SlideShare une entreprise Scribd logo
1  sur  20
MARINE BUSINESS UNDER INDONESIAN
UPSTREAM OIL AND GAS BUSINESS AIMED TO
INTEGRATE ALL TYPES VESSEL SUPPORT AND
TRANSPORTATION DURING EXPLORATION AND
EXPLOITATION ACTIVITIES.
UP TO 2015, ABOUT 235 ADDITIONAL VESSEL IS
NEEDED TO SUPPORT INDONESIAN OIL AND GAS
ACTIVITIES. TODAY, THE INDUSTRY IS OPERATING
630 VESSELS FOR OPERATION AND ABOUT 350
VESSEL FOR ENGINEERING, CONSTRUCTION AND
INSTALLATION
MANY VESSEL TYPES WITH INDONESIAN FLAG
SUCH AS SEISMIC SURVEY, SUBSEA PIPELINE
LAYDOWN, AHTS > 8.000 HP IN CAPACITY, PSV DP
INTRODUCTION
3
ADDITIONAL VESSEL UP TO 2015
IS 235 UNITS
ADDITIONAL VESSEL
AHTS - Anchor Handling Tug Supply Vessel
4
To be used in Drilling Project and Deepwater Project
AHTS with morethan 6000 HP in capacity is needed for
anchor handling, towing and safety standby vessel
services.
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
PSV – Platform Supply Vessels
5
To be used in ERD Drilling and Deepwater Project. These PSVs come with DP-2, which is critical to supporting floating rigs (w/DP) and facilities in DW
operations. These rigs do not allow any non-DP vessels to come alongside the rig. The PSV also has more deck and cargo capacity than AHTSs.
We have only 3 vessel DP 1 with capacity
below 3.500 DWT
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
3D SEISMIC VESSEL
We have only 2 vessel in Indonesia with 8 -12 streamer
MSV – Multi-purpose Support Vessel
7
MSV - Multi-purpose support vessels are designed to operate in a more specific role whether it be pipe-laying, diving, well intervention, ROV,
stand-by and accommodation vessels to name a few. These vessels are typically outfitted with Dynamic Positioning thrusters (DP-2) so that
they have excellent fail-safe station keeping abilities to assist in the installation of deepwater, subsea development infrastructure . Source:
Horneck Offshore
Completed with DP-2, “pipe-laying” vessel, diving, well intervention, ROV, accomodation
and other function
@2010BPMIGAS.Allrightsreserved
PRIVATE AND CONFIDENTIAL
VESSEL TYPE
NOT AVAILABLE IN INDONESIA
JACK UP RIG
SEMISUBMERSIBLE RIG
BARGE TENDER RIGDEEP SEA DRILL SHIP
CABEL LAYING SHIP
9
DRILL SHIP
10
DSV - Diving Support Vessel
Oil Export Pipeline Spool Installation Saturation Diving -500 ft
To be used in subsea deepwater development project
PRIVATE AND CONFIDENTIAL
LYING STRATEGICALLY IN THE ASIA PACIFIC FASTEST ECONOMIC
GROWING REGION, AND WITH THE BIG POPULATION ALMOST 250
MILLION & THE WORLD’S LARGEST ARCHIPELAGO WITH OVER
17.000 ISLANDS ACROSS THE COUNTRY, INDONESIA IS A HUGE
MARKET THAT WILL ALWAYS REMAIN POTENTIAL AND
FULFILLING INVESTORS TO MEET THE HUGE DEMAND
MARITIME INDUSTRY HAS BECOME A PRIORITY BY GOVERNMENT
OF INDONESIA TO DRIVE THE ECONOMY DEVELOPMENT IN
INDONESIA
IT WAS ESTIMATED THAT THE SHIPYARD INDUSTRY IN INDONESIA
COULD BENEFIT BY UP TO 20 % OF US$ 1,5 BILLION IN AVERAGE
ANNUAL CHARTER COSTS (IPERINDO)
PRESENTLY, MANY INVESTOR ARE PLANNED TO RELOCATE THEIR
SHIPYARD INTO INDONESIA
WITH STRONG SUPPORT FROM MINISTRY OF INDUSTRY, REPUBLIC13
INTRODUCTION
SPECTURM OF MARITIME INDUSTRY
INDONESIA SHIPBUILDING INDUSTRY COULD NOT GROW AS
EXPECTED BECAUSE OF HEAVY DEPENDENCE ON IMPORT
COMPONENTS. LOCAL COMPONENT MAKERS COULD PROVIDE
ONLY 35 % OF COMPONENT NEEDED
INDONESIA HAS 250 SHIPYARDS BUT THEY COULD PRODUCE ONLY
SMALL VESSELS. MOST OF EXISTING VESSEL BUILDERS/SHIPYARD
IN INDONESIA IS LOCATED IN BATAM ISLAND WITH LOW TO MEDIUM
DRY DOCK CAPACITY.
TO BUILD FSO, FPSO, OR FPU WITH A CAPACITY OF BETWEEN
300.000-400.000 DEAD WEIGHT TON IS TOO BIG AT THIS TIME. THE
GOI IS PLANNED TO DEVELOP THE SHIPYARD IN EAST JAVA
PROVINCE
NEW SHIPYARD WITH MINIMUM 80 METER IN LENGTH OF DRY
DOCKING MAY NEED FOR SHIP BUILDING, DOCKING, REPAIRING,
OR OTHER PURPOSE
15
INDONESIA SHIPBUILDING
INDONESIA SHIPYARD
SHIPBUILDING CAPACITY
INDONESIA (NEW BUILDING)
95
8
27
119
6
SHIPBUILDING CAPACITY INDONESIA
(REPAIR & MAINTENANCE)
121
6
25
45
7 6
PRODUCTION CAPABILITY OF THE
INDONESIA SHIPYARD
THE LOCAL SHIPBUILDERS ITS CURRENTLY IDLE CAPACITY (REACHED
ABOUT 50 %) TO BE FULLY EXPLOITED UNDER A NEW GOVERNMENT RULES
TO FULFILL OIL AND GAS INDUSTRY NEED
SKKMIGAS AND MINISTRY OF INDUSTRY HAS SIGNED A MEMORANDUM OF
UNDERSTANDING FOR THE IMPLEMENTATION OF THE NEW RULE
SHIPPING EXPENSES IS ELIGIBLE ITEMS AS PARTS OF THE PETROLEUM
COST RECOVERY SCHEME
THE DOMESTIC SHIPBUILDING INDUSTRY WAS ABLE TO BUILD ALMOST
ALL 20 TYPES OF VESSEL ONLY NEEDED BY OIL AND GAS OPERATION
FOREIGN OPERATORS CONTROLLED 90 % OF VESSEL OPERATING IN
INDONESIAN WATERS TO INCLUDE OIL AND GAS OPERATION
CURRENTLY, SINGAPORE, CHINA, JAPAN AND SOUTH KOREA ARE THE
MAIN COUNTRIES ABLE TO BUILD THE SHIPYARD WITH HUGE DRY
DOCKING FACILITIES
20
SHIPYARD FOR OIL & GAS

