SlideShare une entreprise Scribd logo
1  sur  11
Télécharger pour lire hors ligne
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.




           Create Valore nella Vostra
                   Società:
           Trasformate le Difficoltà in
                  Opportunità

                          Franco Oboni & Cesar Oboni
                        Oboni Riskope Associates Inc.,
                      Vancouver, British Columbia, Canada




(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 1 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.


Generalmente le aziende, quando non rifuggono l’analisi
del rischio, si affidano al metodo dei PIG (Grafici
Probabilità-Impatto):

 Probabilità e conseguenze mal
      definite e arbitrarie


  Errori concettuali intrinseci

 I rischi sono mal rappresentati
   perché definiti come entità
             discrete

 Cruscotti poco «parlanti» con
  scarse indicazioni su dove
           intervenire



(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 2 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.

                           La Gestione dei Rischi
non va vista come un obbligo, uno strumento di riduzione
          delle perdite, un ripensamento, bensì
       come uno strumento di Creazione di Valore

        Integrazione Strategica di Conoscenza,
      Informazione e del “Paesaggio” di Rischio:

        Optimum Risk Estimates (ORE)
                  ü
                      Pianificare Meglio
                  ü
                      Investire Oculatamente
                  ü
                      Ridimensionare le Assicurazioni
                  ü
                      Evitare Rischi Inutili
(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 3 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.


Costruzione di una Curva di Tollerabilità, che esiste ed
    è propria di ogni progetto, operazione, società.
Per ogni rischio si può ora valutare la parte intollerabile
             (arancione) vs tollerabile (blu).




 (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 4 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.



    Classifica dei rischi in ordine decrescente di
                     rischio totale.




   Buon risultato, ma questa scala è sufficiente per capire come
                           procedere?
(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 5 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.


 La migliore scala di priorità si ottiene considerando la parte
              intollerabile dei rischi (arancione).
          Ciò costituisce il principio base degli ORE
                                            Dove agire: 83%
                                               del rischio
                                              intollerabile
                                                 totale




I soli rischi realmente pericolosi sono quelli che vanno al di
là della tollerabilità, creata specificatamente per l’azienda o
                  progetto oggetto dello studio.
 (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 6 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.




 Per ragioni di sicurezza e di
  controllo della crescente
complessità i moderni cruscotti
  sono ben più sofisticati di
       quello a fianco.

 Ma allora, perché utilizzare
metodi obsoleti (PIG) per una
  gestione innovativa delle
          società?

 Ciò che serve è avere tutte le indicazioni utili disponibili e
      ben visibili per “guidare sicuri” e creare Valore

 (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 7 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.


                  Esempio di cruscotto ORE (1/2)




(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 8 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.


                  Esempio di cruscotto ORE (2/2)




(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 9 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.




      Gli ORE danno un forte vantaggio competitivo
                                             Perché
    Ad ogni rischio corrisponde un'opportunità: saper
     valutare correttamente é la chiave del successo


AFFIDABILE: risultato di oltre vent'anni di esperienza mondiale, è
stato implementato presso molti clienti.
Compatibile con la norma ISO 31000

VERSATILE: applicabile a qualsiasi business, per interventi a livello
di acquisizioni, prefattibilità, operazioni, cambiamenti e
ristrutturazioni


(c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 10 of 11 15/11/2012
Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società.




  Con Riskope / ORE
  potete “guidare” il
  Vostro Business in
  sicurezza verso la
    prosperità che
       meritate




CONTACT:
Franco Oboni
foboni(a)riskope.com
 (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 11 of 11 15/11/2012

Contenu connexe

En vedette

1st Network-of-BioThings Hackathon
1st Network-of-BioThings Hackathon1st Network-of-BioThings Hackathon
1st Network-of-BioThings HackathonMichel Dumontier
 
Designing a Social Business
Designing a Social BusinessDesigning a Social Business
Designing a Social BusinessPatrick Gladney
 
What Is Windows Azure
What Is Windows AzureWhat Is Windows Azure
What Is Windows AzureDominic Green
 
Health monitoring & predictive analytics to lower the TCO in a datacenter
Health monitoring & predictive analytics to lower the TCO in a datacenterHealth monitoring & predictive analytics to lower the TCO in a datacenter
Health monitoring & predictive analytics to lower the TCO in a datacenterAndrei Khurshudov
 
