Supertech ORB is part of the township project by Supertech Limited. The project comprising of 3BHK, 4BHK luxury apartments in 3 circular towers is located at Sector 74 in Noida.
2. Supertech ORB: Sector 74, Noida 2011
Supertech ORB
1. Overview of the Project:
(For detailed brochure, refer: www.orbhomes.in)
Supertech ORB is part of a 50 acres integrated township. The project is located at Sector-74 in Noida and
comprises 3 circular shaped towers which are 40 storeys high. The high rise project being developed by
Supertech builder consists of luxurious 3 and 4 bedroom apartments. Adjoining a 100 acres City Park,
the homes in this project boast of a beautiful view along with the proximity of serene surroundings to
stretch or have fun with friends and family. A home at ORB comes with the added benefit of a solar
heated swimming pool within the compound. The residents are also provided with a club house that
offers dedicated kids play area, gym, billiards, tennis/basketball courts, library as well as a cigar room
area.
The project is next to proposed Metro line which promises convenient public transport to the residents.
Also, the project has been designed to be Vaastu and Feng Shui friendly.
Amenities:
Part of a 50 acres integrated township (Capetown) in Sector-74, Noida
Well-designed complex with beautiful landscape
Unique circular shaped towers
Adjoining 100 acres City Park
Vaastu and Feng-Shui friendly
24 hour water and power supply
Security System with intercom, CCTV system
State of the art medical facilities
Master Plan:
Supertech ORB comprises of 3 and 4 bedroom apartments with areas ranging between 1980 and
3290 Sq. Ft.
Exclusive swimming pool and club house
Hospitals, Medical facilities, Shopping malls within the premises
Ample parking space
High speed elevators
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 2
Supertech ORB
3. Supertech ORB: Sector 74, Noida 2011
2. Specifications of the Supertech ORB Project:
S. No. Particulars
1 Structure RCC Framed earthquake resistant Structure.
2 Wall Finish
2.a. Internal All internal walls in cement plaster with plastic emulsion paint with POP
punning or texture finish/paneling/wall paper.
2.b. External External walls in texture paint & structural glazing as per design. Plantation in
common areas with proper lighting.
3 Flooring The living room, dining room, family lounge, lobby & passage would be made
of a mix of Italian/Indian stone. Bedroom flooring done with imported wood.
3.a. Living, Dining Italian/Indian stone with designer patterns.
3.b. Master Bedroom Italian/Indian stone with designer patterns / High grade Wooden Flooring.
3.c. Teenager Room Vitrified Tiles
3.d. Other Bedrooms Vitrified Tiles/Imported Wooden Flooring.
3.e. Servant Room Vitrified Tiles
3.f. Kitchen Vitrified Tiles
3.g. Toilets Anti Skid Ceramic Tiles
3.h. Lobby of Buildings Indian Stone/Vitrified Designer Tiles
4 Kitchen Walls shall feature high quality ceramic tiles & counter shall be of granite
stone. Double bowl Stainless steel sink.
Modular Kitchen
R.O. System
4.a. Dado Ceramic tiles up-to 2 ft. above counter level.
5 Doors Seasoned hardwood frame with European style moulded shutter.
6 Toilets Walls with imported ceramic tiles up to false ceiling. W.C. and wash basin in
matching shades Hindware/Cera or equivalent. Single lever C.P. fittings Jaguar
or equivalent. Jacuzzi in Master Bath. Would include exhaust fan/mirror.
7 Plumbing CPVC piping for water supply inside the toilet and kitchen & UPVC pipes for
stacks.
8 Electricals Modular switches of LEGRAND or equivalent make and copper wiring, Lights
in all rooms, Kitchen, Toilets, Balconies and Passages.
9 Power back up 100% DG power back-up for all the apartments and common areas.
10 Communication TV and telephone points, Video door phone, internet.
11 Lobby High Speed passenger Elevators.
12 Security Secured gated community with access control at entrances and CCTV for
parking area and Entrance lobby at ground floor.
