Essam Khalifa has Approximately 14 years experience in civil engineering with excellent hands-on site
supervision, projects feasible studies, review of shop drawings, material planning and submittals and
detailed design review. These years of experience mainly was on various disciplines and projects
including but not limited to High-Rise Buildings (Commercial, Residential), Hospitals, Schools, Landscape
projects, Infrastructure and oil & Gas Projects.
In addition to these engineering skills, Essam had acquired a considerable project management skills and
techniques for managing projects in both design and construction phases. Also well knowledge in follow
up and coordination with utilities departments.
Essam have extensive years of experience and knowledge at senior capacities, which I believe would be
an asset to an organization that aims for progress. In the long term, I aim to reach my full potential and
further my growth with your team that will factor in the firm’s advancement.
Education
. Educational Degree:B.Sc., Civil Engineering, Faculty of Engineering/Tanta UniversityJune 2002.
. General Estimation: Good (72 %)
. Graduation Project in : Study the properties of materials.
. Graduation Project Name: (Recycling of Bypass-dust in concrete industry).
. Graduation Project Estimation: Excellent.
ProfessionalAffiliations
 Syndicate of Egyptian Engineers, 2002
TechnicalCourses/Seminars
 PMP Course @ Cambridge Education Institute, Abu Dhabi.
 Seminar on Managing Project Scope @ 3Fold Education Centre, Abu Dhabi.
 Accident/Incident investigation, Safety Course @ Aspire Middle East Training Institute, Abu Dhabi.
ComputerSkills
 Microsoft Office Applications ( Word, Excel, Power Point )
 AutoCAD Program.
 Prokon Program.
 SAP 2000 Program.
 ETAPS Program.
Professional Experience
1- From Aug 2015 to Present
AS : Senior Structural Engineer at The field of consulting
AT : Engineering Consultants Group ( ECG )
Tel. No. : +971 2 672 8007
Fax No. : +971 2 672 8012
RelatedProject: Construction ofCICPA Camps at QUASHAWIRA(oil & Gas Projects)
Project description:
 The project for Al Hosn Gas Company for Onshore Oil Operations.
 The scope of work on the project consists of Construction of administration and accommodation
complexes spread over 35,548 square meters.
 Infrastructure in the open spaces including a swimming pool, chiller yard, garbage yard, STP
and helipad.
 164,205 square meters of external works consisting of hard and soft landscaping, sidewalks,
and road works
Responsibilities:
 Check Project drawings and documents including sub contractors shop drawings and technical
submittals for compliance with the specifications.
 Coordinate and develop solutions to meet the requirements of resources procurement
and construction program.
 Implement best construction practices and techniques, towards value engineering concepts.
 Liaise with technical team to ensure proper communication with local authorities.
 Attend the coordination & progress meeting.
 Reporting to Project Manager / Projects Director.
2- From Jan 2015 to July 2015
AS : Senior Structural Engineer at The field of Contracting
AT : Nael Energy & General Enterprises
Tel. No : +97137633965
Fax. No: +971 3 7630401
RelatedProject: ADMINISTRATION BUILDING FOR GLENELG SCHOOL AT SAS AL NAKHL (oil & Gas Projects)
Project description:
 The scope of works within this package in GLENELG SCHOOL include the construction
and completion of administration building in four story structure comprising of ground ,first ,second
and roof floor for staff rooms , examination rooms , meeting rooms and all required another facilities
 1864 square meters of external works consisting of hard and soft landscaping.
Responsibilities:
 Preparing all shop drawings and technical submittals according to Project drawings and specs
with the structural team.
 Reviewing all sub contractors shop drawings and technical submittals before submitting to
the consultant.
 Coordinate and develop solutions to meet the requirements of resources procurement and
construction program.
 Implement best construction practices and techniques, towards value engineering concepts.
 Liaise with technical team to ensure proper communication with local authorities.
 Advise the Site and Engineering Department on changes in the design and potential variations.
 Advice site team during construction works to ensure compliance with plans.
 Consults the design consultant on a regular basis for project requirements if any.
3- From Nov 2008 to Dec 2014
AS : Senior Structural Engineer at the The field of consulting
AT : Architecture & Planning Group (APG)
T. +971 2 6333022
F. +971 2 6331362 P.O. Box: 2833, Abu Dhabi, UAE
Responsibilities:
 Coordinate installation works with other aspects (Elec – Arch – Mech)
 Review and approval of shop drawings, material planning, submittals in accordance within budget
and time frame.
 Ensuring Client, Contract and Local Authorities requirements.
 Supervising and monitoring the construction works as per approved shop drawings and according
to quality control plan.
 Attend the coordination & progress meeting.
 Reporting to Project Manager / Projects Director.
Related Projects:
A. Residential High-Rise Bldg. For H.H.SHK. Diab Bin Zayed Al Nahyan, Abu Dhabi

