SlideShare une entreprise Scribd logo
1  sur  28
Télécharger pour lire hors ligne
Gazebo Canopy Assembly




	 OWNER’S	MANUAL		                                                                                              Gazebo
	 	                                                                               Includes instructions for 10’ x 10’ Gazebo
  Gazebo Canopy Assembly                                        Assembled exterior dimensions: 11’ 3”W. x 11’ 3”D. x 11’ 4”H.



	 Before	You	Begin...	
	 •	Consult	your	local	authorities	for	any	permits	required	to	construct	gazebo.	
               Prior to the construction of your gazebo, check with the local building code official to review any required
               permits or building limitations.

	 •	A	level	and	sturdy	foundation	is	required	before	gazebo	construction	can	begin.	
               Site preparation information is available in this manual. Please read before building gazebo.

	 •	Read	instructions	thoroughly	prior	to	assembly.	
		       This kit contains parts that can be damaged if assembled incorrectly or in the wrong sequence.

	 •	Please	follow	instructions.	
		       Suncast is not responsible for replacing parts lost or damaged due to incorrect assembly.

	 •	Check	for	all	parts	before	you	begin.	
		      	
        Using the provided parts check list on pages 4 and 5, verify that you have all the parts required to construct
               your gazebo model. COMPLETE	SITE	PREPARATION	AND	FOUNDATION	CONSTRUCTION	BEFORE		
               UNPACKING	ALL	PARTS.

	 •	Assistance	is	required.	
               Due to the size of the parts, at least two people are required to handle, fit and secure gazebo components.




© 2008 Suncast Corporation, Batavia, IL                                                                                       0361057
Gazebo Canopy Assembly

		         CAUTION
	
    • Gazebo not intended for use in extreme weather conditions.
    • Do not stand, sit, or store items on gazebo roof.
    • Handle carefully in extreme temperatures.
    • Repair or replace broken parts immediately.
    • Suncast is not responsible for damage caused by weather or misuse.
    • At regular intervals inspect your gazebo to make sure that assembly integrity has been maintained.
    • Periodically check that the location you have chosen to set your gazebo is still level.
    • Avoid excess heat from any auxiliary source.
    • Railing is not intended as a seat.
    • Any additional holes drilled into parts could cause unsafe conditions.
    • Gazebo is not intended to be enclosed.
    • Follow manufacturer safety instructions when using ladder.
    • Do not anchor to paver bricks. Foundation must be a solid surface.
    • Exercise caution using a lawn mower, edge trimmer or other yard equipment near gazebo.
    • Maximum weight that can be hung from Top Roof Rail: 20 lbs.
    • Do not hang objects from Bottom Roof Rail.
    • Do not hang objects from Facia Board.




                                                                                         Top roof rail




                                                                                         Bottom roof rail




                                                              2
Gazebo Canopy Assembly

	 Gazebo	Safety	and	Care	

	 • Wash gazebo with garden hose or mild detergent solution and soft cloth. Do not use a stiff brush or abrasive cleaner
     as that could damage gazebo.
    • Hot items, such as recently used grills, blowtorches, etc., must not be used in or near the gazebo.
    • Heavy articles should not be leaned against the post and rails, as this may cause panel distortion and permanent
      damage.
    • Keep roof clean of snow and leaves.




	 Tools	Needed	for	Installation
                                                                                                                 8’

                                                                                                            6’
                                         1/8”

                                                              or
          Concrete
          Foundation



	 Assembly	Day	Tips
	
	 	 		 omplete	site	preparation	and	foundation	construction	before	unpacking	
  •C
     parts	and	beginning	assembly.
	 •		 ake	care	when	removing	PVC	parts.	Other	parts	are	packed	inside	them.
     T
	 •	Do	not	attempt	to	assemble	on	a	day	with	strong	winds.
	 •	Do	not	attempt	to	assemble	on	days	when	temperature	is	below	32	degrees.
	 •	Set	aside	appropriate	amount	of	time	to	completely	assemble	gazebo.	
	 •	Make	sure	you	have	assistance	nearby	to	lift	and	secure	parts	in	place.	
	 •	Wear	light	duty	work	gloves	while	assembling	gazebo.
	 •	If	you	have	questions	on	assembly,	please	call	800-846-2345.

Note: This product contains parts that are used in different orientations to construct the gazebo. Please take note
of the orientation of the parts shown throughout this instruction manual. Failure to follow instructions could result in
damage to parts. Suncast is not responsible for replacing parts lost or damaged due to incorrect assembly.




                                                               3
Gazebo Canopy Assembly


Parts




                                               A                                                            C




         0101856A0 – Bottom upper shingle roof                    0101852A1 – Bottom upper underside roof
                          x8                                                       x8




                                                                                         B



                 0101857A0 – Bottom lower shingle roof/0101853A1 – Bottom lower underside roof
                                                       x8

                                                              Hardware
                                                                                                          J
                  E                            G
                                                                           I
                                                                                     0210152 – Stainless steel screw
                                                                                                  x76
  0101854A0 – Top upper     0101850A1 – Top upper                   0440496 – Turnbuckle
       shingle roof             underside roof
           x8                        x8
                                                                               K
                                                                                                          L

                                       F                       0440496 – Cable clamp       0240049 – Screw cap
                                                                        x2                        x44


         0101855A0 – Top lower shingle roof/                              M                                   N
        0101851A1 – Top lower underside roof
                        x8
                                                               0510496 – 37.75’ Cable    0510498 – Roof railing plug
 Note: Parts D and H are pre-assembled with                                                        x64
 parts B and F respectively.

                                                         4
Gazebo Canopy Assembly


Parts


                                                          R                                                   T

                                                                                       S              0101848A1
                                                                                                      Upper rafter                U
                                        0101846A0                                                      connector
                                          Top cap                            0630464
                                                                          Upper roof rafter               x8
                                                     V                          x8                                      0630470
                                                                                                               Y Center hub spacer
                                          0101847A1                                                                          x8
                                     Bottom hub connector                         X                  0101849A1
                                                                                                     Lower rafter                 Z
                                            W                                                       hub connector
                                                                                                         x8            0630475
                                        0101843A1                          0630471                                     Dowel pin
                                        Post collar                   Roof support posts                                 x16
                                            x8                                x8
                                                                                                      BB

                                                                                         0630463
        O           P            Q              AA                                    Lower roof rafter
                                                                                            x8                          EE

                                                                           CC                        DD
  0630461       0630462 0630460          0630477                  0101845A1                   0101844A1           0630474
Left doorway Right doorway PVC post      Steel post            Lower roof end cap          Upper roof end cap Roof weather strip
 PVC post      PVC post      x6             x8                         x8                          x8               x16



                                                                                      HH                               II
                            GG
              FF                                                 0630467                                        0630469
                                                               Lower roof rail                                 Roof spindle
                                                                   x16                                            x136

                                                                                           JJ                                KK
      0510499         0630466                                    0630472                                        0630468
      Post hole    Hand rail spindle                          Lower roof fascia                               Upper roof rail
      template           x48                                         x7                                           x16

                            LL                                                         MM                                       NN
             0630465                                            0630476                                         0630473
             Hand rail                                   Doorway lower roof fascia                           Upper roof fascia
               x14                                                                                                  x8

                                                                  5
Gazebo Canopy Assembly


	 Site	preparation	and	platform	construction
	 (Materials NOT supplied with Gazebo Kit)
	
 ote: Site preparation and platform construction and Support Post Installation steps may require professional
N
assistance to be installed correctly.

