FMMUG18 :: Seattle 1
Simplify the Complex
Matt Midas
Director of Sales
February 12, 2018
FMMUG18 :: Seattle 2
ID Equipment and
Criticality
Asset Register &
Equipment Records
Life Cycle Asset
Management
Reliability Analysis
& Risk Assessment
Spare Parts Program
Automation &
Controls Program
Calibration Program
OEM Assessment &
Training
Planning &
Scheduling
Metrics and
Measurement
Reliability Strategy
FMMUG18 :: Seattle 3
Building Blocks
Equipment History
- Oral & Written
Equip Failure
Investigations
Maintenance Repair
Analysis
Lube Analysis
OEM Equip Evaluations
FMEAs & RCFA
Maintenance Excellence
Investigations
Spare Parts & Usage
Action Plans
PMs – Job Plans
Task Lines
Spare Parts – ID,
Sourcing & Stocking
Lubrication – Plans &
Routes
Asset Strategy – Repair,
Rebuild, Replace
“Bad Actor”
Equipment Failure
Investigations
Maintenance Plan. &
Sched.
• Regular PMs –
Preventive,
Predictive & CMs
• Minor Shutdowns
• Major Shutdowns
• Unplanned
Shutdowns
Update Asset Plans
• PMs
• Spare Parts
• BOMS
• Lube Plans
• Asset Strategy
• PM, PDM
• Run to Fail
• Repair,
Rebuild,
Replace
Maintenance
Execution
• Breakdowns
• Scheduled PMs
• Predictive
• Rebuilds
Equipment History
• Performance
• Repairs
• Improvement
Statistics by Qtr.
Scorecard
Asset Management
FMMUG18 :: Seattle 4
Waste in Maintenance
Labor Productivity
• Waiting for instructions
• Looking for supervisors
• Checking out the job
• Multiple trips to stores
• Idle at Job Site
• Special tools
• Waiting for approval
• Excess technicians per job
Stores - Materials
• Waiting for Materials
• Travel time to obtain materials
• Time to move materials to job
site
• Time to identify untagged
materials
• Time to find substitute materials
• Time to find parts in
remote/alternative locations
• Requisition/Purchase Order
• Time lost due to:
• Other crafts having material
problems
• Wrong materials planned,
ordered, or delivered
• Materials out of stock
FMMUG18 :: Seattle 5
Planned Maintenance
Reactive without planning
& scheduling
Proactive with
Planning &
Scheduling
Typical Maintenance Worker’s Day - Reactive vs. Proactive
Receiving instructions
Obtaining Tools and materials
Travel to and from job (both with and w/o tools and materials)
Coordination Delays
Idle at job site
Late starts and early quits
Authorized breaks and relief
Excess personal time (extra breaks, phone calls, smoke breaks, slow return from lunch and
breaks, etc.)
Sub-Total
Direct actual work accomplished (as a % if whole day)
5%
12%
15%
8%
5%
5%
10%
5%
65%
35%
3%
5%
10%
3%
2%
1%
10%
1%
35%
65%
Typical Job Planned On-the-Run
Same job if Professionally Planned
Planning Activity Work Activity
Maintenance Practice - Planning and Scheduling
FMMUG18 :: Seattle 6
Planning and Scheduling
Represents an increase of 2.95 FTEs
Full of non-value Waste Moving to LEAN
FMMUG18 :: Seattle 7
Reliability
Lean
Planning and Scheduling
Efficiency
Unleashing the value of your
workforce
Understanding your Assets
Understanding your processes and the value
of your workforce
Understanding your workload and your
resources availability
Eliminating the waste – LEAN
Provide the right tools to maximize the
efficiency of your workforce
Eliminate the Waste
Simplify the Complex
FMMUG18 :: Seattle 8
Joe Lonjin
Maximo Business Analyst
Penn State University, Pennsylvania, USA.
Return on Investment
We are trying not to add more enterprise systems or software, so we critique any new software needs and really try to force an intelligent
decision on whether it is really needed, and provides a return on investment.
AKWIRE was chosen against these standards and provides us value every day.
Doc Palmer
Author, McGraw-Hill Maintenance Planning and Scheduling Handbook, Richard Palmer and Associates, USA.
They Get It!
The best thing about Solufy is they understand planning and scheduling from a maintenance perspective rather than an IT perspective.
All too often, IT people think that if you plan a job for five hours, it should take five hours. IT-centric geared CMMS software is designed around
perfect job plans and perfect schedules that are just not real life.
Dustin Dunaway
Automation and Electrical Manager, Oxy Permian Resources, Texas, USA.
Incredible Results
AKWIRE helped to reduce our average TTR (Time To Repair) from 27 days to 7 days over a three-month implementation period equating to
approximately $25M in savings (bringing on lost production). This was for Maximo priorities 1-7 and with a staff that was reduced by 40 percent.
After the initial phase 1 was so successful, we formed a PIT (Process Improvement Team) and further reduced the TTR by an additional 20 percent

