Managing Environmental Project at PT Inco; Actualization of Professional
            Ethics as a Professional Engineer of Indonesia
                          (Nursery Project)
                           Habibie, Ir., IP, Ridwan Setiawan, Ir
      PT Inco Central Engineering DP.08, Sorowako, South Sulawesi 92984, Indonesia

                             Andi Erwin Syarif, Ir, IP., MT
      PT Inco Government Relation, DP.23, Sorowako, South Sulawesi 92984, Indonesia


1. PT Inco Profile; One of the World’s
Premier Nickel Producers
                                                1.2. Vision
1.1. General Overview
                                                PT Inco intends to remain a leader among
PT Inco for more than three decades, since      multinational businesses based in Indonesia
the signing of its Contract of Work with the    by consistently producing high returns on
Indonesian Government in 1968, the              investment while adhering to strong
Company has provided skilled jobs, shown        corporate values.
concern for the needs of the communities in
which it operates, benefited shareholders       We will realize our vision by enabling
and contributed positively to the Indonesian    employees to reach their full career
economy.                                        potential and achieve outstanding results
                                                for our Company.
PT Inco produces nickel in matte, an
intermediate product, from lateritic ores at    We will strive to provide a safe, healthy
its integrated mining and processing            and stimulating work environment that
facilities near Sorowako on the island of       maximizes opportunities to enhance PT
Sulawesi. Its entire production is sold in US   Inco’s success as a high quality nickel
Dollars under long-term contracts for           producer.
refining in Japan. PT Inco’s competitive
strengths include abundant ore reserves, a      We take pride in promoting environmental
skilled, well-trained workforce, low-cost       responsibility and advancing community
hydroelectric power, modern production          development.
facilities and an assured market for its
product.                                        1.3. Mission

The Company is owned 60,80 percent              We will meet our commitment to:
owned by CVRD Inco, 20,1 percent owned
by Sumitomo Metal Mining Co. Ltd, 17,9                Investors through sustainable and
percent owned by publics and The others                consistent   long-term    earnings
are owned by consortium of 4 Japanese                  growth.
Company.
                                                      Employees by ensuring safe,
Through the strength of our people and                 healthy and rewarding work.
resources, we strive to be a safe, reliable,
and profitable growth-oriented primary                Customers by       meeting our
nickel producer.                                       obligations with respect to the
                                                       quality and timely delivery of our



                                                                                         1
products.                                    form of Post Mining Areas Rehabilitation,
                                                       Sediment Control, Liquid Waste Control as
         Indonesia through responsible                well as Dust Emission Control.
          corporate citizenship, fulfilling our
          Contract of Work commitments and
          community and environmental
          responsibilities.

PT Inco is committed to ensuring that it
will operate in a clean, healthy and safe
work environment; will take necessary
steps and invest approximately to meet its
environmental obligation
                                                       Figure 2 - Plantation of Work in Post Mining Land
2.   PT   Inco’s  Commitment                      in
Environmental around Contract                     of
Work                                                   Since the post mining area reclamation was
                                                       started on 1980, PT Inco has conducted
                                                       continual     improvement       on     their
2.1. Environmental Management in
                                                       performance with sustainable development
Mining Land Operation
                                                       principle. When the post mining area
                                                       reclamation was started, they focused on
The commitment is spelled out in the
                                                       erosion control. Since then many efforts has
Company policy relating to environment,
                                                       been done to improve the performance.
health and safety stating that PT Inco is
committed to sustainable development
                                                       In 2003, PT Inco created standardization of
concept, taking into account the equitable
                                                       post mining area reclamation which has
balance between economic growth and
                                                       been certified by Directorate General of
sound handling of human health and
                                                       Mining to meet the demand for an optimum
environmental protection
                                                       result entirely. It consists of best practice of
                                                       post mining area reclamation activities.
                                                       Since then, the activities became an un-
                                                       separated part of mining plan until
                                                       execution level.

