1. Erick Renaldi Rezal
E: erickrenaldi.rezal@gmail.com M: +65 91337245
https://www.linkedin.com/in/erick-renaldi-rezal-879252b4
Mechanical Engineer
To provide time and cost effective solutions without compromising safety and quality of work.
Professional Experience
Jurong Aromatics Corporation 23 Tembusu Road, Jurong Island | Feb 2016 - Present
Jurong Aromatics (JAC) is one of the largest aromatics facilities in Singapore. It is located on a 58-hectare site in Jurong Island Singapore.
With, investment value of US2.4Billion, JAC will be one of the largest integrated aromatics plants in the world
Maintenance Engineer (Static & Inspection)
1) Engineering & Maintenance
a. Repair and replace steam tracing lines
b. Repair and replace choked sprinklers for all 49 tanks (Internal Floating
Roof/Spherical/Intermediate)
c. Replace damage insulation on heaters due to water ingress cause by poor cladding
d. Maintenance of portable water tank (repair/cleaning)
e. Pump failure during operations, fabricated pipe re-route from 120-P3 to 100-P16 (Install
temporary piping to ensure continuous pumping of caustic)
f. Installation of furmanite clamps to arrest leaking flange
g. Installation of C-Channel and I-Beams to strengthen base of vibrating pipes
h. Jetty loading arm vacuum breaker swap
2) Inspection
a. UTG inspection of interconnecting pipeline (Jetty to JAC) for SCDF license renewal –
calculate remaining life for individual pipes (ASME B31.3/API 570)
b. External inspection on piping/surrounding structures (after 800-TK1B tank fire)
c. Inspection of hydrotest on new pipeline, lifting equipment/lifting machines with MOM
registered AE/PE
2. d. Inspected all 17 OSBL tanks converted to free-venting and obtain measurements for
submission to Vocano and supply group to prove all 17 tanks are deemed free venting
e. Inspected N2 Blanketed internal floating roof tanks with HMT Tape installed except for
Benzene tanks and provide feedback for repair work (Aluminum strap was installed to
secure HMT Tape)
f. Inspection of water tank with PUB registered license plumber to obtain yearly license for
plant wide use
g. UTG Inspection of the 24” and 36” pipes from JAC to JRC corridor with SembCorp
3) Chemical/Catalyst/Clay – Loading/Unloading
a. 431-V3A/B – Clay Treater
b. 300-V8A – Alumina Change-Out
c. 322-R2 – Catalyst Loading
d. R650 Chemical Injection
e. De-hazer EC5459A Chemical Injection
f. DHDT Chemical Injection
g. Merox WS Chemical injection
4) Projects/MOC
a. 800-TK1B Tank Demolition
b. Excavation to extract 8 Leaking U/G PIV’s for repair
c. Assist to co-ordinate and supervise all U/G HDPE firewater pipe repair
d. PVRV weight change out (Pressure Side) - MOC
e. Cursory steam blowing - MOC
5) Documentation & Mics
a. To provide static team with overall activities (daily updates) for critical jobs
b. Represent static team for daily morning meeting
c. Draft a supporting letter to MOM for EVT approval
d. To provide JAC with supporting documents to Vocano to obtain approval for 17 OSBL
tanks to be deemed free-venting for supply group
e. Update documents & drawings for discrepancies in line number for inter-connecting
pipeline
f. Updated master list of lifting equipment in JAC
g. Review of quotation and provide comparison for its terms and conditions
h. Provide report/supporting documents for every maintenance work done in JAC
i. Verify material purchased by JAC (Heat Number etc.)
3. Jurong Aromatics Corporation 23 Tembusu Road, Jurong Island | Aug 2015 – Feb 2016
Jurong Aromatics (JAC) is one of the largest aromatics facilities in Singapore. It is located on a 58-hectare site in Jurong Island Singapore.
With, investment value of US2.4Billion, JAC will be one of the largest integrated aromatics plants in the world
Assistant Mechanical Engineer (Intern)
1) Engineering & Maintenance
a. Interpreted P&ID Drawings, General Assembly Drawings for Heat Exchangers/Coolers,
Pressure Safety Valve, ASME P Material Number and TEMA Codes
b. Conduct time of tools for better understanding and improvement of efficiency of work
c. Calculate and tabulate excavation depth for haunching on U/G HDPE firewater pipes
2) Inspection
a. Inspect cooling water exchangers (shell tubes exchangers) prior and subsequent high
pressure water jet cleaning
b. Inspect/witness service test of cooling water exchangers before handing over to
operations
c. Inspect pipeline hydro-test for jetty installation (MOC works) with accordance to B31.3
3) Documentation & Mics
a. Tabulate quotation of SI Equipment for relief valve (Steam and Air Receiver) and heat
exchangers for quotation
Education
Bachelor (Honors) in Mechanical Engineering
University of Adelaide South Australia, Australia 2015
Diploma (Energy Systems) in Mechanical Engineering
Singapore Polytechnic Dover Road, Singapore 2011
4. Certifications & Skills
Technical Certificate
Gas Metal Arc Welding (Metal Inert Gas) – Basic
Shielded Metal Arc Welding (Metal Manual Arc Welding) – Basic
Motorcycle Maintenance (Basic)
Magnetic Particle Inspection Level II (SNT – TC – 1A)
Perform Ultrasonic Testing Level I
Dye Penetrant Level II
Visual Welding Inspection Level II
Implement Fundamentals of Corrosion and Corrosion Prevention
Work Safety and Health Certificate
Supervise Workplace Safety and Health in Process Plant (SWSHPP/OPSIC)
Supervise Work at Heights (WAHS)
Assess Confined Space for Safe Entry and Work/ Confined Space Assessor Course (ACSSEW)
Riggers & Signalmen Course
Building Construction Safety Supervisor Course (BCSS)
Supervise Work In Confined Space Operations
Language Certificate
Chinese Workplace Literacy (Foundation)
Computer Skills
AutoCAD || Autodesk Inventor || Pro – Engineer WildFire (Creo) || Microsoft Project (Gantt Chart) || Microsoft Products ||
|| ANSYS || Emails ||