SlideShare une entreprise Scribd logo
1  sur  73
Télécharger pour lire hors ligne
PMO Education– 

PMBOK Overview

Tuesday, August 20th

9:00 a.m. – 1:00 p.m.

Training Room
The purpose of this course is to ensure that the
entire Project Management Office (PMO) has the
tools for utilizing the Project Management Body of
Knowledge (PMBOK) principles - specifically around
the Process Groups and Knowledge Areas - to build
up the team's project management capabilities.

2
Course Agenda
3
Course Introduction
Module 1: Knowledge Areas
Module 2: Process Groups
Module 3: Interpersonal Skills
Course Wrap-Up
Course Agenda
4
Course Introduction
Module 1: Knowledge Areas
Module 2: Process Groups
Module 3: Interpersonal Skills
Course Wrap-Up
Introduction
What are the Course Objectives?

What is Project Management?

Why PMI’s Project Management
Body of Knowledge?
5
Course Objectives
By the end of this course, you will be
able to 

Understand how to find the PMBOK
Process Groups and Knowledge Areas

Navigate the PMBOK as a resource to
apply PMBOK principles to Project
Management at Company

Identify the soft skills associated with
delivery according to PMBOK
6
Pay attention... there
will be pop quizzes!
7
Rules of Engagement
8
What is Project
Management?
Project management is the application of
knowledge, skills, tools, and techniques to project
activities to meet the project requirements.
9
Project Management
Maturity Model
10
Ad-hoc

Level 1
Planned

Level 2
Managed

Level 3
Integrated

Level 4
Optimized

Level 5
SOURCE: Capability Maturity Model
Integration (CMMI)
Why the Project Management
Body of Knowledge?
First Edition 1995

Detailed methodology,
process, and tools

Repeatable, adaptable
11
How is the Project Management
Body of Knowledge organized?
Initiating
Process Group
Planning
Process Group
Executing
Process Group
Monitoring
and
Controlling
Closing
Process Group
4. Project Integration Management
5. Project Scope Management
6. Project Time Management
7. Project Cost Management
8. Project Quality Management
9. Project Human Resource Management
10. Project Communication Management
12. Project Procurement Management
11. Project Risk Management
13. Stakeholder Management
Knowledge AreasProcess
Groups
12
Initiating
Process Group
Planning
Process Group
Executing
Process Group
Monitoring
and
Controlling
Closing
Process Group
4.1 Develop
Project Charter
4. Project
Integration
Management
4.2 Develop
Project
Management Plan
4.3 Direct and
Manage Project
Work
4.4 Monitor and
Control Project Work

4.5 Perform
Integrated Change
Control
4.6 Close Project
or Phase
5. Project Scope
Management
5.1 Plan Scope Management

5.2 Collect Requirements

5.3 Define Scope

5.4 Create WBS
6. Project Time
Management
6.1 Plan Schedule Management

6.2 Define Activities

6.3 Sequence Activities

6.4 Estimate Activity Resources

6.5 Estimate Activity Durations

6.6 Develop Schedule
7. Project Cost
Management
7.1 Plan Cost Management

7.2 Estimate Costs

7.3 Determine Budget
5.5 Validate Scope

5.6 Control Scope
6.7 Control Schedule
7.4 Control Costs
8. Project Quality
Management
8.1 Plan Quality
Management
9. Project Human
Resource Management
9.1 Plan HR
Management
Process
Groups
Knowledge
Areas
13
8.2 Perform Quality
Assurance 8.3 Control Quality
9.2 Acquire Project Team

9.3 Develop Project Team

9.4 Manage Project Team
p. 61
Initiating
Process Group
Planning
Process Group
Executing
Process Group
Monitoring
and
Controlling
Closing
Process Group
10. Project
Communication
Management
10.1 Plan
Communications
Management
10.2 Manage
Communications
10.3 Control
Communications
12. Project
Procurement
Management
12.1 Plan Procurement
Management
11. Project Risk
Management
11.1 Plan Risk
Management

11.2 Identify Risks

11.3 Perform
Qualitative Risk
Analysis

11.4 Perform
Quantitative Risk
Analysis

11.5 Plan Risk
Responses
13. Stakeholder
Management
13.2 Plan Stakeholder
Management
12.3 Control
Procurements
13.4 Control
Stakeholder
Engagement
12.2 Conduct
Procurements
13.1 Identify
Stakeholders
13.3 Manage
Stakeholder
Engagement
11.6 Control Risks
Process
Groups
Knowledge
Areas
14
12.3 Close
Procurements
p. 61
Pop Quiz #1
What does PMBOK stand for? 