                                                       Up to the end of 2005 PT Inco Tbk has re-
                                                       vegetated 2.844 hectares of post mining
                                                       areas. PT Inco Tbk has cooperated with
                                                       PSl-UNHAS and The Biotechnological
                                                       Forest Laboratorium IPB in doing repeated
       Figure 1 - Nursery Activities for Mining        surveys and studying the reproduction of
                    Rehabilitation                     many local endemic plants to support the
                                                       local endemic revegetation program.
The policy necessitates PT Inco not only to
meet, but whenever possible, to surpass                PT. Inco always tries to integrate the post
environmental national standard established            mining area reclamation program with the
by existing regulation.                                community development program so
                                                       people can take advantages from the
PT Inco is committed to ensuring that it               company. The company invited Mr. Zukri
will operate in a healthy environment, by              Saad (consultant, former Executive
conducting continual improvement on the                Director of WALHI), to evaluate the
living environment performance, in the                 reclamation program and to give


                                                                                                       2
recommendation over reclamation program                sedimentation    in    during   Mining
which is integrated with community and                 exploration, operation and post mining
local government development program.                  operation.

                                                       PT Inco also had been doing the installation
                                                       of new high technology called Off Gas
                                                       Cleaning System throughout all the
                                                       Processing Plant System starting from
                                                       Furnace System since year of 2004. The
                                                       objective of this project is to reduce the
                                                       amount of gas emission produced by the
                                                       process plant operation.

                                                       The other program is Hydrocarbon
                                                       Management which is ensuring that all the
                                                       hydrocarbon use must comply with
Figure 3 - Areas Rehabilitation Status at the End of   environmental regulation by Indonesian
     2004 PT International Nickel Indonesia
   Performance Monitoring Post Mining Areas            Law. The scopes of the program covered in
          Re-vegetation Status Q4 - 2004               Environmental Management Standard –
                                                       EMS 01 produced by PT Inco with the
                                                       purposes are:

                                                       a.   To ensure all Hydrocarbon facilities at
                                                            PT Inco recorded in a Central PTI
                                                            Hydrocarbon Management Register
                                                            that will be accessible and kept up to
                                                            date.
                                                       b.   To ensure all Hydrocarbon facilities are
                                                            subject to a formal environmental risk
                                                            assessment and that appropriate control
                                                            are implemented.

                                                        3. Support and Engineering Services
                                                       Department of PT Inco; Place for
                                                       Managing the Capital Projects

                                                       3.1. General Overview

                                                       Support and Engineering Services (SES)
Figure 4 – ADITAMA Reward Gold Achievement             provides support to the entire PTI
from Energy and Mineral Resources Department,          organization in the form of Capital Project
Republic of Indonesia.                                 Management,       Engineering     services,
                                                       Construction      Services,   Fabrication,
                                                       Maintenance System support and Shutdown
2.2. Environmental Management in                       Planning. There are approximately 500 PTI
Processing Plant Area                                  employees in the department, while
                                                       approximately another 500 people are
In the year of 2006, PT Inco also Achieve              managed through contractors.
the Gold of Aditama Reward from Energy
and Mineral Resources Department,                      3.2. Vision
Republic of Indonesia due to the successful
in controlling the erosion and managing the


                                                                                                  3
Excellence in selection, installation and
maintenance of Assets required by PTI to             1. To provide facilities that will be able to
meet is vision. A team of highly skilled,               cover the nursery process in one
energized professionals delivering this                 complete facility. The new Nursery was
Support Safely, reliably and predictably.               intended to get 1 Million of trees per
                                                        year.
3.3. Mission                                         2. To provide the international class of
                                                        nursery which also a laboratory for
Provide Asset Management Support to the                 students and to learn how to understand
entire PTI organization in the form of                  the reproduction of endemic population
Capital Project Management, Engineering                 in Sorowako area.
services,      Construction    Services,             3. A recreation place for various of
Fabrication, Maintenance System support                 plantation in Sorowako which also can
and Shutdown Planning.                                  be a training facility for community
                                                        around Luwu Timur area.
3.4. Goals and Objective

