SlideShare une entreprise Scribd logo
1  sur  32
DEMONSTRATION FLIGHT
DEMONSTRATION FLIGHT
Introduction
Demonstration flight (Proving flight) is required as part of the fourth
stage required inAOC.
The stages in conducting flightproving will be explained as follows
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT
Reference
• CASR135.163
• SI 8900-2.3
Proving Test
CASR part 121.105, part 121.163 and part 135.163
require applicants seeking authority to operate certain
types of aircraft and/or new kinds of operations in
revenue service to prove their capability before being
granted operating authority. These applicants must
conduct proving flight
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT
Aircraft Specification
CESSNA C208B EX
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT
Route Information TMH OKL
PRESENTATION PT EXPRESS CARGO AIRLINES
TMH - OKL
WAKT – OKS4 – OKSJ - WAJO
- Distance 76 NM
- AlternateTMH
OKL - TMH
WAJO – OKSJ – OKS4 - WAKT
- Distance 76 NM
- Alternate TMH
DEMONSTRATION FLIGHT
Route Information TMHOKL
FLIGHT PLAN
DEMONSTRATION FLIGHT. Route:TMH-OKL
Segment FlightOperation
PRESENTATION PT EXPRESS CARGO AIRLINES
DEPARTURE AND CLIMB PROCEDURE:
Non visual climb Permitted if all non – visual
Condition met NOT below 1000’ AGL
Recommended Altitudes 9000’ 11000’
DEMONSTRATION FLIGHT. Route:TMH-OKL
Segment FlightOperation
PRESENTATION PT EXPRESS CARGO AIRLINES
FOLLOW FLIGHTPLAN ROUTE @
MINIMULALTITUDE OF 7000 FEET
VISUAL
Emergency Airstrips Reversal
Procedures : At any point left turn
to establish back on Track until
WAJO at IMC altitude
DEMONSTRATION FLIGHT. Route:TMH-OKL
Segment Flight Operation
PRESENTATION PT EXPRESS CARGO AIRLINES
ARRIVAL:
Visual descent only
VNAV 5000’ 1 NM Before OKS 500
FPM
DEMONSTRATION FLIGHT. Route:TMH-OKL
Segment Flight Operation
PRESENTATION PT EXPRESS CARGO AIRLINES
LANDING :
RUNWAY11 / 29
VISUALAPPROACH ONLY
4000 FEETELEVATION ON TOUCHDOWN
DEMONSTRATION FLIGHT. Route:OKL-TMH
Segment FlightOperation
PRESENTATION PT EXPRESS CARGO AIRLINES
DEPARTURE AND CLIMB PROCEDURE:
Visual only Climb but Be Established at
Required altitude before entering non visual
Condition
Recommended Altitudes 10000’ 12000’
DEMONSTRATION FLIGHT. Route:OKL-TMH
Segment FlightOperation
PRESENTATION PT EXPRESS CARGO AIRLINES
FOLLOW FLIGHTPLAN ROUTE @
MINIMULALTITUDE OF 8000 FEET
VISUAL
Emergency Airstrips Reversal
Procedures : At any time after OKS3
and before 2000’
DEMONSTRATION FLIGHT. Route:OKL-TMH
Segment Flight Operation
PRESENTATION PT EXPRESS CARGO AIRLINES
ARRIVAL:
Non Visual descent permiteed to
1500’ Must be Visual below 1500’
Start descent only at 10 NM past
OKS4
VNAV 1100’ 2NM Before WAKT 500
FPM
DEMONSTRATION FLIGHT. Route:OKL-TMH
Segment Flight Operation
PRESENTATION PT EXPRESS CARGO AIRLINES
LANDING :
RUNWAY07 / 25
VISUALAPPROACH ONLY
DEMONSTRATION FLIGHT. Route:CGK-BPN
High Identification and RiskAssessment
SEVERTITY INDEX
Severity of Occurrence
Average Definition Meaning Value
Catastrophic Destroyed/Multiple Death A
Hazardous Facilities/Major Damage B
Major Serous Incident/Injuries C
Minor Minor Incident D
Negligible Little Consequence E
PROBABILITY INDEX
Probability of Occurrence
Qualitative Meaning Value
Frequent Likely to occur many times 5
Occasional Facilities/Major Damage 4
Remote Unlikely, but possible to occur 3
Improbable Very unlikely to occur 2
Extremely Improbable Almost inconceivable 1
RISK
MANAGEMENT
ASSESMENT RISK
INDEX
COMPANY
INTOLERABLE
REGION
5A, 5B,
5C,4A,4B,3A
Unacceptable under
the existing
circumstances
TOLERABLE
AFTER
MITIGATED
5D, 5E, 4C, 4D, 4E,
3B, 3C, 3D, 2A, 2B,
2C
Unacceptable unless
risks is mitigated
ACCEPTABLE
REGION
3E, 2D, 2E,1A,1B,
1C, 1D,1E
Acceptable
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT
High Identification and RiskAssessment FlightOperation
C 208B EX
PRESENTATION PT EXPRESS CARGO AIRLINES
Aircraft & PersonelData Operational Data Related to Company HIRA Team
Aircraft C 208B EX Operation
Manager
Chief Pilot
SSQ Manager
FlightCrew CAPT J. DWI HADYAN
CAPT T.KARIMAH
FO KRISTIYONO
FO DAVID PARTAHI
Ground Support/Handling NAYAG CITRA BALIEM ?
DEMONSTRATION FLIGHT. Route:TMH-OKL
Operational Hazard Identification RiskAssessment
C 208B EX Route TMH- OKL
PRESENTATION PT EXPRESS CARGO AIRLINES
No Hazard
Risk Description &
Current Index
Initial Risk Index Risk Mitigation
Residual Risk
Index
Action