Project Description:-
The scope of works within this package in Saraya C35 include the construction and completion
of 3 basement floors + Ground floor + 5 number of podium levels +Podium Mezzanine + Amenity
floor +28 typical floor + Service floor + Roof floor
B. Saraya Residential High-Rise Towers ( C21 & C22) For Aabar Properties, Al Reem Island - Abu Dhabi.
Project Description:-
The scope of works within this package in Saraya R01 & R02 include the construction and completion
of 48 number of residential units , 16 number of simplex units , 29 number of duplex units , 2 number
of triplex units + 3 basement floors and 6 number of podium levels.
C. Construction of Burjeel Hospital (E-18/01)
Project Description:-
Burjeel Hospital is 120 bed with all required facilities for such high-tech hospital with (10 operation
room and 8 royal suit) and all medical clinics for all specialties at the highest level of health care
In ( 63000 m2 ) = (BF + GF + 6 Typical Floors + RF) .
D. Commercial Building Of H. H. Sh. Nahyan Bin Zayed Al Nahyan Sector (W -13/1)
 Project Description:-
 The scope of works within this package include the construction and completion of the commercial
building which has been executed to include (20 office + 80 flat)
in 17200 m2 (3BF + GF + MF + 25 Typical Floors + RF).
E. Modification of Car Parking Ramp of ADWEA
Project Description:-
The scope of works within this package include the modification of car barking ramp by cutting
of the existing RC walls and strengthened it by using CFRP In order to expand the entrances
and exits of all parking floors ( Six floors ).
F. Villas Complex For MR/ HAMAD RASHED ALNUAIMI Sector (W-9)
Project Description:-
The scope of works within this package include the construction and completion of THREE villas
that everyone has been executed to include (3 master bed room , dining room , activity room ,
kitchen , maid room and swimming pool) in (BF+GF + FF+RF ).
4- From Feb2006 to Nov 2008
AS : Structural Engineer at The field of Contracting
AT : (AL Imad for Engineering and contracting )
Responsibilities
 Preparing methods of statements for sites problems and all activities.
 Preparing procedures of works, shop drawings.
 Estimating quantities & costs.
 Reporting to the project manager.
Executed Projects:
A. Malty story building For MR / JAWAAN SALEM ELDHAHRY Sector (E12)
 Project Description:-
The scope of works within this package include the construction and completion of malty story building
which has been executed to include (4 shops + 4 office + 31 flat) = (GF + MF + 7 Typical Floors + RF)
in 3100 m2.
B. Private Villa For MR / JAWAAN SALEM EL DHAHRY Sector (W 47).
 Project Description:-
 The scope of works within this package include the construction and completion of TWO villas that
everyone has been executed to include (3 master bed room + dining room + kitchen + maid room )
in ( GF + FF + RF ).

5- From June 2002 to Feb 2006
AS : Site Engineer at The field of Contracting at Egypt
AT : At ALMOQAWALAT AL MESRYA ( MOKHTAR IBRAHIM)
3- RelatedProject: Highway from Kfr El Sheikh to Tanta
 Project Description:-
The scope of works within this package include the construction and completion of highway road start
from Kfr El Sheikh City at the highway international road to Tanta City at the Cairo-Alexandria highway
road in 200 km with 4 lanes and 7 bridges .
Responsibilities
 Setting out, levelling and surveying the site with construction team.
 Checking plans, drawings and quantities for accuracy of calculations.
 Ensuring that all materials used and work performed are as per specifications.
 Day-to-day management of the site, including supervising and monitoring the site labours.
 Preparing reports as required.