Contenu connexe

Tendances

Why predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effortWhy predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effortWouter Verbeek
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Helen Fisher
 
CBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLCCBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLCCarl Byington
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCarl Byington
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceFuture-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceAnita Raj
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practicesNikhil Nangia
 
Predictive Maintenance Solution -1019
Predictive Maintenance Solution -1019Predictive Maintenance Solution -1019
Predictive Maintenance Solution -1019Percy-Mitchell
 
Business continuity management (case study)
Business continuity management (case study)Business continuity management (case study)
Business continuity management (case study)Wissam Abdel Baki
 
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?Are Your Process Automation Assets in Tune with Your Manufacturing Assets?
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?ARC Advisory Group
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processesTIP Technologies
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance systemjincy joy
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018Helen Fisher
 
Predictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive MaintenancePredictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive MaintenanceMobility Work
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Helen Fisher
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017Helen Fisher
 

Tendances (20)

Why predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effortWhy predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effort
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview
 
CBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLCCBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLC
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
 
Sky Futures
Sky Futures Sky Futures
Sky Futures
 
RCM
RCMRCM
RCM
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceFuture-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practices
 
Predictive Maintenance Solution -1019
Predictive Maintenance Solution -1019Predictive Maintenance Solution -1019
Predictive Maintenance Solution -1019
 
Business continuity management (case study)
Business continuity management (case study)Business continuity management (case study)
Business continuity management (case study)
 
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?Are Your Process Automation Assets in Tune with Your Manufacturing Assets?
Are Your Process Automation Assets in Tune with Your Manufacturing Assets?
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processes
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance system
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018
 
Predictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive MaintenancePredictive Maintenance vs Preventive Maintenance
Predictive Maintenance vs Preventive Maintenance
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Machine maintenance
Machine maintenanceMachine maintenance
Machine maintenance
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017
 

Similaire à Solufy MaxTalk FMMUG 2018

Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceProjetech
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkJacquie (Keith) Chischillie
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMike Poland, CMRP
 
How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...Tristan Wiggill
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 
ERP - Implementation is The Challenge
ERP - Implementation is The ChallengeERP - Implementation is The Challenge
ERP - Implementation is The Challengevinaya.hs
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Ricky Smith CMRP, CMRT
 
Leveraging OEE to Minimize Downtime and Maximize Performance
Leveraging OEE to Minimize Downtime and Maximize PerformanceLeveraging OEE to Minimize Downtime and Maximize Performance
Leveraging OEE to Minimize Downtime and Maximize PerformanceSafetyChain Software
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
Assessment of maintenance management system
Assessment of maintenance management systemAssessment of maintenance management system
Assessment of maintenance management systemSagar Sharma
 
Tool Box Talk - World Class Maintenance Edited
Tool Box Talk - World Class Maintenance   EditedTool Box Talk - World Class Maintenance   Edited
Tool Box Talk - World Class Maintenance EditedRicky Smith CMRP, CMRT
 
How to Reduce Scheduling Headaches & Increase ROI
How to Reduce Scheduling Headaches & Increase ROIHow to Reduce Scheduling Headaches & Increase ROI
How to Reduce Scheduling Headaches & Increase ROIEPAY Systems
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceWillie Carter
 

Similaire à Solufy MaxTalk FMMUG 2018 (20)

Planning And Scheduling Proactively
Planning And Scheduling ProactivelyPlanning And Scheduling Proactively
Planning And Scheduling Proactively
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenance
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM Work
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
 
How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Viziya
Viziya Viziya
Viziya
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
ERP - Implementation is The Challenge
ERP - Implementation is The ChallengeERP - Implementation is The Challenge
ERP - Implementation is The Challenge
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System
 
Leveraging OEE to Minimize Downtime and Maximize Performance
Leveraging OEE to Minimize Downtime and Maximize PerformanceLeveraging OEE to Minimize Downtime and Maximize Performance
Leveraging OEE to Minimize Downtime and Maximize Performance
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
Assessment of maintenance management system
Assessment of maintenance management systemAssessment of maintenance management system
Assessment of maintenance management system
 
Tool Box Talk - World Class Maintenance Edited
Tool Box Talk - World Class Maintenance   EditedTool Box Talk - World Class Maintenance   Edited
Tool Box Talk - World Class Maintenance Edited
 
Let's face it
Let's face itLet's face it
Let's face it
 
How to Reduce Scheduling Headaches & Increase ROI
How to Reduce Scheduling Headaches & Increase ROIHow to Reduce Scheduling Headaches & Increase ROI
How to Reduce Scheduling Headaches & Increase ROI
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for Service
 