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 3
Supertech ORB
4. Supertech ORB: Sector 74, Noida 2011
3. About the builder:
Supertech is an ISO 9001:2000 certified company and has completed 20 years in the real estate
business. The group has converted more than 33 million sq. ft. area of residential and commercial entity
into architectural landmarks and more than 36 projects that accommodate nearly 30000 families. Its
various projects viz. Residential & Commercial Townships, Shopping Malls, Hotels and IT Parks have
either completed or about to complete.
The company has been active mostly in the region of Delhi NCR along with cities like Meerut,
Moradabad, Haridwar and Rudrapur.
Supertech’s Projects
Residential:
North Eye, Sec-74, Noida
Supertech ORB, Sec-74, Noida
Supertech Supernova, Sec-94, Noida
Cape Town, Sec-74, Noida
Ecociti, Sec-137, Noida
34 Pavilion, Sec-34, Noida
Emerald Court, Sec-93A, Noida
Apex Tower, Sec-93A, Noida
Ceyane Tower, Sec-93A, Noida
Golf Country, Yamuna Expressway, Greater Noida
Up Country, Yamuna Expressway, Greater Noida
Czar Villas, Sec-Omicron1, Greater Noida
Czar Suites, Sec-Omicron1, Greater Noida
Oxford Square, Sec-16B, Greater Noida
Eco Village, Sec-16B, Greater Noida
Eco Village II, Sec-16B, Greater Noida
Eco Village III, Sec-16B, Greater Noida
Livingston, Ghaziabad
Meerut Sports City, Meerut
Green Village, Meerut
Palm Greens, Moradabad
Palm Greens, Meerut
Metropolis City, Rudrapur
Icon, Ghaziabad
Avant Garde, Vaishali
Rameshwar Orchids, Kaushambi
Supertech Enclave, Kaushambi
Supertech Residency, Vaishali
Supertech Plaza, Kaushambi
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 4
Supertech ORB
6. Supertech ORB: Sector 74, Noida 2011
4. Pricing for Supertech ORB:
Price List (w. e. f. 28th September 2011)
Market Price Our Price
3/4 BHK 3/4 BHK
Description (INR/Sq. Ft.) (INR/Sq. Ft.)
Basic Selling Price (CLP) 4800
Inaugural Discount 200
Net BSP 4600 4370
Other Charges:
EDC / IDC 200
Lease Rent 150
IFMS 100
Covered Car Parking
(Mandatory) 300000
Club Membership 200000
PLC (Preferential Location Charges)
Floors PLC/Sq. Ft.
st
1 300/-
nd
2 275/-
rd
3 250/-
th th
4 to 9 225/-
th th
10 to 15 200/-
th th
16 to 20 150/-
st th
21 to 25 250/-
th th
26 to 30 300/-
st th
31 to 35 350/-
th th
35 to 39 300/-
th th
40 to 45 450/-
Please Note:
