SCHOOL OF BUILT ENVIRONMENT
BSc (Hons) QUANTITY SURVEYING & COST
MANAGEMENT
PROJECT FINANCIAL MANAGEMENT
(6518 BEKL)
SITE REPORT
Assessment Requirements
And
Student Checklist
Students’ Name 1. EYELYN LEE XIN YI
2. YOONG AI WEI
Students’ ID 1. 1008613
2. 1008781
Lecturer’s Name MS. NADIRAH
2
Table of Contents
1.0 Introduction..................................................................................................................... 3
1.1 Objective ..................................................................................................................... 3
2.0 Details of the project: ...................................................................................................... 4
3.0 Observation and Activities on Site................................................................................... 5
4.0 Materials on site .............................................................................................................. 7
5.0 Plant and Equipment ..................................................................................................7 - 8
6.0 Site Valuation Process..................................................................................................... 9
7.0 Conclusion .................................................................................................................... 10
3
1.0 Introduction
In 18th Of April 2018, our lecturer held a site visit to a construction site. The project we
visited is located at Mukim Morib, Daerah Kuala Langat, Selangor Darul Ehsan. Before
visiting the site, the lecturer gave all the safety precautions such as encourage to wear the
safety helmet and safety boots when visiting the site. Some student gathered at college
around 8.30am and some of the student straight meets at the site. All of the students reached
the site after one hour journey by van and own car. When we arrived at the site, we meet up
with the people that guide us, the short brief of the project was given by Mr. Lee and his
colleagues after than they start to bring us a tour around the site.
1.1 Objective
 To observe the different activities and techniques carried out on site.
 To learn about the various types of machinery that using in the construction site such
as the crane, bar cutting machine, and scaffolding.
 To learn and understand the importance of safety and take note of the accidents that
may happen before entering into a construction site.
 To know and learn about the construction site environment that will face when
becoming a Quantity Surveyor.
 To have a very close perspective of the whole building structure rather than seeing it
in the illustrations.
4
2.0 Details of the project:
 Project title : CADANGAN PEMBANGUNAN “WATER
PARK” DI ATAS SEBAHAGIAN LOT 13213
(GERAN 314497) (SELUAS 22.0 EKAR), MUKIM
MORIB, DAERAH KUALA LANGAT, SELANGOR
DARUL EHSAN.
 Contract Sum (without hotel) : RM 63,217,500.00
 Construction Period : 1st Nov 2015 – 23rd May 2020
 Client : Sentoria Morib Bay Sdn Bhd
 Architect : SAM Arkitek Perunding
 C&S : HTM Consultants Sdn Bhd
 M&E : ICL Associates Sdn Bhd
 QS : NIL (in house)
 Contractor : Sentoria Bina Sdn Bhd
5
3.0 Observation and Activities on Site
Mr Lee briefs about the project and the progress of the work after we reached the site.
After the briefing session we using the scaffolding to climb up to the second level.
Scaffolding which is a temporary platform for workers to access to a place of work at the
construction sites.
More scaffolding used for several tasks in the second floor.
6
After short observed, we went up to the fourth level of the building (about 9m high) and give
some brief of the progress.
The worker was installing the BRC reinforcement at this level.
Aerial view of part the site.
7
4.0 Materials on site
BRC reinforcement Reinforcement bar
Damp proof membrane
5.0 Plant and Equipment
Scaffolding on the exterior of the
building to gain easy excess to the
upper floors.
Scaffolding in the middle of the building.
8
Steel formwork used to temporary
support the concrete until it reaches
adequate strength
Bar bender used to bend the reinforcement
bar into designed shapes and angles.
Excavator used to excavate or move
large objects.
Tower crane used to carry heavy
loads onto the upper floors.
9
6.0 Site Valuation Process
This is the plan of the construction site. This project is currently under construction by
the world’s highest waterpark and estimated to be completed in October of 2018.
The people that involved in this site visit are Imperia Institute of Technology’s
lecturers, diploma and degree of quantity surveying students. Before going the site, our
lecturer has contacted the person in charge of this project which from Sentoria Bina Sdn Bhd.
When we reached the site, the contractor and contract executive guided us to understand how
the site process, the project progress and our personal safety.
10
7.0 Conclusion
After visited the construction site we gained a lot of experience and have learned
much knowledge that cannot get during the lectures or tutorials session in the classroom.
Most of us are the first time for experiencing climb up the scaffolding, it is a good experience
to us and learn about the construction site environment that will face when becoming a
Quantity Surveyor.
Besides that, we have learned about the various types of machinery that using in the
construction site such as the crane, bar cutting machine, and scaffolding. Safety is very
important when entering the site because that are many dangers will happen on the site.
Finally, after this visited it helped for more understanding for the challenges and
environment going to face in future at the construction site. In overall, we had learned and
gained a lot of experience that cannot get in the classroom and more confident to face with
the challenges as a Quantity Surveyor in future.

