SlideShare une entreprise Scribd logo
1  sur  2
Evan Chiorando
Address: 759B VictoriaStreet, KamloopsBC
Phone: (250)-572-7170
Email: echiorando@hotmail.com
OBJECTIVE:To obtaina full time position as a JourneymanElectrician in
which I will use my electrical knowledge to gainfurther experience with
an innovative and progressive company.
Summary ofTraining
Red Seal Journeymen Electrician CSTS (Construction Safety Training
System)
Arc Flash Training TDG
First Aid Level 1 Fall Arrest Training
OSSA Elevated Work Platform WHMIS
ESTS (Electrical Safety Training
System)
Bucket Truck experience
WORK EXPERINCE
March 2010-November 2015 – Electrical Foreman, Techmation Electric &
Controls, Fort St. John
Summary of Responsibilities:
 Test & Commission Functions: Low & medium voltage distribution systems,
MCC’s & Switchgears as well as VFD’s & motors. UPS Systems,
Communication Systems, RTU’s & PLC’s, heat tracing and lighting systems.
 Participated in Start-up & trouble shooting
 QAQC Documentation
 Red-lines and As-building
 Material procurement
 Organized crews and materials
 Proper grounding grid installations
 Tray system construction
 Running conduit in buildings
 Read & Interpret: circuit & wiring diagrams, electrical schematics, CEC and
P&ID’s.
Project Experience:
Paramount Musreau Gas Plant Phase 2 – On this project I worked as General
Electrical Foremen and was responsible for up to 40 electricians. I organized and
planned daily crew activities, procured materials in advance for crews to stay
working and efficient, and was in charge of reviewing and signing off site Field Level
Hazard Assessments before the commencement of work. Also, I coordinated with
other trades on site to ensure smooth completion of general construction. On this
project I assisted with QAQC, pre-commissioning as well as commissioning.
Tourmaline Banshee Expansion – On this project I worked as Field Foremen and
was responsible for up to 25 electricians. I was in charge of measuring, ordering,
receiving and organizing cables for the site. Also, I took the lead on cable pull and
had consecutive days of 6000-7000m pulled. I implemented safety programs and
chaired daily safety meetings while working closely with other trades to coordinate
onsite logistics. I built QAQC packages and worked with crews to complete onsite
QAQC and turnover documents.
Arc Resources Parkland Gas Plant – On this project I worked as a Field Foremen
and was primarily in charge of the control system throughout the gas plant, I cross-
referenced drawings and verified terminations prior to field construction, and was
in charge of up to 20 electricians. I planned daily tasks and organized materials for
crews as well as worked closely with engineering developing RFI's to assist with site
construction. On this project I assisted with loop-checking, commissioning and start-
up of the plant and helped with the programming of the plant VFD's and
implementing electrical lock-out practices. Also, I performed maintenance on site
during plant operation.
CNRL Battery Project – On this project I worked as a field journeyman. I worked
with piping the field buildings, assisted in cable pull, and worked on large scale MCC
distribution. Also, I worked with engineers to field fab equipment into buildings
while looking after MCC terminations (8 electricians). I assisted with loop-checking
and commissioning prior to start-up.
References available upon request.

Contenu connexe

Tendances (20)

RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
V O Keeffe
V O KeeffeV O Keeffe
V O Keeffe
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
 
Electrical engr
Electrical engr Electrical engr
Electrical engr
 
SENTHIL.k RESUME
SENTHIL.k RESUMESENTHIL.k RESUME
SENTHIL.k RESUME
 
Ashok resume till Date
Ashok resume till DateAshok resume till Date
Ashok resume till Date
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Muhammad talha cv
Muhammad talha cvMuhammad talha cv
Muhammad talha cv
 
Mayur
MayurMayur
Mayur
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
Richard Manalo-Electrical Engineer
Richard Manalo-Electrical EngineerRichard Manalo-Electrical Engineer
Richard Manalo-Electrical Engineer
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
CV
CVCV
CV
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
 
Weekly9 05 54261505
Weekly9 05 54261505Weekly9 05 54261505
Weekly9 05 54261505
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1
 

Similaire à Resume

Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and constructionrana maqsood
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAZeeshan khalid
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2usman ahmed
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 

Similaire à Resume (20)

CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
MY CV
MY CVMY CV
MY CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Resume 5
Resume 5Resume 5
Resume 5
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
Commission resume
Commission resumeCommission resume
Commission resume
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 

Resume

  • 1. Evan Chiorando Address: 759B VictoriaStreet, KamloopsBC Phone: (250)-572-7170 Email: echiorando@hotmail.com OBJECTIVE:To obtaina full time position as a JourneymanElectrician in which I will use my electrical knowledge to gainfurther experience with an innovative and progressive company. Summary ofTraining Red Seal Journeymen Electrician CSTS (Construction Safety Training System) Arc Flash Training TDG First Aid Level 1 Fall Arrest Training OSSA Elevated Work Platform WHMIS ESTS (Electrical Safety Training System) Bucket Truck experience WORK EXPERINCE March 2010-November 2015 – Electrical Foreman, Techmation Electric & Controls, Fort St. John Summary of Responsibilities:  Test & Commission Functions: Low & medium voltage distribution systems, MCC’s & Switchgears as well as VFD’s & motors. UPS Systems, Communication Systems, RTU’s & PLC’s, heat tracing and lighting systems.  Participated in Start-up & trouble shooting  QAQC Documentation  Red-lines and As-building  Material procurement  Organized crews and materials  Proper grounding grid installations  Tray system construction  Running conduit in buildings  Read & Interpret: circuit & wiring diagrams, electrical schematics, CEC and P&ID’s.
  • 2. Project Experience: Paramount Musreau Gas Plant Phase 2 – On this project I worked as General Electrical Foremen and was responsible for up to 40 electricians. I organized and planned daily crew activities, procured materials in advance for crews to stay working and efficient, and was in charge of reviewing and signing off site Field Level Hazard Assessments before the commencement of work. Also, I coordinated with other trades on site to ensure smooth completion of general construction. On this project I assisted with QAQC, pre-commissioning as well as commissioning. Tourmaline Banshee Expansion – On this project I worked as Field Foremen and was responsible for up to 25 electricians. I was in charge of measuring, ordering, receiving and organizing cables for the site. Also, I took the lead on cable pull and had consecutive days of 6000-7000m pulled. I implemented safety programs and chaired daily safety meetings while working closely with other trades to coordinate onsite logistics. I built QAQC packages and worked with crews to complete onsite QAQC and turnover documents. Arc Resources Parkland Gas Plant – On this project I worked as a Field Foremen and was primarily in charge of the control system throughout the gas plant, I cross- referenced drawings and verified terminations prior to field construction, and was in charge of up to 20 electricians. I planned daily tasks and organized materials for crews as well as worked closely with engineering developing RFI's to assist with site construction. On this project I assisted with loop-checking, commissioning and start- up of the plant and helped with the programming of the plant VFD's and implementing electrical lock-out practices. Also, I performed maintenance on site during plant operation. CNRL Battery Project – On this project I worked as a field journeyman. I worked with piping the field buildings, assisted in cable pull, and worked on large scale MCC distribution. Also, I worked with engineers to field fab equipment into buildings while looking after MCC terminations (8 electricians). I assisted with loop-checking and commissioning prior to start-up. References available upon request.