Quality management system
2
You have to be organized.
3
A- Quality Management Principles
1- Customer focus
2- Leadership
3- Involvement of people
4- Process approach
5- Systems approach to management
6- Continual improvement
7- Factual approach to decision making
8- Mutually beneficial supplier relationships
4
B- ISO 9001 – 2008 Standard
0. Introduction
1. Scope
2. Normative Reference
3. Terms and Definitions
4. Quality Management System
5. Management Responsibility
6. Resource Management
7. Product Realization
8. Measurement, Analysis and Improvement
5
C- Steps to ISO 9001 Certification
1. Learn About ISO 9001
2. Identify Project Responsibilities.
3. Train Employees on ISO 9001
4. Perform a Gap Analysis
5. Prepare a Project Plan
6. Document Your System
7. Implement the QMS in Your Organization
8. Audit Your QMS
9. ISO 9001:2008 Registration Audit
10. Certification
11. Maintain and improve your management system
• The quality of something can be determined by comparing
a set of inherent characteristics with a set of requirements.
If those inherent characteristics meet all requirements, high
or excellent quality is achieved.
• The customers' perception of the value of the suppliers' work output
• The properties of products and/or services that are valued by the
consumer.
• A degree of excellence.
• The rate of what has been achieved of the process requirements.
6
7
Document
information and its supporting medium
for examples:
paper
magnetic
electronic or optical computer disc
photograph
master sample
Quality control is a set of activities intended to ensure that
quality requirements are actually being met.
Quality assurance is a set of activities intended to establish
confidence that quality requirements will be met.
8
Quality control is the fulfilling quality requirements
Quality assurance is the providing confidence that quality
requirements will be fulfilled
Policy
A procedure is a way of carrying out a process or activity.
According to ISO 9000, procedures may or may not be
documented. However, in most cases, ISO 9001 expects
you to document your procedures.
9
Mission
Statement explains why an organization exists. It
defines its reason for being
Vision
Describes what it wants to be and how it wants to be
seen by interested parties.
10
An audit is an evidence gathering process. Audit evidence is
used to evaluate how well audit criteria are being met.
There are three types of audits: first-party, second-party, and
third-party audits. First-party audits are internal audits. Second
and third party audits are external audits.
A self-assessment is a comprehensive and systematic review of an
organization’s overall maturity and is used to help achieve and
sustain organizational success.
11
Preventive action
Action to eliminate the cause of a potential
nonconformity or other undesirable potential situation
Corrective action
Action to eliminate the cause of a detected nonconformity
or other undesirable situation
12
Is a set of interrelated or interacting elements that
organizations use to direct and control how quality policies
are implemented and quality objectives are achieved.
such as:
satisfying the customer's quality requirements.
13
Organize our thinking
14
A 1- Develop your process.
2. Document your process.
3. Implement your process .
4. Maintain your process.
5. Monitor your process .
6. Measure your process .
7. Analyze your process.
8. Control your process .
9. Improve your process .
Q what is the steps for a good process?
Is a comprehensive and fundamental rule for leading and operating an organisation, aimed at continually
improving performance over the long term by focusing on customers while addressing the needs of all
other stake holders".
15
1. Customer-Focused Organisation
2. Leadership
3. Involvement of People
4. Process Approach
5. System Approach to Management
6. Continual Improvement
7. Factual Approach to Decision Making
8. Mutually Beneficial Supplier Relationships.
"Organisations depend on their customers and therefore should understand current
and future customer needs, meet customer requirements .
16
Steps in application of this principle are ...
1. Understand customer needs and expectations for
products, delivery, price.
2. Communicate these needs and expectations
throughout the organisation.
3. Measure customer satisfaction & act on results.
4. Manage customer relationships
“Leaders should create and maintain the internal environment in which people can become
fully involved in achieving the organisation's objectives."
17
Steps in application of this principle are ...
1. Be proactive and lead by example.
2. Establish a clear vision of the organisation's future.
3. Provide people with the required resources and freedom
to act with responsibility.
4. Build trust and eliminate fear.
5. Consider the needs of all stake holders including
customers, owners, people, suppliers and society .
6. Educate, train and coach people.
"People at all levels are the essence of an organisation and their full involvement
enables their abilities to be used for the organisation's benefit".
18
Steps in application of this principle are...
1. Accept ownership and responsibility to solve problems.
2. Freely share knowledge & experience in teams.
3. Improve the way of representing the organisation to
customers, local communities .
4. Help people derive satisfaction from their work.
5. Make people to be part of the organisation.
"A desired result is achieved more efficiently when related resources and activities are
managed as a process."
19
Steps in application of this principle are ...
1. Identify and measure the inputs and outputs of the process.
2. Evaluate possible risks, and impacts of processes on customers,
suppliers and other stake holders of the process.
5. Establish clear responsibility, authority, and accountability for
managing the process.
6. Identify internal and external customers, suppliers and other
stake holders of the process,
"Identifying, understanding and managing a system of interrelated processes for a given
objective improves the organisation's effectiveness .
20
Steps in application of this principle are ...
1. Define the system by identifying or developing the
processes that affect a given objective.
2. Structure the system to achieve the objective in the
most efficient way.
3. Continually improve the system through measurement
and evaluation.
4. Estimate the resource requirements .
"Continual improvement should be a permanent objective of the organisation."
Steps in application of this principle are ...
1. Apply the basic improvement concepts.
2. Continually improve the efficiency and effectiveness of all processes.
3. Promote prevention based activities.
4. Provide every member of the organisation with appropriate education and
training, on the methods and tools of continual improvement .
5. Establish measures and goals to guide and track improvements.
21
"Effective decisions are based on the analysis of data and information."
Steps in application of this principle are ...
1. Take measurements and collect data and information relevant to the
objective.
2. Ensure that the data and information are sufficiently accurate, reliable
and accessible.
3. Analyze the data and information using valid methods.
4. Understand the value of appropriate statistical techniques.
5. Make decisions and take action based on the results of logical analysis
balanced with experience and intuition.
22
"An organisation and its suppliers are interdependent, and a mutually beneficial
relationship enhances the ability of both to create value."
Steps in application of this principle are ...
1. Identify and select key suppliers.
2. Create clear and open communications.
3. Initiate joint improvement of products and processes.
4. Jointly establish a clear understanding of customers' needs.
5. Share information and future plans.
6. Recognise supplier improvements and achievements.
23
24
Clause headings:
25
0. Introduction
1. Scope
2. Normative Reference
3. Terms and Definitions
4. Quality Management System
5. Management Responsibility
6. Resource Management
7. Product Realization
8. Measurement, Analysis and Improvement
What does the term "ISO" stand for?
The term ISO stands for the International Organization for
Standardization. You would reasonably assume that it ought
to be IOS, but it isn't. Apparently, the term ISO was chosen
(instead of IOS),
because iso in Greek means equal, and ISO
wanted to convey the idea of equality - the idea that they
develop standards to place organizations on an equal
footing.
26
What are the ISO 9000 standards ?
The ISO 9000 standards are a collection of formal International
Standards, Technical Specifications, Technical Reports, Handbooks and
web based documents on Quality Management.
ISO 9001 is NOT a product Standard - it contains no product
requirements. It is a series of generic requirements for quality
management systems.
27
People in the organization will benefit by:
Better working conditions
Increased job satisfaction
Improved health and safety
Improved stability of employment
Owners and investors will benefit by:
Increased return on investment
Improved operational results
Increased market share
Increased profits
28
Suppliers and partners will benefit by:
Stability
Growth
Partnership and mutual understanding
Society will benefit by:
Fulfillment of legal and regulatory requirements
Improved health and safety
Reduced environmental impact
Increased security
29
(Company ) has developed and implemented this quality
management system to demonstrate its ability to
consistently provide product that meets customer and
statutory and regulatory requirements, and to address
customer satisfaction through the effective application of
the system, including continual improvement and the
prevention of nonconformity.
30
For undated references, the latest edition of the normative
document referred to applies. ISO 9000: 2005 Quality
Management System –Fundamentals and Vocabulary.
31
“Supplier” and “Vendor” are synonymous and refer
to the external source used to acquire purchased
products by (Company Name).
32
The terms and definitions of iso 9000 will applied
4.1 General requirements
33
the organization establish, documented,
implemented and maintained a quality management
system and continually improved its effectiveness in
accordance with the requirements of this
International Standard.
4.2 Documentation requirements
4.2.1 General
4.2.2 Quality manual
4.2.3 Control of documents
4.2.4 Control of quality records
34
The quality management system documentation shall include:
1. documented statements of a quality policy and quality objectives.
2. a quality manual .
3. documented procedures required by this International Standard .
4. documents needed by the organization to ensure the effective
planning, operation and control of its processes.
5. records required by this International Standard.
35
 Requirements for the quality policy are defined in clause 5.3 of ISO 9001:2008.
 The documented quality policy has to be controlled according to the requirements of clause
4.2.3.
Note: Organizations that are revising their quality policy for the first time, or in order to meet
the amended requirements in ISO 9001:2008, should pay particular attention to clause 4.2.3
(c), (d) and (g).
 Requirements for quality objectives are defined in clause 5.4.1 of ISO 9001:2008.
 These documented quality objectives are also subject to the document control requirements
of clause 4.2.3.
36
document specifying the quality management
system of an organization
37
38
The Quality manual includes the following
 It fully describes the scope of QMS.
 It completely explains each and every requirement of the ISO 9001 Standard
 It contains complete detail and explanation of exclusions .
 It contains references for the quality procedures used to describe all the QMS processes
 A flow chart represent the series and interaction of your key business processes.
 The organization's quality policies which shows that the organization is strictly committed to
quality
Following are the primary uses of the quality manual
To communicate management's expectations for quality to the organization
To reveal the organization conformity with ISO 9001 requirements
To serve as a measure for compliance to management's expectations for:
Internal audits
ISO Registrar audits
Customer audits
39
Procedure is the specified way to carry out an activity or a process
ISO 9001:2008 specifically requires the organization to have “documented procedures” for the
following six activities:
4.2.3 Control of documents
4.2.4 Control of records
8.2.2 Internal audit
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3 Preventive action
40
Process maps, process flow charts and/or process descriptions
Organization charts
Specifications
Work and/or test instructions
Documents containing internal communications
Production schedules
Approved supplier lists
Test and inspection plans
Quality plans
41
5.6.1 Management reviews
6.2.2 e) Education, training, skills and experience
7.1 d) Evidence that the realization processes and resulting product fulfill requirements
7.2.2 Results of the review of requirements related to the product and actions arising from
the review
7.3.2 Design and development inputs relating to product requirements
7.3.4 Results of design and development reviews and any necessary actions
7.3.5 Results of design and development verification and any necessary actions
7.3.6 Results of design and development validation and any necessary actions
7.3.7 Results of the review of design and development changes and any necessary actions
7.4.1 Results of supplier evaluations and any necessary actions arising from the evaluations
42
7.5.2 d) As required by the organization to demonstrate the validation of processes where the resulting
output cannot be verified by subsequent monitoring or measurement
7.5.3 The unique identification of the product, where traceability is a requirement
7.5.4 Customer property that is lost, damaged or otherwise found to be unsuitable for use
7.6 a) Basis used for calibration or verification of measuring equipment where no international or national
measurement standards exist
7.6 Validity of the previous measuring results when the measuring equipment is found not to conform to
requirements
7.6 Results of calibration and verification of measuring equipment
8.2.2 Internal audit results and follow-up actions
8.2.4 Indication of the person(s) authorizing release of product.
8.3 Nature of the product nonconformities and any subsequent actions taken, including concessions
obtained
8.5.2 e) Results of corrective action
8.5.3 d) Results of preventive action
43
Documents
information and its supporting medium
for examples:
paper
magnetic
electronic or optical computer disc
photograph
master sample
44
A record is a type of document. Which provide evidence that
activities have been performed or results have been achieved.
Records management addresses six key issues:
identification
storage
protection
retrieval
retention
disposition
45
5.1 Management commitment
5.2 Customer focus
5.3 Quality policy 5.4 Planning
5.4.1 Quality objectives
5.4.2 Quality management system planning
5.5 Responsibility, authority and communication
5.5.1 Responsibility and authority
5.5.2 Management representative
5.5.3 Internal communication
5.6 Management review
5.6.1 General
5.6.2&3 Review input & output
46
Top management is committed to the development and implementation of the quality
management system and continually improves its effectiveness by:
communicating to (Company Name) the importance of meeting customer as well as
statutory and regulatory requirements,
establishing a quality policy,
establishing quality objectives,
conducting management reviews, and
ensuring the availability of resources
47
Steps in application of this principle are ...
1. Understand customer needs and expectations for products, delivery, price, dependability,
2. Ensure a balanced approach among customers and other stake holders (owners, people,
suppliers, local communities and society at large) needs and expectations.
3. Communicate these needs and expectations throughout the organisation.
4. Measure customer satisfaction & act on results, and
5. Manage customer relationships.
48
6.1 Provision of resources
6.2 Human resources
6.2.1 General
6.2.2 Competence, training and awareness
6.3 Infrastructure
6.4 Work environment
49
6.1 Provision of resources
(Company Name) determines and provides the resources needed
to implement and maintain the quality management system and continually improve its
effectiveness, and
to enhance customer satisfaction by meeting customer requirements.
50
6.2.1 General
Personnel performing work affecting conformity to product requirements are competent on the
basis of appropriate education, training, skills and experience.
6.2.2 Competence, training, and awareness
determines the necessary competence for personnel performing work affecting conformity to
product requirements,
where applicable, provides training or takes other actions to achieve the necessary competence,
evaluates the effectiveness of the actions taken,
ensures that its personnel are aware of the relevance and importance of their activities and how
they contribute to the achievement of the quality objectives, and
maintains appropriate records of education, training, skills and experience .
Supporting Documentation QOP-62-01 Competence, Training, and Awareness
51
The organization shall determine, provide and maintain the infrastructure needed to achieve
conformity to product requirements.
buildings, workspace and associated utilities,
process equipment (both hardware and software), and
supporting services (such as transport, or communication, or information systems).
52
6.4 Work environment
set of conditions under which work is performed
NOTE Conditions include physical, social, psychological
and environmental factors (such as temperature).
Company determines and manages the work
environment needed to achieve conformity to product
requirements.
53
7.1 Planning of product realization
7.2 Customer-related processes
7.2.1 Determination of requirements related to the product
7.2.2 Review of requirements related to the product
7.2.3 Customer communication
7.3 Design and development
7.3.1 Design and development planning
7.3.2&3 Design and development inputs &output
7.3.4 Design and development review
7.3.5&6 Design and development verification &validation
7.3.7 Control of design and development changes
54
7.4 Purchasing
7.4.1 Purchasing process
7.4.2 Purchasing information
7.4.3 Verification of purchased product
7.5 Production and service provision
7.5.1 Control of production and service provision
7.5.2 Validation of processes for production and service provision
7.5.3 Identification and traceability
7.5.4 Customer property
7.5.5 Preservation of product
7.6 Control of monitoring and measuring equipment
55
8.1 General
8.2 Monitoring and measurement
8.2.1 Customer satisfaction
8.2.2 Internal audit
8.2.3&4 Monitoring and measurement of processes & product
8.3 Control of nonconforming product
8.4 Analysis of data
8.5 Improvement
8.5.1 Continual improvement
8.5.2 Corrective action
8.5.3 Preventive action
56
57
58
1. Learn About ISO 9001
2. The cost of the project.
3. Identify Project Responsibilities.
4. Train Employees on ISO 9001
5. Perform a Gap Analysis
6. Prepare a Project Plan
7. Document Your System
8. Implement the QMS in Your Organization
9. Audit Your QMS
10. ISO 9001:2008 Registration Audit
11. Certification
12. Maintain and improve your management system
Learn About ISO 9001
NO. Activity Who When How How Long
1 ISO purchase Mr. Farzad On line One day
2
Study the
requirements
ISO Project
Manager
Review One week
3
Study the
requirements
Steering team Action plan
Two
meeting/
week
Two weeks
59
The cost of the project
1. The consultant cost.
2. Hiring some peoples.
3. Training cost.
4. Infrastructure and documentation.
5. Software and format.
6. Registration and certificate cost.
60
Identify Project Responsibilities
1. Top management
2. Project manager.
3. Management representative.
4. Internal Auditors.
5. Steering team.
6. task team.
7. Infrastructure.
61
Establish the quality policy.
Ensure that quality objectives are established at all relevant levels of the organization.
Ensure availability of resources.
Ensure that the planning of the quality system is carried out to meet the requirements of the
standard and the quality objectives.
Ensure that responsibilities, authorities and their interrelation are defined and
communicated.
Ensure that appropriate communication is established within the organization and
effectiveness of the quality management system is communicated.
62
Choose your PM
1. The Project Manager completes the Training.
2. The Project Manager prepares a Project Plan.
3. Management and the Project Manager identify an ISO 9001 Steering Team.
4. The Project Manager and others conduct a Gap Analysis with the Gap
Analysis Checklist.
5. Revise processes and procedures and train those within your organization
63
Choose your MR
1. The standard requires that the MR must be "a member of management"