a. Capital Projects delivered safely, on             4.2. Project Life Cycle
   time, on budget and meeting the
   owner’s expectations.                             The life cycle of the project was started
b. Safe, cost effective, timely and high             from project initiation until close out
   quality delivery of construction                  process as follows:
   projects.
c. Installation of the Asset Management              4.2.1. Project Initiation
   Framework.
d. Support for the operating departments             Project initiation, was started in January
   to maintain PTI’s assets to fulfill the           2005, there were several part in this phase:
   stakeholders’             sustainability          a. Business case submission to strengthen
   expectations.                                         the justification was submitted by
                                                        INCO CAPITAL PROJECT DEVELOPMENT PROCESS
   e. Effective and efficient maintenance                Manager Mining and the Project
                                                         Sponsor. It was consisting of the




                                                                                                                                                                                   INCEPTION
       shutdowns every time.                                                                            IDEA / OPPORTUNITY   Q /A

                                                              MANAGEMENT GATE 1

   f. Effective People meeting personal                  background why the request should be
                                                             - OPPORTUNITY REVIEW
                                                                  - RISK RANKING                                  1
                                                                                                                                                NO



       and organizational goals.                         approved, the safety and environment
                                                                     - BUSINESS PLAN FIT
                                                    ( CAPITAL REVIEW TEAM / MANAGEMENT APPROVAL )
                                                                                                            YES


                                                         risk ranking process, defining the
                                                                                                           PRELIMINARY                                                        NO
                                                                 MANAGEMENT GATE 2                       FEASIBILITY STUDY   Q /A
                                                                 PRELIMINARY REVIEW
                                                         alternatives of what we’re going to do
                                                            - EVALUATION OF ALTERNATIVES
                                                                      - RISK ASSESSMENT                           2
                                                                                                                                                NO


                                                         to solve the issue, and providing
                                                                     - BUSINESS PLAN FIT


4. Nursery Facility Project                                         - STRATEGIC PLAN FIT
                                                    ( CAPITAL REVIEW TEAM / MANAGEMENT APPROVAL )
                                                                                                           YES


                                                         sensitivity analysis of return on
                                                                                                                                                                                   VIABILITY
                                                                                                    TECHNICAL FEASIBILITY STUDY

                                                         investment and payback period.
                                                                 MANAGEMENT GATE 3                                           Q /A

4.1. The Background and Key Objectives                           FEASIBILITY REVIEW
                                                                   - PROJECT VIABILITY
                                                                                                            YES                                 NO

                                                     b. Capital review committee was doing
                                                                                                                  3
                                                                     - BUSINESS PLAN FIT
                                                                     - STRATEGIC PLAN FIT
                                                                   ( CAPITAL REVIEW TEAM )                  YES

The background of this project was the                   the risk ranking and approved to be             CAR PREPARATION

                                                         capitalized as unplanned capital project
                                                                                                                             Q /A


previous nursery facility could not provide                      MANAGEMENT GATE 4
                                                                                                                  4
                                                                                                                                                NO



more contribution to rehabilitation need                 in early of 2005.
                                                                   CAR APPROVAL
                                                                                                            YES



since the land of post mining required more          c. Engineering work request (EWR) was              ORGANIZE PROJECT
                                                                                                                                                           Reject & File

                                                         raised by the Mining Department as the
                                                                                                                                                                                   EXECUTION




seeding and variety of trees to be re-                                                                   PROJECT KICK-OFF


vegetated. The existing facility also was not            Owner to Central Engineering to            ENGINEERING / PROCUREMENT                            Q/A PEER REVIEWS


                                                         continue the project to the process.
                                                                                                                                                     / PROJECT QUALITY PLAN


presenting the face of commitment of PT
Inco to provide international quality of re-         d. Superintendent of Engineering to assign           CONSTRUCTION



vegetation result in post mining process.                the Project Manager and Team.                    COMMISSIONING      Q /A


                                                     In this phase, the sponsor also provided the
                                                                 MANAGEMENT GATE 5
                                                                 OWNER ACCEPTANCE
                                                                 ( CARE, CUSTODY & CONTROL )
                                                                                                                  5