Contenu connexe

Tendances

Foreign interests on gwadar port
Foreign interests on gwadar portForeign interests on gwadar port
Foreign interests on gwadar port
Muhammad Ali Asghar
 

Tendances (20)

Gwadar port
Gwadar portGwadar port
Gwadar port
 
Gawadar Port
Gawadar  Port Gawadar  Port
Gawadar Port
 
An overview to Kandla port
An overview to Kandla portAn overview to Kandla port
An overview to Kandla port
 
study on mundra port
study on mundra portstudy on mundra port
study on mundra port
 
Kandala port view
Kandala port viewKandala port view
Kandala port view
 
Foreign interests on gwadar port
Foreign interests on gwadar portForeign interests on gwadar port
Foreign interests on gwadar port
 
Major ports in india
Major ports in indiaMajor ports in india
Major ports in india
 
mundra port
mundra portmundra port
mundra port
 
Ports In India
Ports In IndiaPorts In India
Ports In India
 
Pipavav Port
Pipavav PortPipavav Port
Pipavav Port
 
Sea ports in india
Sea ports in indiaSea ports in india
Sea ports in india
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
Business opportunity in gwadar
Business opportunity in gwadarBusiness opportunity in gwadar
Business opportunity in gwadar
 
Comparative analysis of chahbahar port and gwadar port
Comparative analysis of chahbahar port and gwadar portComparative analysis of chahbahar port and gwadar port
Comparative analysis of chahbahar port and gwadar port
 