serving primarily as the "eyes" and "ears" of top management.
2. The MR primarily provides feedback( report) to top management on the
effectiveness of the quality management system.
3. Ensuring that processes needed for the quality management system are
established, implemented and maintained.
4. Ensuring the promotion of awareness of customer requirements
throughout the organization.
64
Choose your auditors team
1. Trained internal auditors for your audit program.
2. Auditing each area of your facility once or twice a year,
3. A general guidance number is 10% of the total number of employees; a company with 50
employees would train 5 auditors.
4. Look for employees that have a strength in investigating issues and that are good
communicators.
5. The better people skills the auditors have, the smoother your audits will be performed.
65
Choose your Steering team
Management must identify a steering team for the project. It
should be made up of managers from different areas of the
organization.
The purpose of the team will be to assign resources and
responsibilities for the project as well as providing
leadership for the project.
A team led by top management that will coordinate and lead
the implementation project
66
1. Identify team members for each procedure.
2. Assign target start date and completion date for each team.
3. Identify training needs for employees and schedule training sessions for ISO 9001:2008
4. Meet on a regular basis to evaluate progress, answer questions for the teams and
evaluate resource needs for the
implementation.
5. Review and approve procedures as they are finalized.
6. Evaluate and choose a Registrar
67
Choose your Task teams
The Task Team is led by a member of the Steering Team.
A Task Team is set-up for each Quality System Procedure that
needs to be developed.
68
1. Review the “Implementation Steps” to the group
2. Review Responsibilities of the ISO 9001:2008 Steering Team
3. Review procedure that the team will be responsible for.
4. Review the section of the Gap Analysis that applies to the team.
5. Determine resources required for completion of the tasks.
69
The organization shall determine, provide and maintain the
infrastructure needed to achieve conformity to product
requirements. Infrastructure includes, as applicable
1. buildings, workspace and associated utilities.
2. process equipment (both hardware and software).
3. supporting services (such as transport, or communication,
or information systems).
70
Train Your Organization
1. Top management.
2. Project manager.
3. Internal Auditors.
4. Steering team.
5. task team.
6. All employees.
71
Define the knowledge and skill needed for each employee to conduct their job.
Deliver training or other learning activities to develop the required knowledge and skill.
Provide a way to prove whether the training was effective (test for understanding)
Ensure employee awareness of how their activities contribute to the quality objectives. They
should understand the relevance and importance of their role.
Keep training records and records of employee education, skills and experience.
72
ALL of the employees in an organization so they understand the importance of ISO 9001 and
their role in meeting the requirements.
The course will educate them on:
What is an ISO 9001 Quality Management System?
Why is our company involved with ISO 9001?
What does ISO 9001 require?
How does it impact me and how can I impact quality?
What and why are people auditing?
73
Perform a Gap Analysis
Consider the start of your project as the date of the Gap Analysis.
Before conducting the Gap Analysis:
1. Identify one or more people to conduct the Gap Analysis; it is
helpful if they have some quality experience or audit experience.
2. Print the Gap Analysis Checklist.
3. Schedule the Gap Analysis, and communicate to all employees what
is being done, and why.
74
Perform a Gap Analysis
Schedule the Gap Analysis
NO. Activity Who When How How Long
1
2
3
75
Question YES NO N/A Auditor Remarks
1 Do you identify the requirements that your
customers want you to comply with?
2 Do you identify your customers'
product requirements?
3 Do you identify your customers'
delivery requirements?
4 Do you identify your customers'
post-delivery requirements?
5 Do you identify warranty requirements?
6 Do you identify maintenance requirements?
76
ISO 9001 Gap Analysis Report
Summarize the audit findings in the form of a task list.
You will usually identify several categories of tasks.
Processes that comply with the standard and are documented.
Processes that comply with the standard and must be documented.
Processes that do not comply with the standard and must be redesigned.
Processes required by the standard that are not currently in place.
77
Prepare a Project Plan
ISO 9001 Step-by-Step Workbook
The Team Approach
Gantt chart
78
1- Prepare Your Organization
2- Develop Your ISO 9001 Quality Management System (QMS)
3- Implementation and ISO 9001 Registration
79
Task 1: Management Describe your company
Task 2: Management Choose your ISO Management System
Task 3: Management Obtain the latest ISO 9001 standard
Task 4: Management Select the Management Rep & Steering Team
Task 5: ISO Steering Team Prepare an Organizational Chart
Task 6: ISO Steering Team Establish the Quality Team
Task 7: Quality Team Conduct First Team Meeting
Task 8: ISO Steering Team Formulate the Quality Policy / Objectives
Task 9: ISO Steering Team State the scope of the QMS
Task 10: Quality Team/ Identify applicable regulations ISO Steering Team
80
Task 11: Quality Team Identify/Describe processes/Prepare process flow diagrams
Task 12: ISO Steering Team Provide Communication Tools
Task 13: Quality Team Conduct a Preliminary Assessment –c/list
Task 14: ISO Steering Team Assign Improvement Actions for QMS
Task 15: ISO Steering Team Provide ISO 9001 training-Exercises A--F
Task 16: ISO Steering Team Manage the Implementation Project
Task 17: ISO Steering Team Complete Project Timing Chart
Task 18: ISO Steering Team Collect Existing Documents
Task 19: ISO Steering Team Perform financial study of costs and benefits
Task 20: ISO Steering Team Reconfirm the ISO 9001 Decision
Task 21: ISO Steering Team Promote and practice teamwork
81
Task 22: Obtain and Review a Model for a QMS Manual
Task 23: Use the Model as a Template to generate QMS documentation
Task 24: Implement the Quality Management System
Task 25: Conduct Internal Audit of the QMS
Task 26: Conduct the Management Review
Task 27: Select a Certification Body to register the QMS
Task 28: Receive Certification and Celebrate
82
A Gantt chart is a graphical representation of the duration of tasks
against the progression of time.
A Gantt chart is a useful tool for planning and scheduling projects.
And helpful when monitoring a project's progress.
83
84
Document Your System
How Much Documentation Do You Need?
Importance of Document Control
ISO 9001 QMS Templates
85
Clause 4.2.1 General explains that the quality management system
documentation shall include:
1. documented statements of a quality policy and quality
objectives;
2. a quality manual
3. documented procedures required by this International Standard
4. documents needed by the organization to ensure the effective
planning, operation and control of its processes, and
5. records required by this International Standard;
86
Establish a documented procedure to:
Approve documents for adequacy prior to issue
Review, update as necessary, and re-approve documents
Identify the changes and current document revision status
Make relevant documents available at points of use
Ensure the documents remain legible and readily identifiable
Identify external documents and control their distribution
Prevent obsolete documents from unintended use
Apply suitable identification if obsolete documents are retained
87
Implement the QMS in Your Organization
Training on New Procedures
Training of Internal Auditors
88
Follow documented procedures and work instructions
Everyone in your organization should be performing processes following your documented
procedures and work instructions, complying with the QMS requirements.
Make improvements to the processes
Many of these procedures may be new to your organization, or have changed significantly
during your ISO 9001 project. Now that they are actually in use, you will most likely find
areas that can be improved. Make improvements using the Corrective and Preventive Action
process and the document revision process
89
Training Objectives:
Fully understand and successfully interpret the ISO 9001:2008 requirements
Understand how to audit using the process approach
Ask audit questions that get results
Identify and document nonconformities
Qualify additional staff to conduct internal audits
Gain knowledge to help manage a successful ISO 9001:2008 implementation project
Provide professional credentials to internal auditors
Provide critical knowledge for staff and management
90
Audit Your QMS
Conduct Internal Audits
Corrective/Preventive Action
91
During an internal audit you will compare your quality system
against the requirements of the standard.
You will select a group of internal auditors from within your
company to perform the audits.
Conduct Internal Audits
Schedule internal audits to cover all areas of the organization
before your Registration Audit. Allow time to take corrective
action on any findings.
A robust and effective internal audit program is one of the best
tools to finding and correcting shortcomings in the QMS before
your Registration Audit.
92
Corrective action is re-active ie dealing with the problem AFTER the event.
Your corrective action procedure must explain how you:
review non-conformance and customer complaints
decide the cause of the problem
decide an appropriate course of action to stop the problem recurring
put the plan into action
ensure that the action has solved the problem
93
Preventive action is a pro-active procedure ie dealing with the problem BEFORE it happens.
Your preventive action procedure must explain how you:
review potential problems
decide the potential cause of the problem
decide an appropriate course of action to stop the problem occurring
put the plan into action
ensure that the preventive action has solved the potential problem
94
ISO 9001:2008 Registration Audit
Selecting a Registrar
When to select a Registrar
Registration Costs
Choosing a Registrar
Registrar Questionnaire
Recommended Registrars
95
96
1- Registration
2- Initial assessment
3- Certification audit
4- Surveillance audits
5- Reassessments
6- Certificate
97
Maintain and improve your management system
98
99