In 2005, PT Inco decided to start to build           presentation called “Preliminary Study                YES

                                                                                                        START-UP / RAMP-UP

                                                     Stage” as the part of business case
                                                                                                                                                                                   COMPLETION




the world class of Nursery (total area is 2.5
Ha) with the objectives are:                         submission consist the background of the          POST PROJECT REVIEW
                                                                                                                             Q /A


                                                                                                                                    NO
                                                                                                            TURN-OVER

                                                                                                                      YES

                                                                                                            CLOSE-OUT

                                                             MANAGEMENT GATE 6
                                                                                                                                                4             QUALITY
                                                                                                                                                             ASSURANCE
                                                           OWNER FINAL ACCEPTANCE                                 6                      Q /A                   PEER
                                                                                                            YES                                               REVIEWS

                                                                                                         ARCHIVE PROJECT     Q /A

                                                MARCH 31, 2004
request, the benefit for the company, was it
                opportunity or stay in business and how
                significant the product will impact the
                production and long term company
                business.

                The flowchart below (Figure 5) is showing
                the management of capital project
                development process at PT Inco.

              4.2.2. Project Planning                                Figure 5 - Inco Capital Project Development
                                                                      Process (Project Initiation Process Group)
               Project planning, was started the in March
               2005 under PT Inco Project Manager. This
               phase comprise of:                                d. Risk Planning, the Project Manager,
                  a.Project Engineer will be assigned to help       Project Engineer and Team to review
 ger related to Technical Issue during pro life cycle.
                                          ject                      the     documentation       of   related
                  b.Established project scope definition            information, gathering the information
  sponsor to get information deeper about “why are we doing         such as the location of the project in
 tives, the generic project scope requirements, the location        term of physical condition, community
  on, the major material and equipment required for this            and social condition, the topographical
ment, health and safety requirement, what the product will          assessment, the security and safety
dget, project constraints and risk planning, and other related      aspects to be considered during the
                                                                    project life cycles so the risk can be
                 c.Scope       planning       and     project       planned, solved, monitored and
development, to seek more input about the requirement of            responded as it should be. Also the
phase was really important to ensure the operation people,          analysis of assumptions and constraints
tative and the owner were in the same perception of the end         should be collected to ensure we had
  The project manager required to understand what the               the quick and proper response risk
pen in this nursery (Hazop study), what kind of facility and        planning.
 red to ensure the operation is running, the type of materials   e. Provided preliminary Layout and Work
 re interruption after the product completed. There were so         Breakdown Structure (WBS) to ensure
must be addressed prior to procurement and design phase.            there were no work packages were
                                                                    missed as agreed scope with the
                                                                    sponsor of the project.
                                                                 f. Arranged CAR and budget book
                                                                    comprises of:
                                                                    - Statement of objectives and
                                                                        deliverables of the project,
                                                                    - Budget Estimate,
                                                                    - Scope of Work.
                                                                    - Schedule        Development       and
                                                                        Network Diagram,
                                                                    - Hazard and Operability (Hazop)
                                                                        study result, technical feasibility
                                                                        study (including environment and
                                                                        safety evaluation).
                                                                    - Human resources planning and
                                                                        organization chart. The type of the
                                                                        organization is Composite type
                                                                        where all the project Manager’s
                                                                        team were taken from different


                                                                                                               5
Functional Manager and some of
         the team also were doing other
         projects and daily activities and
         report to their Manager which was
         outside this project activities.