Responsibility
1
PAPUA MOUNTAIN
OPERATION WITH
HIGH TERRAIN
INVOLVED
• PT ECA
CARAVAN
EQUIPPED WITH
TAWS
• PT ECA PROVIDE
PILOT WITH
ADEQUATE
EXPERIENCE ON
PAPUA MOUNTAIN
OPERATION
OPS
SSQ
MAINTENANCE
2
HIGH AMOUNT OF
TRAFFIC AROUND
OPERATING
AERODROMES
•PT ECA CARAVAN
EQUIPPED WITH
TCAS
OPS
SSQ
MAINTENANCE
3
HIGH ELEVATION
TAKE OFF
LANDING
OPERATION
•PT ECA PROVIDE
PILOT WITH
ADEQUATE
EXPERIENCE ON
PAPUA MOUNTAIN
OPERATION
OPS
SSQ
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Introduction
An Emergency Response Plan meant to guide the company
and its personnel in dealing with unexpected emergency
situation with objectives to coordinate all company effort in
preventing the victim from further unnecessary injury. With
the introduction of new aircraft type to the company, it is
required to demonstrate that Deraya is capable in handling
emergencyoccurrence.
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Reference
CASR 135amendment12:
I. Appendix G 1.4
II. Operations Manual PartA
III. Safety Management SystemManual
IV. Emergency Response PlanManual
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Purpose
1. T
opractice procedureseffectiveness
2. T
oexerciseteam work and coordination in respond and
handling anemergency
3. Demonstrate the effectiveness of crewemergencytraining
and evacuationprocedures
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Target
1. Provide the head quarter staff experience in respond and
handling andemergency.
2. Able to evaluatethe procedure for further improvement
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Scope 0fExercise
1) Individual Roles Training
• Operations Department, Operations Control Center
, Technical
Departments, Administration/Finance Department, initially practices ERP
individual roles/function
• Flight Crew, briefing and practice aircraft drill as necessary.
2) Combined Exercise.
• On the proposed time the company practice responding and handling a
simulated aircraft emergency:
• The Head Quarter respond to aircraft report inemergency
• Crew practice emergency evacuation – terrain due to Wheel Well Fire
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Personnel Involved
PRESENTATION PT EXPRESS CARGO AIRLINES
No Name Position Roles
1
2
3
4
5
6
OPERATION MANAGER
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
ERPSTRUCTURE
DGCA INSPECTOR
ERP DRILL DIRECTOR
1st Scenario
NormalFlight
2nd Scenario
Diversion Flight
3rd Scenario
RTB Flight
SITE/STATION
CRISIS CENTER
CRISIS CENTER
BOARD OFDIRECTOR
OPERATION MANAGER
PRESENTATION PT EXPRESS CARGO AIRLINES
OPERATION CRISIS
CENTER
EMERGENCY RESPONSE PLAN
MAY DAY MAY DAY
PK-ECA CARGO FIRE,
REQUIRED EXPEDITE
DESCENT
ATC
FLOPS
OCC
OPERATIONAL CONTROL CENTER:
- Operation Division
- Maintenance Division
- Others as Required
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Equipment’sInvolved
EQUIPMENTREQUIRED
PRESENTATION PT EXPRESS CARGO AIRLINES
REMARK
ASpecified Room as CMC Equippedwith:
- Round T
able&chairs
- Communications
- Mapsand Charts as required
- RequiredManuals
- ERPFlow Charts & ContactPersons
- Checklist for Individual ERT
eammember
- White board
Available
Phones, Fax,Email
Available
Available
Available
Available
Available
DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN
Procedure to bePracticed
Company Respond to anaircraft accident
The scope of the ERP respond practice will be limited to:
• Notification after received information an aircraft in emergencysituation
• Initial response
• Actions of CrisisCenter
• Accident Site.
Crew practicing aircraft emergency evacuation drill – terrain.
• Classical review, briefing and practice regarding the use of emergency equipment and
procedures.
• Simulated crew briefing due to emergency condition due to cargo smoke.
• Crew practices the simulated emergency evacuationprocedure.
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: FLIGHT SCENARIO
FlightScenario:
PRESENTATION PT EXPRESS CARGO AIRLINES
TMH - OKL
OKL - TMH
DEMONSTRATION FLIGHT: FLIGHT SCENARIO
Flight Scenario1: UNRESTSAT DESTINATION
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: FLIGHT SCENARIO
Flight Scenario2: PIC INCAPACITATED
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: FLIGHT SCENARIO
Communication FlowChart:
PRESENTATION PT EXPRESS CARGO AIRLINES
DEMONSTRATION FLIGHT: CHECKLIST
Check List:
PRESENTATION PT EXPRESS CARGO AIRLINES