Ports in india and its facilities
Ports in india and its facilitiesPorts in india and its facilities
Ports in india and its facilities
 
Mormugao port ppt
Mormugao port pptMormugao port ppt
Mormugao port ppt
 
Knowledge management
Knowledge managementKnowledge management
Knowledge management
 
Mormugao Port Trust
Mormugao Port TrustMormugao Port Trust
Mormugao Port Trust
 
TRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORTTRAFFIC MANAGEMENT AT KANDLA PORT
TRAFFIC MANAGEMENT AT KANDLA PORT
 
Holiday inn lakshadweep
Holiday inn lakshadweepHoliday inn lakshadweep
Holiday inn lakshadweep
 

En vedette

Andalusia Antar Benua
Andalusia Antar BenuaAndalusia Antar Benua
Andalusia Antar Benua
HCI-IT
 
Nusa Konstruksi Enjiniring
Nusa Konstruksi EnjiniringNusa Konstruksi Enjiniring
Nusa Konstruksi Enjiniring
HCI-IT
 
Under the sea
Under the seaUnder the sea
Under the sea
SycoFoamy
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014
Arnaud van Oers
 
Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123
Jimmy James
 
Submarine cables structuring and financing options
Submarine cables   structuring and financing optionsSubmarine cables   structuring and financing options
Submarine cables structuring and financing options
Amy Walls
 

En vedette (16)

Andalusia Antar Benua
Andalusia Antar BenuaAndalusia Antar Benua
Andalusia Antar Benua
 
Nusa Konstruksi Enjiniring
Nusa Konstruksi EnjiniringNusa Konstruksi Enjiniring
Nusa Konstruksi Enjiniring
 
Design thinking e Jornadas do Cliente
Design thinking e Jornadas do ClienteDesign thinking e Jornadas do Cliente
Design thinking e Jornadas do Cliente
 
Under the sea
Under the seaUnder the sea
Under the sea
 
PTC 14 O&M Overview Final
PTC 14 O&M Overview FinalPTC 14 O&M Overview Final
PTC 14 O&M Overview Final
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Marine Communications Cable
Marine Communications CableMarine Communications Cable
Marine Communications Cable
 
The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014The true value of a multi-purpose vessel - IHC - July 2014
The true value of a multi-purpose vessel - IHC - July 2014
 
Multi-Purpose Barge Design
Multi-Purpose Barge DesignMulti-Purpose Barge Design
Multi-Purpose Barge Design
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
234
234234
234
 
PTC15 OM Overview Part 2
PTC15 OM Overview Part 2PTC15 OM Overview Part 2
PTC15 OM Overview Part 2
 
Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123
 
Submarine cables structuring and financing options
Submarine cables   structuring and financing optionsSubmarine cables   structuring and financing options
Submarine cables structuring and financing options
 
Then and Now - Offshore Support Vessel
Then and Now - Offshore Support VesselThen and Now - Offshore Support Vessel
Then and Now - Offshore Support Vessel
 
Cable landing station
Cable landing stationCable landing station
Cable landing station
 

Similaire à Mega Maroci Lines

Presentation at AMA Ahmedabad on 17072009
Presentation at AMA Ahmedabad on 17072009Presentation at AMA Ahmedabad on 17072009
Presentation at AMA Ahmedabad on 17072009
Capt. Gopal Jha
 
CV for Mark Weir 2
CV for Mark Weir 2CV for Mark Weir 2
CV for Mark Weir 2
Mark Weir
 
Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressedJinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
Lin Wang
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.e
andreastzortzis
 

Similaire à Mega Maroci Lines (20)

Asl batam presentation 2015 v1
Asl batam   presentation 2015 v1Asl batam   presentation 2015 v1
Asl batam presentation 2015 v1
 
MAR-APR 2015
MAR-APR 2015MAR-APR 2015
MAR-APR 2015
 
Presentation at AMA Ahmedabad on 17072009
Presentation at AMA Ahmedabad on 17072009Presentation at AMA Ahmedabad on 17072009
Presentation at AMA Ahmedabad on 17072009
 