                                                        Figure 7 - Simple Project Organization Chart of
                                                                       Nursery Project




                                                       4.2.3. Project Execution

                                                        Project Execution, was started on June 2005
                                                        and finish on April 2006. There were several
                                                        phases to be included as the part of execution
                                                        phase, these could continue after the
                                                        CAR/Budget Book have been approved by
                                                        PTI Senior Management Level.
                                                         a. Continued the Approved Preliminary
                                                             Lay Out into the detail design phase.
                                                             The process of the design consist
                                                             drafting of the drawing and bill of
                                                             material calculation, scope of work,
                                                             specification detail. These whole works
     Figure 6 - Failure to Communicate Scope                 were collected into the product called
                                                             “Engineering Work Package – EWP”.
 In this phase, the Project Manager worked               b. Tendering and Contract Process. This
with the Project Engineer to ensure all the                  process was involving contract services
related aspects of the project requirements                  department to assign Contract Engineer
were fulfilled. The organization chart of the                to help the Project Manager in
project was shown in CAR/Budget Book                         arranging the tender (pretender meeting
submission as shown below. The budget of                     and site visit with the contractor) and
the project was US$150,000 at the first                      contract submission with the awarded
stage, due to scope creep the project value                  contractor afterward.
became US$ 350,000 by the end of the                     c. Procurement Process. The required
project.                                                     materials as per Bill of Material could
                   Owner: Harry Asmar                        be directly ordered as warehouse stock
                    Manager of Mining                        and/or direct purchase. The phase of the
                                                             purchase could be divided by three
                                                             major processes are: provided MR,
                   Sponsor: Dwayne Kroll                     select the best vendor and produce the
              Mine Engineering Department                    contract to liaise with the selected
                                                             vendors.
                                                         d. Construction Process. The construction
                       Project Manager                       of the Nursery Project was undertaken
                     Glenn Schrum, P.Eng
                                                             by 2 main contractors as the project was
                                                             divided by two major works:
    Project Engineer               Construction Manager       i. Landscaping work by PT Mitra
     Habibie, Ir., IP                 Terry Cavender             Ateda using Turnkey project type.
                                                                 The contractor was responsible to

Design Engineer:             Contractor:
PT. Mitra Ateda, Jakarta     PT. Capra Karya                                                              6
Habibie, Oesman Reza,        PT. Mitra Ateda Selaras
Alamsyah Syamsuddin
design, procure, construct and           c. Scope Control and Verification, to
        provide 3 months warranty after the         ensure the scope of the project still
        product of the project was                  meet the updated project scope
        completed. The landscaping work             definition as the Project Sponsor
        product will be detailed in                 requested and ensuring the product of
        deliverables of the project.                the project to be accepted in every
    ii. Main access road, drainage,                 phase or process of the project.
        electrical power supply and lighting     d. Risk Monitoring and Controlling, this
        facilities.                                 process was intended to identify,
e. Commissioning           Process.      The        analyze, and planning for new risk and
    commissioning of the facilities to be           keeping on track the current risk that
    divided in four major disciplines, the          has     been    identified    in   Risk
    building itself, the electrical and             Identification/Risk Planning. In this
    instrumentation system and mechanical           particular case, the risk of the project
    commissioning consists of pump, tank            was only concern on schedule
    and sprinkler commissioning.                    achievement due to the new facilities
During Project Execution Process Group              will be inaugurated by the Minister of
the Project Manager will give more                  Forestry on April 2007. Other related
responsibility to Project Engineer to set up        risk such as material and equipment
and implement the Quality Assurance; is             delivery from manufacturer to project
the application of planned, systematic              site was very low.
quality activities to ensure that the project
will employ all process needed to meet the       4.2.5. Project Close Out
requirements.
                                                 This phase was intended to close out the
4.2.4. Project     Monitoring            and     project that was started on May 2006 and
       Controlling                               completed on August 2007. The closing out
                                                 process divided into two major activities;
This phase consisted of several Process          administrative closure and contract close
Group:                                           out. Arrangement of Care, Custody and
a. Managed Project Team, during this             Control was taking place formalizing the
   phase the Project Manager was strongly        final acceptance of the Sponsor to the final
   recommended to keep the team                  product.
   consistent to the completion of the
   project. Building the team spirit and         The final product from this project
   resolving the conflict during the             comprised of several facilities as follows:
   execution of the project. The Project          Office building, Senior Supervisor of
   Manager should be able to ensure the             Re-vegetation of PT Inco and his crews
   project was finished on time, on budget,         getting the office for daily activities to
   on schedule without Disabling Injuries.          plan, execute, monitor and control the
b. Quality Control Program, the inspection          nursery activities.
   of quality control should be the part of       Parking area access road along the area.
   the Project Manager’s responsibility to        Water tank with capacity 50,000 liters
   ensure the satisfaction of the client after      for watering the plantation.
   the project was handed over to the             Electric pump to operate the
   Operation (project Sponsor). The                 sprinkler/spray system.
   quality control program such as
                                                  Open area for watering area/hardening
   concrete compressive strength test,
                                                    (sprinkling area). Place for seed to
   galvanized film and painting thickness
                                                    adapt before planted on the field,
   of the structure, electrical grounding
                                                    automatic spray system. The capacity is
   test, pressure test, and other related
                                                    600,000 plants per cycle.
   inspection and testing plan (ITP).