Project Management Body of Knowledge

What are the PMBOK Process
Groups?

Initiating

Planning

Executing

Monitoring and Controlling

Closing
15
Course Agenda
16
Course Introduction
Module 2: Process Groups
Module 3: Interpersonal Skills
Course Wrap-Up
Module 1: Knowledge Areas
Knowledge Areas
17
Project Case Study
18
Marriott Bedding Case
Study
Time limit: 3 minutes
4 Project Integration
Management
19
What is Project Integration
Management?

Identify, define, combine, unify, and
coordinate the various processes and
project management activities within the
Project Management Process groups.
p. 63
4 Project Integration
Management
20
What activities does Project
Integration Management
include?

Coordination across Process Areas

Communication

Making decisions
p. 63
4 Project Integration
Management
21
What are the outputs of
the Project Management
Plan?

Scope baseline, schedule baseline, cost
baseline; 

Subsidiary plans to include scope
management, requirements, schedule
p. 76
4.1 Develop Project
Charter
22
p. 66
4.1 Develop Project
Charter
What is included in a
project charter?

Project purpose or justification, 

Measurable project objectives and related success criteria, 

High-level requirements, 

Assumptions and constraints, 

High-level project description and boundaries, 

High-level risks, 

Summary milestone schedule, 

Summary budget, 

Stakeholder list, 

Project approval requirements 

Assigned project manager, responsibility, and authority level

Name and authority of the sponsor or other person(s)
authorizing the project charter.
23
Hint:
Turn to
page 71
p. 71
Project Case Study #2 -
Project Charter
Project purpose or
justification

Measurable project
objectives and related
success criteria

High level risks

24
Group Exercise #1
Split into 2 groups - Group A and
Group B

Group A: Scope Management, Time Management

Group B: Cost Management, Quality Management

Discuss and prepare the
following:

Describe the process area

What components have you used? How?

25
Time limit: 20 minutes
Group Exercise #1
Describe the process area.

What components have you
used? How?

What is new? How can you use
this at Company?
26
5 Project Scope
Management
What is WBS?
27
Work Breakdown Structure
p. 105
5.4 Create WBS
5.4.2.1 Decomposition

Dividing and subdividing the project scope and
project deliverables into smaller, more manageable
parts. 

Work package is the work defined at the lowest
level of the WBS for which cost and duration can
be estimated and managed. 

The level of decomposition is often guided by the
degree of control needed to effectively manage
the project.
28
p. 128
5.4 Create WBS
29
p. 125
Sample WBS
30
p. 129
Project Case Study #3-
Create WBS
Create WBS for the
Marriott Case Study
31
6 Project Time
Management
Activity Definition

Activity Sequencing

Project Schedule
32
p. 141
7 Project Cost
Management
Budgeting

Finance
33
p. 193
8 Project Quality
Management
Quality Metrics

Quality Audit
34
p. 227
Pop Quiz #2
When do you begin developing
the project charter?

What is a WBS?

Name 3 Knowledge Areas that
we have discussed so far.
35
Pop Quiz #2
When do you begin developing the
project charter? In the beginning!

What is a WBS? Work Breakdown
Structure

Name 3 Knowledge Areas that we
have discussed so far. Integration,
Scope, Time, Cost, or Quality
36
Course Agenda
37
Course Introduction
Module 2: Process Groups
Module 3: Interpersonal Skills
Course Wrap-Up
Module 1: Knowledge Areas
38
SOURCE: http://www.dilbert.com/

Used for educational purposes.
9 Project Human
Resource Management
What are the Human
Resource elements of
project management?

Team building

Resource calendars

Onboarding and orientation

Staff assignments

Team performance
39
p. 255
10 Project Communications
Management
Project Communications Management includes
the processes that are required to ensure
timely and appropriate planning, collection,
creation, distribution, storage, retrieval,
management, control, monitoring, and the
ultimate disposition of project information.
40
p. 287
Case Study #4:
Communication Plan
41
Audience/
Stakeholder
Group
Purpose/
Objective
Format
(meetings, email,
status, etc.)
Frequency Responsible
42
SOURCE: http://www.dilbert.com/

Used for educational purposes.
10.2.2.5 Performance
Reporting

Performance reporting involves the periodic
collection and analysis of baseline versus
actual data to understand and communicate the
project progress and performance as well as
to forecast the project results.
43
p. 301
Case Study #5:
Status Report
Accomplishments

Next Steps

Risks
44
Status Reporting:
Best Practices
Keep It Simple

Clear/ concise

Unambiguous

Active vs. passive tense
45
Group Exercise #2
Split into 2 groups - Group A and
Group B

Group A: 11 Risk Management

Group B: 12 Procurement Management

Discuss and prepare the
following:

Describe the process area

What components have you used? How?

