For use in assistance in estimating
times and costs. NOTE: Does not take into
account, standy time, minimum billing hours or
Project: delays for weather, traffic or other variable factors.
Description:
Prepared by: Date:
bright YELLOW & GREEN boxes
Road Grading 16G Grader
Machine loading trucks Type Capacity Hourly rate 125.00$
Loader type EX 270 1.0 Cubic yards Km of road graded per DAY 5
Loader hourly rate 160.00$ 0.8 Cubic meters Km of road graded per HOUR 0.6
Truck Type Capacity Road Compactor Bomag
Truck type Gravel (off road) 15.0 Cubic yards Hourly rate 125.00$
Truck Rate 125.00$ 11.5 Cubic meters Km of road compacted per DAY 2
Spreading Equipment Type Loading and standby Km of road compacted per HOUR 0.3
Machine type 5 ton excavator with blade Water truck L800 ford
Rate 85.00$ Hourly rate 90.00$
Km of road watered per DAY 4
Km of road watered per HOUR 0.5
Number of passes watering 2 0.3 km/hr
Materials Road width (m) Material depth (mm) Road length (m) Road length (km)
Volume Calculation 6.0 150 660 0.66 Volume
5.9 inches Weight (approx) Cubic Meters 594.0
11.5 lineal meters 1056.7 Tons Cubic Yards 777.0
37.6 lineal feet # of truckloads 58.0
Machine loading trucks - Time calculator
Truck capacity 15.0 Cu Yards Bucket Capacity (yards) 1.0
Truck capacity 11.5 Cu Meters Bucket Capacity (meters) 0.8
% of full capacity 90% Seconds per bucket cycle 20
Actual truck load 10.3 Cu Meters Minutes per bucket cycle 0.33
Distance from gravel pit to site 9 Km (one way) Loading cycles per minute 3.0
Job work area distance (1/2) 0.33 Km (one way) Buckets required per truckload 13.5
Trucking distance TOTAL: 9.33 Km (one way) 14.0
Trucking distance TOTAL: 18.7 Km (round trip) Turnaround minutes to load truck 5.7
Truck Travel Speed (mph21.0) 35 Km/hr (average) Minutes to load truck (rounded up) 6.0
Truck travel time 32.0 Minutes Optimum number of Trucks 6.3
Loading time/truck 6.0 Minutes (rounded up) Rounded down number of trucks 6.0
Dumping time/truck 5 Minutes(includes turn-aroun 5.0
Position trucks for loading 1.0 Minutes
Truck cycle time 44.0 Minutes
Trucking Time (HRS) Gravel (off road) Loading trucks Time (HRS) EX 270
Calculated values 43.0 5,375.00$ Calculated values 9.0 1,440.00$
User entered values 50.0 6,250.00$ User entered values 10.0 1,600.00$
5 ton excavator Road Watering (during project) L800 ford
Calculated values 9.0 765.00$ Calculated values 2.6 237.60$
User entered values 10.0 850.00$ User entered values 8.0 720.00$
Road Compaction (prior to job start) Bomag 16G Grader
Calculated values 2.6 330.00$ Calculated values 1.1 132.00$
User entered values 4.0 500.00$ User entered values 4.0 500.00$
Road Compaction (during project) Bomag Road Grading (final grading) 16G Grader
Calculated values 2.6 330.00$ Calculated values 1.1 132.00$
User entered values 8.0 1,000.00$ User entered values 4.0 500.00$
Road Watering (prior to job start) L800 ford S U M M A R Y of Equipment COSTS
Calculated values 1.3 118.80$ Calculated Equipment Value: 8,860.40$
User entered values 2.0 180.00$ User entered Equipment value: 12,280.00$
Additional Costs Mobilization: 500.00$ Demobilization: 500.00$ 1,000.00$
Surfacing Materials: $ 6.50 per Yard $ 8.50 per cu Meter $ 4.75 per TON Price at the pit 5,050.19$
Version: 11.0 Type: 4" minus jaw crush Total Cost: 18,330.19$
Instructions: The user enters specific project data into the
Equipment Data Entry
Spreading equipment - time tied to loading time
NOTE: In the calculations below, Loading Trucks time is based on USER entered number of trucks
Road Re-surfacing Equipment Calculator
13-Mar-10
Trucking - Time calculator
Eric L Kay, KAY ASSOCIATES
Material depth (inches)
Distance covered with one truckload
Distance covered with one truckload
Kyuquot West Coast Main
3+750 to 3+800 road settling repair
Double-check all calculations, use at own risk, no warranty expressed or implied
Rounded UP buckets/truckload
Truck times - assume that there are adequate passing places for the trucks on the road and no travel delays. Eg traffic, other work equipment etc.
Road Grading (prior to job start)
**User entered number of trucks
Trucking Calculator Work-sheet V11.xls

