1. Essam Morsy Khalifa
Senior Structural Engineer
MOB: 00971508252829 (UAE)
E mail: essamkhalifa1416@yahoo.com
Summary
Essam Khalifa has Approximately 14 years experience in civil engineering with excellent hands-on site
supervision, projects feasible studies, review of shop drawings, material planning and submittals and
detailed design review. These years of experience mainly was on various disciplines and projects
including but not limited to High-Rise Buildings (Commercial, Residential), Hospitals, Schools, Landscape
projects, Infrastructure and oil & Gas Projects.
In addition to these engineering skills, Essam had acquired a considerable project management skills and
techniques for managing projects in both design and construction phases. Also well knowledge in follow
up and coordination with utilities departments.
Essam have extensive years of experience and knowledge at senior capacities, which I believe would be
an asset to an organization that aims for progress. In the long term, I aim to reach my full potential and
further my growth with your team that will factor in the firm’s advancement.
Education
. Educational Degree:B.Sc., Civil Engineering, Faculty of Engineering/Tanta UniversityJune 2002.
. General Estimation: Good (72 %)
. Graduation Project in : Study the properties of materials.
. Graduation Project Name: (Recycling of Bypass-dust in concrete industry).
. Graduation Project Estimation: Excellent.
ProfessionalAffiliations
Syndicate of Egyptian Engineers, 2002
TechnicalCourses/Seminars
PMP Course @ Cambridge Education Institute, Abu Dhabi.
Seminar on Managing Project Scope @ 3Fold Education Centre, Abu Dhabi.
Accident/Incident investigation, Safety Course @ Aspire Middle East Training Institute, Abu Dhabi.
ComputerSkills
Microsoft Office Applications ( Word, Excel, Power Point )
AutoCAD Program.
Prokon Program.
SAP 2000 Program.
ETAPS Program.
2. Professional Experience
1- From Aug 2015 to Present
AS : Senior Structural Engineer at The field of consulting
AT : Engineering Consultants Group ( ECG )
Tel. No. : +971 2 672 8007
Fax No. : +971 2 672 8012
RelatedProject: Construction ofCICPA Camps at QUASHAWIRA(oil & Gas Projects)
Project description:
The project for Al Hosn Gas Company for Onshore Oil Operations.
The scope of work on the project consists of Construction of administration and accommodation
complexes spread over 35,548 square meters.
Infrastructure in the open spaces including a swimming pool, chiller yard, garbage yard, STP
and helipad.
164,205 square meters of external works consisting of hard and soft landscaping, sidewalks,
and road works
Responsibilities:
Check Project drawings and documents including sub contractors shop drawings and technical
submittals for compliance with the specifications.
Coordinate and develop solutions to meet the requirements of resources procurement
and construction program.
Implement best construction practices and techniques, towards value engineering concepts.
Liaise with technical team to ensure proper communication with local authorities.
Attend the coordination & progress meeting.
Reporting to Project Manager / Projects Director.
2- From Jan 2015 to July 2015
AS : Senior Structural Engineer at The field of Contracting
AT : Nael Energy & General Enterprises
Tel. No : +97137633965
Fax. No: +971 3 7630401
RelatedProject: ADMINISTRATION BUILDING FOR GLENELG SCHOOL AT SAS AL NAKHL (oil & Gas Projects)
Project description:
The scope of works within this package in GLENELG SCHOOL include the construction
and completion of administration building in four story structure comprising of ground ,first ,second
and roof floor for staff rooms , examination rooms , meeting rooms and all required another facilities
1864 square meters of external works consisting of hard and soft landscaping.
Responsibilities:
Preparing all shop drawings and technical submittals according to Project drawings and specs
with the structural team.
Reviewing all sub contractors shop drawings and technical submittals before submitting to
the consultant.
Coordinate and develop solutions to meet the requirements of resources procurement and
construction program.
Implement best construction practices and techniques, towards value engineering concepts.
Liaise with technical team to ensure proper communication with local authorities.
Advise the Site and Engineering Department on changes in the design and potential variations.
Advice site team during construction works to ensure compliance with plans.
Consults the design consultant on a regular basis for project requirements if any.
