SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
Co. Reg. 2005 / 134576 / 23
Head Office
No. 110 Zendeling Street, Rustenburg 0300
Telephone: 086 129 3848 Fax: 014 592 8865 e-mail:awethu@awethuscaffold.co.za
( 0861 AWETHU ) www.awethuscaffold.co.za
SHEET METAL & INSULATION
ASSURANCE OF TECHNICAL EXCELLENCE
Branches
Gauteng Branch : George Shrives 082 855 3747
Limpopo Branch : Bennie Wessel 082 314 3975
 Awethu scaffold is a professional company in the scaffold, insulation and corrosion protection industries.
 The need for the erection of scaffold was identified for a save work environment.
Awethu Scaffold is a well established business based in Rustenburg with operations in North- West and
Limpopo.
Awethu Scaffold is now opening a branch in Thabazimbi as a result of the growing demand of business in
the area.
 The scope of our tender for a project is solely defined according to the task and desires of our customer.
Our aim is to ensure a safe working environment to all employees.
 Awethu Scaffold is BEE compliant with level 2 rating.
THE COMPANY
We comply with S.A.N.S. 10085 as our minimum standard. With our years of experience we
exceeded all safety standards.
With experience from working over 100 different sites, we understand the importance and
implementation of safety. We do not only understand it but is also capable of communicating it
to all personnel.
Awethu Scaffold, the company, has zero lost time injury as up to date.
With a manpower of 350 men, we have 5 safety officers , 19 safety representatives.
We understand and obey all safety standards
Safety records compliance documentation:
Awethu have in place: D.S.T.I`s, mini risk assessments, P.T.O`s, tool box talks, scaffold
registers, weekly PPE inspection etc.
All erected scaffold will be inspected by a competent scaffold inspector and be handed over with
a handing over certificate.
Safety milestones (L.T.I):
~Impala Platinum maintenance: 1 000 000 hrs ( 48 Months)
~ Kimberley new prison: 270 000 hrs ( 36 Months)
~Amandelbult: 125 000 hrs ( 54 Months)
~Lafarge Lightenburg: 49 881 ( 24 Months)
~ Anglo Platinum, BMR, Capacity Increase Project : 60 000 hrs ( 6 Months )
~ Medupi Power Station : 350 000 hrs ( 26 Months )
SAFETY
Management have over 40 years scaffold, sheet metal & insulation and corrosion protection
experience on Power stations, Acid plants and various other construction sites.
All scaffolds over 20 meters and all specialized scaffolds are designed, inspected and
approved by qualified scaffold designers.
Our fleet consists of 16 vehicles.
We currently manage over 1000 tons of scaffold with ease.
We have a well established efficient infrastructure in place.
The company have a workforce of over 300 employees with the majority having over 3 years
Scaffold erection experience.
Head office management consists of 14 competent and well experienced staff with honest
and strong characteristics. This also enables Awethu Scaffold to have a personal
relationship with our employees and clients.
TECHNICAL COMPETENCE
Awethu Scaffold conduct scaffold training on a regular basis for existing and new
employees. Example: Nosa, risk assessment, safety at heights, material handling training,
material quality control training, stack & storage training, first aid training, mine health &
safety training etc.
Awethu Scaffold make use of accredited training companies only.
Proof of regular training is available.
TRAINING
Impala Platinum : Mr Hendry Hurn Tel: 082 908 6669