Please read all manual steps thoroughly before starting this project.

 ote: Site preparation and platform construction are required for this gazebo. Placing the gazebo on the ground
N
without any type of foundation is not recommended. Suncast is not responsible for replacing parts damaged or
property lost due to construction without a foundation or platform.

Complete the site preparation and platform construction before unpacking parts.

To	prepare	your	gazebo	site,	follow	the	below	steps:

1) Consult your local authorities for building codes and covenants before beginning foundation or erecting
   gazebo.

2) Consult your local building supply retailer to assist you in determining the best foundation or platform method for
   your application. The building supply retailer can also help you determine what anchoring hardware you will need
   once the foundation or platform method has been determined. Bring this manual with you to the retailer so they
   can see the scope of the project.

3) Before any digging, check with local utilities to determine location of buried cables, pipes, etc.

4) A	4	inch	thick	concrete	slab	is	recommended	as	the	foundation.

 - If a wood platform is chosen as the foundation, use exterior grade wood.

Note: Do not erect gazebo on paver bricks. Foundation must be a solid surface.

If you plan to erect the gazebo on an existing deck, consult local authorities for building codes and make sure that
the structure is sound and can hold the additional weight of the gazebo (approx. 375 lbs.). Consult local building
supply retailer to determine the best method and hardware for your application.

5) Preparing the building site:

 - The ground should slope away from the foundation area to provide drainage.
 - The foundation surface must be flat and level.
 - Follow local building codes for a proper vapor barrier.

Ensure	site	allows	room	for	your	gazebo:

1) Square foundation should be 10’ 6” x 10’ 6”.

2) If an octagon foundation is wanted for your gazebo, consult your local building supply retailer to help you
   determine materials and hardware required.

3) Overall height (foundation to top of top cap) – 11’ 4”.

4) Overall base width (support post to support post) – 10’ 2.5”.

5) Overall roof width (rafter end to rafter end) – 11’ 3”.



                                                              6
Gazebo Canopy Assembly


Support	Post	Installation
                                                                   1


                                       10’
                                             6”
                ”
             ’6
           10




Ensure square foundation is 10’ 6” x 10’ 6”.                    Locate and mark center of foundation slab or deck.




  2                                                                3


                           115
                              ”




                                                                     Do
                                                                       orw
                                                                           ay




Using center point and wire, draw a 115” diameter                Determine doorway location and mark right
circle. DO	NOT use string (string will stretch causing           doorway post.
inaccurate measurements).


                                                            7
Gazebo Canopy Assembly




   4                                                                5




                            44”                                                            44”

                                                       x8




Measure 44” from the intersection of circle and chalk            Double check markings to ensure there are 44” be-
line to next post position. Measure directly from point          tween each post location.
to point, NOT along circle. Mark this spot. Do this eight
times to identify all post
locations.



   6                                                                7



                                                                                           115
                                                                                              ”




                                                                                                                                x32
                                                                                                          O     B
                                                                                                             ZE
                                                                                                          GA
                                                                                                              OF
                                                                                                                TER    N
                                                                                                                    CE




                                                                                                                           FF

Snap all chalk lines so that all post locations have             Using the post hole template, align with circle and
straight lines (bisecting center of circle).                     chalk line for each of the eight post locations. Mark
                                                                 where drill holes are needed. Double check that circle
                                                                 diameter is still 115”.
                                                             8
Gazebo Canopy Assembly
Note:	Before drilling into foundation, check with local building supply retailer for best method and hardware for your
application.


    8a   Concrete foundation                                        8b      Wood foundation




                     5
                                          2                                                                2
1                                                x32
                                                                1                                                     x32
           x32                                                             x32



Using a hammer drill, make holes for each post.                 Drill holes for each post. From underside of
Then insert concrete lag anchors and four                       foundation, insert four full-threaded lag bolts and
full-threaded studs.                                            washers.




    9                                                               10


                               AA
                                                                                                AA x8




                                                                                                                 x32




Ensure steel posts are in correct orientation.                  Bolt down all steel posts.
                                                                Note: Ensure all steel posts are secured to foundation.
Gazebo Canopy Assembly

Parts	Pre-Assembly
Note:	To avoid scratching finish in steps where parts are placed upside down, place parts on smooth surface. Flat-
ten cardboard from carton to create a smooth surface.


 11                                                             12
                          A
                                                                            A




                                                                                           B
                              B
          x4                                                       x4


Insert A into the corresponding slots in B.                   Slide A and lock into place in B.
Note:Ensure that preassembled B is assembled
properly.



 13                                                             14
                           C



                                                                     Repeat steps 11-13
          A
                                                                    for seven remaining
                                                                     bottom roof panels.
                                         B



     x3

Snap C into A and B to form a single bottom
roof panel.



                                                         10
Gazebo Canopy Assembly




 15                                                             16
                   E


                                                                           E




                                            F
                                                                                                  F

          x2                                                        x2


Insert E into the corresponding slots in F.                   Slide E and lock into place in F.
Note:Ensure preassembled F is assembled properly.




 17                                                             18
                        G



               E                                                      Repeat steps 15-17
                                                                     for seven remaining
                                                                        top roof panels.


                               F
     x2


Snap G into E and F to form a single top roof panel.




                                                         11
Gazebo Canopy Assembly




 19                                                               20
                                                                                  LL
        GG




                             LL




Insert eight hand rail spindles into square hand rail           Place another hand rail (matching spindles with
holes.                                                          square holes).




 21                                                               22
      Repeat steps 19-20
       for six remaining
           hand rails.
   Optional: After assembled, run                                      II
   a band of low tack tape around
    assembly. This will help hold                                                       HH
     rails together until they are
              used again.


                                                                Insert eleven roof spindles into square lower roof rail
                                                                holes.


                                                           12
Gazebo Canopy Assembly




 23                                                              24
                                                                       Repeat steps 22-23
                    HH
                                                                      for seven remaining
                                                                       bottom roof railings.
                                                                   Optional: After assembled, run
                                                                   a band of low tack tape around
                                                                    assembly. This will help hold
                                                                     rails together until they are
                                                                              used again.


Place another lower roof rail (matching spindles with
square holes).
Note:Match orientation of bottom of roof rail.




 25                                                              26


                                                                                 KK


        II


                           KK




Insert six roof spindles into upper roof rail.                 Place another upper roof rail (matching roof
                                                               spindles with square holes).
                                                               Note:Match orientation of bottom roof rail.

                                                          13
Gazebo Canopy Assembly




 27                                                                28

         Repeat steps 25-26
                                                                       Y
        for seven remaining
         upper roof railings.
   Optional: After assembled, run
   a band of low tack tape around                                                                 BB
    assembly. This will help hold
     rails together until they are
              used again.


                                                                 Snap lower rafter hub connector into place at angled
                                                                 end of lower roof rafter.




 29                                                                30
               U

                            X
                                                                            T


                                                                                                       S

                       BB

    1
                                               2

Snap center hub spacer into lower roof rafter hub                Snap upper rafter connector into place on angled side
connector. Add roof support post to lower roof rafter.           of upper roof rafter.