                                                                                            7
   Media handling, the open building to                   determine the actual results of the
    prepare the seed.                                      project with respect to Savings, Profits,
   Germination house, the facility to for                 etc.
    seed reproduction using generative                  To recognize subsequent actions which
    method and place for sprinkling the                    may be necessary that was not taken in
    seed. The capacity is around 300,000                   the project from beginning till the end.
    seeds per cycle.                                       We called it work breakdown structure
   Propagation house, facility for local                  lessons learned.
    plant reproduction using vegetative
    method. The capacity is 400,000 per
    cycles. The use of sprinkling for
    adequate watering, the light intensity is
    75% and the roof type of the facility is
    using UV plastic.
   Mycorrhiza house, the facility to
    produce the fertilizer with the capacity
    2 tons/year.
                                              Areal pembibitan berdiri di atas lahan seluas 2,5 hektar.
   Hydroponik training facility.             Fasilitas pembibitan terbesar industri tambang di Indonesia.
   Seed storage container.
   Wooden house for recreation and                          Germinationn House
    refreshing.                            Seed Container
                                                                                    Propagation House
                                                               Media
                                                               handling
                                                                                                 Shaded House


                                                                                                           Hardening




                                                 Hydroponik Training
                                                      Facility

                                                                                Pump
                                                             Mycorrhiza House                     Office
                                                                                    Water Tank




                                                        Figure 8 - Final Product of Nursery Facility Project


Other things should be the part of close out            5.      Code of Ethics as Professional
process group is to complete the post audit                     Engineer of Indonesia
contains lessons learned with the purposes
as follows:                                             5.1. The Ethical Professional Engineers
      To provide valuable source of                    The Institution of Engineers, Indonesia
    information for improving the project               (PII) declared the professional ethics that
    and any lesson shared.                              should be practiced by all the Engineers of
   To provide opportunity to create                    Indonesia as per Anggaran Dasar and
    accountability within the process for               Anggaran Rumah Tangga of PII.
    estimates given and any decision made
    during the project execution phase.                 We know exactly that the Engineering is an
   To provide an important financial                   important and learned profession. As
    control mechanism, to look back and                 members of PII, engineers are expected to