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...Sascha Funk
 
Reputation snapshot for the banking industry, 2012, final
Reputation snapshot for the banking industry, 2012, finalReputation snapshot for the banking industry, 2012, final
Reputation snapshot for the banking industry, 2012, finalDamjana Kocjanc
 
Rockford
RockfordRockford
Rockfordjanfiga
 
English Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewEnglish Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewThomas Nastas
 
Kenenisa
KenenisaKenenisa
Kenenisargana
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationIain Sanders
 
GeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet
 
Better Search With Structured Knowledge
Better Search With Structured KnowledgeBetter Search With Structured Knowledge
Better Search With Structured KnowledgeMichel Dumontier
 

En vedette (20)

Squizz presentation
Squizz presentationSquizz presentation
Squizz presentation
 
1st Network-of-BioThings Hackathon
1st Network-of-BioThings Hackathon1st Network-of-BioThings Hackathon
1st Network-of-BioThings Hackathon
 
Designing a Social Business
Designing a Social BusinessDesigning a Social Business
Designing a Social Business
 
What Is Windows Azure
What Is Windows AzureWhat Is Windows Azure
What Is Windows Azure
 
Health monitoring & predictive analytics to lower the TCO in a datacenter
Health monitoring & predictive analytics to lower the TCO in a datacenterHealth monitoring & predictive analytics to lower the TCO in a datacenter
Health monitoring & predictive analytics to lower the TCO in a datacenter
 
Howgirlsunderstand
HowgirlsunderstandHowgirlsunderstand
Howgirlsunderstand
 
Collaborate
CollaborateCollaborate
Collaborate
 
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...
University Students Fighting World Hunger - Slacktivism vs. Activism. Does a ...
 
Reputation snapshot for the banking industry, 2012, final
Reputation snapshot for the banking industry, 2012, finalReputation snapshot for the banking industry, 2012, final
Reputation snapshot for the banking industry, 2012, final
 
Rockford
RockfordRockford
Rockford
 
Cassass presentation WLF2 Rome
Cassass presentation WLF2 RomeCassass presentation WLF2 Rome
Cassass presentation WLF2 Rome
 
English Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewEnglish Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus Review
 
Chemistry Intro
Chemistry IntroChemistry Intro
Chemistry Intro
 
Kenenisa
KenenisaKenenisa
Kenenisa
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed Generation
 
Tennessee Ballot
Tennessee BallotTennessee Ballot
Tennessee Ballot
 
GeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet Iasi Intro
GeekMeet Iasi Intro
 
Lourenza
LourenzaLourenza
Lourenza
 
Better Search With Structured Knowledge
Better Search With Structured KnowledgeBetter Search With Structured Knowledge
Better Search With Structured Knowledge
 
Nozawa thesis
Nozawa thesisNozawa thesis
Nozawa thesis
 

Plus de Oboni Riskope Associates Inc.

Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Oboni Riskope Associates Inc.
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Oboni Riskope Associates Inc.
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Associates Inc.
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeOboni Riskope Associates Inc.
 

Plus de Oboni Riskope Associates Inc. (20)

Riskope new web site announcement
Riskope new web site announcementRiskope new web site announcement
Riskope new web site announcement
 
Rational Risk and Crisis Management Course
Rational Risk and Crisis Management CourseRational Risk and Crisis Management Course
Rational Risk and Crisis Management Course
 
Cim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniukCim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniuk
 
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
 
Riskope for christmas 2012
Riskope for christmas 2012Riskope for christmas 2012
Riskope for christmas 2012
 
Ore cockpit castellano
Ore cockpit castellanoOre cockpit castellano
Ore cockpit castellano
 
Mining 012 riskope is it true that pi_gs
Mining 012 riskope  is it true that pi_gsMining 012 riskope  is it true that pi_gs
Mining 012 riskope is it true that pi_gs
 
Bogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining SummitBogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining Summit
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
 
Review ICS Guidelines
Review ICS GuidelinesReview ICS Guidelines
Review ICS Guidelines
 
Road Safety- Sicurezza Stradale
Road Safety- Sicurezza StradaleRoad Safety- Sicurezza Stradale
Road Safety- Sicurezza Stradale
 
