1. Eric M. Weiner
7 New England Dr. Rochester, NY 14618 (585) 733-4435 eric.weiner2@gmail.com
Education Binghamton University, State University of New York
Masters of Science, Systems Science & Industrial Engineering
Binghamton University, State University of New York
Bachelorof Science, Industrial & Systems Engineering
Anticipated Dec 2015
Awarded May 2013
Lean Six Sigma - Green Belt Certification Awarded January 2012
Work Experience SUNY Research Foundation January – May 2014
Analog Devices Inc., General Trias, Philippines – Research Associate
Fostered international relationship with partner company
Opportunity to do research overseas in global marketplace
o Analyzed process performance to find root causes ofyield instability during NPI
o Created process monitoring tool using control charts
o Designed interface to improve traceability and visibility of process performance
o Improved existing reporting methods by updating data extraction method
SUNY Binghamton University September 2014 – December 2014
Teaching Assistant, Optimization & Operations Research II
Taught optimization techniques relating to queuing systems,inventory modeling, and others
Skills MS: Word, Excel, PowerPoint, Project, Visio
Minitab
Solid Edge
AutoCAD
Simio Simulation Software
Pro/E Wildfire
Python
MATLAB
LabVIEW
Arena Simulation Software
Technical Projects Senior Design, Capstone Project
Quantum Chip Manufacturing– Team Leader
Lead team of 18 engineering students
Forecasted seasonaldemand data based on Winters’ method
Designed and optimized flow shop with multiple processors using Arena Simulation Software
Created a MasterProduction Schedule to minimize costs and uncertainty
Implemented Scan-Based Trading and Vendor Managed Inventory
Modeling & Simulation
Queuing System
o Performed on-site time study of local bar/restaurant
o Created simulation using Arena simulation software
o Made recommendations based on cost analysis
Pizza Parlor - Production & Delivery System
o Developed simulation of pizza restaurant using Simio
o Forecasted demand for cost planning & staffing needs
Boeing Global Supply Chain Research
Analyzed supply chain strategy,competitive strategy and strategic fit
Assessed responsiveness and effectiveness ofsupply chain network design to drivers
F-22 “Raptor” Design Analysis
Investigated sources ofproject risk and their effects on the product through root cause analysis
Autopilot Fuzzy Control System
Programmed autopilot systemusing Fuzzy Logic & Fuzzy Set Theory
Enterprise Systems Case Studies
Haynor Construction
o Optimized construction process using CPM, Cost Analysis & Sensitivity Analysis
Brodart Furniture Co.
o Introduced principles of Lean, JIT and one-piece flow to optimize production system
Display SolutionsInc.
o Created MasterProduction Schedule to decrease supplier uncertainty and maintain stock
o Performed capacity planning and created a PBOM to meet forecasted demand