Contenu connexe

Similaire à demo flight Eca caravan.pptx

Runway Condition Reporting
Runway Condition ReportingRunway Condition Reporting
Runway Condition Reporting
apcae
 
FSA_Flying Ops
FSA_Flying OpsFSA_Flying Ops
FSA_Flying Ops
Greg Cox
 
Visual approach
Visual approachVisual approach
Visual approach
AbuRoma
 
Final Report -Aircraft Design
Final Report -Aircraft DesignFinal Report -Aircraft Design
Final Report -Aircraft Design
Thomas Spisak
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3
tomrickard
 
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdfESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
Aman899833
 

Similaire à demo flight Eca caravan.pptx (20)

Runway Condition Reporting
Runway Condition ReportingRunway Condition Reporting
Runway Condition Reporting
 
A320 NORMAL PROCEDURES
A320 NORMAL PROCEDURESA320 NORMAL PROCEDURES
A320 NORMAL PROCEDURES
 
Ifr quick reviewsheets pilot cafe
Ifr quick reviewsheets pilot cafeIfr quick reviewsheets pilot cafe
Ifr quick reviewsheets pilot cafe
 
Assignment_Airport Operation_SahibJada_EyakubKhan_BSMRAAU_MBA.pdf
Assignment_Airport Operation_SahibJada_EyakubKhan_BSMRAAU_MBA.pdfAssignment_Airport Operation_SahibJada_EyakubKhan_BSMRAAU_MBA.pdf
Assignment_Airport Operation_SahibJada_EyakubKhan_BSMRAAU_MBA.pdf
 
Airside Ops & Ntm
Airside Ops & NtmAirside Ops & Ntm
Airside Ops & Ntm
 
FSA_Flying Ops
FSA_Flying OpsFSA_Flying Ops
FSA_Flying Ops
 
Visual approach
Visual approachVisual approach
Visual approach
 
Airspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptxAirspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptx
 
