PROJECT DESCRIPTION 
PROJECT CHARTER 1 
<Project Name> 
The project description should be a stand alone statement of 
what this project will accomplish and for whom. Make sure the 
description is very specific and concrete. Try to limit it to one 
sentence or two sentences. Try to get it right because this 
description should not change, and you will be able to point to it 
throughout the project to remind them of the focus of the project. 
Use verbs in your description. Describe the project in a way that 
anyone could read your description and know what the project is 
without having to read other text.
CONTENTS <Project Name> 
• Project Description 
• Project Objectives 
• Project Scope 
• Project Assumptions 
• Project Approach 
• Project Team Structure 
• Communication Plan 
PROJECT CHARTER 2
PROJECT OBJECTIVES <Project Name> 
Project Objectives 
 Project objectives address “why” you are doing this project. What are we trying to 
accomplish? What do we want the impacted area to look like afterwards or what do 
we want them to be able to do? Think of business benefits when completing this 
section. These are business objectives, not project process or methodology 
objectives (I.e., “develop specifications” is not a project objective) If you have more 
than a dozen or so, consider consolidating them or organizing them into two levels of 
bullets 
 Objective 1 
 Objective 2 
Measures of Success 
 Measures of success are developed with the sponsor to determine at the end of a 
project how we will know whether or not we were successful. What will the solution 
enable the customer to do or have? These measures are very important to determine 
in advance so there is no misunderstanding about how the project will be measured 
once it has concluded. 
 Measure 1 
 Measure 2 
PROJECT CHARTER 3
PROJECT SCOPE <Project Name> 
• Scope tells what your project is going to 
accomplish and sets the boundaries for your 
project. What are the sponsor and the 
business going to get at the end of your 
project? This goes to the very reason for 
doing the project. Create a bulleted list of 
deliverables. Each item on the list should 
begin with an action verb. 
For example: 
 Deliver an ORT to XYZ client with survey data 
files undated weekly. 
• Project will including the following customer 
requested modifications: 
• If there are a lot of scope items, organize 
them into two levels of bullets with the first 
bullet being more like a category of 
deliverables (still with a verb in it!), and the 
sub-bullets being the deliverables 
• Scope item 1 
• Scope item 2 
PROJECT CHARTER 4 
• Scope item 3 
• Scope item n
OUT OF SCOPE <Project Name> 
• As important as defining what’s in the scope of your project is defining what’s out of scope. 
In this section you should cover things that someone might assume would be part of your 
project but aren’t. Building on the in-scope items an example of something out of scope 
might be: 
• ORT Special KPI or calculation or report 
• Think this through carefully. You want to be very clear with your sponsor and project team 
what will be delivered at the end of your project. 
• Also, you will need to think about the sequencing of releases. You can define the project as 
release 1, and have everything in future releases considered out of scope (and list them 
here!), or you can define the project to have several releases. In general, it is better to keep 
projects shorter (1-4 months at the most). 
• Out of scope 1 
• Out of scope 2 
• Out of scope 3 
PROJECT CHARTER 5
PROJECT ASSUMPTIONS <Project Name> 
• This section documents what assumptions you are making relative to this project. 
If for example, you are assuming certain Customer detailed requirements will 
become available to you when it’s needed at a future date, but isn’t available 
today, you should document that. 
• Assumption 1 
• Assumption 2 
• Assumption n 
PROJECT CHARTER 6
PROJECT APPROACH 
<Note: Graphically depict how you will package your work to complete the project. Think about how the “deliverables” of the project will be 
organized, and think about dependencies vs. what can be done in parallel. This should be the start of your work breakdown structure, product 
backlog and your work plan. The dates at the bottom are, of course, going to be rough.> 
PLANNING DEFINITION SOLUTION DESIGN BUILD & TEST DEPLOY 
High Level 
Requirements/ Create 
Product Backlog: 
• Security 
• Hierarchy 
• KPI’s/Goals 
• Historical / Trans 
Identify players: 
project team, 
analysts and 
developers 
PROJECT CHARTER 7 
<Project Name> 
Deploy to Staging 
Date Date Date Date 
Data 
Feature 
Design/wireframes 
Analyze customer 
requirements, 