                                                            14
Gazebo Canopy Assembly




 31                                                               32




                                                                     x2
                                                                    J
                                            2                                L
        1

Snap upper rafter connector onto center hub spacer.              Secure roof support posts to upper and lower roof
Slide upper roof rafter into place over roof support post        rafters using screws and screw caps.
on lower roof rafter.                                            Note: Make sure you go through the roof support post.




 33

                                                                           Before starting
       Repeat steps 28-32                                                gazebo assembly,
      for seven remaining                                               allow adequate time
           roof rafters.                                                   (about 6 hours).




                                                            15
Gazebo	Assembly                                   Gazebo Canopy Assembly

Note: Verify post assembly orientation (see Step 9).



 34                                                                      35

                                                                                                       Q
                          O
                                   P                                                                         x6




         Inside                                                                                             AA
         of gazebo
                     Do
                       orw
                          ay



Place left and right doorway PVC posts over steel                       Place the six other PVC posts over remaining steel
posts, making sure that hand rail holes face away from                  posts.
doorway.




 36                                                                      37




                                                          1-1/2”                                                  J

                                                       1”

                                                     x16                                                                 x16


Predrill two 1/8” holes through PVC posts and into                      Secure all posts with screws in pilot holes.
steel posts (both flat sides of steel posts). Make sure
to take into account the “Z” shape of steel post when
drilling hole on opposite side of PVC posts.
                                                                   16
Gazebo Canopy Assembly




 38                                                                39
                                                                       For steps 40-45 have one
                                                                           person stand on an 8’
                                                                          ladder in the middle of
                                                                         foundation and another
                                                                      person on a 6’ ladder next
                                                                        to the PVC post you are
                                                                         working with. The extra
                                                         W            height will make it easier to
                                                     x8                      assemble parts.


Slide one post collar over each post.




 40                                                                41




                                             Z                                                                       Z

Slide one rafter assembly up through PVC post notch               Slide opposite rafter assembly up through PVC post notch
and into postion. Secure with two dowel pins. (If                 and into position. Secure with two dowel pins. (If necessary,
necessary, use a rubber mallet to ensure tips of dowel            use a rubber mallet to ensure tips of dowel pins exit other
pins exit other side of PVC post.) The person on 8’               side of PVC post.) Make sure to support rafters ather
ladder will need to support rafter assembly.                      assembling.
                                                             17
Gazebo Canopy Assembly




 42                                                              43


                                                                     Repeat steps 40-42
                       V                                            for two perpendicular
                                                                      rafter assemblies.




Snap bottom hub connector onto rafter connectors.
Note:The hub connector will only engage on
alternating rafter assemblies.




 44                                                              45


                                                                            Repeat step 44
                                                                          for remaining three
                                                                           rafter assemblies.



                                                  Z

Lift fifth rafter assembly 6” above installed rafters.
Slide connector down into place along grooves.
Secure lower end of rafter with two dowel pins. (If
necessary, use a rubber mallet to ensure tips of pins
exit other side of PVC post).
                                                          18
Gazebo Canopy Assembly




 46                                                             47


                                                                                                  M
                                                                               I
                                                                                            1




                                                                   K


            M
                                                                   2                                              3


Thread turnbuckle cable through the upper most                Loop cable through turnbuckle eyelet. Put clamp on
dowel pins, between posts and rafters (to stabilize           cable. Use wrench to tighten nuts.
assembly).




 48                                                             49

                   K
                                                                                       1




                                 M
                            1


                                                                                                              3
                                                                   2
                                                                                                      I
           2
                                                                          I


Put clamp on remaining end of cable. Use wrench to            Standing on a ladder, push bottom hub connector up.
tighten nuts.                                                 Place loop cable around turnbuckle hook. Tighten
                                                              turnbuckle to take up slack. DO	NOT	FULLY	TIGHTEN	  	
                                                              TURNBUCKLE.
                                                         1
Gazebo Canopy Assembly




 50                                                               51                          R


                            1
                          111”




Check that the distance from the bottom hub                     Using a rubber mallet, attach top cap onto upper roof
connector to the floor is 111”. If necessary, adjust            rafter connectors.
turnbuckle. DO	NOT	FULLY	TIGHTEN		
TURNBUCKLE.




 52                                                               53
               NN



                                                                            Repeat step 52
                                                                            for remaining
                                                                           seven upper roof
                                                                            fascia boards.




Insert one upper roof fascia board between upper roof
rafters.



                                                           20
Gazebo Canopy Assembly




 54                                                             55




                                                                 1                                          2       J

Take one pre-assembled upper roof panel and slide              Predrill 1/8” holes and screw the upper roof panel to
over fascia boards along rafter groove and under top           the fascia board.
cap. Make sure roof panel is fully engaged on inside of
fascia boards.




 56                                                             57
     Repeat steps 53-55
    for remaining seven                                                            1
   top roof fascia boards.
                                                                           EE

     DO NOT proceed to
    next step until step 56
         is complete.                                                                                           2




                                                               Snap one roof weather strip 3/4 of the way up on upper
                                                               roof rafter. Slide up under top cap until flush with end
                                                               of upper roof rafters.


                                                          21
Gazebo Canopy Assembly




 58                                                           59


        Repeat step 57
     for remaining seven
        weather strips.                                                 DD




                                                                                                        x8


                                                            Snap one upper roof end cap onto end of each upper
                                                            roof rafter.




 60                                                           61


                                                                     Repeat step 60
                                                                  for remaining seven
                                                                   upper roof railings.


                                      x8




Insert one pre-assembled upper roof railing between
roof support posts. (Ensure rails are centered.)



                                                       22
Gazebo Canopy Assembly




 62                                                                63


                                                                     MM




                                            x32     N




Insert roof railing plugs into pre-drilled holes (top and        Insert doorway lower roof fascia board into place
bottom) of upper roof railings (four per rail).                  between doorway posts.




 64                                                                65




                                                                    1                                        2       J

Take one pre-assembled lower roof panel and slide                Predrill 1/8” holes and screw the lower roof panel to
over lower fascia board along the rafter groove. Make            the lower fascia board.
sure lower roof panel is fully engaged on inside of
lower fascia boards.
                                                            23
Gazebo Canopy Assembly




66                                      67
    Repeat steps 63-65
   for remaining seven
lower roof fascia boards
  and lower roof panels.                               1

                                                 EE
  DO NOT proceed to
 next step until step 66
      is complete.                                                                2



                                      Snap one roof weather strip 3/4 of the way up on lower
                                      roof rafter. Slide up until flush.




68                                      69


     Repeat step 67
  for remaining seven
     weather strips.

                                                  CC

                                                                                         x8


                                      Snap one lower roof end caps onto lower rafters.
                                      Repeat for remaining seven lower roof rafters.



                                 24
Gazebo Canopy Assembly




 70                                                                  71


                                                                         Repeat step 70
                                                                          for remaining
                                                                      seven lower roof rails.




Insert one pre-assembled lower roof railing between
each roof support post. (Ensure rails are centered.)




 72                                                                  73




                                                   N             I          1
                                          x32
                                                                                                                       2



Insert roof railing plugs into pre-drilled holes (top and        If necessary, finish tightening turnbuckle cable to
bottom) of lower roof railings. (Four per rail).                 secure complete upper assembly. Using a wire cutter
                                                                 or hacksaw, cut off excess cable beyond clamp.