Contenu connexe

Tendances

Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qms
alabs
 

Tendances (20)

Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
ISO Standards
ISO StandardsISO Standards
ISO Standards
 
ISO 9001:2015 awareness.
ISO 9001:2015 awareness. ISO 9001:2015 awareness.
ISO 9001:2015 awareness.
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 
Iso 9001
Iso 9001Iso 9001
Iso 9001
 
ISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness TrainingISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness Training
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015
 
ISO 9001:2015 Awareness
 ISO 9001:2015 Awareness  ISO 9001:2015 Awareness
ISO 9001:2015 Awareness
 
Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qms
 
Quality management system
Quality management systemQuality management system
Quality management system
 
(5) integrated management system (ims)
(5) integrated management system (ims)(5) integrated management system (ims)
(5) integrated management system (ims)
 
What is iso 9001 qms
What is iso 9001 qmsWhat is iso 9001 qms
What is iso 9001 qms
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training Presentation
 
Iso 9000
Iso 9000Iso 9000
Iso 9000
 
Quality management system
Quality management system Quality management system
Quality management system
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
 
ISO9001:2015 presentation
ISO9001:2015 presentationISO9001:2015 presentation
ISO9001:2015 presentation
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 

Similaire à ISO 9001

Principios de gestión de calidad
Principios de gestión de calidadPrincipios de gestión de calidad
Principios de gestión de calidad
DEPROCESS
 
BSI-ISO-9001-implementation-guide
BSI-ISO-9001-implementation-guideBSI-ISO-9001-implementation-guide
BSI-ISO-9001-implementation-guide
Colin Mayson
 

Similaire à ISO 9001 (20)

Iso basic and 9001
Iso basic and 9001Iso basic and 9001
Iso basic and 9001
 
Principios de gestión de calidad
Principios de gestión de calidadPrincipios de gestión de calidad
Principios de gestión de calidad
 
ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions
 
vdocuments.net_iso-9001ppt.ppt
vdocuments.net_iso-9001ppt.pptvdocuments.net_iso-9001ppt.ppt
vdocuments.net_iso-9001ppt.ppt
 
ISO 9000 & ISO 14000: pptx..............
ISO 9000 & ISO 14000: pptx..............ISO 9000 & ISO 14000: pptx..............
ISO 9000 & ISO 14000: pptx..............
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
 
ISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptxISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptx
 
Iso by bishnu prasad aryal
Iso by bishnu  prasad aryalIso by bishnu  prasad aryal
Iso by bishnu prasad aryal
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
ISO 9001 Implementation Series - Session 1.pptx
ISO 9001 Implementation Series - Session 1.pptxISO 9001 Implementation Series - Session 1.pptx
ISO 9001 Implementation Series - Session 1.pptx
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality management
 
QMS awareness 12th may 2015
QMS awareness 12th may 2015QMS awareness 12th may 2015
QMS awareness 12th may 2015
 
Pe 6421 chapter 3 iso 9000 quality system oct 13 2014
Pe 6421 chapter 3  iso 9000 quality system oct 13  2014Pe 6421 chapter 3  iso 9000 quality system oct 13  2014
Pe 6421 chapter 3 iso 9000 quality system oct 13 2014
 
JARO Thermal ISO9001 2015 internal auditor training 20170118
JARO Thermal ISO9001 2015 internal auditor training  20170118JARO Thermal ISO9001 2015 internal auditor training  20170118
JARO Thermal ISO9001 2015 internal auditor training 20170118
 
Iso 9001 2008 - qms
Iso 9001  2008 - qmsIso 9001  2008 - qms
Iso 9001 2008 - qms
 
Quality Management System in Operations of Companies: A Case Study of North B...
Quality Management System in Operations of Companies: A Case Study of North B...Quality Management System in Operations of Companies: A Case Study of North B...
Quality Management System in Operations of Companies: A Case Study of North B...
 