                                                                                                           8
exhibit the highest standards of honesty and        Develops and implements the planning,
integrity. Engineering has a direct and vital        scheduling and estimating of the
impact on the quality of life for all people.        Engineering function.
Accordingly, the services are provided by           Responsible for the quality, technical
the engineers require honesty, impartiality,         competence and professionalism of the
fairness and equity, and must be dedicated           Engineering effort.
to the protection of the public health, safety      Complete         engineering      design
and welfare.                                         calculations to meet accepted design
                                                     standards, project scope and PTI
In fulfilling our professional duties, we            standard specifications.
shall:                                              Prepare and collate Engineering Work
 Hold paramount the public’s health,                Package documentation, to ensure all
    safety and welfare.                              aspects of construction, safety and
 Perform services only in areas of our              quality are clearly defined.
    competences.                                    Provides Engineering direction and
 Avoids conflict of interests.                      support      for     Procurement     and
 Act as a faithful agents or trustees of            Construction groups in the formulation
    our client’s interest.                           of the Procurement and Construction
                                                     Plans.
 Avoid improper conduct in the
                                                    Resolve technical issues during project
    solicitations for assignments.
                                                     execution and commissioning, to ensure
 Act to uphold honor, integrity and the             the project meets the planned objectives
    dignity of our professions.                      and quality.
 Maintain competence in our professions            Informing the project manager
    through continuing education and                 regarding progress on tasks and report
    training.                                        immediately when a judgment is made
 Respect         our      community     and         that the output targets cannot be met, or
    environment in all of our endeavors.             more can be achieved.
                                                    Asking the project manager for
                                                     clarification, when needed, on what is
5.2.      Project Engineer’s Role as an              expected of the role.
       Actor       who     Implemented              Taking the initiative to improve your
       Professional Ethics                           work, the overall business, and promote
                                                     the goals of the organization.
In PT Inco, Project Engineer has more               Working effectively and collaterally
responsibility rather than other project team        with immediate colleagues and others
to run the project to meet the deliverables          in cross-functional relationships, on
of the final product, safety, cost and related       tasks within the context of corporate
Key Performance Indicator (KPI) factors.             policy, values, and culture.
In this case, the purpose of Project             There are a lot of accountabilities should be
Engineer’s role is to provide Civil              performed by Project Engineer of PT Inco
Engineering Technical Expertise to support       and should be relevant to actualization of
all civil work related to Engineering            Professional Ethics as Professional
Department’s Accountability. Managing            Engineers.
Engineering projects related to civil
engineering and implementation program.          During working in Nursery Project, there
Generic Accountabilities (all employees will     were several engineering activities
be accountable for the following):               decisions made up by the project engineer
                                                 such as:
                                                  Determined the best location of new
                                                    Nursery Facility as per Feasibility


                                                                                            9
1
       Study conducted together with project       Project Management Body of Knowledge,
       team. This means, the decision was         3rd Edition. Project Management Institute,
       made based technical judgment as the       Four Campus Boulevard, Newton Square,
       way should be (no conflict of interest).   USA, 2004
      Managed the scope limitation between
                                                  2
       the two contractors who did the works.      Capital Project Owner’s and Sponsor’s
       The scope of works had been performed      Handbook. PT International Nickel
       in the contract and tender arrangement     Indonesia, 2005
       before then. No works shall proceed
                                                  3
       without contract agreement and so the       Engineering Procedures Manual.         PT
       contract must be detailed on what and      International Nickel Indonesia, 2006
       who’s doing the related works.
                                                  4
      Managed the construction works on the       AD/ART & Susunan Pengurus Masa Bakti
       field, fair in making the decision if      2006 - 2009 Persatuan Insinyur Indonesia.
       there was a deviation to quality or        Persatuan Insinyur Indonesia (PII), 2006
       scope of works performed by the
                                                  5
       contractors. They should rework and/or      Sid Dewberry GMU Graduation Speech,
       repair the defects if it was not meeting   2005.
       the quality satisfaction.
                                                  6
      Conducted the safety layer audit (SLA)      PT     Inco    website:     http://www.pt-
       to ensure all the workers were working     inco.co.id/new/profil.php, 2006.
       safely and returns at home safely. The
       professional engineers should hold the
       responsibility to protect and help the
       project team (from PTI project team or
       contractor) with ensuring the done the
       right, safe and proper actions.
      Improved the designs that were raised
       by the consultant to meet the standard
       and specification of PT Inco such as the
       installation of vertical and horizontal
       bar inside the concrete block walls to
       ensure the building is strong enough
       from seismic design since Sorowako
       area is very closed to central of earth
       work (zone#4).
      Approved all the design changes done
       by the contractor which were expected
       to change the quality of required
       designs and specifications. Professional
       Engineers should always rely on
       technical judgment during project
       execution.
      Decided to install the disconnect switch
       outside the office building for electric
       pump to ensure the power could be
       switch off if the failure occur to the
       existing system.