Media Object File Flt Ops Appr Seq03
Media Object File Flt Ops Appr Seq03Media Object File Flt Ops Appr Seq03
Media Object File Flt Ops Appr Seq03
 
A320 normal-procedures
A320 normal-proceduresA320 normal-procedures
A320 normal-procedures
 
Final Report -Aircraft Design
Final Report -Aircraft DesignFinal Report -Aircraft Design
Final Report -Aircraft Design
 
Flying safely at fakr
Flying safely at fakrFlying safely at fakr
Flying safely at fakr
 
Air traffic management
Air traffic managementAir traffic management
Air traffic management
 
Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08
 
Fallas Múltiples
Fallas MúltiplesFallas Múltiples
Fallas Múltiples
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3
 
A320.pdf
A320.pdfA320.pdf
A320.pdf
 
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfFLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
 
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdfESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
ESCO Zodiac Aerospace Solutions Workshop Presentation.pdf
 
2016 07 CMY resume
2016 07 CMY resume2016 07 CMY resume
2016 07 CMY resume
 

Dernier

No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
Sheetaleventcompany
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
raffaeleoman
 

Dernier (20)

No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 

demo flight Eca caravan.pptx

  • 2. DEMONSTRATION FLIGHT Introduction Demonstration flight (Proving flight) is required as part of the fourth stage required inAOC. The stages in conducting flightproving will be explained as follows PRESENTATION PT EXPRESS CARGO AIRLINES
  • 3. DEMONSTRATION FLIGHT Reference • CASR135.163 • SI 8900-2.3 Proving Test CASR part 121.105, part 121.163 and part 135.163 require applicants seeking authority to operate certain types of aircraft and/or new kinds of operations in revenue service to prove their capability before being granted operating authority. These applicants must conduct proving flight PRESENTATION PT EXPRESS CARGO AIRLINES
  • 4. DEMONSTRATION FLIGHT Aircraft Specification CESSNA C208B EX PRESENTATION PT EXPRESS CARGO AIRLINES
  • 5. DEMONSTRATION FLIGHT Route Information TMH OKL PRESENTATION PT EXPRESS CARGO AIRLINES TMH - OKL WAKT – OKS4 – OKSJ - WAJO - Distance 76 NM - AlternateTMH OKL - TMH WAJO – OKSJ – OKS4 - WAKT - Distance 76 NM - Alternate TMH
  • 7. DEMONSTRATION FLIGHT. Route:TMH-OKL Segment FlightOperation PRESENTATION PT EXPRESS CARGO AIRLINES DEPARTURE AND CLIMB PROCEDURE: Non visual climb Permitted if all non – visual Condition met NOT below 1000’ AGL Recommended Altitudes 9000’ 11000’
  • 8. DEMONSTRATION FLIGHT. Route:TMH-OKL Segment FlightOperation PRESENTATION PT EXPRESS CARGO AIRLINES FOLLOW FLIGHTPLAN ROUTE @ MINIMULALTITUDE OF 7000 FEET VISUAL Emergency Airstrips Reversal Procedures : At any point left turn to establish back on Track until WAJO at IMC altitude
  • 9. DEMONSTRATION FLIGHT. Route:TMH-OKL Segment Flight Operation PRESENTATION PT EXPRESS CARGO AIRLINES ARRIVAL: Visual descent only VNAV 5000’ 1 NM Before OKS 500 FPM
  • 10. DEMONSTRATION FLIGHT. Route:TMH-OKL Segment Flight Operation PRESENTATION PT EXPRESS CARGO AIRLINES LANDING : RUNWAY11 / 29 VISUALAPPROACH ONLY 4000 FEETELEVATION ON TOUCHDOWN
  • 11. DEMONSTRATION FLIGHT. Route:OKL-TMH Segment FlightOperation PRESENTATION PT EXPRESS CARGO AIRLINES DEPARTURE AND CLIMB PROCEDURE: Visual only Climb but Be Established at Required altitude before entering non visual Condition Recommended Altitudes 10000’ 12000’