Tolerability and Decision Making Discussion
Tolerability and Decision Making DiscussionTolerability and Decision Making Discussion
Tolerability and Decision Making Discussion
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, Riskope
 
Rims Metals and Mining Session
Rims Metals and Mining Session Rims Metals and Mining Session
Rims Metals and Mining Session
 
Force Majeure: a Time Bomb
Force Majeure: a Time BombForce Majeure: a Time Bomb
Force Majeure: a Time Bomb
 
Oboni02 castellano
Oboni02 castellanoOboni02 castellano
Oboni02 castellano
 
Oboni01 castellano
Oboni01 castellanoOboni01 castellano
Oboni01 castellano
 
Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2
 
Force Majeure Clause in Contracts
Force Majeure Clause in ContractsForce Majeure Clause in Contracts
Force Majeure Clause in Contracts
 

Ore creazione di valore flash

  • 1. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Create Valore nella Vostra Società: Trasformate le Difficoltà in Opportunità Franco Oboni & Cesar Oboni Oboni Riskope Associates Inc., Vancouver, British Columbia, Canada (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 1 of 11 15/11/2012
  • 2. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Generalmente le aziende, quando non rifuggono l’analisi del rischio, si affidano al metodo dei PIG (Grafici Probabilità-Impatto): Probabilità e conseguenze mal definite e arbitrarie Errori concettuali intrinseci I rischi sono mal rappresentati perché definiti come entità discrete Cruscotti poco «parlanti» con scarse indicazioni su dove intervenire (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 2 of 11 15/11/2012
  • 3. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. La Gestione dei Rischi non va vista come un obbligo, uno strumento di riduzione delle perdite, un ripensamento, bensì come uno strumento di Creazione di Valore Integrazione Strategica di Conoscenza, Informazione e del “Paesaggio” di Rischio: Optimum Risk Estimates (ORE) ü Pianificare Meglio ü Investire Oculatamente ü Ridimensionare le Assicurazioni ü Evitare Rischi Inutili (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 3 of 11 15/11/2012
  • 4. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Costruzione di una Curva di Tollerabilità, che esiste ed è propria di ogni progetto, operazione, società. Per ogni rischio si può ora valutare la parte intollerabile (arancione) vs tollerabile (blu). (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 4 of 11 15/11/2012
  • 5. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Classifica dei rischi in ordine decrescente di rischio totale. Buon risultato, ma questa scala è sufficiente per capire come procedere? (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 5 of 11 15/11/2012
  • 6. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. La migliore scala di priorità si ottiene considerando la parte intollerabile dei rischi (arancione). Ciò costituisce il principio base degli ORE Dove agire: 83% del rischio intollerabile totale I soli rischi realmente pericolosi sono quelli che vanno al di là della tollerabilità, creata specificatamente per l’azienda o progetto oggetto dello studio. (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 6 of 11 15/11/2012
  • 7. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Per ragioni di sicurezza e di controllo della crescente complessità i moderni cruscotti sono ben più sofisticati di quello a fianco. Ma allora, perché utilizzare metodi obsoleti (PIG) per una gestione innovativa delle società? Ciò che serve è avere tutte le indicazioni utili disponibili e ben visibili per “guidare sicuri” e creare Valore (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 7 of 11 15/11/2012
  • 8. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Esempio di cruscotto ORE (1/2) (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 8 of 11 15/11/2012
  • 9. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Esempio di cruscotto ORE (2/2) (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 9 of 11 15/11/2012
  • 10. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Gli ORE danno un forte vantaggio competitivo Perché Ad ogni rischio corrisponde un'opportunità: saper valutare correttamente é la chiave del successo AFFIDABILE: risultato di oltre vent'anni di esperienza mondiale, è stato implementato presso molti clienti. Compatibile con la norma ISO 31000 VERSATILE: applicabile a qualsiasi business, per interventi a livello di acquisizioni, prefattibilità, operazioni, cambiamenti e ristrutturazioni (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 10 of 11 15/11/2012
  • 11. Gli Optimum Risk Estimates (ORE) sono una moderna ed efficiente bussola per la tua società. Con Riskope / ORE potete “guidare” il Vostro Business in sicurezza verso la prosperità che meritate CONTACT: Franco Oboni foboni(a)riskope.com (c)Oboni Riskope Associates Inc. www.riskope.com foboni(a)riskope.com Page 11 of 11 15/11/2012