customizations build task 
backlog with estimates 
Sign-off from 
customer 
Collect requirements for in-scope 
items 
Confirm data file inputs 
Test Plan 
Build / Unit Test 
IT System 
Testing 
Build / Test data extracts 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
Project Team 
System Testing 
Date 
UAT 
Date 
Deploy & 
Communicate 
13 
14
PROJECT TEAM STRUCTURE 
PROJECT CHARTER 8 
<Project Name> 
ROLE NAMES AND PARTICIPATION % Allocation 
Account GM ----- 
Project Sponsor ----- 
Product Owner ----- 
Project Manager 
Business 
Analyst(s) 
Tester(s) 
Technical Lead 
DBA 
Developers
REGULARLY SCHEDULED MEETINGS & COMMUNICATIONS 
PROJECT CHARTER 9 
<Project Name> 
<Note: This should be a basic communication plan. Only include communications that you really need and can commit to following through on. 
The best way to do this is to think about who will need to know what, and then design your communication mechanisms from there. Keep it as 
streamlined as possible. 
COMMUNICATION ITEM AUDIENCE SENDER 
COMMUNICATION 
VEHICLE 
FREQUENCY MESSAGES 
Sponsor Meetings GM, Sponsor Product 
Owner, 
Project 
Manager 
½ hour “check-in” 
meeting 
Bi-weekly Discuss status, work through 
major issues, review 
deliverables 
Project Team Meetings All project team 
members 
Project 
Manager 
Meeting Daily Internal project SCRUM 
status, progress, 
issues/blocks 
Status Reporting for Consolidated 
Program Reporting 
Product Owner, 
Project Sponsor 
Project 
Manager 
Email Weekly This is how the project is 
progressing; key issues 
Project Status to Team Members Project Team 
Members 
Project 
Manager 
Email Weekly Highlight achievements and 
challenges 
Project Review Process Product Owner 
IT Management 
Project 
Manager 
Meeting Weekly Overall status and how 
issues are being addressed. 
Issue escalation and 
decisions that need to be 
made
RISK MITIGATION PLAN <Project Name> 
Evaluation RISK & RESPONSE 
Risk:. 
Response: 
Risk: 
Response 
Risk 
Response 
Risk: 
Response: 
Likely, High Impact 
Not Likely, High Impact 
Not Likely, Low Impact 
Likely, Low Impact 
PROJECT CHARTER 10
PROJECT CHARTER 11 
<Project Name> 
Change Control is the process for controlling and coordinating all change administration activities 
impacting the project. The change control process determines if and when a change request will 
be performed by analyzing all functions impacted by the change. 
Change is 
incorporated 
into Project 
Plan & 
Requestor documents Schedule 
desired change 
Project Manager reviews 
w/team to determine impact Change document 
is created with 
requirements, cost & 
schedule impact 
Prod, Owner 
& Sponsor 
Review 
End 
Work-around 
or future 
enhancement 
is documented 
Approved 
Deferred 
CHANGE CONTROL PLAN
12 
<Project Name> 
APPENDIX 
Additional Pages for the Project Review Process 
Some pages are for non-ORT projects
PROJECT REVIEW PROCESS (SUMMARY INFORMATION) 
Maintenance & Production: (What will it cost later?) 
 This section would list bullets about M&P 
 Include Ongoing costs 
 Provide information regarding resources, hardware, software, 3rd party, etc. 
PROJECT CHARTER 13 
<Project Name> 
Dependencies or Related Projects: Is your project dependent on or related to another initiative or is one dependent on or 
related to yours? 
 Enter any dependencies and relationships here 
Issues for IT Management: (How can Management help?) 
 List issues you need help with or need to bring to the attention of management. 
 This is not a complete issues list. Only high-level or ones that you want to cover with IT management 
Recommendation/Decisions: (Is there anything needing approval?) 
 If you are recommending anything related to a project, identify it here. This would include budget increase requests, issue 
resolution recommendation, etc. 
 Limit your recommendations and decisions to those that are IT related. No business decisions should be made as part of this 
process.
PROJECT REVIEW PROCESS (FINANCIAL INFORMATION) 
PROJECT CHARTER 14 
<Project Name> 
Stage End Project Budget 
Dates Actual 
Person Years 
IT Resources Project Budget/Estimate 0.00 
Actuals to Date 0.00 
IT Budget 
Contractor Project Budget/Estimate 0.00 
Actuals to Date 0.00 
IT Budget 
Totals Total Project Budget 0.00 0.00 0.00 0.00 0.00 0.00 
Total Actuals to Date 0.00 0.00 0.00 0.00 0.00 0.00 
Variance 0.00 0.00 0.00 0.00 0.00 0.00 
Dollars 
Contractor & Project Budget/Estimate 0 
Consulting Actuals to Date 0 
IT Budget 
Software Project Budget/Estimate 0 
Actuals to Date 0 
IT Budget 
Hardware Project Budget/Estimate 0 
Actuals to Date 0 
IT Budget 
Totals Total Project Budget/Estimate 0 0 0 0 0 0 
Total Actuals to Date 0 0 0 0 0 0 
Variance 0 0 0 0 0 0