                                                            25
Gazebo Canopy Assembly




    74                                                           75


                                                                          Repeat step 74
                                                                           for remaining
                                                                          six hand rails.




Starting at one side of the doorway, insert one side of
one preassembled hand rail into notches in PVC post.
Insert remaining side of hand rail and center between
PVC posts.




    76                                                           77




                                                                  L       J
                                                                           x2
             x2
L
         J

Center hand rail and make sure spindles are vertical.           Center hand rail and make sure spindles are vertical.
Secure lower handrails using two screws and screw caps          Secure upper handrails using two screws and screw caps
per section (top side of bottom hand rail—one per side).        per section (underside of top hand rail—one per side).
Place screws and screw caps as close to PVC post as             Place screws and screw caps as close to PVC post as
possible where the hand rail meets the PVC post.                possible where the hand rail meets the PVC post.
                                                           26
Gazebo Canopy Assembly




78


     Repeat steps 76-77
       for remaining
         hand rails.




                                        Complete.




                                   27
Gazebo Canopy Assembly

 Warranty
Suncast® Corporation, 701 North Kirk Road, Batavia, Illinois 60510 (Manufacturer) warrants to the original purchas-
er only that the enclosed product is free from material and workmanship defects under normal, household use at
time of purchase. Defective product or part must be returned, freight prepaid, to the Manufacturer’s address (Atten-
tion: Parts Department) along with proof of purchase. Upon receipt of the aforesaid, the defective product or part
will be repaired or replaced at the option of the Manufacturer without charge to the original purchaser and returned
to the customer freight collect.

This limited warranty does not apply to damage resulting from accident, neglect, misuse, commercial use, alteration,
operation not in accordance with instruction or repairs made or attempted by unauthorized persons.

This limited warranty applies only to the product enclosed and does not apply to accessory parts.

THE MANUFACTURER’S LIABILITY HEREUNDER IS LIMITED SOLELY TO THE REPAIR OR REPLACEMENT
OF THE DEFECTIVE PRODUCT OR PART AND THE MANUFACTURER SHALL IN NO EVENT BE LIABLE FOR
ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES WHICH MAY RESULT FROM ANY DEFECT IN MATERIAL
OR WORKMANSHIP OR FROM THE BREACH OF ANY EXPRESS OR IMPLIED WARRANTY.

Some states do not allow the exclusion or limitation of incidental or consequential damages, or a limitation of how
long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal
rights, and you may have other rights which may vary from state to state.


  Factory	Repairs
Repair service and assembly assistance are available direct from the factory, not from the place of purchase. If this
product requires repair, please call or write us. Warranty repair parts are sent out free of charge. If the product is out
of warranty, we will inform you of the charges prior to sending out the parts. VISA and MasterCard are accepted on
phone orders. For assembly or replacement parts information:

                                                  Replacement Parts
                                                  Suncast Corporation
                                                  701 North Kirk Road
                                                   Batavia, IL 60510

                                       Outside Illinois, but within North America
                                                     800-846-2345
                                           24 hour service / 7 days a week

                                        Within Illinois, or outside North America
                                                       630-87-2050
                                                 visit: www.suncast.com
                                              email: parts@suncast.com

                                                       PATENTS
                                                    Patents pending.

Contenu connexe

Tendances

hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilitiesFãrük Ñäzmî
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingAbhijeet Nagle
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping worksSurya Kant
 
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docx26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docxDwarika Bhushan Sharma
 
7 Common Sandblasting Mistakes to Avoid
7 Common Sandblasting Mistakes to Avoid7 Common Sandblasting Mistakes to Avoid
7 Common Sandblasting Mistakes to AvoidJack Smith
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
safety induction furnace.pdf
safety induction furnace.pdfsafety induction furnace.pdf
safety induction furnace.pdfKKKMETALPSGCT
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007Tonni Bruce
 
mock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bitemock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake biteHarish Yalal
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 
Daily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaaDaily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaaSastraDiharlan1
 
Visual Inspection of Welding Process
Visual Inspection of Welding ProcessVisual Inspection of Welding Process
Visual Inspection of Welding ProcessGaurav Singh Rajput
 
Case Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 PipingCase Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 PipingWilliam Jensen
 

Tendances (20)

hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
Use of PPEs
Use of PPEsUse of PPEs
Use of PPEs
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Working Safety With Forklift Stacker
Working Safety With Forklift StackerWorking Safety With Forklift Stacker
Working Safety With Forklift Stacker
 
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docx26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
 
7 Common Sandblasting Mistakes to Avoid
7 Common Sandblasting Mistakes to Avoid7 Common Sandblasting Mistakes to Avoid
7 Common Sandblasting Mistakes to Avoid
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
safety induction furnace.pdf
safety induction furnace.pdfsafety induction furnace.pdf
safety induction furnace.pdf
 
Powered Pallet Jack Safety Poster
Powered Pallet Jack Safety PosterPowered Pallet Jack Safety Poster
Powered Pallet Jack Safety Poster
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
Safe_Erections_Web
Safe_Erections_WebSafe_Erections_Web
Safe_Erections_Web
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
Turkish ports
Turkish portsTurkish ports
Turkish ports
 
mock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bitemock drill demonstrating first aid management of snake bite
mock drill demonstrating first aid management of snake bite
 
Safety plan
Safety planSafety plan
Safety plan
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Daily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaaDaily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaa
 
Visual Inspection of Welding Process
Visual Inspection of Welding ProcessVisual Inspection of Welding Process
Visual Inspection of Welding Process
 
Case Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 PipingCase Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 Piping
 

En vedette

10x10 Gazebo.pdf
10x10 Gazebo.pdf10x10 Gazebo.pdf
10x10 Gazebo.pdfGiller Doit
 
10 ft. square steel gazebo assembly manuals
10 ft. square steel gazebo assembly manuals10 ft. square steel gazebo assembly manuals
10 ft. square steel gazebo assembly manualsGiller Doit
 
10 ft. x 12 ft. steel gazebo assembly & instructions manuals
10 ft. x 12 ft. steel gazebo assembly & instructions manuals10 ft. x 12 ft. steel gazebo assembly & instructions manuals
10 ft. x 12 ft. steel gazebo assembly & instructions manualsGiller Doit
 
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions Manual
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions ManualSan Marino 10’,12’ and 14’ Gazebo Assembly and Instructions Manual
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions ManualGiller Doit
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualGiller Doit
 
Palladian Gazebo Assembly Instructions and Owner’s Manual
Palladian Gazebo Assembly Instructions and Owner’s ManualPalladian Gazebo Assembly Instructions and Owner’s Manual
Palladian Gazebo Assembly Instructions and Owner’s ManualGiller Doit
 

En vedette (6)

10x10 Gazebo.pdf
10x10 Gazebo.pdf10x10 Gazebo.pdf
10x10 Gazebo.pdf
 
10 ft. square steel gazebo assembly manuals
10 ft. square steel gazebo assembly manuals10 ft. square steel gazebo assembly manuals
10 ft. square steel gazebo assembly manuals
 
10 ft. x 12 ft. steel gazebo assembly & instructions manuals
10 ft. x 12 ft. steel gazebo assembly & instructions manuals10 ft. x 12 ft. steel gazebo assembly & instructions manuals
10 ft. x 12 ft. steel gazebo assembly & instructions manuals
 