Contenu connexe

Tendances (6)

Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
 
Hinh ảnh công ty Acorp
Hinh ảnh công ty AcorpHinh ảnh công ty Acorp
Hinh ảnh công ty Acorp
 
Earthworks of Parking Area Development Project
Earthworks of Parking Area Development ProjectEarthworks of Parking Area Development Project
Earthworks of Parking Area Development Project
 
Ppt 3
Ppt 3Ppt 3
Ppt 3
 
Material Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,PeshawarMaterial Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,Peshawar
 
Ultratech Cement Presentation on Constraints
Ultratech Cement Presentation on ConstraintsUltratech Cement Presentation on Constraints
Ultratech Cement Presentation on Constraints
 

En vedette

Tariff checkmate_Presentation
Tariff checkmate_PresentationTariff checkmate_Presentation
Tariff checkmate_Presentation
arunav ghosh
 

En vedette (12)

HEDW Regional Conference NYC - Net Price Cost Calculator
HEDW Regional Conference NYC - Net Price Cost CalculatorHEDW Regional Conference NYC - Net Price Cost Calculator
HEDW Regional Conference NYC - Net Price Cost Calculator
 
Tradeshow Program ROI Calculator
Tradeshow Program ROI CalculatorTradeshow Program ROI Calculator
Tradeshow Program ROI Calculator
 
Tariff checkmate_Presentation
Tariff checkmate_PresentationTariff checkmate_Presentation
Tariff checkmate_Presentation
 
Triple Bottom Line Calculator
Triple Bottom Line CalculatorTriple Bottom Line Calculator
Triple Bottom Line Calculator
 
Insourcing v Outsourcing - the jury is still out!
Insourcing v Outsourcing - the jury is still out!Insourcing v Outsourcing - the jury is still out!
Insourcing v Outsourcing - the jury is still out!
 
Logistics system solutions
Logistics system solutionsLogistics system solutions
Logistics system solutions
 
ROAD – on-time delivery and online control over freight transportation
ROAD – on-time delivery and online control over freight transportationROAD – on-time delivery and online control over freight transportation
ROAD – on-time delivery and online control over freight transportation
 
2016 #3PLStudy: The State of Logistics Outsourcing
2016 #3PLStudy: The State of Logistics Outsourcing2016 #3PLStudy: The State of Logistics Outsourcing
2016 #3PLStudy: The State of Logistics Outsourcing
 
Jack Roberts "The Future of Trucking in America"
Jack Roberts "The Future of Trucking in America"Jack Roberts "The Future of Trucking in America"
Jack Roberts "The Future of Trucking in America"
 
CSCMP 2014: Dr. Robert C. Lieb 2014 3PL Provider CEO Perspective
CSCMP 2014: Dr. Robert C. Lieb 2014 3PL Provider CEO PerspectiveCSCMP 2014: Dr. Robert C. Lieb 2014 3PL Provider CEO Perspective
CSCMP 2014: Dr. Robert C. Lieb 2014 3PL Provider CEO Perspective
 
The Trucking Industry
The Trucking IndustryThe Trucking Industry
The Trucking Industry
 
A journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategyA journey from a bad kpi to an excellent strategy
A journey from a bad kpi to an excellent strategy
 

Similaire à Trucking calculator work sheet v11

Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
HafidzQadli1
 
Modern_Equipment_Calculations.pdf
Modern_Equipment_Calculations.pdfModern_Equipment_Calculations.pdf
Modern_Equipment_Calculations.pdf
FeteneBefekadu
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
Sagnik Datta
 
Real-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
Real-World Activity and Fuel Use of Diesel and CNG Refuse TrucksReal-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
Real-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
Gurdas Sandhu
 
Innovative transport
Innovative  transportInnovative  transport
Innovative transport
google
 