  • 12. DEMONSTRATION FLIGHT. Route:OKL-TMH Segment FlightOperation PRESENTATION PT EXPRESS CARGO AIRLINES FOLLOW FLIGHTPLAN ROUTE @ MINIMULALTITUDE OF 8000 FEET VISUAL Emergency Airstrips Reversal Procedures : At any time after OKS3 and before 2000’
  • 13. DEMONSTRATION FLIGHT. Route:OKL-TMH Segment Flight Operation PRESENTATION PT EXPRESS CARGO AIRLINES ARRIVAL: Non Visual descent permiteed to 1500’ Must be Visual below 1500’ Start descent only at 10 NM past OKS4 VNAV 1100’ 2NM Before WAKT 500 FPM
  • 14. DEMONSTRATION FLIGHT. Route:OKL-TMH Segment Flight Operation PRESENTATION PT EXPRESS CARGO AIRLINES LANDING : RUNWAY07 / 25 VISUALAPPROACH ONLY
  • 15. DEMONSTRATION FLIGHT. Route:CGK-BPN High Identification and RiskAssessment SEVERTITY INDEX Severity of Occurrence Average Definition Meaning Value Catastrophic Destroyed/Multiple Death A Hazardous Facilities/Major Damage B Major Serous Incident/Injuries C Minor Minor Incident D Negligible Little Consequence E PROBABILITY INDEX Probability of Occurrence Qualitative Meaning Value Frequent Likely to occur many times 5 Occasional Facilities/Major Damage 4 Remote Unlikely, but possible to occur 3 Improbable Very unlikely to occur 2 Extremely Improbable Almost inconceivable 1 RISK MANAGEMENT ASSESMENT RISK INDEX COMPANY INTOLERABLE REGION 5A, 5B, 5C,4A,4B,3A Unacceptable under the existing circumstances TOLERABLE AFTER MITIGATED 5D, 5E, 4C, 4D, 4E, 3B, 3C, 3D, 2A, 2B, 2C Unacceptable unless risks is mitigated ACCEPTABLE REGION 3E, 2D, 2E,1A,1B, 1C, 1D,1E Acceptable PRESENTATION PT EXPRESS CARGO AIRLINES
  • 16. DEMONSTRATION FLIGHT High Identification and RiskAssessment FlightOperation C 208B EX PRESENTATION PT EXPRESS CARGO AIRLINES Aircraft & PersonelData Operational Data Related to Company HIRA Team Aircraft C 208B EX Operation Manager Chief Pilot SSQ Manager FlightCrew CAPT J. DWI HADYAN CAPT T.KARIMAH FO KRISTIYONO FO DAVID PARTAHI Ground Support/Handling NAYAG CITRA BALIEM ?
  • 17. DEMONSTRATION FLIGHT. Route:TMH-OKL Operational Hazard Identification RiskAssessment C 208B EX Route TMH- OKL PRESENTATION PT EXPRESS CARGO AIRLINES No Hazard Risk Description & Current Index Initial Risk Index Risk Mitigation Residual Risk Index Action Responsibility 1 PAPUA MOUNTAIN OPERATION WITH HIGH TERRAIN INVOLVED • PT ECA CARAVAN EQUIPPED WITH TAWS • PT ECA PROVIDE PILOT WITH ADEQUATE EXPERIENCE ON PAPUA MOUNTAIN OPERATION OPS SSQ MAINTENANCE 2 HIGH AMOUNT OF TRAFFIC AROUND OPERATING AERODROMES •PT ECA CARAVAN EQUIPPED WITH TCAS OPS SSQ MAINTENANCE 3 HIGH ELEVATION TAKE OFF LANDING OPERATION •PT ECA PROVIDE PILOT WITH ADEQUATE EXPERIENCE ON PAPUA MOUNTAIN OPERATION OPS SSQ
  • 18. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Introduction An Emergency Response Plan meant to guide the company and its personnel in dealing with unexpected emergency situation with objectives to coordinate all company effort in preventing the victim from further unnecessary injury. With the introduction of new aircraft type to the company, it is required to demonstrate that Deraya is capable in handling emergencyoccurrence. PRESENTATION PT EXPRESS CARGO AIRLINES
  • 19. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Reference CASR 135amendment12: I. Appendix G 1.4 II. Operations Manual PartA III. Safety Management SystemManual IV. Emergency Response PlanManual PRESENTATION PT EXPRESS CARGO AIRLINES