1. Cheque/draft to be made in favor of “Supertech Limited” payable at Noida/New Delhi.
2. Service tax extra as applicable.
3. Booking is subject to terms & conditions as given in the company application form and sale/purchase agreement.
4. Subject to number of bookings, the base selling price for Supertech ORB can be further negotiated with the builder.
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 6
Supertech ORB
7. Supertech ORB: Sector 74, Noida 2011
5. Payment Plans for Supertech ORB Project:
Down Payment Plan (12% rebate on BSP)
S. No. Particulars Installments
1 On Booking 10%
2 Within 60 days of booking 85% + (LR+EDC+PLC)
3 On offer of possession 5% + (IFMS + CM + CP + Other Charges)
Flexi Payment Plan (6% Rebate on BSP)
S. No. Particulars Installments
1 On Booking 10%
2 Within 60 days of booking 30%
3 On Completion of Foundation work 10%
4 On start of 5th Floor 5%
5 On start of 10th Floor 5%
6 On start of 15th Floor 5% + 25% of (EDC + LR)
7 On start of 20th Floor 5% + 25% of (EDC + LR)
8 On start of 25th Floor 5% + 25% of (EDC + LR)
9 On start of 30th Floor 5% + 25% of (EDC + LR + PLC)
10 On start of 35th Floor 5% + 25% of (PLC)
11 On start of 37th Floor 5% + 25% of (PLC)
12 On start of super structure 5% + 25% of (PLC)
13 On offer of Possession 5% + IFMS + CM + CP + Other Charges
Construction Linked Plan
S. No. Particulars Installments
1 On Booking 10%
2 Within 45 days from Booking 10%
3 On Completion of Foundation work 5%
4 On start of 2nd Floor 5%
5 On start of 5th Floor 5%
6 On start of 10th Floor 5%
7 On start of 15th Floor 5%
8 On start of 20th Floor 5% + 25% of (EDC + LR)
9 On start of 25th Floor 5% + 25% of (EDC + LR)
10 On start of 30th Floor 5% + 25% of (EDC + LR)
11 On start of 35th Floor 5% + 25% of (EDC + LR)
12 On start of 37th Floor 5% + 25% of (PLC)
13 On start of 40th Floor 5% + 25% of (PLC)
14 On start of 43rd Floor 5% + 25% of (PLC)
15 On start of super structure 5% + 25% of (PLC)
16 On start of Internal plastering 5%
17 On start of External plastering 5%
18 On offer of Possession 5% + IFMS + CM + CP + Other Charges
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 7
Supertech ORB
8. Supertech ORB: Sector 74, Noida 2011
6. Financing:
Home loans for Supertech ORB are available from HDFC Bank, IDBI and other leading banks for this
project. According to RBI guidelines 20% of total property value has to be borne out by the buyer and
remaining 80% of the total property value can be financed by financial institutions.
Home loan rates are available on floating and fixed interest rates. Fixed rate loans are expensive but are
fixed during the whole tenure of the loan whereas floating rates are indexed to banks’ base rate and
fluctuate as and when banks revise their base rates.
We work with leading banks in the industry and as part of our total service we facilitate the process of
securing the home loan for our customers.
For loan eligibility, consider the example below:
Example for loan eligibility:
Monthly Household Loan Applied for
Income (Rs.) (Rs.) EMI (Rs.) Eligible*
100000 4000000 39,935.20 Yes
100000 5000000 49,918.99 Yes
100000 6000000 59,902.79 No
100000 7000000 69,886.59 No
* Banks normally provide loans based on the households' capacity to pay the EMIs.
Generally, 40-50% of household income can be accounted for paying the EMIs
In this example,
we have assumed rate of interest at 10.5%
Tenure of the loan is 240 months
EMI will increase if interest rates go up and decrease if interest rates fall. EMI decreases if the tenure of
the loan increases. However, 20 years (240 months) is the maximum available tenure for the home loan.
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 8
Supertech ORB
9. Supertech ORB: Sector 74, Noida 2011
7. Location:
Sector 74, Noida
8. Floor Plans for Supertech ORB:
(For details, refer: http://orbhomes.in/)
Floor Plan
Type Super Area (Sq. Ft.)
3BHK + 3T 1980
3BHK + 3T+ Servant 2370
4BHK + 6T + Servant 3290
Areas are subject to change.
Please Note: The floors are subject to availability at given point of time.
Disclaimer:
Green Realtech Projects Pvt. Ltd does not warrant the accuracy, adequacy or completeness of the
information presented herein and expressly disclaims liability for any errors or omissions therein. The
information presented herein for Supertech ORB may include data supplied to Green Realtech Project
Pvt. Ltd by third parties. Such data may be amended or changed at any time by third parties without
notice to Green Realtech Projects Pvt. Ltd. Accordingly; no warranties of any kind, implied, express or
statutory are given in respect of the information.
Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 9
Supertech ORB