The fundamentals of iso 9001
The fundamentals of iso 9001The fundamentals of iso 9001
The fundamentals of iso 9001
 
BSI-ISO-9001-implementation-guide
BSI-ISO-9001-implementation-guideBSI-ISO-9001-implementation-guide
BSI-ISO-9001-implementation-guide
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 

Plus de Gamal Abdel Hamid

Plus de Gamal Abdel Hamid (20)

Marketing
Marketing  Marketing
Marketing
 
Think 3
Think 3Think 3
Think 3
 
Think 2
Think 2Think 2
Think 2
 
Think
ThinkThink
Think
 
Intro. to PowerPoint
Intro. to PowerPointIntro. to PowerPoint
Intro. to PowerPoint
 
Method development
Method developmentMethod development
Method development
 
ICP - ICP/MS comparison
ICP - ICP/MS comparisonICP - ICP/MS comparison
ICP - ICP/MS comparison
 
ICP / MS Technique
ICP / MS TechniqueICP / MS Technique
ICP / MS Technique
 
HPLC System Selection
HPLC System SelectionHPLC System Selection
HPLC System Selection
 
ICP / AAS Comparison
ICP / AAS ComparisonICP / AAS Comparison
ICP / AAS Comparison
 
DMA Direct Mercury Analyzer
DMA  Direct Mercury AnalyzerDMA  Direct Mercury Analyzer
DMA Direct Mercury Analyzer
 
ICP software qtegra
ICP software qtegraICP software qtegra
ICP software qtegra
 
UV - VIS SW
UV - VIS SWUV - VIS SW
UV - VIS SW
 
UV / VIS
UV / VIS UV / VIS
UV / VIS
 
Gas Analysis Using FTIR
Gas Analysis Using FTIRGas Analysis Using FTIR
Gas Analysis Using FTIR
 
Tqa
TqaTqa
Tqa
 
FTIR software
FTIR softwareFTIR software
FTIR software
 
HPLC Chromeleon Software
HPLC Chromeleon SoftwareHPLC Chromeleon Software
HPLC Chromeleon Software
 
ICP QC protocol
ICP  QC  protocolICP  QC  protocol
ICP QC protocol
 
Microwave digestion
Microwave digestionMicrowave digestion
Microwave digestion
 

Dernier

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 

Dernier (20)