46
Time limit: 10 minutes
Group Exercise #2
Describe the process area.

What components have you
used? How?

What is new? How can you use
this at Compn?
47
11 Project Risk
Management
Risk Identification

Probability vs. Impact

Risk Responses
48
p. p. 309
12 Project Procurement
Management
Contract Administration

Purchase Orders

Vendor Management
49
p. 355
13 Project Stakeholder
Management
Project Stakeholder Management includes
the processes required to identify the
people, groups, or organizations that could
impact or be impacted by the project, to
analyze stakeholder expectations and their
impact on the project, and to develop
appropriate management strategies for
effectively engaging stakeholders in project
decisions and execution.
50
p. 391
Power/ Influence Grid
51
p. 397
Stakeholder Engagement
Matrix
52
p. 403
Pop Quiz
What are the PMBOK Knowledge Areas?

What can I use to plan communications for my
project?

I have defined the scope of my project and
need to develop a schedule, what should I do
next?

What are available responses to risk?
53
Break: 5 minutes
Pop Quiz
What are the PMBOK Knowledge Areas? Integration,
Time, Cost, Human Resource, Risk, Procurement,
Stakeholder, Quality, Communication

What can I use to plan communications for my project?
Communication Plan

I have defined the scope of my project and need to
develop a schedule, what should I do next? Create WBS

What are available responses to risk? Avoid, Transfer,
Mitigate, Accept
54
Course Agenda
55
Course Introduction
Module 1: Knowledge Areas
Module 3: Interpersonal Skills
Course Wrap-Up
Module 2: Process Groups
Process Groups
56
Initiating Process Group
57
Annex A1, p . 425
Planning Process Group
58
Annex A1, p . 428
Executing Process Group
59
Annex A1, p . 445
Monitoring and Controlling
Process Group
60
Annex A1, p . 451
Closing Process Group
61
Annex A1, p . 460
Pop Quiz
What Process Group touches
every Knowledge Area?
62
Any Questions?
63
Break/ Lunch: 15 minutes
Course Agenda
64
Course Introduction
Module 1: Knowledge Areas
Module 2: Process Groups
Course Wrap-Up
Module 3: Interpersonal Skills
Interpersonal Skills
65
Interpersonal Skills for
Successful Project
The key to your project’s
success is the project team.
66
p. 513
Group Exercise
1. What would you define as
interpersonal skills?

2. Prioritize the top 3
interpersonal skills for project
managers at Company.
67
Group Exercise...Cont’d
Interpersonal
Skills
Behaviors
Behaviors
Behaviors
68
Group Exercise...Cont’d
Rating Scale: 1-5

1: Not at all

2: A little

3: So-so

4: Most times

5: Always
69
What will you do
differently?
Write down 3 new behaviors
you will take on to help
develop your interpersonal
skills.
70
Course Agenda
71
Course Introduction
Module 1: Knowledge Areas
Module 2: Process Groups
Module 3: Interpersonal Skills
Course Wrap-Up
Feedback
72
Next Steps
• PMBOK Resource

• PMO Wiki

• ITIL Training

• 4 PMI PDUs (Cat B - Continuing Ed)

• PMP certification
Thank you!
73

Contenu connexe

Tendances

Tendances (20)

Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Pmo
PmoPmo
Pmo
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
Pmo final 1
Pmo final 1Pmo final 1
Pmo final 1
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
PMO - Added value instead of administration
PMO - Added value instead of administrationPMO - Added value instead of administration
PMO - Added value instead of administration
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
PMO - Delivering Business Results
PMO - Delivering Business ResultsPMO - Delivering Business Results
PMO - Delivering Business Results
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio Management
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavor
 

En vedette

IMT 589- Business Intelligence Final Recommendation
IMT 589- Business Intelligence Final RecommendationIMT 589- Business Intelligence Final Recommendation
IMT 589- Business Intelligence Final Recommendation
Akshay Ajgaonkar
 