Contenu connexe

Tendances

Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Robert Schroedter
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15Amro Ali Ali
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAhamed Mohideen
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15Lloyd Guillory
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Sadek
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDANMani Kandan
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016JESUS MENDOZA
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land developmentFernando Bravo, P.E., CFM
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalorepiasi sinha
 

Tendances (19)

Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
CV2
CV2CV2
CV2
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_original
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalore
 

En vedette

CBSWATCH_Dec15_Body and Soul_Perkins
CBSWATCH_Dec15_Body and Soul_PerkinsCBSWATCH_Dec15_Body and Soul_Perkins
CBSWATCH_Dec15_Body and Soul_PerkinsMichele Shapiro
 
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)Rank Saharath
 
Instagram Presentation
Instagram PresentationInstagram Presentation
Instagram PresentationSami Postma
 
Rachelle Kong Press Hits
Rachelle Kong Press HitsRachelle Kong Press Hits
Rachelle Kong Press HitsRachelle Chee
 
Using Energy to Heal Addiction
Using Energy to Heal AddictionUsing Energy to Heal Addiction
Using Energy to Heal AddictionIrene Cauwels
 
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...CASRAI
 
Arabská dod 2014
Arabská dod 2014Arabská dod 2014
Arabská dod 2014kajakup
 
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...CASRAI
 
Grzesiak mateuszresocjalizacja
Grzesiak mateuszresocjalizacjaGrzesiak mateuszresocjalizacja
Grzesiak mateuszresocjalizacjaKarolina Sadowska
 

En vedette (18)

CBSWATCH_Dec15_Body and Soul_Perkins
CBSWATCH_Dec15_Body and Soul_PerkinsCBSWATCH_Dec15_Body and Soul_Perkins
CBSWATCH_Dec15_Body and Soul_Perkins
 
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)
5กระบวนการวิทยาศาสตร์(สมเกียรติ วิชาการ)
 
RNs
RNsRNs
RNs
 
Global KTech Corporate_3
Global KTech Corporate_3Global KTech Corporate_3
Global KTech Corporate_3
 
resume
resumeresume
resume
 
Instagram Presentation
Instagram PresentationInstagram Presentation
Instagram Presentation
 
Question 2
Question 2Question 2
Question 2
 
Rachelle Kong Press Hits
Rachelle Kong Press HitsRachelle Kong Press Hits
Rachelle Kong Press Hits
 
Using Energy to Heal Addiction
Using Energy to Heal AddictionUsing Energy to Heal Addiction
Using Energy to Heal Addiction
 
HACKING MERCADONA
HACKING MERCADONAHACKING MERCADONA
HACKING MERCADONA
 
ahmed basiony cv
ahmed basiony cvahmed basiony cv
ahmed basiony cv
 
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...
Provincial Perspectives on Research Impacts: Eddy Nason, Renata Osika, Krista...
 
Arabská dod 2014
Arabská dod 2014Arabská dod 2014
Arabská dod 2014
 
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...
Tutorial: CASRAI Standards Development (for a non-technology audience) - Davi...
 
Grzesiak mateuszresocjalizacja
Grzesiak mateuszresocjalizacjaGrzesiak mateuszresocjalizacja
Grzesiak mateuszresocjalizacja
 
Linked in
Linked inLinked in
Linked in
 
Webinar session 2
Webinar session 2Webinar session 2
Webinar session 2
 
Planesformas
PlanesformasPlanesformas
Planesformas
 

Similaire à 1 Essam CV

Similaire à 1 Essam CV (20)

Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
CV 21-08-2016
CV 21-08-2016CV 21-08-2016
CV 21-08-2016
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
CV MZ
CV MZCV MZ
CV MZ
 
CV GENDY 2016
CV GENDY 2016CV GENDY 2016
CV GENDY 2016
 
Abdulrahman Shakboua15
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
zk resume
zk resumezk resume
zk resume
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
 
Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
my cv 2
my cv 2my cv 2
my cv 2
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16Wesam Maannee CV- Aug16
Wesam Maannee CV- Aug16
 