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 

ISO 9001

  • 2. 2 You have to be organized.
  • 3. 3 A- Quality Management Principles 1- Customer focus 2- Leadership 3- Involvement of people 4- Process approach 5- Systems approach to management 6- Continual improvement 7- Factual approach to decision making 8- Mutually beneficial supplier relationships
  • 4. 4 B- ISO 9001 – 2008 Standard 0. Introduction 1. Scope 2. Normative Reference 3. Terms and Definitions 4. Quality Management System 5. Management Responsibility 6. Resource Management 7. Product Realization 8. Measurement, Analysis and Improvement
  • 5. 5 C- Steps to ISO 9001 Certification 1. Learn About ISO 9001 2. Identify Project Responsibilities. 3. Train Employees on ISO 9001 4. Perform a Gap Analysis 5. Prepare a Project Plan 6. Document Your System 7. Implement the QMS in Your Organization 8. Audit Your QMS 9. ISO 9001:2008 Registration Audit 10. Certification 11. Maintain and improve your management system
  • 6. • The quality of something can be determined by comparing a set of inherent characteristics with a set of requirements. If those inherent characteristics meet all requirements, high or excellent quality is achieved. • The customers' perception of the value of the suppliers' work output • The properties of products and/or services that are valued by the consumer. • A degree of excellence. • The rate of what has been achieved of the process requirements. 6
  • 7. 7 Document information and its supporting medium for examples: paper magnetic electronic or optical computer disc photograph master sample
  • 8. Quality control is a set of activities intended to ensure that quality requirements are actually being met. Quality assurance is a set of activities intended to establish confidence that quality requirements will be met. 8 Quality control is the fulfilling quality requirements Quality assurance is the providing confidence that quality requirements will be fulfilled
  • 9. Policy A procedure is a way of carrying out a process or activity. According to ISO 9000, procedures may or may not be documented. However, in most cases, ISO 9001 expects you to document your procedures. 9
  • 10. Mission Statement explains why an organization exists. It defines its reason for being Vision Describes what it wants to be and how it wants to be seen by interested parties. 10
  • 11. An audit is an evidence gathering process. Audit evidence is used to evaluate how well audit criteria are being met. There are three types of audits: first-party, second-party, and third-party audits. First-party audits are internal audits. Second and third party audits are external audits. A self-assessment is a comprehensive and systematic review of an organization’s overall maturity and is used to help achieve and sustain organizational success. 11
  • 12. Preventive action Action to eliminate the cause of a potential nonconformity or other undesirable potential situation Corrective action Action to eliminate the cause of a detected nonconformity or other undesirable situation 12
  • 13. Is a set of interrelated or interacting elements that organizations use to direct and control how quality policies are implemented and quality objectives are achieved. such as: satisfying the customer's quality requirements. 13
  • 14. Organize our thinking 14 A 1- Develop your process. 2. Document your process. 3. Implement your process . 4. Maintain your process. 5. Monitor your process . 6. Measure your process . 7. Analyze your process. 8. Control your process . 9. Improve your process . Q what is the steps for a good process?
  • 15. Is a comprehensive and fundamental rule for leading and operating an organisation, aimed at continually improving performance over the long term by focusing on customers while addressing the needs of all other stake holders". 15 1. Customer-Focused Organisation 2. Leadership 3. Involvement of People 4. Process Approach 5. System Approach to Management 6. Continual Improvement 7. Factual Approach to Decision Making 8. Mutually Beneficial Supplier Relationships.
  • 16. "Organisations depend on their customers and therefore should understand current and future customer needs, meet customer requirements . 16 Steps in application of this principle are ... 1. Understand customer needs and expectations for products, delivery, price. 2. Communicate these needs and expectations throughout the organisation. 3. Measure customer satisfaction & act on results. 4. Manage customer relationships
  • 17. “Leaders should create and maintain the internal environment in which people can become fully involved in achieving the organisation's objectives." 17 Steps in application of this principle are ... 1. Be proactive and lead by example. 2. Establish a clear vision of the organisation's future. 3. Provide people with the required resources and freedom to act with responsibility. 4. Build trust and eliminate fear. 5. Consider the needs of all stake holders including customers, owners, people, suppliers and society . 6. Educate, train and coach people.
  • 18. "People at all levels are the essence of an organisation and their full involvement enables their abilities to be used for the organisation's benefit". 18 Steps in application of this principle are... 1. Accept ownership and responsibility to solve problems. 2. Freely share knowledge & experience in teams. 3. Improve the way of representing the organisation to customers, local communities . 4. Help people derive satisfaction from their work. 5. Make people to be part of the organisation.
  • 19. "A desired result is achieved more efficiently when related resources and activities are managed as a process." 19 Steps in application of this principle are ... 1. Identify and measure the inputs and outputs of the process. 2. Evaluate possible risks, and impacts of processes on customers, suppliers and other stake holders of the process. 5. Establish clear responsibility, authority, and accountability for managing the process. 6. Identify internal and external customers, suppliers and other stake holders of the process,
  • 20. "Identifying, understanding and managing a system of interrelated processes for a given objective improves the organisation's effectiveness . 20 Steps in application of this principle are ... 1. Define the system by identifying or developing the processes that affect a given objective. 2. Structure the system to achieve the objective in the most efficient way. 3. Continually improve the system through measurement and evaluation. 4. Estimate the resource requirements .
  • 21. "Continual improvement should be a permanent objective of the organisation." Steps in application of this principle are ... 1. Apply the basic improvement concepts. 2. Continually improve the efficiency and effectiveness of all processes. 3. Promote prevention based activities. 4. Provide every member of the organisation with appropriate education and training, on the methods and tools of continual improvement . 5. Establish measures and goals to guide and track improvements. 21
  • 22. "Effective decisions are based on the analysis of data and information." Steps in application of this principle are ... 1. Take measurements and collect data and information relevant to the objective. 2. Ensure that the data and information are sufficiently accurate, reliable and accessible. 3. Analyze the data and information using valid methods. 4. Understand the value of appropriate statistical techniques. 5. Make decisions and take action based on the results of logical analysis balanced with experience and intuition. 22
  • 23. "An organisation and its suppliers are interdependent, and a mutually beneficial relationship enhances the ability of both to create value." Steps in application of this principle are ... 1. Identify and select key suppliers. 2. Create clear and open communications. 3. Initiate joint improvement of products and processes. 4. Jointly establish a clear understanding of customers' needs. 5. Share information and future plans. 6. Recognise supplier improvements and achievements. 23
  • 24. 24
  • 25. Clause headings: 25 0. Introduction 1. Scope 2. Normative Reference 3. Terms and Definitions 4. Quality Management System 5. Management Responsibility 6. Resource Management 7. Product Realization 8. Measurement, Analysis and Improvement
  • 26. What does the term "ISO" stand for? The term ISO stands for the International Organization for Standardization. You would reasonably assume that it ought to be IOS, but it isn't. Apparently, the term ISO was chosen (instead of IOS), because iso in Greek means equal, and ISO wanted to convey the idea of equality - the idea that they develop standards to place organizations on an equal footing. 26
  • 27. What are the ISO 9000 standards ? The ISO 9000 standards are a collection of formal International Standards, Technical Specifications, Technical Reports, Handbooks and web based documents on Quality Management. ISO 9001 is NOT a product Standard - it contains no product requirements. It is a series of generic requirements for quality management systems. 27
  • 28. People in the organization will benefit by: Better working conditions Increased job satisfaction Improved health and safety Improved stability of employment Owners and investors will benefit by: Increased return on investment Improved operational results Increased market share Increased profits 28
  • 29. Suppliers and partners will benefit by: Stability Growth Partnership and mutual understanding Society will benefit by: Fulfillment of legal and regulatory requirements Improved health and safety Reduced environmental impact Increased security 29
  • 30. (Company ) has developed and implemented this quality management system to demonstrate its ability to consistently provide product that meets customer and statutory and regulatory requirements, and to address customer satisfaction through the effective application of the system, including continual improvement and the prevention of nonconformity. 30
  • 31. For undated references, the latest edition of the normative document referred to applies. ISO 9000: 2005 Quality Management System –Fundamentals and Vocabulary. 31
  • 32. “Supplier” and “Vendor” are synonymous and refer to the external source used to acquire purchased products by (Company Name). 32 The terms and definitions of iso 9000 will applied
  • 33. 4.1 General requirements 33 the organization establish, documented, implemented and maintained a quality management system and continually improved its effectiveness in accordance with the requirements of this International Standard.
  • 34. 4.2 Documentation requirements 4.2.1 General 4.2.2 Quality manual 4.2.3 Control of documents 4.2.4 Control of quality records 34