Contenu connexe

Tendances

Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
Naseer Muhammud
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
Allan Leyte
 

Tendances (20)

Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
PM Project-Charter.pptx
PM Project-Charter.pptxPM Project-Charter.pptx
PM Project-Charter.pptx
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Kick off meeting presentation
Kick off meeting presentationKick off meeting presentation
Kick off meeting presentation
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
Fme procurement-plan-template
Fme procurement-plan-templateFme procurement-plan-template
Fme procurement-plan-template
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Company project kick off
Company project kick off Company project kick off
Company project kick off
 
project management
project managementproject management
project management
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
Project charter-template
Project charter-templateProject charter-template
Project charter-template
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Project Management
Project ManagementProject Management
Project Management
 
Project Planning Scheduling
Project Planning SchedulingProject Planning Scheduling
Project Planning Scheduling
 
Project charter for Six Sigma Project
Project charter for Six Sigma ProjectProject charter for Six Sigma Project
Project charter for Six Sigma Project
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 

Similaire à Project charter sample

Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
 
V 2.0Project Charter Project NamePro.docx
V 2.0Project Charter Project NamePro.docxV 2.0Project Charter Project NamePro.docx
V 2.0Project Charter Project NamePro.docx
dickonsondorris
 
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docxPROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
tarifarmarie
 
Project Charter V 2.0Project CharterProjec.docx
Project Charter V 2.0Project CharterProjec.docxProject Charter V 2.0Project CharterProjec.docx
Project Charter V 2.0Project CharterProjec.docx
stilliegeorgiana
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
Jonathan Joyce
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
Sharad Srivastava
 
Project CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docxProject CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docx
briancrawford30935
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
Mary Stevenson
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
CruzIbarra161
 
Post mortem report
Post mortem reportPost mortem report
Post mortem report
Kuaci Pedas
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
cford1973
 

Similaire à Project charter sample (20)

Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
V 2.0Project Charter Project NamePro.docx
V 2.0Project Charter Project NamePro.docxV 2.0Project Charter Project NamePro.docx
V 2.0Project Charter Project NamePro.docx
 
The Project Charter Ensuring Quality
The Project Charter Ensuring QualityThe Project Charter Ensuring Quality
The Project Charter Ensuring Quality
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3
 
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docxPROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
 
Project Charter V 2.0Project CharterProjec.docx
Project Charter V 2.0Project CharterProjec.docxProject Charter V 2.0Project CharterProjec.docx
Project Charter V 2.0Project CharterProjec.docx
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
De vry mgmt 404 all course projects latest 2016 november
De vry mgmt 404 all course projects latest 2016 novemberDe vry mgmt 404 all course projects latest 2016 november
De vry mgmt 404 all course projects latest 2016 november
 
Project CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docxProject CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docx
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
PROJECT -SCOPE-STATEMENT.pptx
PROJECT -SCOPE-STATEMENT.pptxPROJECT -SCOPE-STATEMENT.pptx
PROJECT -SCOPE-STATEMENT.pptx
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
Post mortem report
Post mortem reportPost mortem report
Post mortem report
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 