Espanyistan, de la bombolla immobiliària a la
Espanyistan, de la bombolla immobiliària a laEspanyistan, de la bombolla immobiliària a la
Espanyistan, de la bombolla immobiliària a la
Blu3kai
 

En vedette (20)

Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Use of iron in india
Use of iron in indiaUse of iron in india
Use of iron in india
 
Student
StudentStudent
Student
 
my cv edit
my cv editmy cv edit
my cv edit
 
Orbit Feasbility Report
Orbit Feasbility ReportOrbit Feasbility Report
Orbit Feasbility Report
 
Webcam
WebcamWebcam
Webcam
 
IMT 589- Business Intelligence Final Recommendation
IMT 589- Business Intelligence Final RecommendationIMT 589- Business Intelligence Final Recommendation
IMT 589- Business Intelligence Final Recommendation
 
5. las hipotesis
5. las hipotesis5. las hipotesis
5. las hipotesis
 
Catalogo delka 2015
Catalogo delka 2015Catalogo delka 2015
Catalogo delka 2015
 
Proyecto
ProyectoProyecto
Proyecto
 
lesson Plan
lesson Planlesson Plan
lesson Plan
 
Espanyistan, de la bombolla immobiliària a la
Espanyistan, de la bombolla immobiliària a laEspanyistan, de la bombolla immobiliària a la
Espanyistan, de la bombolla immobiliària a la
 
Tuyens1
Tuyens1Tuyens1
Tuyens1
 
Online assignment
Online assignmentOnline assignment
Online assignment
 
What is cooperative extension trainingppt2015
What is cooperative extension trainingppt2015What is cooperative extension trainingppt2015
What is cooperative extension trainingppt2015
 
Final Case Analysis
Final Case AnalysisFinal Case Analysis
Final Case Analysis
 
Modern Supervision
Modern SupervisionModern Supervision
Modern Supervision
 
Ppt examen didac, clase 3
Ppt examen didac, clase 3Ppt examen didac, clase 3
Ppt examen didac, clase 3
 
USB flash drive
USB flash drive USB flash drive
USB flash drive
 
Project Management in nutshell
Project Management in nutshellProject Management in nutshell
Project Management in nutshell
 

Similaire à Pmbok Training for pmo

Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
houserdah
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
John Macasio
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
Aarti Dahiya PMP
 

Similaire à Pmbok Training for pmo (20)

Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Day 1 framework
Day 1 frameworkDay 1 framework
Day 1 framework
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
Project management
Project managementProject management
Project management
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
project and risk management level 1 2 3 and ms project
project and risk management level 1 2 3 and ms projectproject and risk management level 1 2 3 and ms project
project and risk management level 1 2 3 and ms project
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 

Dernier

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Dernier (20)