  • 35. The quality management system documentation shall include: 1. documented statements of a quality policy and quality objectives. 2. a quality manual . 3. documented procedures required by this International Standard . 4. documents needed by the organization to ensure the effective planning, operation and control of its processes. 5. records required by this International Standard. 35
  • 36.  Requirements for the quality policy are defined in clause 5.3 of ISO 9001:2008.  The documented quality policy has to be controlled according to the requirements of clause 4.2.3. Note: Organizations that are revising their quality policy for the first time, or in order to meet the amended requirements in ISO 9001:2008, should pay particular attention to clause 4.2.3 (c), (d) and (g).  Requirements for quality objectives are defined in clause 5.4.1 of ISO 9001:2008.  These documented quality objectives are also subject to the document control requirements of clause 4.2.3. 36
  • 37. document specifying the quality management system of an organization 37
  • 38. 38 The Quality manual includes the following  It fully describes the scope of QMS.  It completely explains each and every requirement of the ISO 9001 Standard  It contains complete detail and explanation of exclusions .  It contains references for the quality procedures used to describe all the QMS processes  A flow chart represent the series and interaction of your key business processes.  The organization's quality policies which shows that the organization is strictly committed to quality
  • 39. Following are the primary uses of the quality manual To communicate management's expectations for quality to the organization To reveal the organization conformity with ISO 9001 requirements To serve as a measure for compliance to management's expectations for: Internal audits ISO Registrar audits Customer audits 39
  • 40. Procedure is the specified way to carry out an activity or a process ISO 9001:2008 specifically requires the organization to have “documented procedures” for the following six activities: 4.2.3 Control of documents 4.2.4 Control of records 8.2.2 Internal audit 8.3 Control of nonconforming product 8.5.2 Corrective action 8.5.3 Preventive action 40
  • 41. Process maps, process flow charts and/or process descriptions Organization charts Specifications Work and/or test instructions Documents containing internal communications Production schedules Approved supplier lists Test and inspection plans Quality plans 41
  • 42. 5.6.1 Management reviews 6.2.2 e) Education, training, skills and experience 7.1 d) Evidence that the realization processes and resulting product fulfill requirements 7.2.2 Results of the review of requirements related to the product and actions arising from the review 7.3.2 Design and development inputs relating to product requirements 7.3.4 Results of design and development reviews and any necessary actions 7.3.5 Results of design and development verification and any necessary actions 7.3.6 Results of design and development validation and any necessary actions 7.3.7 Results of the review of design and development changes and any necessary actions 7.4.1 Results of supplier evaluations and any necessary actions arising from the evaluations 42
  • 43. 7.5.2 d) As required by the organization to demonstrate the validation of processes where the resulting output cannot be verified by subsequent monitoring or measurement 7.5.3 The unique identification of the product, where traceability is a requirement 7.5.4 Customer property that is lost, damaged or otherwise found to be unsuitable for use 7.6 a) Basis used for calibration or verification of measuring equipment where no international or national measurement standards exist 7.6 Validity of the previous measuring results when the measuring equipment is found not to conform to requirements 7.6 Results of calibration and verification of measuring equipment 8.2.2 Internal audit results and follow-up actions 8.2.4 Indication of the person(s) authorizing release of product. 8.3 Nature of the product nonconformities and any subsequent actions taken, including concessions obtained 8.5.2 e) Results of corrective action 8.5.3 d) Results of preventive action 43
  • 44. Documents information and its supporting medium for examples: paper magnetic electronic or optical computer disc photograph master sample 44
  • 45. A record is a type of document. Which provide evidence that activities have been performed or results have been achieved. Records management addresses six key issues: identification storage protection retrieval retention disposition 45
  • 46. 5.1 Management commitment 5.2 Customer focus 5.3 Quality policy 5.4 Planning 5.4.1 Quality objectives 5.4.2 Quality management system planning 5.5 Responsibility, authority and communication 5.5.1 Responsibility and authority 5.5.2 Management representative 5.5.3 Internal communication 5.6 Management review 5.6.1 General 5.6.2&3 Review input & output 46
  • 47. Top management is committed to the development and implementation of the quality management system and continually improves its effectiveness by: communicating to (Company Name) the importance of meeting customer as well as statutory and regulatory requirements, establishing a quality policy, establishing quality objectives, conducting management reviews, and ensuring the availability of resources 47
  • 48. Steps in application of this principle are ... 1. Understand customer needs and expectations for products, delivery, price, dependability, 2. Ensure a balanced approach among customers and other stake holders (owners, people, suppliers, local communities and society at large) needs and expectations. 3. Communicate these needs and expectations throughout the organisation. 4. Measure customer satisfaction & act on results, and 5. Manage customer relationships. 48
  • 49. 6.1 Provision of resources 6.2 Human resources 6.2.1 General 6.2.2 Competence, training and awareness 6.3 Infrastructure 6.4 Work environment 49
  • 50. 6.1 Provision of resources (Company Name) determines and provides the resources needed to implement and maintain the quality management system and continually improve its effectiveness, and to enhance customer satisfaction by meeting customer requirements. 50
  • 51. 6.2.1 General Personnel performing work affecting conformity to product requirements are competent on the basis of appropriate education, training, skills and experience. 6.2.2 Competence, training, and awareness determines the necessary competence for personnel performing work affecting conformity to product requirements, where applicable, provides training or takes other actions to achieve the necessary competence, evaluates the effectiveness of the actions taken, ensures that its personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives, and maintains appropriate records of education, training, skills and experience . Supporting Documentation QOP-62-01 Competence, Training, and Awareness 51
  • 52. The organization shall determine, provide and maintain the infrastructure needed to achieve conformity to product requirements. buildings, workspace and associated utilities, process equipment (both hardware and software), and supporting services (such as transport, or communication, or information systems). 52
  • 53. 6.4 Work environment set of conditions under which work is performed NOTE Conditions include physical, social, psychological and environmental factors (such as temperature). Company determines and manages the work environment needed to achieve conformity to product requirements. 53
  • 54. 7.1 Planning of product realization 7.2 Customer-related processes 7.2.1 Determination of requirements related to the product 7.2.2 Review of requirements related to the product 7.2.3 Customer communication 7.3 Design and development 7.3.1 Design and development planning 7.3.2&3 Design and development inputs &output 7.3.4 Design and development review 7.3.5&6 Design and development verification &validation 7.3.7 Control of design and development changes 54
  • 55. 7.4 Purchasing 7.4.1 Purchasing process 7.4.2 Purchasing information 7.4.3 Verification of purchased product 7.5 Production and service provision 7.5.1 Control of production and service provision 7.5.2 Validation of processes for production and service provision 7.5.3 Identification and traceability 7.5.4 Customer property 7.5.5 Preservation of product 7.6 Control of monitoring and measuring equipment 55
  • 56. 8.1 General 8.2 Monitoring and measurement 8.2.1 Customer satisfaction 8.2.2 Internal audit 8.2.3&4 Monitoring and measurement of processes & product 8.3 Control of nonconforming product 8.4 Analysis of data 8.5 Improvement 8.5.1 Continual improvement 8.5.2 Corrective action 8.5.3 Preventive action 56
  • 57. 57
  • 58. 58 1. Learn About ISO 9001 2. The cost of the project. 3. Identify Project Responsibilities. 4. Train Employees on ISO 9001 5. Perform a Gap Analysis 6. Prepare a Project Plan 7. Document Your System 8. Implement the QMS in Your Organization 9. Audit Your QMS 10. ISO 9001:2008 Registration Audit 11. Certification 12. Maintain and improve your management system
  • 59. Learn About ISO 9001 NO. Activity Who When How How Long 1 ISO purchase Mr. Farzad On line One day 2 Study the requirements ISO Project Manager Review One week 3 Study the requirements Steering team Action plan Two meeting/ week Two weeks 59
  • 60. The cost of the project 1. The consultant cost. 2. Hiring some peoples. 3. Training cost. 4. Infrastructure and documentation. 5. Software and format. 6. Registration and certificate cost. 60
  • 61. Identify Project Responsibilities 1. Top management 2. Project manager. 3. Management representative. 4. Internal Auditors. 5. Steering team. 6. task team. 7. Infrastructure. 61
  • 62. Establish the quality policy. Ensure that quality objectives are established at all relevant levels of the organization. Ensure availability of resources. Ensure that the planning of the quality system is carried out to meet the requirements of the standard and the quality objectives. Ensure that responsibilities, authorities and their interrelation are defined and communicated. Ensure that appropriate communication is established within the organization and effectiveness of the quality management system is communicated. 62
  • 63. Choose your PM 1. The Project Manager completes the Training. 2. The Project Manager prepares a Project Plan. 3. Management and the Project Manager identify an ISO 9001 Steering Team. 4. The Project Manager and others conduct a Gap Analysis with the Gap Analysis Checklist. 5. Revise processes and procedures and train those within your organization 63