Anglo Platinum ~ Amandelbult AMS: Mr. Koen Maritz Tel: 071 157 9362
~ Waterfall Concentrator : Mr. Willie Schoombee Tel: 082 781 4366
~ Western Limb
~ Mogolakwane ( Potgietersrus )
LTA Kimberley Prison : Mr. Johan Faber Tel: 082 825 9227
SMEI : Mr. Shane Els Tel: 083 655 1137
Lafarge Cement : Mr. Gert Mouton Tel: 082 601 9246
CMTS : Mr. David Muller Tel: 071 683 4938
Tubular : Mr. Louis Correra Tel: 082 573 8421
Northam Platinum : Mr. Theuns Botha Tel: 073 854 3924
LTA - Medupi Power Station : Mr. Stefaan Thompson Tel : 082 332 0433
REFERENCES
To have a save, active and positive workforce
To be the leader in safety and all scaffolding aspects
 To secure the majority of work
 To be a key player by contributing to sustainable development in Southern-Africa
 To be a stable and prosperous company
 To be your partner, not only your supplier
 To provide job security for all our personnel
 To promote advanced training
COMPANY VALUES
 Over years of experience Awethu Scaffold has gained knowledge of
all kinds and types of scaffolding and erection aspects.
 The most widely used is the System scaffolding, also used by Awethu
Scaffold.
 The correct use and safe working load of all components are well
known to Awethu and implemented on a daily basis.
 Awethu Scaffold is also updated on all new components and safe
working factors of new components in the scaffold industry.
 Our scaffolding is SABS approved, proof of certificates are available.
 All scaffolding is checked by quality controllers and rotated on a regular
basis.
 All materials are quality checked and colour coded.
 Scaffold material are annually rotated to ensure the utmost quality of
all scaffold materials.
PRODUCT KNOWLEDGE
All Scaffolding Services
 Static towers
 Suspended scaffolding
 Bird cage scaffolding
 Support structure scaffolding
 Boiler/Furnaces scaffolding
 Internal and external vessels
 Formwork
SERVICES
Supply and Apply
 Scaffold Erection
 Scaffold Hire
 Scaffold Sales
 Scaffold Inspection
 Sheet Metal Application
 IBR ( Profile Sheeting )
 Hot & Cold Insulation
 Industrial Painting
 Corrosion Protection
 Sand Blasting
 More work in less time
 Improve business performance
 Advance safety
 Best quality
 Less or no dispute
 Super fast reaction time
 Commitment to success
 Exceptional affirmative results
 We strive towards excellent housekeeping and commit ourselves to a clean working area
before as well as after the job is completed
SUCCESS WILL INCLUDE
 We are loyal & committed to our customers
 We have long-term relationships with our clients
 We honour our clients
 We follow their policy and procedures
 We value their assets
 We give clients the 100% quality they deserve
 We appreciate their business
 100% Safety record
OUR COMPETITIVE EDGE
Impala Platinum ~ Three year maintenance contract
~ 120 Personnel on site
~ 650 Tons scaffold material on site
~ Fully equipped & operation sheet metal and insulation workshop
Anglo ~ Waterfall Smelters – 50 Personnel on site
- 200 Tons scaffold material on site
~ BMR – 65 Personnel on site
- 275 Tons scaffold material on site
~ Amandelbult
~ Western Limb
~ Swartklip Union Section
Lafarge Cement ~ Maintenance
Xtrata
Impala ~ PMR, Springs
Lta Grinaker ~ Kimberly Prison – 3 Year project
~ Medupi Power Station
 100% Safety record
CONTRACTS
Mr. G.J.Burger ( General Manager )
Mr. C. Engelbrecht ( Contracts Manager )
Mrs. A. Burger ( Financial Manager )
Mrs. E. Pelser ( Safety Manager )
Mrs. F.A. Brits ( Admin Manager )
MANAGEMENT