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

Pmbok Training for pmo

  • 1. PMO Education– PMBOK Overview Tuesday, August 20th 9:00 a.m. – 1:00 p.m. Training Room
  • 2. The purpose of this course is to ensure that the entire Project Management Office (PMO) has the tools for utilizing the Project Management Body of Knowledge (PMBOK) principles - specifically around the Process Groups and Knowledge Areas - to build up the team's project management capabilities. 2
  • 3. Course Agenda 3 Course Introduction Module 1: Knowledge Areas Module 2: Process Groups Module 3: Interpersonal Skills Course Wrap-Up
  • 4. Course Agenda 4 Course Introduction Module 1: Knowledge Areas Module 2: Process Groups Module 3: Interpersonal Skills Course Wrap-Up
  • 5. Introduction What are the Course Objectives? What is Project Management? Why PMI’s Project Management Body of Knowledge? 5
  • 6. Course Objectives By the end of this course, you will be able to Understand how to find the PMBOK Process Groups and Knowledge Areas Navigate the PMBOK as a resource to apply PMBOK principles to Project Management at Company Identify the soft skills associated with delivery according to PMBOK 6
  • 7. Pay attention... there will be pop quizzes! 7
  • 9. What is Project Management? Project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. 9
  • 10. Project Management Maturity Model 10 Ad-hoc Level 1 Planned Level 2 Managed Level 3 Integrated Level 4 Optimized Level 5 SOURCE: Capability Maturity Model Integration (CMMI)
  • 11. Why the Project Management Body of Knowledge? First Edition 1995 Detailed methodology, process, and tools Repeatable, adaptable 11
  • 12. How is the Project Management Body of Knowledge organized? Initiating Process Group Planning Process Group Executing Process Group Monitoring and Controlling Closing Process Group 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human Resource Management 10. Project Communication Management 12. Project Procurement Management 11. Project Risk Management 13. Stakeholder Management Knowledge AreasProcess Groups 12
  • 13. Initiating Process Group Planning Process Group Executing Process Group Monitoring and Controlling Closing Process Group 4.1 Develop Project Charter 4. Project Integration Management 4.2 Develop Project Management Plan 4.3 Direct and Manage Project Work 4.4 Monitor and Control Project Work 4.5 Perform Integrated Change Control 4.6 Close Project or Phase 5. Project Scope Management 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS 6. Project Time Management 6.1 Plan Schedule Management 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources 6.5 Estimate Activity Durations 6.6 Develop Schedule 7. Project Cost Management 7.1 Plan Cost Management 7.2 Estimate Costs 7.3 Determine Budget 5.5 Validate Scope 5.6 Control Scope 6.7 Control Schedule 7.4 Control Costs 8. Project Quality Management 8.1 Plan Quality Management 9. Project Human Resource Management 9.1 Plan HR Management Process Groups Knowledge Areas 13 8.2 Perform Quality Assurance 8.3 Control Quality 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team p. 61
  • 14. Initiating Process Group Planning Process Group Executing Process Group Monitoring and Controlling Closing Process Group 10. Project Communication Management 10.1 Plan Communications Management 10.2 Manage Communications 10.3 Control Communications 12. Project Procurement Management 12.1 Plan Procurement Management 11. Project Risk Management 11.1 Plan Risk Management 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 13. Stakeholder Management 13.2 Plan Stakeholder Management 12.3 Control Procurements 13.4 Control Stakeholder Engagement 12.2 Conduct Procurements 13.1 Identify Stakeholders 13.3 Manage Stakeholder Engagement 11.6 Control Risks Process Groups Knowledge Areas 14 12.3 Close Procurements p. 61
  • 15. Pop Quiz #1 What does PMBOK stand for? Project Management Body of Knowledge What are the PMBOK Process Groups? Initiating Planning Executing Monitoring and Controlling Closing 15
  • 16. Course Agenda 16 Course Introduction Module 2: Process Groups Module 3: Interpersonal Skills Course Wrap-Up Module 1: Knowledge Areas
  • 18. Project Case Study 18 Marriott Bedding Case Study Time limit: 3 minutes
  • 19. 4 Project Integration Management 19 What is Project Integration Management? Identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process groups. p. 63
  • 20. 4 Project Integration Management 20 What activities does Project Integration Management include? Coordination across Process Areas Communication Making decisions p. 63
  • 21. 4 Project Integration Management 21 What are the outputs of the Project Management Plan? Scope baseline, schedule baseline, cost baseline; Subsidiary plans to include scope management, requirements, schedule p. 76
  • 23. 4.1 Develop Project Charter What is included in a project charter? Project purpose or justification, Measurable project objectives and related success criteria, High-level requirements, Assumptions and constraints, High-level project description and boundaries, High-level risks, Summary milestone schedule, Summary budget, Stakeholder list, Project approval requirements Assigned project manager, responsibility, and authority level Name and authority of the sponsor or other person(s) authorizing the project charter. 23 Hint: Turn to page 71 p. 71
  • 24. Project Case Study #2 - Project Charter Project purpose or justification Measurable project objectives and related success criteria High level risks 24