  • 20. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Purpose 1. T opractice procedureseffectiveness 2. T oexerciseteam work and coordination in respond and handling anemergency 3. Demonstrate the effectiveness of crewemergencytraining and evacuationprocedures PRESENTATION PT EXPRESS CARGO AIRLINES
  • 21. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Target 1. Provide the head quarter staff experience in respond and handling andemergency. 2. Able to evaluatethe procedure for further improvement PRESENTATION PT EXPRESS CARGO AIRLINES
  • 22. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Scope 0fExercise 1) Individual Roles Training • Operations Department, Operations Control Center , Technical Departments, Administration/Finance Department, initially practices ERP individual roles/function • Flight Crew, briefing and practice aircraft drill as necessary. 2) Combined Exercise. • On the proposed time the company practice responding and handling a simulated aircraft emergency: • The Head Quarter respond to aircraft report inemergency • Crew practice emergency evacuation – terrain due to Wheel Well Fire PRESENTATION PT EXPRESS CARGO AIRLINES
  • 23. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Personnel Involved PRESENTATION PT EXPRESS CARGO AIRLINES No Name Position Roles 1 2 3 4 5 6
  • 24. OPERATION MANAGER DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN ERPSTRUCTURE DGCA INSPECTOR ERP DRILL DIRECTOR 1st Scenario NormalFlight 2nd Scenario Diversion Flight 3rd Scenario RTB Flight SITE/STATION CRISIS CENTER CRISIS CENTER BOARD OFDIRECTOR OPERATION MANAGER PRESENTATION PT EXPRESS CARGO AIRLINES OPERATION CRISIS CENTER
  • 25. EMERGENCY RESPONSE PLAN MAY DAY MAY DAY PK-ECA CARGO FIRE, REQUIRED EXPEDITE DESCENT ATC FLOPS OCC OPERATIONAL CONTROL CENTER: - Operation Division - Maintenance Division - Others as Required PRESENTATION PT EXPRESS CARGO AIRLINES
  • 26. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Equipment’sInvolved EQUIPMENTREQUIRED PRESENTATION PT EXPRESS CARGO AIRLINES REMARK ASpecified Room as CMC Equippedwith: - Round T able&chairs - Communications - Mapsand Charts as required - RequiredManuals - ERPFlow Charts & ContactPersons - Checklist for Individual ERT eammember - White board Available Phones, Fax,Email Available Available Available Available Available
  • 27. DEMONSTRATION FLIGHT: EMERGENCY RESPONSE PLAN Procedure to bePracticed Company Respond to anaircraft accident The scope of the ERP respond practice will be limited to: • Notification after received information an aircraft in emergencysituation • Initial response • Actions of CrisisCenter • Accident Site. Crew practicing aircraft emergency evacuation drill – terrain. • Classical review, briefing and practice regarding the use of emergency equipment and procedures. • Simulated crew briefing due to emergency condition due to cargo smoke. • Crew practices the simulated emergency evacuationprocedure. PRESENTATION PT EXPRESS CARGO AIRLINES
  • 28. DEMONSTRATION FLIGHT: FLIGHT SCENARIO FlightScenario: PRESENTATION PT EXPRESS CARGO AIRLINES TMH - OKL OKL - TMH
  • 29. DEMONSTRATION FLIGHT: FLIGHT SCENARIO Flight Scenario1: UNRESTSAT DESTINATION PRESENTATION PT EXPRESS CARGO AIRLINES
  • 30. DEMONSTRATION FLIGHT: FLIGHT SCENARIO Flight Scenario2: PIC INCAPACITATED PRESENTATION PT EXPRESS CARGO AIRLINES
  • 31. DEMONSTRATION FLIGHT: FLIGHT SCENARIO Communication FlowChart: PRESENTATION PT EXPRESS CARGO AIRLINES
  • 32. DEMONSTRATION FLIGHT: CHECKLIST Check List: PRESENTATION PT EXPRESS CARGO AIRLINES