Contenu connexe

Tendances

CT site visit report
CT site visit report CT site visit report
CT site visit report
Yap Xin
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
ZIyeeTan
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
Gebeyehu Worku
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
Aisyah Asyikin
 

Tendances (20)

PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Building Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah AlamBuilding Services System in PKNS Complex, Shah Alam
Building Services System in PKNS Complex, Shah Alam
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE  SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Site visit report
Site visit reportSite visit report
Site visit report
 
BCT MODULE 2 - Caisson
BCT MODULE 2 - CaissonBCT MODULE 2 - Caisson
BCT MODULE 2 - Caisson
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Road Safety Audit Malaysian
Road Safety Audit Malaysian Road Safety Audit Malaysian
Road Safety Audit Malaysian
 

Similaire à Site visit report

Project brief
Project brief Project brief
Project brief
PK146
 
Project brief
Project brief Project brief
Project brief
Haziq1511
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
JamesMoy7
 
Project Management (Group)
Project Management (Group)Project Management (Group)
Project Management (Group)
FabienFoo
 

Similaire à Site visit report (20)

Pfm site report in morib
Pfm site report in moribPfm site report in morib
Pfm site report in morib
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
 
Bcon report final 4.0
Bcon report final 4.0Bcon report final 4.0
Bcon report final 4.0
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
Project background
Project backgroundProject background
Project background
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and Technology
 
Project brief
Project brief Project brief
Project brief
 
Infinity studio project report
Infinity studio project reportInfinity studio project report
Infinity studio project report
 
Project brief
Project brief Project brief
Project brief
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
 
Done
DoneDone
Done
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Final Project
Final ProjectFinal Project
Final Project
 
Project Management (Group)
Project Management (Group)Project Management (Group)
Project Management (Group)
 
RCD INTERNSHIP REPORT
RCD INTERNSHIP REPORTRCD INTERNSHIP REPORT
RCD INTERNSHIP REPORT
 

Dernier

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Dernier (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 