  • 25. Group Exercise #1 Split into 2 groups - Group A and Group B Group A: Scope Management, Time Management Group B: Cost Management, Quality Management Discuss and prepare the following: Describe the process area What components have you used? How? 25 Time limit: 20 minutes
  • 26. Group Exercise #1 Describe the process area. What components have you used? How? What is new? How can you use this at Company? 26
  • 27. 5 Project Scope Management What is WBS? 27 Work Breakdown Structure p. 105
  • 28. 5.4 Create WBS 5.4.2.1 Decomposition Dividing and subdividing the project scope and project deliverables into smaller, more manageable parts. Work package is the work defined at the lowest level of the WBS for which cost and duration can be estimated and managed. The level of decomposition is often guided by the degree of control needed to effectively manage the project. 28 p. 128
  • 31. Project Case Study #3- Create WBS Create WBS for the Marriott Case Study 31
  • 32. 6 Project Time Management Activity Definition Activity Sequencing Project Schedule 32 p. 141
  • 34. 8 Project Quality Management Quality Metrics Quality Audit 34 p. 227
  • 35. Pop Quiz #2 When do you begin developing the project charter? What is a WBS? Name 3 Knowledge Areas that we have discussed so far. 35
  • 36. Pop Quiz #2 When do you begin developing the project charter? In the beginning! What is a WBS? Work Breakdown Structure Name 3 Knowledge Areas that we have discussed so far. Integration, Scope, Time, Cost, or Quality 36
  • 37. Course Agenda 37 Course Introduction Module 2: Process Groups Module 3: Interpersonal Skills Course Wrap-Up Module 1: Knowledge Areas
  • 39. 9 Project Human Resource Management What are the Human Resource elements of project management? Team building Resource calendars Onboarding and orientation Staff assignments Team performance 39 p. 255
  • 40. 10 Project Communications Management Project Communications Management includes the processes that are required to ensure timely and appropriate planning, collection, creation, distribution, storage, retrieval, management, control, monitoring, and the ultimate disposition of project information. 40 p. 287
  • 41. Case Study #4: Communication Plan 41 Audience/ Stakeholder Group Purpose/ Objective Format (meetings, email, status, etc.) Frequency Responsible
  • 43. 10.2.2.5 Performance Reporting Performance reporting involves the periodic collection and analysis of baseline versus actual data to understand and communicate the project progress and performance as well as to forecast the project results. 43 p. 301
  • 44. Case Study #5: Status Report Accomplishments Next Steps Risks 44
  • 45. Status Reporting: Best Practices Keep It Simple Clear/ concise Unambiguous Active vs. passive tense 45
  • 46. Group Exercise #2 Split into 2 groups - Group A and Group B Group A: 11 Risk Management Group B: 12 Procurement Management Discuss and prepare the following: Describe the process area What components have you used? How? 46 Time limit: 10 minutes
  • 47. Group Exercise #2 Describe the process area. What components have you used? How? What is new? How can you use this at Compn? 47
  • 48. 11 Project Risk Management Risk Identification Probability vs. Impact Risk Responses 48 p. p. 309
  • 49. 12 Project Procurement Management Contract Administration Purchase Orders Vendor Management 49 p. 355
  • 50. 13 Project Stakeholder Management Project Stakeholder Management includes the processes required to identify the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholder expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. 50 p. 391
  • 53. Pop Quiz What are the PMBOK Knowledge Areas? What can I use to plan communications for my project? I have defined the scope of my project and need to develop a schedule, what should I do next? What are available responses to risk? 53 Break: 5 minutes
  • 54. Pop Quiz What are the PMBOK Knowledge Areas? Integration, Time, Cost, Human Resource, Risk, Procurement, Stakeholder, Quality, Communication What can I use to plan communications for my project? Communication Plan I have defined the scope of my project and need to develop a schedule, what should I do next? Create WBS What are available responses to risk? Avoid, Transfer, Mitigate, Accept 54
  • 55. Course Agenda 55 Course Introduction Module 1: Knowledge Areas Module 3: Interpersonal Skills Course Wrap-Up Module 2: Process Groups
  • 60. Monitoring and Controlling Process Group 60 Annex A1, p . 451
  • 62. Pop Quiz What Process Group touches every Knowledge Area? 62
  • 64. Course Agenda 64 Course Introduction Module 1: Knowledge Areas Module 2: Process Groups Course Wrap-Up Module 3: Interpersonal Skills
  • 66. Interpersonal Skills for Successful Project The key to your project’s success is the project team. 66 p. 513
  • 67. Group Exercise 1. What would you define as interpersonal skills? 2. Prioritize the top 3 interpersonal skills for project managers at Company. 67
  • 69. Group Exercise...Cont’d Rating Scale: 1-5 1: Not at all 2: A little 3: So-so 4: Most times 5: Always 69
  • 70. What will you do differently? Write down 3 new behaviors you will take on to help develop your interpersonal skills. 70
  • 71. Course Agenda 71 Course Introduction Module 1: Knowledge Areas Module 2: Process Groups Module 3: Interpersonal Skills Course Wrap-Up
  • 73. Next Steps • PMBOK Resource • PMO Wiki • ITIL Training • 4 PMI PDUs (Cat B - Continuing Ed) • PMP certification Thank you! 73