  • 64. Choose your MR 1. The standard requires that the MR must be "a member of management" serving primarily as the "eyes" and "ears" of top management. 2. The MR primarily provides feedback( report) to top management on the effectiveness of the quality management system. 3. Ensuring that processes needed for the quality management system are established, implemented and maintained. 4. Ensuring the promotion of awareness of customer requirements throughout the organization. 64
  • 65. Choose your auditors team 1. Trained internal auditors for your audit program. 2. Auditing each area of your facility once or twice a year, 3. A general guidance number is 10% of the total number of employees; a company with 50 employees would train 5 auditors. 4. Look for employees that have a strength in investigating issues and that are good communicators. 5. The better people skills the auditors have, the smoother your audits will be performed. 65
  • 66. Choose your Steering team Management must identify a steering team for the project. It should be made up of managers from different areas of the organization. The purpose of the team will be to assign resources and responsibilities for the project as well as providing leadership for the project. A team led by top management that will coordinate and lead the implementation project 66
  • 67. 1. Identify team members for each procedure. 2. Assign target start date and completion date for each team. 3. Identify training needs for employees and schedule training sessions for ISO 9001:2008 4. Meet on a regular basis to evaluate progress, answer questions for the teams and evaluate resource needs for the implementation. 5. Review and approve procedures as they are finalized. 6. Evaluate and choose a Registrar 67
  • 68. Choose your Task teams The Task Team is led by a member of the Steering Team. A Task Team is set-up for each Quality System Procedure that needs to be developed. 68
  • 69. 1. Review the “Implementation Steps” to the group 2. Review Responsibilities of the ISO 9001:2008 Steering Team 3. Review procedure that the team will be responsible for. 4. Review the section of the Gap Analysis that applies to the team. 5. Determine resources required for completion of the tasks. 69
  • 70. The organization shall determine, provide and maintain the infrastructure needed to achieve conformity to product requirements. Infrastructure includes, as applicable 1. buildings, workspace and associated utilities. 2. process equipment (both hardware and software). 3. supporting services (such as transport, or communication, or information systems). 70
  • 71. Train Your Organization 1. Top management. 2. Project manager. 3. Internal Auditors. 4. Steering team. 5. task team. 6. All employees. 71
  • 72. Define the knowledge and skill needed for each employee to conduct their job. Deliver training or other learning activities to develop the required knowledge and skill. Provide a way to prove whether the training was effective (test for understanding) Ensure employee awareness of how their activities contribute to the quality objectives. They should understand the relevance and importance of their role. Keep training records and records of employee education, skills and experience. 72
  • 73. ALL of the employees in an organization so they understand the importance of ISO 9001 and their role in meeting the requirements. The course will educate them on: What is an ISO 9001 Quality Management System? Why is our company involved with ISO 9001? What does ISO 9001 require? How does it impact me and how can I impact quality? What and why are people auditing? 73
  • 74. Perform a Gap Analysis Consider the start of your project as the date of the Gap Analysis. Before conducting the Gap Analysis: 1. Identify one or more people to conduct the Gap Analysis; it is helpful if they have some quality experience or audit experience. 2. Print the Gap Analysis Checklist. 3. Schedule the Gap Analysis, and communicate to all employees what is being done, and why. 74
  • 75. Perform a Gap Analysis Schedule the Gap Analysis NO. Activity Who When How How Long 1 2 3 75
  • 76. Question YES NO N/A Auditor Remarks 1 Do you identify the requirements that your customers want you to comply with? 2 Do you identify your customers' product requirements? 3 Do you identify your customers' delivery requirements? 4 Do you identify your customers' post-delivery requirements? 5 Do you identify warranty requirements? 6 Do you identify maintenance requirements? 76
  • 77. ISO 9001 Gap Analysis Report Summarize the audit findings in the form of a task list. You will usually identify several categories of tasks. Processes that comply with the standard and are documented. Processes that comply with the standard and must be documented. Processes that do not comply with the standard and must be redesigned. Processes required by the standard that are not currently in place. 77
  • 78. Prepare a Project Plan ISO 9001 Step-by-Step Workbook The Team Approach Gantt chart 78
  • 79. 1- Prepare Your Organization 2- Develop Your ISO 9001 Quality Management System (QMS) 3- Implementation and ISO 9001 Registration 79
  • 80. Task 1: Management Describe your company Task 2: Management Choose your ISO Management System Task 3: Management Obtain the latest ISO 9001 standard Task 4: Management Select the Management Rep & Steering Team Task 5: ISO Steering Team Prepare an Organizational Chart Task 6: ISO Steering Team Establish the Quality Team Task 7: Quality Team Conduct First Team Meeting Task 8: ISO Steering Team Formulate the Quality Policy / Objectives Task 9: ISO Steering Team State the scope of the QMS Task 10: Quality Team/ Identify applicable regulations ISO Steering Team 80
  • 81. Task 11: Quality Team Identify/Describe processes/Prepare process flow diagrams Task 12: ISO Steering Team Provide Communication Tools Task 13: Quality Team Conduct a Preliminary Assessment –c/list Task 14: ISO Steering Team Assign Improvement Actions for QMS Task 15: ISO Steering Team Provide ISO 9001 training-Exercises A--F Task 16: ISO Steering Team Manage the Implementation Project Task 17: ISO Steering Team Complete Project Timing Chart Task 18: ISO Steering Team Collect Existing Documents Task 19: ISO Steering Team Perform financial study of costs and benefits Task 20: ISO Steering Team Reconfirm the ISO 9001 Decision Task 21: ISO Steering Team Promote and practice teamwork 81
  • 82. Task 22: Obtain and Review a Model for a QMS Manual Task 23: Use the Model as a Template to generate QMS documentation Task 24: Implement the Quality Management System Task 25: Conduct Internal Audit of the QMS Task 26: Conduct the Management Review Task 27: Select a Certification Body to register the QMS Task 28: Receive Certification and Celebrate 82
  • 83. A Gantt chart is a graphical representation of the duration of tasks against the progression of time. A Gantt chart is a useful tool for planning and scheduling projects. And helpful when monitoring a project's progress. 83
  • 84. 84
  • 85. Document Your System How Much Documentation Do You Need? Importance of Document Control ISO 9001 QMS Templates 85
  • 86. Clause 4.2.1 General explains that the quality management system documentation shall include: 1. documented statements of a quality policy and quality objectives; 2. a quality manual 3. documented procedures required by this International Standard 4. documents needed by the organization to ensure the effective planning, operation and control of its processes, and 5. records required by this International Standard; 86
  • 87. Establish a documented procedure to: Approve documents for adequacy prior to issue Review, update as necessary, and re-approve documents Identify the changes and current document revision status Make relevant documents available at points of use Ensure the documents remain legible and readily identifiable Identify external documents and control their distribution Prevent obsolete documents from unintended use Apply suitable identification if obsolete documents are retained 87
  • 88. Implement the QMS in Your Organization Training on New Procedures Training of Internal Auditors 88
  • 89. Follow documented procedures and work instructions Everyone in your organization should be performing processes following your documented procedures and work instructions, complying with the QMS requirements. Make improvements to the processes Many of these procedures may be new to your organization, or have changed significantly during your ISO 9001 project. Now that they are actually in use, you will most likely find areas that can be improved. Make improvements using the Corrective and Preventive Action process and the document revision process 89
  • 90. Training Objectives: Fully understand and successfully interpret the ISO 9001:2008 requirements Understand how to audit using the process approach Ask audit questions that get results Identify and document nonconformities Qualify additional staff to conduct internal audits Gain knowledge to help manage a successful ISO 9001:2008 implementation project Provide professional credentials to internal auditors Provide critical knowledge for staff and management 90
  • 91. Audit Your QMS Conduct Internal Audits Corrective/Preventive Action 91
  • 92. During an internal audit you will compare your quality system against the requirements of the standard. You will select a group of internal auditors from within your company to perform the audits. Conduct Internal Audits Schedule internal audits to cover all areas of the organization before your Registration Audit. Allow time to take corrective action on any findings. A robust and effective internal audit program is one of the best tools to finding and correcting shortcomings in the QMS before your Registration Audit. 92
  • 93. Corrective action is re-active ie dealing with the problem AFTER the event. Your corrective action procedure must explain how you: review non-conformance and customer complaints decide the cause of the problem decide an appropriate course of action to stop the problem recurring put the plan into action ensure that the action has solved the problem 93
  • 94. Preventive action is a pro-active procedure ie dealing with the problem BEFORE it happens. Your preventive action procedure must explain how you: review potential problems decide the potential cause of the problem decide an appropriate course of action to stop the problem occurring put the plan into action ensure that the preventive action has solved the potential problem 94
  • 95. ISO 9001:2008 Registration Audit Selecting a Registrar When to select a Registrar Registration Costs Choosing a Registrar Registrar Questionnaire Recommended Registrars 95
  • 96. 96 1- Registration 2- Initial assessment 3- Certification audit 4- Surveillance audits 5- Reassessments 6- Certificate
  • 97. 97
  • 98. Maintain and improve your management system 98
  • 99. 99