Plus de Gregory Weiss

Plus de Gregory Weiss (20)

Bi reporting tool master wireframe specification
Bi reporting tool   master wireframe specificationBi reporting tool   master wireframe specification
Bi reporting tool master wireframe specification
 
BRD - Work Estimate - Client example
BRD - Work Estimate - Client exampleBRD - Work Estimate - Client example
BRD - Work Estimate - Client example
 
BI Reporting Tool - Functional Wireframes Work Sample
BI Reporting Tool - Functional Wireframes  Work SampleBI Reporting Tool - Functional Wireframes  Work Sample
BI Reporting Tool - Functional Wireframes Work Sample
 
BI Tool - Alt. Reporting Concept
BI Tool - Alt. Reporting ConceptBI Tool - Alt. Reporting Concept
BI Tool - Alt. Reporting Concept
 
BI Tool - Brand Tracker Reporting Concept
BI Tool -  Brand Tracker Reporting ConceptBI Tool -  Brand Tracker Reporting Concept
BI Tool - Brand Tracker Reporting Concept
 
Ark Naturals - Version 2.0 Design Concept
Ark Naturals - Version 2.0 Design ConceptArk Naturals - Version 2.0 Design Concept
Ark Naturals - Version 2.0 Design Concept
 
Business Process Diagram - Sales to Invoice to Cash Workflow
Business Process Diagram - Sales to Invoice to Cash WorkflowBusiness Process Diagram - Sales to Invoice to Cash Workflow
Business Process Diagram - Sales to Invoice to Cash Workflow
 
Ebay listing fsd_v1
Ebay listing fsd_v1Ebay listing fsd_v1
Ebay listing fsd_v1
 
Car Wireframe Design - v5.2
Car Wireframe Design - v5.2Car Wireframe Design - v5.2
Car Wireframe Design - v5.2
 
CAR Report - xsl specification
CAR Report - xsl specificationCAR Report - xsl specification
CAR Report - xsl specification
 
Mota - Mims: Summary Data Model
Mota - Mims: Summary Data ModelMota - Mims: Summary Data Model
Mota - Mims: Summary Data Model
 
Mota - Mims pre-insertion process work flow
Mota - Mims   pre-insertion process work flowMota - Mims   pre-insertion process work flow
Mota - Mims pre-insertion process work flow
 
Mota - Mims post auction process work flow
Mota - Mims   post auction process work flowMota - Mims   post auction process work flow
Mota - Mims post auction process work flow
 
Mota - Mims stage 3 marketplace management use-case documentation
Mota - Mims   stage 3 marketplace management use-case documentationMota - Mims   stage 3 marketplace management use-case documentation
Mota - Mims stage 3 marketplace management use-case documentation
 
Mota - Mims Metadata Documentation
Mota - Mims Metadata DocumentationMota - Mims Metadata Documentation
Mota - Mims Metadata Documentation
 
Mota - Mims - Enterprise Data Model Specification
Mota - Mims - Enterprise Data Model SpecificationMota - Mims - Enterprise Data Model Specification
Mota - Mims - Enterprise Data Model Specification
 
Mota - Matrix Page Specification (SuperUser View)
Mota - Matrix Page Specification (SuperUser View)Mota - Matrix Page Specification (SuperUser View)
Mota - Matrix Page Specification (SuperUser View)
 
Mims dashboard prototype
Mims dashboard prototypeMims dashboard prototype
Mims dashboard prototype
 
Mota - Customer Acquisition Strategy
Mota - Customer Acquisition StrategyMota - Customer Acquisition Strategy
Mota - Customer Acquisition Strategy
 
Mims Overview Presentation
Mims Overview PresentationMims Overview Presentation
Mims Overview Presentation
 

Dernier

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Dernier (20)

Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 

Project charter sample

  • 1. S P O N S O R A P P R O V A L <CLIENT> Project Charter
  • 2. PROJECT DESCRIPTION PROJECT CHARTER 1 <Project Name> The project description should be a stand alone statement of what this project will accomplish and for whom. Make sure the description is very specific and concrete. Try to limit it to one sentence or two sentences. Try to get it right because this description should not change, and you will be able to point to it throughout the project to remind them of the focus of the project. Use verbs in your description. Describe the project in a way that anyone could read your description and know what the project is without having to read other text.
  • 3. CONTENTS <Project Name> • Project Description • Project Objectives • Project Scope • Project Assumptions • Project Approach • Project Team Structure • Communication Plan PROJECT CHARTER 2
  • 4. PROJECT OBJECTIVES <Project Name> Project Objectives  Project objectives address “why” you are doing this project. What are we trying to accomplish? What do we want the impacted area to look like afterwards or what do we want them to be able to do? Think of business benefits when completing this section. These are business objectives, not project process or methodology objectives (I.e., “develop specifications” is not a project objective) If you have more than a dozen or so, consider consolidating them or organizing them into two levels of bullets  Objective 1  Objective 2 Measures of Success  Measures of success are developed with the sponsor to determine at the end of a project how we will know whether or not we were successful. What will the solution enable the customer to do or have? These measures are very important to determine in advance so there is no misunderstanding about how the project will be measured once it has concluded.  Measure 1  Measure 2 PROJECT CHARTER 3
  • 5. PROJECT SCOPE <Project Name> • Scope tells what your project is going to accomplish and sets the boundaries for your project. What are the sponsor and the business going to get at the end of your project? This goes to the very reason for doing the project. Create a bulleted list of deliverables. Each item on the list should begin with an action verb. For example:  Deliver an ORT to XYZ client with survey data files undated weekly. • Project will including the following customer requested modifications: • If there are a lot of scope items, organize them into two levels of bullets with the first bullet being more like a category of deliverables (still with a verb in it!), and the sub-bullets being the deliverables • Scope item 1 • Scope item 2 PROJECT CHARTER 4 • Scope item 3 • Scope item n
  • 6. OUT OF SCOPE <Project Name> • As important as defining what’s in the scope of your project is defining what’s out of scope. In this section you should cover things that someone might assume would be part of your project but aren’t. Building on the in-scope items an example of something out of scope might be: • ORT Special KPI or calculation or report • Think this through carefully. You want to be very clear with your sponsor and project team what will be delivered at the end of your project. • Also, you will need to think about the sequencing of releases. You can define the project as release 1, and have everything in future releases considered out of scope (and list them here!), or you can define the project to have several releases. In general, it is better to keep projects shorter (1-4 months at the most). • Out of scope 1 • Out of scope 2 • Out of scope 3 PROJECT CHARTER 5
  • 7. PROJECT ASSUMPTIONS <Project Name> • This section documents what assumptions you are making relative to this project. If for example, you are assuming certain Customer detailed requirements will become available to you when it’s needed at a future date, but isn’t available today, you should document that. • Assumption 1 • Assumption 2 • Assumption n PROJECT CHARTER 6
  • 8. PROJECT APPROACH <Note: Graphically depict how you will package your work to complete the project. Think about how the “deliverables” of the project will be organized, and think about dependencies vs. what can be done in parallel. This should be the start of your work breakdown structure, product backlog and your work plan. The dates at the bottom are, of course, going to be rough.> PLANNING DEFINITION SOLUTION DESIGN BUILD & TEST DEPLOY High Level Requirements/ Create Product Backlog: • Security • Hierarchy • KPI’s/Goals • Historical / Trans Identify players: project team, analysts and developers PROJECT CHARTER 7 <Project Name> Deploy to Staging Date Date Date Date Data Feature Design/wireframes Analyze customer requirements, customizations build task backlog with estimates Sign-off from customer Collect requirements for in-scope items Confirm data file inputs Test Plan Build / Unit Test IT System Testing Build / Test data extracts 1 2 3 4 5 6 7 8 9 10 11 12 Project Team System Testing Date UAT Date Deploy & Communicate 13 14