Contenu connexe

Tendances

Protecting Hearth & Home Rev. 2015
Protecting Hearth & Home  Rev. 2015Protecting Hearth & Home  Rev. 2015
Protecting Hearth & Home Rev. 2015
Debra Catura
 
Pumpline-A4 version ccc
Pumpline-A4 version cccPumpline-A4 version ccc
Pumpline-A4 version ccc
David Pocock
 
Dean Smith CV.18-05-16
Dean Smith CV.18-05-16Dean Smith CV.18-05-16
Dean Smith CV.18-05-16
Dean Smith
 

Tendances (20)

Ocean-ten company profile
Ocean-ten company profileOcean-ten company profile
Ocean-ten company profile
 
NZSC Brochure
NZSC BrochureNZSC Brochure
NZSC Brochure
 
Ca drillers brochure
Ca drillers brochureCa drillers brochure
Ca drillers brochure
 
APAR
APARAPAR
APAR
 
Allflow-Slottedpipe16AUG-1
Allflow-Slottedpipe16AUG-1Allflow-Slottedpipe16AUG-1
Allflow-Slottedpipe16AUG-1
 
Alan's CV 1 2015 updated
Alan's CV 1  2015 updatedAlan's CV 1  2015 updated
Alan's CV 1 2015 updated
 
Protecting Hearth & Home Rev. 2015
Protecting Hearth & Home  Rev. 2015Protecting Hearth & Home  Rev. 2015
Protecting Hearth & Home Rev. 2015
 
Pumpline-A4 version ccc
Pumpline-A4 version cccPumpline-A4 version ccc
Pumpline-A4 version ccc
 
Construction Services from Magicman
Construction Services from MagicmanConstruction Services from Magicman
Construction Services from Magicman
 
Anthony Underwood Resume
Anthony Underwood ResumeAnthony Underwood Resume
Anthony Underwood Resume
 
Die forgings
Die forgingsDie forgings
Die forgings
 
2017 06-20 amiante july abestos cement removal - hampshire
2017 06-20 amiante july abestos cement removal - hampshire2017 06-20 amiante july abestos cement removal - hampshire
2017 06-20 amiante july abestos cement removal - hampshire
 
Floor sanding perth
Floor sanding perthFloor sanding perth
Floor sanding perth
 
EMTECH ENGINEERS - Introduction Letter
EMTECH ENGINEERS - Introduction LetterEMTECH ENGINEERS - Introduction Letter
EMTECH ENGINEERS - Introduction Letter
 
DML schede inglese
DML schede ingleseDML schede inglese
DML schede inglese
 
Torrey berard
Torrey berardTorrey berard
Torrey berard
 
Mechanical Repair Experts
Mechanical Repair ExpertsMechanical Repair Experts
Mechanical Repair Experts
 
Ci profile
Ci profileCi profile
Ci profile
 
Dean Smith CV.18-05-16
Dean Smith CV.18-05-16Dean Smith CV.18-05-16
Dean Smith CV.18-05-16
 
LRQA Certification of Approval
LRQA Certification of ApprovalLRQA Certification of Approval
LRQA Certification of Approval
 

En vedette

Costella Resume June 2015
Costella Resume June 2015Costella Resume June 2015
Costella Resume June 2015
Lauren Costella
 
кайнозойская эра
кайнозойская эракайнозойская эра
кайнозойская эра
ANNA_SH77
 
Question 333
Question 333Question 333
Question 333
danwj
 

En vedette (18)

Question 1111111
Question 1111111Question 1111111
Question 1111111
 
Costella Resume June 2015
Costella Resume June 2015Costella Resume June 2015
Costella Resume June 2015
 
July 2015 Resume Update
July 2015 Resume UpdateJuly 2015 Resume Update
July 2015 Resume Update
 
Doing_business_with_BSTDB_2012
Doing_business_with_BSTDB_2012Doing_business_with_BSTDB_2012
Doing_business_with_BSTDB_2012
 
Question 4 5
Question 4 5Question 4 5
Question 4 5
 
Presentazione Bookingfax - piattaforma b2c b2c
Presentazione Bookingfax - piattaforma b2c b2c Presentazione Bookingfax - piattaforma b2c b2c
Presentazione Bookingfax - piattaforma b2c b2c
 
What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016
 
кайнозойская эра
кайнозойская эракайнозойская эра
кайнозойская эра
 
Question 7
Question 7Question 7
Question 7
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Question 6
Question 6Question 6
Question 6
 
проект на тему мезозойская эра
проект на тему мезозойская эрапроект на тему мезозойская эра
проект на тему мезозойская эра
 