1 Essam CV

  • 1. Essam Morsy Khalifa Senior Structural Engineer MOB: 00971508252829 (UAE) E mail: essamkhalifa1416@yahoo.com Summary Essam Khalifa has Approximately 14 years experience in civil engineering with excellent hands-on site supervision, projects feasible studies, review of shop drawings, material planning and submittals and detailed design review. These years of experience mainly was on various disciplines and projects including but not limited to High-Rise Buildings (Commercial, Residential), Hospitals, Schools, Landscape projects, Infrastructure and oil & Gas Projects. In addition to these engineering skills, Essam had acquired a considerable project management skills and techniques for managing projects in both design and construction phases. Also well knowledge in follow up and coordination with utilities departments. Essam have extensive years of experience and knowledge at senior capacities, which I believe would be an asset to an organization that aims for progress. In the long term, I aim to reach my full potential and further my growth with your team that will factor in the firm’s advancement. Education . Educational Degree:B.Sc., Civil Engineering, Faculty of Engineering/Tanta UniversityJune 2002. . General Estimation: Good (72 %) . Graduation Project in : Study the properties of materials. . Graduation Project Name: (Recycling of Bypass-dust in concrete industry). . Graduation Project Estimation: Excellent. ProfessionalAffiliations  Syndicate of Egyptian Engineers, 2002 TechnicalCourses/Seminars  PMP Course @ Cambridge Education Institute, Abu Dhabi.  Seminar on Managing Project Scope @ 3Fold Education Centre, Abu Dhabi.  Accident/Incident investigation, Safety Course @ Aspire Middle East Training Institute, Abu Dhabi. ComputerSkills  Microsoft Office Applications ( Word, Excel, Power Point )  AutoCAD Program.  Prokon Program.  SAP 2000 Program.  ETAPS Program.
  • 2. Professional Experience 1- From Aug 2015 to Present AS : Senior Structural Engineer at The field of consulting AT : Engineering Consultants Group ( ECG ) Tel. No. : +971 2 672 8007 Fax No. : +971 2 672 8012 RelatedProject: Construction ofCICPA Camps at QUASHAWIRA(oil & Gas Projects) Project description:  The project for Al Hosn Gas Company for Onshore Oil Operations.  The scope of work on the project consists of Construction of administration and accommodation complexes spread over 35,548 square meters.  Infrastructure in the open spaces including a swimming pool, chiller yard, garbage yard, STP and helipad.  164,205 square meters of external works consisting of hard and soft landscaping, sidewalks, and road works Responsibilities:  Check Project drawings and documents including sub contractors shop drawings and technical submittals for compliance with the specifications.  Coordinate and develop solutions to meet the requirements of resources procurement and construction program.  Implement best construction practices and techniques, towards value engineering concepts.  Liaise with technical team to ensure proper communication with local authorities.  Attend the coordination & progress meeting.  Reporting to Project Manager / Projects Director. 2- From Jan 2015 to July 2015 AS : Senior Structural Engineer at The field of Contracting AT : Nael Energy & General Enterprises Tel. No : +97137633965 Fax. No: +971 3 7630401 RelatedProject: ADMINISTRATION BUILDING FOR GLENELG SCHOOL AT SAS AL NAKHL (oil & Gas Projects) Project description:  The scope of works within this package in GLENELG SCHOOL include the construction and completion of administration building in four story structure comprising of ground ,first ,second and roof floor for staff rooms , examination rooms , meeting rooms and all required another facilities  1864 square meters of external works consisting of hard and soft landscaping. Responsibilities:  Preparing all shop drawings and technical submittals according to Project drawings and specs with the structural team.  Reviewing all sub contractors shop drawings and technical submittals before submitting to the consultant.  Coordinate and develop solutions to meet the requirements of resources procurement and construction program.  Implement best construction practices and techniques, towards value engineering concepts.  Liaise with technical team to ensure proper communication with local authorities.  Advise the Site and Engineering Department on changes in the design and potential variations.  Advice site team during construction works to ensure compliance with plans.  Consults the design consultant on a regular basis for project requirements if any.