Plus de FMMUG

IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsFMMUG
 
IBM Maximo Performance Tuning
IBM Maximo Performance TuningIBM Maximo Performance Tuning
IBM Maximo Performance TuningFMMUG
 
Projetech MaxTalk FMMUG 2018
Projetech MaxTalk FMMUG 2018Projetech MaxTalk FMMUG 2018
Projetech MaxTalk FMMUG 2018FMMUG
 
IBM Maximo Predictive Maintenance FMMUG 2018
IBM Maximo Predictive Maintenance FMMUG 2018IBM Maximo Predictive Maintenance FMMUG 2018
IBM Maximo Predictive Maintenance FMMUG 2018FMMUG
 
JFC & Associates MaxTalk Maximo FMMUG 2018
JFC & Associates MaxTalk Maximo FMMUG 2018JFC & Associates MaxTalk Maximo FMMUG 2018
JFC & Associates MaxTalk Maximo FMMUG 2018FMMUG
 
Interloc MaxTalk FMMUG 2018
Interloc MaxTalk FMMUG 2018Interloc MaxTalk FMMUG 2018
Interloc MaxTalk FMMUG 2018FMMUG
 
Aquitas MaxTalk FMMUG Maximo 2018
Aquitas MaxTalk FMMUG Maximo 2018Aquitas MaxTalk FMMUG Maximo 2018
Aquitas MaxTalk FMMUG Maximo 2018FMMUG
 
TTC MaxTalk FMMUG Maximo 2018
TTC MaxTalk FMMUG Maximo 2018TTC MaxTalk FMMUG Maximo 2018
TTC MaxTalk FMMUG Maximo 2018FMMUG
 
IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018FMMUG
 

Plus de FMMUG (9)

IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and Operators
 
IBM Maximo Performance Tuning
IBM Maximo Performance TuningIBM Maximo Performance Tuning
IBM Maximo Performance Tuning
 
Projetech MaxTalk FMMUG 2018
Projetech MaxTalk FMMUG 2018Projetech MaxTalk FMMUG 2018
Projetech MaxTalk FMMUG 2018
 
IBM Maximo Predictive Maintenance FMMUG 2018
IBM Maximo Predictive Maintenance FMMUG 2018IBM Maximo Predictive Maintenance FMMUG 2018
IBM Maximo Predictive Maintenance FMMUG 2018
 
JFC & Associates MaxTalk Maximo FMMUG 2018
JFC & Associates MaxTalk Maximo FMMUG 2018JFC & Associates MaxTalk Maximo FMMUG 2018
JFC & Associates MaxTalk Maximo FMMUG 2018
 
Interloc MaxTalk FMMUG 2018
Interloc MaxTalk FMMUG 2018Interloc MaxTalk FMMUG 2018
Interloc MaxTalk FMMUG 2018
 
Aquitas MaxTalk FMMUG Maximo 2018
Aquitas MaxTalk FMMUG Maximo 2018Aquitas MaxTalk FMMUG Maximo 2018
Aquitas MaxTalk FMMUG Maximo 2018
 
TTC MaxTalk FMMUG Maximo 2018
TTC MaxTalk FMMUG Maximo 2018TTC MaxTalk FMMUG Maximo 2018
TTC MaxTalk FMMUG Maximo 2018
 
IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018
 

Dernier

call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyviewmasabamasaba
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisamasabamasaba
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrandmasabamasaba
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in sowetomasabamasaba
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...masabamasaba
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...masabamasaba
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...masabamasaba
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesVictorSzoltysek
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park masabamasaba
 
Harnessing ChatGPT - Elevating Productivity in Today's Agile Environment
Harnessing ChatGPT  - Elevating Productivity in Today's Agile EnvironmentHarnessing ChatGPT  - Elevating Productivity in Today's Agile Environment
Harnessing ChatGPT - Elevating Productivity in Today's Agile EnvironmentVictorSzoltysek
 
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2
 
8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech studentsHimanshiGarg82
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsArshad QA
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Bert Jan Schrijver
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...panagenda
 
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdfPayment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdfkalichargn70th171
 
Introducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) SolutionIntroducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) SolutionOnePlan Solutions
 
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...Shane Coughlan
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsJhone kinadey
 

Dernier (20)

call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
Harnessing ChatGPT - Elevating Productivity in Today's Agile Environment
Harnessing ChatGPT  - Elevating Productivity in Today's Agile EnvironmentHarnessing ChatGPT  - Elevating Productivity in Today's Agile Environment
Harnessing ChatGPT - Elevating Productivity in Today's Agile Environment
 
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
 
8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview Questions
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdfPayment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
Payment Gateway Testing Simplified_ A Step-by-Step Guide for Beginners.pdf
 
Introducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) SolutionIntroducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) Solution
 