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions Manual
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions ManualSan Marino 10’,12’ and 14’ Gazebo Assembly and Instructions Manual
San Marino 10’,12’ and 14’ Gazebo Assembly and Instructions Manual
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly Manual
 
Palladian Gazebo Assembly Instructions and Owner’s Manual
Palladian Gazebo Assembly Instructions and Owner’s ManualPalladian Gazebo Assembly Instructions and Owner’s Manual
Palladian Gazebo Assembly Instructions and Owner’s Manual
 

Similaire à 10 x 10 ft. gazebo assembly instruction

Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
Ch8 steering
Ch8 steeringCh8 steering
Ch8 steering_AXE_PM
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guidDon Pell
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsMot panels
 
Longboard Installation Instructions
Longboard Installation InstructionsLongboard Installation Instructions
Longboard Installation Instructionsjhaveruk
 

Similaire à 10 x 10 ft. gazebo assembly instruction (7)

Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
Ch8 steering
Ch8 steeringCh8 steering
Ch8 steering
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
Tesla Model X Rear Lighted T Installation Guide
Tesla Model X Rear Lighted T Installation GuideTesla Model X Rear Lighted T Installation Guide
Tesla Model X Rear Lighted T Installation Guide
 
Longboard Installation Instructions
Longboard Installation InstructionsLongboard Installation Instructions
Longboard Installation Instructions
 
RIELES-Y-BARRAS-USA
RIELES-Y-BARRAS-USARIELES-Y-BARRAS-USA
RIELES-Y-BARRAS-USA
 

Plus de Giller Doit

Maclaren Strollers.pdf
Maclaren Strollers.pdfMaclaren Strollers.pdf
Maclaren Strollers.pdfGiller Doit
 
Baby Trend Umbrella Stroller.pdf
Baby Trend Umbrella Stroller.pdfBaby Trend Umbrella Stroller.pdf
Baby Trend Umbrella Stroller.pdfGiller Doit
 
Digital Baby Monitor.pdf
Digital Baby Monitor.pdfDigital Baby Monitor.pdf
Digital Baby Monitor.pdfGiller Doit
 
Chicco Car Seat.pdf
Chicco Car Seat.pdfChicco Car Seat.pdf
Chicco Car Seat.pdfGiller Doit
 
Baby Monitor Reviews.pdf
Baby Monitor Reviews.pdfBaby Monitor Reviews.pdf
Baby Monitor Reviews.pdfGiller Doit
 
Fisher Price Baby Monitor.pdf
Fisher Price Baby Monitor.pdfFisher Price Baby Monitor.pdf
Fisher Price Baby Monitor.pdfGiller Doit
 
MTD Lawn Mowers.pdf
MTD Lawn Mowers.pdfMTD Lawn Mowers.pdf
MTD Lawn Mowers.pdfGiller Doit
 
Electric Lawnmowers.pdf
Electric Lawnmowers.pdfElectric Lawnmowers.pdf
Electric Lawnmowers.pdfGiller Doit
 
Electric Lawn Trimmers.pdf
Electric Lawn Trimmers.pdfElectric Lawn Trimmers.pdf
Electric Lawn Trimmers.pdfGiller Doit
 
Cordless Trimmer.pdf
Cordless Trimmer.pdfCordless Trimmer.pdf
Cordless Trimmer.pdfGiller Doit
 
Murray Riding Mower.pdf
Murray Riding Mower.pdfMurray Riding Mower.pdf
Murray Riding Mower.pdfGiller Doit
 
Greenhouse Glass.pdf
Greenhouse Glass.pdfGreenhouse Glass.pdf
Greenhouse Glass.pdfGiller Doit
 
Green House Designs.pdf
Green House Designs.pdfGreen House Designs.pdf
Green House Designs.pdfGiller Doit
 
Modern Outdoor Furniture.pdf
Modern Outdoor Furniture.pdfModern Outdoor Furniture.pdf
Modern Outdoor Furniture.pdfGiller Doit
 
Gazebo Covers Replacement.pdf
Gazebo Covers Replacement.pdfGazebo Covers Replacement.pdf
Gazebo Covers Replacement.pdfGiller Doit
 
Lowes Gazebo.pdf
Lowes Gazebo.pdfLowes Gazebo.pdf
Lowes Gazebo.pdfGiller Doit
 
John Deere Mowers.pdf
John Deere Mowers.pdfJohn Deere Mowers.pdf
John Deere Mowers.pdfGiller Doit
 
Exmark Lawn Mowers.pdf
Exmark Lawn Mowers.pdfExmark Lawn Mowers.pdf
Exmark Lawn Mowers.pdfGiller Doit
 
Riding Mowers.pdf
Riding Mowers.pdfRiding Mowers.pdf
Riding Mowers.pdfGiller Doit
 

Plus de Giller Doit (20)

Maclaren Strollers.pdf
Maclaren Strollers.pdfMaclaren Strollers.pdf
Maclaren Strollers.pdf
 
Baby Trend Umbrella Stroller.pdf
Baby Trend Umbrella Stroller.pdfBaby Trend Umbrella Stroller.pdf
Baby Trend Umbrella Stroller.pdf
 
Digital Baby Monitor.pdf
Digital Baby Monitor.pdfDigital Baby Monitor.pdf
Digital Baby Monitor.pdf
 
Chicco Car Seat.pdf
Chicco Car Seat.pdfChicco Car Seat.pdf
Chicco Car Seat.pdf
 
Baby Monitor Reviews.pdf
Baby Monitor Reviews.pdfBaby Monitor Reviews.pdf
Baby Monitor Reviews.pdf
 
Fisher Price Baby Monitor.pdf
Fisher Price Baby Monitor.pdfFisher Price Baby Monitor.pdf
Fisher Price Baby Monitor.pdf
 
MTD Lawn Mowers.pdf
MTD Lawn Mowers.pdfMTD Lawn Mowers.pdf
MTD Lawn Mowers.pdf
 
Electric Lawnmowers.pdf
Electric Lawnmowers.pdfElectric Lawnmowers.pdf
Electric Lawnmowers.pdf
 
Electric Lawn Trimmers.pdf
Electric Lawn Trimmers.pdfElectric Lawn Trimmers.pdf
Electric Lawn Trimmers.pdf
 
Cordless Trimmer.pdf
Cordless Trimmer.pdfCordless Trimmer.pdf
Cordless Trimmer.pdf
 
Murray Riding Mower.pdf
Murray Riding Mower.pdfMurray Riding Mower.pdf
Murray Riding Mower.pdf
 
Greenhouse Glass.pdf
Greenhouse Glass.pdfGreenhouse Glass.pdf
Greenhouse Glass.pdf
 
Green House Designs.pdf
Green House Designs.pdfGreen House Designs.pdf
Green House Designs.pdf
 
Modern Outdoor Furniture.pdf
Modern Outdoor Furniture.pdfModern Outdoor Furniture.pdf
Modern Outdoor Furniture.pdf
 
Cub Cadet.pdf
Cub Cadet.pdfCub Cadet.pdf
Cub Cadet.pdf
 
Gazebo Covers Replacement.pdf
Gazebo Covers Replacement.pdfGazebo Covers Replacement.pdf
Gazebo Covers Replacement.pdf
 
Lowes Gazebo.pdf
Lowes Gazebo.pdfLowes Gazebo.pdf
Lowes Gazebo.pdf
 
John Deere Mowers.pdf
John Deere Mowers.pdfJohn Deere Mowers.pdf
John Deere Mowers.pdf
 