  • 9. PROJECT TEAM STRUCTURE PROJECT CHARTER 8 <Project Name> ROLE NAMES AND PARTICIPATION % Allocation Account GM ----- Project Sponsor ----- Product Owner ----- Project Manager Business Analyst(s) Tester(s) Technical Lead DBA Developers
  • 10. REGULARLY SCHEDULED MEETINGS & COMMUNICATIONS PROJECT CHARTER 9 <Project Name> <Note: This should be a basic communication plan. Only include communications that you really need and can commit to following through on. The best way to do this is to think about who will need to know what, and then design your communication mechanisms from there. Keep it as streamlined as possible. COMMUNICATION ITEM AUDIENCE SENDER COMMUNICATION VEHICLE FREQUENCY MESSAGES Sponsor Meetings GM, Sponsor Product Owner, Project Manager ½ hour “check-in” meeting Bi-weekly Discuss status, work through major issues, review deliverables Project Team Meetings All project team members Project Manager Meeting Daily Internal project SCRUM status, progress, issues/blocks Status Reporting for Consolidated Program Reporting Product Owner, Project Sponsor Project Manager Email Weekly This is how the project is progressing; key issues Project Status to Team Members Project Team Members Project Manager Email Weekly Highlight achievements and challenges Project Review Process Product Owner IT Management Project Manager Meeting Weekly Overall status and how issues are being addressed. Issue escalation and decisions that need to be made
  • 11. RISK MITIGATION PLAN <Project Name> Evaluation RISK & RESPONSE Risk:. Response: Risk: Response Risk Response Risk: Response: Likely, High Impact Not Likely, High Impact Not Likely, Low Impact Likely, Low Impact PROJECT CHARTER 10
  • 12. PROJECT CHARTER 11 <Project Name> Change Control is the process for controlling and coordinating all change administration activities impacting the project. The change control process determines if and when a change request will be performed by analyzing all functions impacted by the change. Change is incorporated into Project Plan & Requestor documents Schedule desired change Project Manager reviews w/team to determine impact Change document is created with requirements, cost & schedule impact Prod, Owner & Sponsor Review End Work-around or future enhancement is documented Approved Deferred CHANGE CONTROL PLAN
  • 13. 12 <Project Name> APPENDIX Additional Pages for the Project Review Process Some pages are for non-ORT projects
  • 14. PROJECT REVIEW PROCESS (SUMMARY INFORMATION) Maintenance & Production: (What will it cost later?)  This section would list bullets about M&P  Include Ongoing costs  Provide information regarding resources, hardware, software, 3rd party, etc. PROJECT CHARTER 13 <Project Name> Dependencies or Related Projects: Is your project dependent on or related to another initiative or is one dependent on or related to yours?  Enter any dependencies and relationships here Issues for IT Management: (How can Management help?)  List issues you need help with or need to bring to the attention of management.  This is not a complete issues list. Only high-level or ones that you want to cover with IT management Recommendation/Decisions: (Is there anything needing approval?)  If you are recommending anything related to a project, identify it here. This would include budget increase requests, issue resolution recommendation, etc.  Limit your recommendations and decisions to those that are IT related. No business decisions should be made as part of this process.
  • 15. PROJECT REVIEW PROCESS (FINANCIAL INFORMATION) PROJECT CHARTER 14 <Project Name> Stage End Project Budget Dates Actual Person Years IT Resources Project Budget/Estimate 0.00 Actuals to Date 0.00 IT Budget Contractor Project Budget/Estimate 0.00 Actuals to Date 0.00 IT Budget Totals Total Project Budget 0.00 0.00 0.00 0.00 0.00 0.00 Total Actuals to Date 0.00 0.00 0.00 0.00 0.00 0.00 Variance 0.00 0.00 0.00 0.00 0.00 0.00 Dollars Contractor & Project Budget/Estimate 0 Consulting Actuals to Date 0 IT Budget Software Project Budget/Estimate 0 Actuals to Date 0 IT Budget Hardware Project Budget/Estimate 0 Actuals to Date 0 IT Budget Totals Total Project Budget/Estimate 0 0 0 0 0 0 Total Actuals to Date 0 0 0 0 0 0 Variance 0 0 0 0 0 0