реклама учебника биологии. воронина к
реклама учебника биологии. воронина креклама учебника биологии. воронина к
реклама учебника биологии. воронина к
 
NSEL-FTIL merger is delayed
NSEL-FTIL merger is delayedNSEL-FTIL merger is delayed
NSEL-FTIL merger is delayed
 
Wagner Desrosiers RESUME2
Wagner Desrosiers RESUME2Wagner Desrosiers RESUME2
Wagner Desrosiers RESUME2
 
Question 333
Question 333Question 333
Question 333
 
мезозой 2016
мезозой 2016мезозой 2016
мезозой 2016
 
Question 7
Question 7Question 7
Question 7
 

Similaire à Awethu Scaffold Profile PDFb 2015

Company Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-JuneCompany Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-June
Flora N. Sugiarto
 
Company Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-JuneCompany Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-June
Flora N. Sugiarto
 
HMF-Tender-Brochure-Email
HMF-Tender-Brochure-EmailHMF-Tender-Brochure-Email
HMF-Tender-Brochure-Email
Stephanus Hyman
 
ALISTAIR SCOTT RESUME 2016
ALISTAIR SCOTT RESUME 2016ALISTAIR SCOTT RESUME 2016
ALISTAIR SCOTT RESUME 2016
Alistair Scott
 
R&D Contracting Presentation 2015
R&D Contracting Presentation 2015R&D Contracting Presentation 2015
R&D Contracting Presentation 2015
David Williams
 
4401 - R&D - 3D Mag Presentation - T1
4401 - R&D - 3D Mag Presentation - T14401 - R&D - 3D Mag Presentation - T1
4401 - R&D - 3D Mag Presentation - T1
Remo Torrente
 
Umlilo Profile - 2015 May
Umlilo  Profile - 2015 May Umlilo  Profile - 2015 May
Umlilo Profile - 2015 May
Shafick Bagus
 
Women at work rev2
Women at work rev2Women at work rev2
Women at work rev2
womenatwork
 
Women at work rev2
Women at work rev2Women at work rev2
Women at work rev2
womenatwork
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15
David Graham
 
USMI Company Profile- 2015
USMI Company Profile- 2015USMI Company Profile- 2015
USMI Company Profile- 2015
Ailyn Catarata
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
Hassan Al-Yami
 
Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015
Sam Morrison
 

Similaire à Awethu Scaffold Profile PDFb 2015 (20)

Company Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-JuneCompany Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-June
 
Company Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-JuneCompany Profile-SPGW-MKM - 2016-June
Company Profile-SPGW-MKM - 2016-June
 
Company profile spgw-mkm - 2016-june
Company profile spgw-mkm - 2016-juneCompany profile spgw-mkm - 2016-june
Company profile spgw-mkm - 2016-june
 
Angstrom overview September
Angstrom overview SeptemberAngstrom overview September
Angstrom overview September
 
HMF-Tender-Brochure-Email
HMF-Tender-Brochure-EmailHMF-Tender-Brochure-Email
HMF-Tender-Brochure-Email
 
ALISTAIR SCOTT RESUME 2016
ALISTAIR SCOTT RESUME 2016ALISTAIR SCOTT RESUME 2016
ALISTAIR SCOTT RESUME 2016
 
E profiil-presentation
E profiil-presentationE profiil-presentation
E profiil-presentation
 
R&D Contracting Presentation 2015
R&D Contracting Presentation 2015R&D Contracting Presentation 2015
R&D Contracting Presentation 2015
 
4401 - R&D - 3D Mag Presentation - T1
4401 - R&D - 3D Mag Presentation - T14401 - R&D - 3D Mag Presentation - T1
4401 - R&D - 3D Mag Presentation - T1
 
Storage System
Storage SystemStorage System
Storage System
 
Umlilo Profile - 2015 May
Umlilo  Profile - 2015 May Umlilo  Profile - 2015 May
Umlilo Profile - 2015 May
 