  • 3. 3- From Nov 2008 to Dec 2014 AS : Senior Structural Engineer at the The field of consulting AT : Architecture & Planning Group (APG) T. +971 2 6333022 F. +971 2 6331362 P.O. Box: 2833, Abu Dhabi, UAE Responsibilities:  Coordinate installation works with other aspects (Elec – Arch – Mech)  Review and approval of shop drawings, material planning, submittals in accordance within budget and time frame.  Ensuring Client, Contract and Local Authorities requirements.  Supervising and monitoring the construction works as per approved shop drawings and according to quality control plan.  Attend the coordination & progress meeting.  Reporting to Project Manager / Projects Director. Related Projects: A. Residential High-Rise Bldg. For H.H.SHK. Diab Bin Zayed Al Nahyan, Abu Dhabi  Project Description:- The scope of works within this package in Saraya C35 include the construction and completion of 3 basement floors + Ground floor + 5 number of podium levels +Podium Mezzanine + Amenity floor +28 typical floor + Service floor + Roof floor B. Saraya Residential High-Rise Towers ( C21 & C22) For Aabar Properties, Al Reem Island - Abu Dhabi. Project Description:- The scope of works within this package in Saraya R01 & R02 include the construction and completion of 48 number of residential units , 16 number of simplex units , 29 number of duplex units , 2 number of triplex units + 3 basement floors and 6 number of podium levels. C. Construction of Burjeel Hospital (E-18/01) Project Description:- Burjeel Hospital is 120 bed with all required facilities for such high-tech hospital with (10 operation room and 8 royal suit) and all medical clinics for all specialties at the highest level of health care In ( 63000 m2 ) = (BF + GF + 6 Typical Floors + RF) . D. Commercial Building Of H. H. Sh. Nahyan Bin Zayed Al Nahyan Sector (W -13/1)  Project Description:-  The scope of works within this package include the construction and completion of the commercial building which has been executed to include (20 office + 80 flat) in 17200 m2 (3BF + GF + MF + 25 Typical Floors + RF).
  • 4. E. Modification of Car Parking Ramp of ADWEA Project Description:- The scope of works within this package include the modification of car barking ramp by cutting of the existing RC walls and strengthened it by using CFRP In order to expand the entrances and exits of all parking floors ( Six floors ). F. Villas Complex For MR/ HAMAD RASHED ALNUAIMI Sector (W-9) Project Description:- The scope of works within this package include the construction and completion of THREE villas that everyone has been executed to include (3 master bed room , dining room , activity room , kitchen , maid room and swimming pool) in (BF+GF + FF+RF ). 4- From Feb2006 to Nov 2008 AS : Structural Engineer at The field of Contracting AT : (AL Imad for Engineering and contracting ) Responsibilities  Preparing methods of statements for sites problems and all activities.  Preparing procedures of works, shop drawings.  Estimating quantities & costs.  Reporting to the project manager. Executed Projects: A. Malty story building For MR / JAWAAN SALEM ELDHAHRY Sector (E12)  Project Description:- The scope of works within this package include the construction and completion of malty story building which has been executed to include (4 shops + 4 office + 31 flat) = (GF + MF + 7 Typical Floors + RF) in 3100 m2. B. Private Villa For MR / JAWAAN SALEM EL DHAHRY Sector (W 47).  Project Description:-  The scope of works within this package include the construction and completion of TWO villas that everyone has been executed to include (3 master bed room + dining room + kitchen + maid room ) in ( GF + FF + RF ). 
  • 5. 5- From June 2002 to Feb 2006 AS : Site Engineer at The field of Contracting at Egypt AT : At ALMOQAWALAT AL MESRYA ( MOKHTAR IBRAHIM) 3- RelatedProject: Highway from Kfr El Sheikh to Tanta  Project Description:- The scope of works within this package include the construction and completion of highway road start from Kfr El Sheikh City at the highway international road to Tanta City at the Cairo-Alexandria highway road in 200 km with 4 lanes and 7 bridges . Responsibilities  Setting out, levelling and surveying the site with construction team.  Checking plans, drawings and quantities for accuracy of calculations.  Ensuring that all materials used and work performed are as per specifications.  Day-to-day management of the site, including supervising and monitoring the site labours.  Preparing reports as required.