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
OpenChain - The Ramifications of ISO/IEC 5230 and ISO/IEC 18974 for Legal Pro...
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 

Solufy MaxTalk FMMUG 2018

  • 1. FMMUG18 :: Seattle 1 Simplify the Complex Matt Midas Director of Sales February 12, 2018
  • 2. FMMUG18 :: Seattle 2 ID Equipment and Criticality Asset Register & Equipment Records Life Cycle Asset Management Reliability Analysis & Risk Assessment Spare Parts Program Automation & Controls Program Calibration Program OEM Assessment & Training Planning & Scheduling Metrics and Measurement Reliability Strategy
  • 3. FMMUG18 :: Seattle 3 Building Blocks Equipment History - Oral & Written Equip Failure Investigations Maintenance Repair Analysis Lube Analysis OEM Equip Evaluations FMEAs & RCFA Maintenance Excellence Investigations Spare Parts & Usage Action Plans PMs – Job Plans Task Lines Spare Parts – ID, Sourcing & Stocking Lubrication – Plans & Routes Asset Strategy – Repair, Rebuild, Replace “Bad Actor” Equipment Failure Investigations Maintenance Plan. & Sched. • Regular PMs – Preventive, Predictive & CMs • Minor Shutdowns • Major Shutdowns • Unplanned Shutdowns Update Asset Plans • PMs • Spare Parts • BOMS • Lube Plans • Asset Strategy • PM, PDM • Run to Fail • Repair, Rebuild, Replace Maintenance Execution • Breakdowns • Scheduled PMs • Predictive • Rebuilds Equipment History • Performance • Repairs • Improvement Statistics by Qtr. Scorecard Asset Management
  • 4. FMMUG18 :: Seattle 4 Waste in Maintenance Labor Productivity • Waiting for instructions • Looking for supervisors • Checking out the job • Multiple trips to stores • Idle at Job Site • Special tools • Waiting for approval • Excess technicians per job Stores - Materials • Waiting for Materials • Travel time to obtain materials • Time to move materials to job site • Time to identify untagged materials • Time to find substitute materials • Time to find parts in remote/alternative locations • Requisition/Purchase Order • Time lost due to: • Other crafts having material problems • Wrong materials planned, ordered, or delivered • Materials out of stock
  • 5. FMMUG18 :: Seattle 5 Planned Maintenance Reactive without planning & scheduling Proactive with Planning & Scheduling Typical Maintenance Worker’s Day - Reactive vs. Proactive Receiving instructions Obtaining Tools and materials Travel to and from job (both with and w/o tools and materials) Coordination Delays Idle at job site Late starts and early quits Authorized breaks and relief Excess personal time (extra breaks, phone calls, smoke breaks, slow return from lunch and breaks, etc.) Sub-Total Direct actual work accomplished (as a % if whole day) 5% 12% 15% 8% 5% 5% 10% 5% 65% 35% 3% 5% 10% 3% 2% 1% 10% 1% 35% 65% Typical Job Planned On-the-Run Same job if Professionally Planned Planning Activity Work Activity Maintenance Practice - Planning and Scheduling
  • 6. FMMUG18 :: Seattle 6 Planning and Scheduling Represents an increase of 2.95 FTEs Full of non-value Waste Moving to LEAN
  • 7. FMMUG18 :: Seattle 7 Reliability Lean Planning and Scheduling Efficiency Unleashing the value of your workforce Understanding your Assets Understanding your processes and the value of your workforce Understanding your workload and your resources availability Eliminating the waste – LEAN Provide the right tools to maximize the efficiency of your workforce Eliminate the Waste Simplify the Complex
  • 8. FMMUG18 :: Seattle 8 Joe Lonjin Maximo Business Analyst Penn State University, Pennsylvania, USA. Return on Investment We are trying not to add more enterprise systems or software, so we critique any new software needs and really try to force an intelligent decision on whether it is really needed, and provides a return on investment. AKWIRE was chosen against these standards and provides us value every day. Doc Palmer Author, McGraw-Hill Maintenance Planning and Scheduling Handbook, Richard Palmer and Associates, USA. They Get It! The best thing about Solufy is they understand planning and scheduling from a maintenance perspective rather than an IT perspective. All too often, IT people think that if you plan a job for five hours, it should take five hours. IT-centric geared CMMS software is designed around perfect job plans and perfect schedules that are just not real life. Dustin Dunaway Automation and Electrical Manager, Oxy Permian Resources, Texas, USA. Incredible Results AKWIRE helped to reduce our average TTR (Time To Repair) from 27 days to 7 days over a three-month implementation period equating to approximately $25M in savings (bringing on lost production). This was for Maximo priorities 1-7 and with a staff that was reduced by 40 percent. After the initial phase 1 was so successful, we formed a PIT (Process Improvement Team) and further reduced the TTR by an additional 20 percent