Exmark Lawn Mowers.pdf
Exmark Lawn Mowers.pdfExmark Lawn Mowers.pdf
Exmark Lawn Mowers.pdf
 
Riding Mowers.pdf
Riding Mowers.pdfRiding Mowers.pdf
Riding Mowers.pdf
 

Dernier

西伦敦大学毕业证学位证成绩单-怎么样做
西伦敦大学毕业证学位证成绩单-怎么样做西伦敦大学毕业证学位证成绩单-怎么样做
西伦敦大学毕业证学位证成绩单-怎么样做j5bzwet6
 
南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证kbdhl05e
 
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)oannq
 
Inspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxInspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxShubham Rawat
 
Call Girls In Dwarka Sub City ☎️7838079806 ✅ 💯Call Girls In Delhi
Call Girls In Dwarka Sub City  ☎️7838079806 ✅ 💯Call Girls In DelhiCall Girls In Dwarka Sub City  ☎️7838079806 ✅ 💯Call Girls In Delhi
Call Girls In Dwarka Sub City ☎️7838079806 ✅ 💯Call Girls In DelhiSoniyaSingh
 
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ EscortsDelhi Escorts Service
 
办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭o8wvnojp
 
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilable
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 AvilableCall Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilable
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilabledollysharma2066
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxJackieSparrow3
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan
 

Dernier (12)

西伦敦大学毕业证学位证成绩单-怎么样做
西伦敦大学毕业证学位证成绩单-怎么样做西伦敦大学毕业证学位证成绩单-怎么样做
西伦敦大学毕业证学位证成绩单-怎么样做
 
南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证
 
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
 
(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)
 
Inspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxInspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptx
 
Call Girls In Dwarka Sub City ☎️7838079806 ✅ 💯Call Girls In Delhi
Call Girls In Dwarka Sub City  ☎️7838079806 ✅ 💯Call Girls In DelhiCall Girls In Dwarka Sub City  ☎️7838079806 ✅ 💯Call Girls In Delhi
Call Girls In Dwarka Sub City ☎️7838079806 ✅ 💯Call Girls In Delhi
 
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
 
办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭
 
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
 
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilable
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 AvilableCall Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilable
Call Girls In Karkardooma 83770 87607 Just-Dial Escorts Service 24X7 Avilable
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptx
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
 