Royalty for transport, p p on profit
Royalty for  transport, p p on  profitRoyalty for  transport, p p on  profit
Royalty for transport, p p on profit
google
 
typical construction equipment
typical construction equipmenttypical construction equipment
typical construction equipment
Che Quit'z
 
Transport systems catapult
Transport systems catapultTransport systems catapult
Transport systems catapult
google
 
A t ton kmpl1
A t ton kmpl1A t ton kmpl1
A t ton kmpl1
google
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
Sanjay Patnaik
 

Similaire à Trucking calculator work sheet v11 (20)

Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
 
AWMA PHA 3
AWMA PHA 3AWMA PHA 3
AWMA PHA 3
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
National perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD toolNational perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD tool
 
Modern_Equipment_Calculations.pdf
Modern_Equipment_Calculations.pdfModern_Equipment_Calculations.pdf
Modern_Equipment_Calculations.pdf
 
Master Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology CourseMaster Student Presentation in Construction Technology Course
Master Student Presentation in Construction Technology Course
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
 
Measuring Life Cycle Impact of Transformers in Practice by Ghazi Kablouti.pdf
Measuring Life Cycle Impact of Transformers in Practice by Ghazi Kablouti.pdfMeasuring Life Cycle Impact of Transformers in Practice by Ghazi Kablouti.pdf
Measuring Life Cycle Impact of Transformers in Practice by Ghazi Kablouti.pdf
 
Real-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
Real-World Activity and Fuel Use of Diesel and CNG Refuse TrucksReal-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
Real-World Activity and Fuel Use of Diesel and CNG Refuse Trucks
 
Innovative transport
Innovative  transportInnovative  transport
Innovative transport
 
India 2010 Vehicle Present Scenario
India 2010 Vehicle Present ScenarioIndia 2010 Vehicle Present Scenario
India 2010 Vehicle Present Scenario
 
Construction equipment management chapter 3
Construction equipment management chapter 3Construction equipment management chapter 3
Construction equipment management chapter 3
 
Royalty for transport, p p on profit
Royalty for  transport, p p on  profitRoyalty for  transport, p p on  profit
Royalty for transport, p p on profit
 
TASK 1 ITS
TASK 1 ITSTASK 1 ITS
TASK 1 ITS
 
typical construction equipment
typical construction equipmenttypical construction equipment
typical construction equipment
 
Armoured Ford construction calculator v15
Armoured Ford construction calculator v15Armoured Ford construction calculator v15
Armoured Ford construction calculator v15
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
Transport systems catapult
Transport systems catapultTransport systems catapult
Transport systems catapult
 
A t ton kmpl1
A t ton kmpl1A t ton kmpl1
A t ton kmpl1
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 

Plus de Eric Lestock Kay

Safe Equipment Operation V17
Safe Equipment Operation V17Safe Equipment Operation V17
Safe Equipment Operation V17
Eric Lestock Kay
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream Crossing
Eric Lestock Kay
 

Plus de Eric Lestock Kay (8)

Safe Equipment Operation V17
Safe Equipment Operation V17Safe Equipment Operation V17
Safe Equipment Operation V17
 
Forest road water quality management issues and solutions
Forest road water quality management   issues and solutionsForest road water quality management   issues and solutions
Forest road water quality management issues and solutions
 
Inspection and investigation ver 27a
Inspection and investigation   ver 27aInspection and investigation   ver 27a
Inspection and investigation ver 27a
 
Spider excavator contour drainage v11
Spider excavator   contour drainage v11Spider excavator   contour drainage v11
Spider excavator contour drainage v11
 
Forklift training - refresher course
Forklift training - refresher courseForklift training - refresher course
Forklift training - refresher course
 
Culvert inspection and investigation
Culvert inspection and investigationCulvert inspection and investigation
Culvert inspection and investigation
 
Green solutions for culvert headwalls
Green solutions for culvert headwallsGreen solutions for culvert headwalls
Green solutions for culvert headwalls
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream Crossing
 

Dernier

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Dernier (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Trucking calculator work sheet v11