Spotlight ASRY
Spotlight ASRYSpotlight ASRY
Spotlight ASRY
 
Dockwiser Middle East digital magazine
Dockwiser Middle East digital magazine Dockwiser Middle East digital magazine
Dockwiser Middle East digital magazine
 
KAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptxKAKINADA DEEP WATER PORT.pptx
KAKINADA DEEP WATER PORT.pptx
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
Amc floating dock
Amc floating dockAmc floating dock
Amc floating dock
 
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORTHINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
 
CV for Mark Weir 2
CV for Mark Weir 2CV for Mark Weir 2
CV for Mark Weir 2
 
Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressedJinglu ShipyardIntroduction_EN_Sep.2105_compressed
Jinglu ShipyardIntroduction_EN_Sep.2105_compressed
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.e
 
BPlanFishing00
BPlanFishing00BPlanFishing00
BPlanFishing00
 
Acisa inflatable boat perahu karet
Acisa inflatable boat perahu karet Acisa inflatable boat perahu karet
Acisa inflatable boat perahu karet
 
Dockwiser Africa eMagazine
Dockwiser Africa eMagazineDockwiser Africa eMagazine
Dockwiser Africa eMagazine
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
Type of rig
Type of rigType of rig
Type of rig
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Another world record by the largest crane in the world
Another world record by the largest crane in the worldAnother world record by the largest crane in the world
Another world record by the largest crane in the world
 
COMPANY-PROFILE-PT-KDM
COMPANY-PROFILE-PT-KDMCOMPANY-PROFILE-PT-KDM
COMPANY-PROFILE-PT-KDM
 

Dernier

!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 

Dernier (20)

Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 

Mega Maroci Lines

  • 1.
  • 2. MARINE BUSINESS UNDER INDONESIAN UPSTREAM OIL AND GAS BUSINESS AIMED TO INTEGRATE ALL TYPES VESSEL SUPPORT AND TRANSPORTATION DURING EXPLORATION AND EXPLOITATION ACTIVITIES. UP TO 2015, ABOUT 235 ADDITIONAL VESSEL IS NEEDED TO SUPPORT INDONESIAN OIL AND GAS ACTIVITIES. TODAY, THE INDUSTRY IS OPERATING 630 VESSELS FOR OPERATION AND ABOUT 350 VESSEL FOR ENGINEERING, CONSTRUCTION AND INSTALLATION MANY VESSEL TYPES WITH INDONESIAN FLAG SUCH AS SEISMIC SURVEY, SUBSEA PIPELINE LAYDOWN, AHTS > 8.000 HP IN CAPACITY, PSV DP INTRODUCTION
  • 3. 3 ADDITIONAL VESSEL UP TO 2015 IS 235 UNITS ADDITIONAL VESSEL
  • 4. AHTS - Anchor Handling Tug Supply Vessel 4 To be used in Drilling Project and Deepwater Project AHTS with morethan 6000 HP in capacity is needed for anchor handling, towing and safety standby vessel services. @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 5. PSV – Platform Supply Vessels 5 To be used in ERD Drilling and Deepwater Project. These PSVs come with DP-2, which is critical to supporting floating rigs (w/DP) and facilities in DW operations. These rigs do not allow any non-DP vessels to come alongside the rig. The PSV also has more deck and cargo capacity than AHTSs. We have only 3 vessel DP 1 with capacity below 3.500 DWT @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 6. 3D SEISMIC VESSEL We have only 2 vessel in Indonesia with 8 -12 streamer
  • 7. MSV – Multi-purpose Support Vessel 7 MSV - Multi-purpose support vessels are designed to operate in a more specific role whether it be pipe-laying, diving, well intervention, ROV, stand-by and accommodation vessels to name a few. These vessels are typically outfitted with Dynamic Positioning thrusters (DP-2) so that they have excellent fail-safe station keeping abilities to assist in the installation of deepwater, subsea development infrastructure . Source: Horneck Offshore Completed with DP-2, “pipe-laying” vessel, diving, well intervention, ROV, accomodation and other function @2010BPMIGAS.Allrightsreserved PRIVATE AND CONFIDENTIAL
  • 8. VESSEL TYPE NOT AVAILABLE IN INDONESIA JACK UP RIG SEMISUBMERSIBLE RIG BARGE TENDER RIGDEEP SEA DRILL SHIP
  • 11. DSV - Diving Support Vessel Oil Export Pipeline Spool Installation Saturation Diving -500 ft To be used in subsea deepwater development project PRIVATE AND CONFIDENTIAL
  • 12.
  • 13. LYING STRATEGICALLY IN THE ASIA PACIFIC FASTEST ECONOMIC GROWING REGION, AND WITH THE BIG POPULATION ALMOST 250 MILLION & THE WORLD’S LARGEST ARCHIPELAGO WITH OVER 17.000 ISLANDS ACROSS THE COUNTRY, INDONESIA IS A HUGE MARKET THAT WILL ALWAYS REMAIN POTENTIAL AND FULFILLING INVESTORS TO MEET THE HUGE DEMAND MARITIME INDUSTRY HAS BECOME A PRIORITY BY GOVERNMENT OF INDONESIA TO DRIVE THE ECONOMY DEVELOPMENT IN INDONESIA IT WAS ESTIMATED THAT THE SHIPYARD INDUSTRY IN INDONESIA COULD BENEFIT BY UP TO 20 % OF US$ 1,5 BILLION IN AVERAGE ANNUAL CHARTER COSTS (IPERINDO) PRESENTLY, MANY INVESTOR ARE PLANNED TO RELOCATE THEIR SHIPYARD INTO INDONESIA WITH STRONG SUPPORT FROM MINISTRY OF INDUSTRY, REPUBLIC13 INTRODUCTION
  • 15. INDONESIA SHIPBUILDING INDUSTRY COULD NOT GROW AS EXPECTED BECAUSE OF HEAVY DEPENDENCE ON IMPORT COMPONENTS. LOCAL COMPONENT MAKERS COULD PROVIDE ONLY 35 % OF COMPONENT NEEDED INDONESIA HAS 250 SHIPYARDS BUT THEY COULD PRODUCE ONLY SMALL VESSELS. MOST OF EXISTING VESSEL BUILDERS/SHIPYARD IN INDONESIA IS LOCATED IN BATAM ISLAND WITH LOW TO MEDIUM DRY DOCK CAPACITY. TO BUILD FSO, FPSO, OR FPU WITH A CAPACITY OF BETWEEN 300.000-400.000 DEAD WEIGHT TON IS TOO BIG AT THIS TIME. THE GOI IS PLANNED TO DEVELOP THE SHIPYARD IN EAST JAVA PROVINCE NEW SHIPYARD WITH MINIMUM 80 METER IN LENGTH OF DRY DOCKING MAY NEED FOR SHIP BUILDING, DOCKING, REPAIRING, OR OTHER PURPOSE 15 INDONESIA SHIPBUILDING
  • 17. SHIPBUILDING CAPACITY INDONESIA (NEW BUILDING) 95 8 27 119 6
  • 18. SHIPBUILDING CAPACITY INDONESIA (REPAIR & MAINTENANCE) 121 6 25 45 7 6
  • 19. PRODUCTION CAPABILITY OF THE INDONESIA SHIPYARD
  • 20. THE LOCAL SHIPBUILDERS ITS CURRENTLY IDLE CAPACITY (REACHED ABOUT 50 %) TO BE FULLY EXPLOITED UNDER A NEW GOVERNMENT RULES TO FULFILL OIL AND GAS INDUSTRY NEED SKKMIGAS AND MINISTRY OF INDUSTRY HAS SIGNED A MEMORANDUM OF UNDERSTANDING FOR THE IMPLEMENTATION OF THE NEW RULE SHIPPING EXPENSES IS ELIGIBLE ITEMS AS PARTS OF THE PETROLEUM COST RECOVERY SCHEME THE DOMESTIC SHIPBUILDING INDUSTRY WAS ABLE TO BUILD ALMOST ALL 20 TYPES OF VESSEL ONLY NEEDED BY OIL AND GAS OPERATION FOREIGN OPERATORS CONTROLLED 90 % OF VESSEL OPERATING IN INDONESIAN WATERS TO INCLUDE OIL AND GAS OPERATION CURRENTLY, SINGAPORE, CHINA, JAPAN AND SOUTH KOREA ARE THE MAIN COUNTRIES ABLE TO BUILD THE SHIPYARD WITH HUGE DRY DOCKING FACILITIES 20 SHIPYARD FOR OIL & GAS