Women at work rev2
Women at work rev2Women at work rev2
Women at work rev2
 
Women at work rev2
Women at work rev2Women at work rev2
Women at work rev2
 
1444902641.5458
1444902641.54581444902641.5458
1444902641.5458
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15
 
Tanya Galvanizers- Leading Galvanized Cable Tray Manufacturer
Tanya Galvanizers- Leading Galvanized Cable Tray ManufacturerTanya Galvanizers- Leading Galvanized Cable Tray Manufacturer
Tanya Galvanizers- Leading Galvanized Cable Tray Manufacturer
 
USMI Company Profile- 2015
USMI Company Profile- 2015USMI Company Profile- 2015
USMI Company Profile- 2015
 
SEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTINGSEMOUHA GENERAL MAINTENANCE CONTRACTING
SEMOUHA GENERAL MAINTENANCE CONTRACTING
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015
 

Awethu Scaffold Profile PDFb 2015

  • 1. Co. Reg. 2005 / 134576 / 23 Head Office No. 110 Zendeling Street, Rustenburg 0300 Telephone: 086 129 3848 Fax: 014 592 8865 e-mail:awethu@awethuscaffold.co.za ( 0861 AWETHU ) www.awethuscaffold.co.za SHEET METAL & INSULATION ASSURANCE OF TECHNICAL EXCELLENCE Branches Gauteng Branch : George Shrives 082 855 3747 Limpopo Branch : Bennie Wessel 082 314 3975
  • 2.  Awethu scaffold is a professional company in the scaffold, insulation and corrosion protection industries.  The need for the erection of scaffold was identified for a save work environment. Awethu Scaffold is a well established business based in Rustenburg with operations in North- West and Limpopo. Awethu Scaffold is now opening a branch in Thabazimbi as a result of the growing demand of business in the area.  The scope of our tender for a project is solely defined according to the task and desires of our customer. Our aim is to ensure a safe working environment to all employees.  Awethu Scaffold is BEE compliant with level 2 rating. THE COMPANY
  • 3. We comply with S.A.N.S. 10085 as our minimum standard. With our years of experience we exceeded all safety standards. With experience from working over 100 different sites, we understand the importance and implementation of safety. We do not only understand it but is also capable of communicating it to all personnel. Awethu Scaffold, the company, has zero lost time injury as up to date. With a manpower of 350 men, we have 5 safety officers , 19 safety representatives. We understand and obey all safety standards Safety records compliance documentation: Awethu have in place: D.S.T.I`s, mini risk assessments, P.T.O`s, tool box talks, scaffold registers, weekly PPE inspection etc. All erected scaffold will be inspected by a competent scaffold inspector and be handed over with a handing over certificate. Safety milestones (L.T.I): ~Impala Platinum maintenance: 1 000 000 hrs ( 48 Months) ~ Kimberley new prison: 270 000 hrs ( 36 Months) ~Amandelbult: 125 000 hrs ( 54 Months) ~Lafarge Lightenburg: 49 881 ( 24 Months) ~ Anglo Platinum, BMR, Capacity Increase Project : 60 000 hrs ( 6 Months ) ~ Medupi Power Station : 350 000 hrs ( 26 Months ) SAFETY
  • 4. Management have over 40 years scaffold, sheet metal & insulation and corrosion protection experience on Power stations, Acid plants and various other construction sites. All scaffolds over 20 meters and all specialized scaffolds are designed, inspected and approved by qualified scaffold designers. Our fleet consists of 16 vehicles. We currently manage over 1000 tons of scaffold with ease. We have a well established efficient infrastructure in place. The company have a workforce of over 300 employees with the majority having over 3 years Scaffold erection experience. Head office management consists of 14 competent and well experienced staff with honest and strong characteristics. This also enables Awethu Scaffold to have a personal relationship with our employees and clients. TECHNICAL COMPETENCE