  • 1. For use in assistance in estimating times and costs. NOTE: Does not take into account, standy time, minimum billing hours or Project: delays for weather, traffic or other variable factors. Description: Prepared by: Date: bright YELLOW & GREEN boxes Road Grading 16G Grader Machine loading trucks Type Capacity Hourly rate 125.00$ Loader type EX 270 1.0 Cubic yards Km of road graded per DAY 5 Loader hourly rate 160.00$ 0.8 Cubic meters Km of road graded per HOUR 0.6 Truck Type Capacity Road Compactor Bomag Truck type Gravel (off road) 15.0 Cubic yards Hourly rate 125.00$ Truck Rate 125.00$ 11.5 Cubic meters Km of road compacted per DAY 2 Spreading Equipment Type Loading and standby Km of road compacted per HOUR 0.3 Machine type 5 ton excavator with blade Water truck L800 ford Rate 85.00$ Hourly rate 90.00$ Km of road watered per DAY 4 Km of road watered per HOUR 0.5 Number of passes watering 2 0.3 km/hr Materials Road width (m) Material depth (mm) Road length (m) Road length (km) Volume Calculation 6.0 150 660 0.66 Volume 5.9 inches Weight (approx) Cubic Meters 594.0 11.5 lineal meters 1056.7 Tons Cubic Yards 777.0 37.6 lineal feet # of truckloads 58.0 Machine loading trucks - Time calculator Truck capacity 15.0 Cu Yards Bucket Capacity (yards) 1.0 Truck capacity 11.5 Cu Meters Bucket Capacity (meters) 0.8 % of full capacity 90% Seconds per bucket cycle 20 Actual truck load 10.3 Cu Meters Minutes per bucket cycle 0.33 Distance from gravel pit to site 9 Km (one way) Loading cycles per minute 3.0 Job work area distance (1/2) 0.33 Km (one way) Buckets required per truckload 13.5 Trucking distance TOTAL: 9.33 Km (one way) 14.0 Trucking distance TOTAL: 18.7 Km (round trip) Turnaround minutes to load truck 5.7 Truck Travel Speed (mph21.0) 35 Km/hr (average) Minutes to load truck (rounded up) 6.0 Truck travel time 32.0 Minutes Optimum number of Trucks 6.3 Loading time/truck 6.0 Minutes (rounded up) Rounded down number of trucks 6.0 Dumping time/truck 5 Minutes(includes turn-aroun 5.0 Position trucks for loading 1.0 Minutes Truck cycle time 44.0 Minutes Trucking Time (HRS) Gravel (off road) Loading trucks Time (HRS) EX 270 Calculated values 43.0 5,375.00$ Calculated values 9.0 1,440.00$ User entered values 50.0 6,250.00$ User entered values 10.0 1,600.00$ 5 ton excavator Road Watering (during project) L800 ford Calculated values 9.0 765.00$ Calculated values 2.6 237.60$ User entered values 10.0 850.00$ User entered values 8.0 720.00$ Road Compaction (prior to job start) Bomag 16G Grader Calculated values 2.6 330.00$ Calculated values 1.1 132.00$ User entered values 4.0 500.00$ User entered values 4.0 500.00$ Road Compaction (during project) Bomag Road Grading (final grading) 16G Grader Calculated values 2.6 330.00$ Calculated values 1.1 132.00$ User entered values 8.0 1,000.00$ User entered values 4.0 500.00$ Road Watering (prior to job start) L800 ford S U M M A R Y of Equipment COSTS Calculated values 1.3 118.80$ Calculated Equipment Value: 8,860.40$ User entered values 2.0 180.00$ User entered Equipment value: 12,280.00$ Additional Costs Mobilization: 500.00$ Demobilization: 500.00$ 1,000.00$ Surfacing Materials: $ 6.50 per Yard $ 8.50 per cu Meter $ 4.75 per TON Price at the pit 5,050.19$ Version: 11.0 Type: 4" minus jaw crush Total Cost: 18,330.19$ Instructions: The user enters specific project data into the Equipment Data Entry Spreading equipment - time tied to loading time NOTE: In the calculations below, Loading Trucks time is based on USER entered number of trucks Road Re-surfacing Equipment Calculator 13-Mar-10 Trucking - Time calculator Eric L Kay, KAY ASSOCIATES Material depth (inches) Distance covered with one truckload Distance covered with one truckload Kyuquot West Coast Main 3+750 to 3+800 road settling repair Double-check all calculations, use at own risk, no warranty expressed or implied Rounded UP buckets/truckload Truck times - assume that there are adequate passing places for the trucks on the road and no travel delays. Eg traffic, other work equipment etc. Road Grading (prior to job start) **User entered number of trucks Trucking Calculator Work-sheet V11.xls