10 x 10 ft. gazebo assembly instruction

  • 1. Gazebo Canopy Assembly OWNER’S MANUAL Gazebo Includes instructions for 10’ x 10’ Gazebo Gazebo Canopy Assembly Assembled exterior dimensions: 11’ 3”W. x 11’ 3”D. x 11’ 4”H. Before You Begin... • Consult your local authorities for any permits required to construct gazebo. Prior to the construction of your gazebo, check with the local building code official to review any required permits or building limitations. • A level and sturdy foundation is required before gazebo construction can begin. Site preparation information is available in this manual. Please read before building gazebo. • Read instructions thoroughly prior to assembly. This kit contains parts that can be damaged if assembled incorrectly or in the wrong sequence. • Please follow instructions. Suncast is not responsible for replacing parts lost or damaged due to incorrect assembly. • Check for all parts before you begin. Using the provided parts check list on pages 4 and 5, verify that you have all the parts required to construct your gazebo model. COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS. • Assistance is required. Due to the size of the parts, at least two people are required to handle, fit and secure gazebo components. © 2008 Suncast Corporation, Batavia, IL 0361057
  • 2. Gazebo Canopy Assembly CAUTION • Gazebo not intended for use in extreme weather conditions. • Do not stand, sit, or store items on gazebo roof. • Handle carefully in extreme temperatures. • Repair or replace broken parts immediately. • Suncast is not responsible for damage caused by weather or misuse. • At regular intervals inspect your gazebo to make sure that assembly integrity has been maintained. • Periodically check that the location you have chosen to set your gazebo is still level. • Avoid excess heat from any auxiliary source. • Railing is not intended as a seat. • Any additional holes drilled into parts could cause unsafe conditions. • Gazebo is not intended to be enclosed. • Follow manufacturer safety instructions when using ladder. • Do not anchor to paver bricks. Foundation must be a solid surface. • Exercise caution using a lawn mower, edge trimmer or other yard equipment near gazebo. • Maximum weight that can be hung from Top Roof Rail: 20 lbs. • Do not hang objects from Bottom Roof Rail. • Do not hang objects from Facia Board. Top roof rail Bottom roof rail 2
  • 3. Gazebo Canopy Assembly Gazebo Safety and Care • Wash gazebo with garden hose or mild detergent solution and soft cloth. Do not use a stiff brush or abrasive cleaner as that could damage gazebo. • Hot items, such as recently used grills, blowtorches, etc., must not be used in or near the gazebo. • Heavy articles should not be leaned against the post and rails, as this may cause panel distortion and permanent damage. • Keep roof clean of snow and leaves. Tools Needed for Installation 8’ 6’ 1/8” or Concrete Foundation Assembly Day Tips omplete site preparation and foundation construction before unpacking •C parts and beginning assembly. • ake care when removing PVC parts. Other parts are packed inside them. T • Do not attempt to assemble on a day with strong winds. • Do not attempt to assemble on days when temperature is below 32 degrees. • Set aside appropriate amount of time to completely assemble gazebo. • Make sure you have assistance nearby to lift and secure parts in place. • Wear light duty work gloves while assembling gazebo. • If you have questions on assembly, please call 800-846-2345. Note: This product contains parts that are used in different orientations to construct the gazebo. Please take note of the orientation of the parts shown throughout this instruction manual. Failure to follow instructions could result in damage to parts. Suncast is not responsible for replacing parts lost or damaged due to incorrect assembly. 3
  • 4. Gazebo Canopy Assembly Parts A C 0101856A0 – Bottom upper shingle roof 0101852A1 – Bottom upper underside roof x8 x8 B 0101857A0 – Bottom lower shingle roof/0101853A1 – Bottom lower underside roof x8 Hardware J E G I 0210152 – Stainless steel screw x76 0101854A0 – Top upper 0101850A1 – Top upper 0440496 – Turnbuckle shingle roof underside roof x8 x8 K L F 0440496 – Cable clamp 0240049 – Screw cap x2 x44 0101855A0 – Top lower shingle roof/ M N 0101851A1 – Top lower underside roof x8 0510496 – 37.75’ Cable 0510498 – Roof railing plug Note: Parts D and H are pre-assembled with x64 parts B and F respectively. 4
  • 5. Gazebo Canopy Assembly Parts R T S 0101848A1 Upper rafter U 0101846A0 connector Top cap 0630464 Upper roof rafter x8 V x8 0630470 Y Center hub spacer 0101847A1 x8 Bottom hub connector X 0101849A1 Lower rafter Z W hub connector x8 0630475 0101843A1 0630471 Dowel pin Post collar Roof support posts x16 x8 x8 BB 0630463 O P Q AA Lower roof rafter x8 EE CC DD 0630461 0630462 0630460 0630477 0101845A1 0101844A1 0630474 Left doorway Right doorway PVC post Steel post Lower roof end cap Upper roof end cap Roof weather strip PVC post PVC post x6 x8 x8 x8 x16 HH II GG FF 0630467 0630469 Lower roof rail Roof spindle x16 x136 JJ KK 0510499 0630466 0630472 0630468 Post hole Hand rail spindle Lower roof fascia Upper roof rail template x48 x7 x16 LL MM NN 0630465 0630476 0630473 Hand rail Doorway lower roof fascia Upper roof fascia x14 x8 5
  • 6. Gazebo Canopy Assembly Site preparation and platform construction (Materials NOT supplied with Gazebo Kit) ote: Site preparation and platform construction and Support Post Installation steps may require professional N assistance to be installed correctly. Please read all manual steps thoroughly before starting this project. ote: Site preparation and platform construction are required for this gazebo. Placing the gazebo on the ground N without any type of foundation is not recommended. Suncast is not responsible for replacing parts damaged or property lost due to construction without a foundation or platform. Complete the site preparation and platform construction before unpacking parts. To prepare your gazebo site, follow the below steps: 1) Consult your local authorities for building codes and covenants before beginning foundation or erecting gazebo. 2) Consult your local building supply retailer to assist you in determining the best foundation or platform method for your application. The building supply retailer can also help you determine what anchoring hardware you will need once the foundation or platform method has been determined. Bring this manual with you to the retailer so they can see the scope of the project. 3) Before any digging, check with local utilities to determine location of buried cables, pipes, etc. 4) A 4 inch thick concrete slab is recommended as the foundation. - If a wood platform is chosen as the foundation, use exterior grade wood. Note: Do not erect gazebo on paver bricks. Foundation must be a solid surface. If you plan to erect the gazebo on an existing deck, consult local authorities for building codes and make sure that the structure is sound and can hold the additional weight of the gazebo (approx. 375 lbs.). Consult local building supply retailer to determine the best method and hardware for your application. 5) Preparing the building site: - The ground should slope away from the foundation area to provide drainage. - The foundation surface must be flat and level. - Follow local building codes for a proper vapor barrier. Ensure site allows room for your gazebo: 1) Square foundation should be 10’ 6” x 10’ 6”. 2) If an octagon foundation is wanted for your gazebo, consult your local building supply retailer to help you determine materials and hardware required. 3) Overall height (foundation to top of top cap) – 11’ 4”. 4) Overall base width (support post to support post) – 10’ 2.5”. 5) Overall roof width (rafter end to rafter end) – 11’ 3”. 6
  • 7. Gazebo Canopy Assembly Support Post Installation 1 10’ 6” ” ’6 10 Ensure square foundation is 10’ 6” x 10’ 6”. Locate and mark center of foundation slab or deck. 2 3 115 ” Do orw ay Using center point and wire, draw a 115” diameter Determine doorway location and mark right circle. DO NOT use string (string will stretch causing doorway post. inaccurate measurements). 7
  • 8. Gazebo Canopy Assembly 4 5 44” 44” x8 Measure 44” from the intersection of circle and chalk Double check markings to ensure there are 44” be- line to next post position. Measure directly from point tween each post location. to point, NOT along circle. Mark this spot. Do this eight times to identify all post locations. 6 7 115 ” x32 O B ZE GA OF TER N CE FF Snap all chalk lines so that all post locations have Using the post hole template, align with circle and straight lines (bisecting center of circle). chalk line for each of the eight post locations. Mark where drill holes are needed. Double check that circle diameter is still 115”. 8
  • 9. Gazebo Canopy Assembly Note: Before drilling into foundation, check with local building supply retailer for best method and hardware for your application. 8a Concrete foundation 8b Wood foundation 5 2 2 1 x32 1 x32 x32 x32 Using a hammer drill, make holes for each post. Drill holes for each post. From underside of Then insert concrete lag anchors and four foundation, insert four full-threaded lag bolts and full-threaded studs. washers. 9 10 AA AA x8 x32 Ensure steel posts are in correct orientation. Bolt down all steel posts. Note: Ensure all steel posts are secured to foundation.
  • 10. Gazebo Canopy Assembly Parts Pre-Assembly Note: To avoid scratching finish in steps where parts are placed upside down, place parts on smooth surface. Flat- ten cardboard from carton to create a smooth surface. 11 12 A A B B x4 x4 Insert A into the corresponding slots in B. Slide A and lock into place in B. Note:Ensure that preassembled B is assembled properly. 13 14 C Repeat steps 11-13 A for seven remaining bottom roof panels. B x3 Snap C into A and B to form a single bottom roof panel. 10
  • 11. Gazebo Canopy Assembly 15 16 E E F F x2 x2 Insert E into the corresponding slots in F. Slide E and lock into place in F. Note:Ensure preassembled F is assembled properly. 17 18 G E Repeat steps 15-17 for seven remaining top roof panels. F x2 Snap G into E and F to form a single top roof panel. 11