Site visit report

  • 1. SCHOOL OF BUILT ENVIRONMENT BSc (Hons) QUANTITY SURVEYING & COST MANAGEMENT PROJECT FINANCIAL MANAGEMENT (6518 BEKL) SITE REPORT Assessment Requirements And Student Checklist Students’ Name 1. EYELYN LEE XIN YI 2. YOONG AI WEI Students’ ID 1. 1008613 2. 1008781 Lecturer’s Name MS. NADIRAH
  • 2. 2 Table of Contents 1.0 Introduction..................................................................................................................... 3 1.1 Objective ..................................................................................................................... 3 2.0 Details of the project: ...................................................................................................... 4 3.0 Observation and Activities on Site................................................................................... 5 4.0 Materials on site .............................................................................................................. 7 5.0 Plant and Equipment ..................................................................................................7 - 8 6.0 Site Valuation Process..................................................................................................... 9 7.0 Conclusion .................................................................................................................... 10
  • 3. 3 1.0 Introduction In 18th Of April 2018, our lecturer held a site visit to a construction site. The project we visited is located at Mukim Morib, Daerah Kuala Langat, Selangor Darul Ehsan. Before visiting the site, the lecturer gave all the safety precautions such as encourage to wear the safety helmet and safety boots when visiting the site. Some student gathered at college around 8.30am and some of the student straight meets at the site. All of the students reached the site after one hour journey by van and own car. When we arrived at the site, we meet up with the people that guide us, the short brief of the project was given by Mr. Lee and his colleagues after than they start to bring us a tour around the site. 1.1 Objective  To observe the different activities and techniques carried out on site.  To learn about the various types of machinery that using in the construction site such as the crane, bar cutting machine, and scaffolding.  To learn and understand the importance of safety and take note of the accidents that may happen before entering into a construction site.  To know and learn about the construction site environment that will face when becoming a Quantity Surveyor.  To have a very close perspective of the whole building structure rather than seeing it in the illustrations.
  • 4. 4 2.0 Details of the project:  Project title : CADANGAN PEMBANGUNAN “WATER PARK” DI ATAS SEBAHAGIAN LOT 13213 (GERAN 314497) (SELUAS 22.0 EKAR), MUKIM MORIB, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN.  Contract Sum (without hotel) : RM 63,217,500.00  Construction Period : 1st Nov 2015 – 23rd May 2020  Client : Sentoria Morib Bay Sdn Bhd  Architect : SAM Arkitek Perunding  C&S : HTM Consultants Sdn Bhd  M&E : ICL Associates Sdn Bhd  QS : NIL (in house)  Contractor : Sentoria Bina Sdn Bhd
  • 5. 5 3.0 Observation and Activities on Site Mr Lee briefs about the project and the progress of the work after we reached the site. After the briefing session we using the scaffolding to climb up to the second level. Scaffolding which is a temporary platform for workers to access to a place of work at the construction sites. More scaffolding used for several tasks in the second floor.
  • 6. 6 After short observed, we went up to the fourth level of the building (about 9m high) and give some brief of the progress. The worker was installing the BRC reinforcement at this level. Aerial view of part the site.
  • 7. 7 4.0 Materials on site BRC reinforcement Reinforcement bar Damp proof membrane 5.0 Plant and Equipment Scaffolding on the exterior of the building to gain easy excess to the upper floors. Scaffolding in the middle of the building.
  • 8. 8 Steel formwork used to temporary support the concrete until it reaches adequate strength Bar bender used to bend the reinforcement bar into designed shapes and angles. Excavator used to excavate or move large objects. Tower crane used to carry heavy loads onto the upper floors.
  • 9. 9 6.0 Site Valuation Process This is the plan of the construction site. This project is currently under construction by the world’s highest waterpark and estimated to be completed in October of 2018. The people that involved in this site visit are Imperia Institute of Technology’s lecturers, diploma and degree of quantity surveying students. Before going the site, our lecturer has contacted the person in charge of this project which from Sentoria Bina Sdn Bhd. When we reached the site, the contractor and contract executive guided us to understand how the site process, the project progress and our personal safety.
  • 10. 10 7.0 Conclusion After visited the construction site we gained a lot of experience and have learned much knowledge that cannot get during the lectures or tutorials session in the classroom. Most of us are the first time for experiencing climb up the scaffolding, it is a good experience to us and learn about the construction site environment that will face when becoming a Quantity Surveyor. Besides that, we have learned about the various types of machinery that using in the construction site such as the crane, bar cutting machine, and scaffolding. Safety is very important when entering the site because that are many dangers will happen on the site. Finally, after this visited it helped for more understanding for the challenges and environment going to face in future at the construction site. In overall, we had learned and gained a lot of experience that cannot get in the classroom and more confident to face with the challenges as a Quantity Surveyor in future.