  • 5. Awethu Scaffold conduct scaffold training on a regular basis for existing and new employees. Example: Nosa, risk assessment, safety at heights, material handling training, material quality control training, stack & storage training, first aid training, mine health & safety training etc. Awethu Scaffold make use of accredited training companies only. Proof of regular training is available. TRAINING
  • 6. Impala Platinum : Mr Hendry Hurn Tel: 082 908 6669 Anglo Platinum ~ Amandelbult AMS: Mr. Koen Maritz Tel: 071 157 9362 ~ Waterfall Concentrator : Mr. Willie Schoombee Tel: 082 781 4366 ~ Western Limb ~ Mogolakwane ( Potgietersrus ) LTA Kimberley Prison : Mr. Johan Faber Tel: 082 825 9227 SMEI : Mr. Shane Els Tel: 083 655 1137 Lafarge Cement : Mr. Gert Mouton Tel: 082 601 9246 CMTS : Mr. David Muller Tel: 071 683 4938 Tubular : Mr. Louis Correra Tel: 082 573 8421 Northam Platinum : Mr. Theuns Botha Tel: 073 854 3924 LTA - Medupi Power Station : Mr. Stefaan Thompson Tel : 082 332 0433 REFERENCES
  • 7. To have a save, active and positive workforce To be the leader in safety and all scaffolding aspects  To secure the majority of work  To be a key player by contributing to sustainable development in Southern-Africa  To be a stable and prosperous company  To be your partner, not only your supplier  To provide job security for all our personnel  To promote advanced training COMPANY VALUES
  • 8.  Over years of experience Awethu Scaffold has gained knowledge of all kinds and types of scaffolding and erection aspects.  The most widely used is the System scaffolding, also used by Awethu Scaffold.  The correct use and safe working load of all components are well known to Awethu and implemented on a daily basis.  Awethu Scaffold is also updated on all new components and safe working factors of new components in the scaffold industry.  Our scaffolding is SABS approved, proof of certificates are available.  All scaffolding is checked by quality controllers and rotated on a regular basis.  All materials are quality checked and colour coded.  Scaffold material are annually rotated to ensure the utmost quality of all scaffold materials. PRODUCT KNOWLEDGE
  • 9. All Scaffolding Services  Static towers  Suspended scaffolding  Bird cage scaffolding  Support structure scaffolding  Boiler/Furnaces scaffolding  Internal and external vessels  Formwork SERVICES Supply and Apply  Scaffold Erection  Scaffold Hire  Scaffold Sales  Scaffold Inspection  Sheet Metal Application  IBR ( Profile Sheeting )  Hot & Cold Insulation  Industrial Painting  Corrosion Protection  Sand Blasting
  • 10.  More work in less time  Improve business performance  Advance safety  Best quality  Less or no dispute  Super fast reaction time  Commitment to success  Exceptional affirmative results  We strive towards excellent housekeeping and commit ourselves to a clean working area before as well as after the job is completed SUCCESS WILL INCLUDE
  • 11.  We are loyal & committed to our customers  We have long-term relationships with our clients  We honour our clients  We follow their policy and procedures  We value their assets  We give clients the 100% quality they deserve  We appreciate their business  100% Safety record OUR COMPETITIVE EDGE
  • 12. Impala Platinum ~ Three year maintenance contract ~ 120 Personnel on site ~ 650 Tons scaffold material on site ~ Fully equipped & operation sheet metal and insulation workshop Anglo ~ Waterfall Smelters – 50 Personnel on site - 200 Tons scaffold material on site ~ BMR – 65 Personnel on site - 275 Tons scaffold material on site ~ Amandelbult ~ Western Limb ~ Swartklip Union Section Lafarge Cement ~ Maintenance Xtrata Impala ~ PMR, Springs Lta Grinaker ~ Kimberly Prison – 3 Year project ~ Medupi Power Station  100% Safety record CONTRACTS
  • 13. Mr. G.J.Burger ( General Manager ) Mr. C. Engelbrecht ( Contracts Manager ) Mrs. A. Burger ( Financial Manager ) Mrs. E. Pelser ( Safety Manager ) Mrs. F.A. Brits ( Admin Manager ) MANAGEMENT