3. 3- From Nov 2008 to Dec 2014
AS : Senior Structural Engineer at the The field of consulting
AT : Architecture & Planning Group (APG)
T. +971 2 6333022
F. +971 2 6331362 P.O. Box: 2833, Abu Dhabi, UAE
Responsibilities:
Coordinate installation works with other aspects (Elec – Arch – Mech)
Review and approval of shop drawings, material planning, submittals in accordance within budget
and time frame.
Ensuring Client, Contract and Local Authorities requirements.
Supervising and monitoring the construction works as per approved shop drawings and according
to quality control plan.
Attend the coordination & progress meeting.
Reporting to Project Manager / Projects Director.
Related Projects:
A. Residential High-Rise Bldg. For H.H.SHK. Diab Bin Zayed Al Nahyan, Abu Dhabi
Project Description:-
The scope of works within this package in Saraya C35 include the construction and completion
of 3 basement floors + Ground floor + 5 number of podium levels +Podium Mezzanine + Amenity
floor +28 typical floor + Service floor + Roof floor
B. Saraya Residential High-Rise Towers ( C21 & C22) For Aabar Properties, Al Reem Island - Abu Dhabi.
Project Description:-
The scope of works within this package in Saraya R01 & R02 include the construction and completion
of 48 number of residential units , 16 number of simplex units , 29 number of duplex units , 2 number
of triplex units + 3 basement floors and 6 number of podium levels.
C. Construction of Burjeel Hospital (E-18/01)
Project Description:-
Burjeel Hospital is 120 bed with all required facilities for such high-tech hospital with (10 operation
room and 8 royal suit) and all medical clinics for all specialties at the highest level of health care
In ( 63000 m2 ) = (BF + GF + 6 Typical Floors + RF) .
D. Commercial Building Of H. H. Sh. Nahyan Bin Zayed Al Nahyan Sector (W -13/1)
Project Description:-
The scope of works within this package include the construction and completion of the commercial
building which has been executed to include (20 office + 80 flat)
in 17200 m2 (3BF + GF + MF + 25 Typical Floors + RF).
4. E. Modification of Car Parking Ramp of ADWEA
Project Description:-
The scope of works within this package include the modification of car barking ramp by cutting
of the existing RC walls and strengthened it by using CFRP In order to expand the entrances
and exits of all parking floors ( Six floors ).
F. Villas Complex For MR/ HAMAD RASHED ALNUAIMI Sector (W-9)
Project Description:-
The scope of works within this package include the construction and completion of THREE villas
that everyone has been executed to include (3 master bed room , dining room , activity room ,
kitchen , maid room and swimming pool) in (BF+GF + FF+RF ).
4- From Feb2006 to Nov 2008
AS : Structural Engineer at The field of Contracting
AT : (AL Imad for Engineering and contracting )
Responsibilities
Preparing methods of statements for sites problems and all activities.
Preparing procedures of works, shop drawings.
Estimating quantities & costs.
Reporting to the project manager.
Executed Projects:
A. Malty story building For MR / JAWAAN SALEM ELDHAHRY Sector (E12)
Project Description:-
The scope of works within this package include the construction and completion of malty story building
which has been executed to include (4 shops + 4 office + 31 flat) = (GF + MF + 7 Typical Floors + RF)
in 3100 m2.
B. Private Villa For MR / JAWAAN SALEM EL DHAHRY Sector (W 47).
Project Description:-
The scope of works within this package include the construction and completion of TWO villas that
everyone has been executed to include (3 master bed room + dining room + kitchen + maid room )
in ( GF + FF + RF ).
5. 5- From June 2002 to Feb 2006
AS : Site Engineer at The field of Contracting at Egypt
AT : At ALMOQAWALAT AL MESRYA ( MOKHTAR IBRAHIM)
3- RelatedProject: Highway from Kfr El Sheikh to Tanta
Project Description:-
The scope of works within this package include the construction and completion of highway road start
from Kfr El Sheikh City at the highway international road to Tanta City at the Cairo-Alexandria highway
road in 200 km with 4 lanes and 7 bridges .
Responsibilities
Setting out, levelling and surveying the site with construction team.
Checking plans, drawings and quantities for accuracy of calculations.
Ensuring that all materials used and work performed are as per specifications.
Day-to-day management of the site, including supervising and monitoring the site labours.
Preparing reports as required.