corrective maintenance Over the last years we have greatly influenced the market for corrective maintenance. You can gain the most financially once you endow us with your defective cylinders for complete corrective maintenance. They must equal at least €3000,00 as per new product. The refurbished rams and cylinders comply with and exceed the requirements of newly manufactured products. You will save more than 40% of the price for new products and you will obviously get an estimate of the costs for the corrective maintenance for each cylinder after we have checked the degree of wear and tear of the delivered products. Then you have to decide: Corrective maintenance yes or no! We offer a test order as a way to convince you!
  • 12. We reinforce mining B. Heynck GmbH Ruenhorst 31 46395 Bocholt (Germany) Telefon: +49 (0) 2871 - 72 46 Fax: +49 (0) 2871 - 184 222 www.heynck-hydraulics.com E-Mail:info@heynck-hydraulics.comGerd Peters marketing & sales Bernhard Heynck production Our clients give feedback… Reference letter to the product „hey Tec 1000 „ In the Year 2004 the rams in our coal mines failed after a short operating time due to corrosion. We searched for a solution to this problem and found one presented by the company Heynck. The company Heynck offered the coating in bronze inside the rams. First units have been refurbished in this manner. After that we tested the refurbished units in the coal mine. The result of this solution was more than satisfactory. The rams regained their original operating time and didn’t have to scrapped prematurely. The bronze welding solution Hey Tec 1000 offered by Heynck saved our Company a lot of rams’ failures as well as high maintenance costs. Yours sincerely, DSK Antrahzit Ibbenbüren GmbH