  • 12. Gazebo Canopy Assembly 19 20 LL GG LL Insert eight hand rail spindles into square hand rail Place another hand rail (matching spindles with holes. square holes). 21 22 Repeat steps 19-20 for six remaining hand rails. Optional: After assembled, run II a band of low tack tape around assembly. This will help hold HH rails together until they are used again. Insert eleven roof spindles into square lower roof rail holes. 12
  • 13. Gazebo Canopy Assembly 23 24 Repeat steps 22-23 HH for seven remaining bottom roof railings. Optional: After assembled, run a band of low tack tape around assembly. This will help hold rails together until they are used again. Place another lower roof rail (matching spindles with square holes). Note:Match orientation of bottom of roof rail. 25 26 KK II KK Insert six roof spindles into upper roof rail. Place another upper roof rail (matching roof spindles with square holes). Note:Match orientation of bottom roof rail. 13
  • 14. Gazebo Canopy Assembly 27 28 Repeat steps 25-26 Y for seven remaining upper roof railings. Optional: After assembled, run a band of low tack tape around BB assembly. This will help hold rails together until they are used again. Snap lower rafter hub connector into place at angled end of lower roof rafter. 29 30 U X T S BB 1 2 Snap center hub spacer into lower roof rafter hub Snap upper rafter connector into place on angled side connector. Add roof support post to lower roof rafter. of upper roof rafter. 14
  • 15. Gazebo Canopy Assembly 31 32 x2 J 2 L 1 Snap upper rafter connector onto center hub spacer. Secure roof support posts to upper and lower roof Slide upper roof rafter into place over roof support post rafters using screws and screw caps. on lower roof rafter. Note: Make sure you go through the roof support post. 33 Before starting Repeat steps 28-32 gazebo assembly, for seven remaining allow adequate time roof rafters. (about 6 hours). 15
  • 16. Gazebo Assembly Gazebo Canopy Assembly Note: Verify post assembly orientation (see Step 9). 34 35 Q O P x6 Inside AA of gazebo Do orw ay Place left and right doorway PVC posts over steel Place the six other PVC posts over remaining steel posts, making sure that hand rail holes face away from posts. doorway. 36 37 1-1/2” J 1” x16 x16 Predrill two 1/8” holes through PVC posts and into Secure all posts with screws in pilot holes. steel posts (both flat sides of steel posts). Make sure to take into account the “Z” shape of steel post when drilling hole on opposite side of PVC posts. 16
  • 17. Gazebo Canopy Assembly 38 39 For steps 40-45 have one person stand on an 8’ ladder in the middle of foundation and another person on a 6’ ladder next to the PVC post you are working with. The extra W height will make it easier to x8 assemble parts. Slide one post collar over each post. 40 41 Z Z Slide one rafter assembly up through PVC post notch Slide opposite rafter assembly up through PVC post notch and into postion. Secure with two dowel pins. (If and into position. Secure with two dowel pins. (If necessary, necessary, use a rubber mallet to ensure tips of dowel use a rubber mallet to ensure tips of dowel pins exit other pins exit other side of PVC post.) The person on 8’ side of PVC post.) Make sure to support rafters ather ladder will need to support rafter assembly. assembling. 17
  • 18. Gazebo Canopy Assembly 42 43 Repeat steps 40-42 V for two perpendicular rafter assemblies. Snap bottom hub connector onto rafter connectors. Note:The hub connector will only engage on alternating rafter assemblies. 44 45 Repeat step 44 for remaining three rafter assemblies. Z Lift fifth rafter assembly 6” above installed rafters. Slide connector down into place along grooves. Secure lower end of rafter with two dowel pins. (If necessary, use a rubber mallet to ensure tips of pins exit other side of PVC post). 18
  • 19. Gazebo Canopy Assembly 46 47 M I 1 K M 2 3 Thread turnbuckle cable through the upper most Loop cable through turnbuckle eyelet. Put clamp on dowel pins, between posts and rafters (to stabilize cable. Use wrench to tighten nuts. assembly). 48 49 K 1 M 1 3 2 I 2 I Put clamp on remaining end of cable. Use wrench to Standing on a ladder, push bottom hub connector up. tighten nuts. Place loop cable around turnbuckle hook. Tighten turnbuckle to take up slack. DO NOT FULLY TIGHTEN TURNBUCKLE. 1
  • 20. Gazebo Canopy Assembly 50 51 R 1 111” Check that the distance from the bottom hub Using a rubber mallet, attach top cap onto upper roof connector to the floor is 111”. If necessary, adjust rafter connectors. turnbuckle. DO NOT FULLY TIGHTEN TURNBUCKLE. 52 53 NN Repeat step 52 for remaining seven upper roof fascia boards. Insert one upper roof fascia board between upper roof rafters. 20
  • 21. Gazebo Canopy Assembly 54 55 1 2 J Take one pre-assembled upper roof panel and slide Predrill 1/8” holes and screw the upper roof panel to over fascia boards along rafter groove and under top the fascia board. cap. Make sure roof panel is fully engaged on inside of fascia boards. 56 57 Repeat steps 53-55 for remaining seven 1 top roof fascia boards. EE DO NOT proceed to next step until step 56 is complete. 2 Snap one roof weather strip 3/4 of the way up on upper roof rafter. Slide up under top cap until flush with end of upper roof rafters. 21
  • 22. Gazebo Canopy Assembly 58 59 Repeat step 57 for remaining seven weather strips. DD x8 Snap one upper roof end cap onto end of each upper roof rafter. 60 61 Repeat step 60 for remaining seven upper roof railings. x8 Insert one pre-assembled upper roof railing between roof support posts. (Ensure rails are centered.) 22
  • 23. Gazebo Canopy Assembly 62 63 MM x32 N Insert roof railing plugs into pre-drilled holes (top and Insert doorway lower roof fascia board into place bottom) of upper roof railings (four per rail). between doorway posts. 64 65 1 2 J Take one pre-assembled lower roof panel and slide Predrill 1/8” holes and screw the lower roof panel to over lower fascia board along the rafter groove. Make the lower fascia board. sure lower roof panel is fully engaged on inside of lower fascia boards. 23
  • 24. Gazebo Canopy Assembly 66 67 Repeat steps 63-65 for remaining seven lower roof fascia boards and lower roof panels. 1 EE DO NOT proceed to next step until step 66 is complete. 2 Snap one roof weather strip 3/4 of the way up on lower roof rafter. Slide up until flush. 68 69 Repeat step 67 for remaining seven weather strips. CC x8 Snap one lower roof end caps onto lower rafters. Repeat for remaining seven lower roof rafters. 24
  • 25. Gazebo Canopy Assembly 70 71 Repeat step 70 for remaining seven lower roof rails. Insert one pre-assembled lower roof railing between each roof support post. (Ensure rails are centered.) 72 73 N I 1 x32 2 Insert roof railing plugs into pre-drilled holes (top and If necessary, finish tightening turnbuckle cable to bottom) of lower roof railings. (Four per rail). secure complete upper assembly. Using a wire cutter or hacksaw, cut off excess cable beyond clamp. 25
  • 26. Gazebo Canopy Assembly 74 75 Repeat step 74 for remaining six hand rails. Starting at one side of the doorway, insert one side of one preassembled hand rail into notches in PVC post. Insert remaining side of hand rail and center between PVC posts. 76 77 L J x2 x2 L J Center hand rail and make sure spindles are vertical. Center hand rail and make sure spindles are vertical. Secure lower handrails using two screws and screw caps Secure upper handrails using two screws and screw caps per section (top side of bottom hand rail—one per side). per section (underside of top hand rail—one per side). Place screws and screw caps as close to PVC post as Place screws and screw caps as close to PVC post as possible where the hand rail meets the PVC post. possible where the hand rail meets the PVC post. 26
  • 27. Gazebo Canopy Assembly 78 Repeat steps 76-77 for remaining hand rails. Complete. 27
  • 28. Gazebo Canopy Assembly Warranty Suncast® Corporation, 701 North Kirk Road, Batavia, Illinois 60510 (Manufacturer) warrants to the original purchas- er only that the enclosed product is free from material and workmanship defects under normal, household use at time of purchase. Defective product or part must be returned, freight prepaid, to the Manufacturer’s address (Atten- tion: Parts Department) along with proof of purchase. Upon receipt of the aforesaid, the defective product or part will be repaired or replaced at the option of the Manufacturer without charge to the original purchaser and returned to the customer freight collect. This limited warranty does not apply to damage resulting from accident, neglect, misuse, commercial use, alteration, operation not in accordance with instruction or repairs made or attempted by unauthorized persons. This limited warranty applies only to the product enclosed and does not apply to accessory parts. THE MANUFACTURER’S LIABILITY HEREUNDER IS LIMITED SOLELY TO THE REPAIR OR REPLACEMENT OF THE DEFECTIVE PRODUCT OR PART AND THE MANUFACTURER SHALL IN NO EVENT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES WHICH MAY RESULT FROM ANY DEFECT IN MATERIAL OR WORKMANSHIP OR FROM THE BREACH OF ANY EXPRESS OR IMPLIED WARRANTY. Some states do not allow the exclusion or limitation of incidental or consequential damages, or a limitation of how long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights, and you may have other rights which may vary from state to state. Factory Repairs Repair service and assembly assistance are available direct from the factory, not from the place of purchase. If this product requires repair, please call or write us. Warranty repair parts are sent out free of charge. If the product is out of warranty, we will inform you of the charges prior to sending out the parts. VISA and MasterCard are accepted on phone orders. For assembly or replacement parts information: Replacement Parts Suncast Corporation 701 North Kirk Road Batavia, IL 60510 Outside Illinois, but within North America 800-846-2345 24 hour service / 7 days a week Within Illinois, or outside North America 630-87-2050 visit: www.suncast.com email: parts@suncast.com PATENTS Patents pending.