Reference:



                                                                                          10

Contenu connexe

En vedette

Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Mamuaya
 
CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015Herry Bachruddin
 
Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)Anbika, ST
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)FERI NOVIARDI
 

En vedette (7)

Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012Andryaas Project Manager Cv 2012
Andryaas Project Manager Cv 2012
 
CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
12 servicios webftp_windowsasoitson
12 servicios webftp_windowsasoitson12 servicios webftp_windowsasoitson
12 servicios webftp_windowsasoitson
 
CV Rizky Tyas Perwitasari
CV Rizky Tyas PerwitasariCV Rizky Tyas Perwitasari
CV Rizky Tyas Perwitasari
 
CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015
 
Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)
 

Similaire à Managing Environmental Project at PT Inco; Actualization of Professional Ethics as a Professional Engineer of Indonesia

Ntpc summer-training-report
Ntpc summer-training-reportNtpc summer-training-report
Ntpc summer-training-reportVikash Kumar
 
Intergen Energy Limited Wind Energy
Intergen Energy Limited Wind EnergyIntergen Energy Limited Wind Energy
Intergen Energy Limited Wind EnergyIntergen Energy Ltd.
 
andy_whyle_and_mark_anderson_pdf_14278
andy_whyle_and_mark_anderson_pdf_14278andy_whyle_and_mark_anderson_pdf_14278
andy_whyle_and_mark_anderson_pdf_14278Andy Whyle
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTAnubhav Ghosh
 
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02Aritra Majumdar
 
Iberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind
 
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02Amit Gupta
 
VISION 2030 PROGRESS REPORT
VISION 2030 PROGRESS REPORTVISION 2030 PROGRESS REPORT
VISION 2030 PROGRESS REPORTMuthuri Kinyamu
 
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE No to mining in Palawan
 
Smoke on water – Countering global threats from peatland loss and degradation...
Smoke on water – Countering global threats from peatland loss and degradation...Smoke on water – Countering global threats from peatland loss and degradation...
Smoke on water – Countering global threats from peatland loss and degradation...Global Landscapes Forum (GLF)
 
PT Freeport-Indonesia's Sustainability Development Framework (SDF): Kuala Ke...
PT Freeport-Indonesia's Sustainability Development Framework (SDF):  Kuala Ke...PT Freeport-Indonesia's Sustainability Development Framework (SDF):  Kuala Ke...
PT Freeport-Indonesia's Sustainability Development Framework (SDF): Kuala Ke...Jenkins Macedo
 
Clean Development Biogas Processing
Clean Development Biogas ProcessingClean Development Biogas Processing
Clean Development Biogas ProcessingSuhaimi Nordin
 
Corporate Profile
Corporate ProfileCorporate Profile
Corporate Profileytbaloyi
 
Daikin Corporate Profile
Daikin Corporate Profile Daikin Corporate Profile
Daikin Corporate Profile Daikin India
 

Similaire à Managing Environmental Project at PT Inco; Actualization of Professional Ethics as a Professional Engineer of Indonesia (20)

Ntpc summer-training-report
Ntpc summer-training-reportNtpc summer-training-report
Ntpc summer-training-report
 
Intergen Energy Wind Energy
Intergen Energy Wind EnergyIntergen Energy Wind Energy
Intergen Energy Wind Energy
 
Intergen Energy Limited Wind Energy
Intergen Energy Limited Wind EnergyIntergen Energy Limited Wind Energy
Intergen Energy Limited Wind Energy
 
Intergen Energy Ltd.Wind Energy
Intergen Energy Ltd.Wind EnergyIntergen Energy Ltd.Wind Energy
Intergen Energy Ltd.Wind Energy
 
andy_whyle_and_mark_anderson_pdf_14278
andy_whyle_and_mark_anderson_pdf_14278andy_whyle_and_mark_anderson_pdf_14278
andy_whyle_and_mark_anderson_pdf_14278
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORT
 
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
 
Iberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, Europe
 
DHL GoGreen
DHL GoGreenDHL GoGreen
DHL GoGreen
 
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
114349206 ntpc-badarpur-summer-training-report-130717175524-phpapp02
 
VISION 2030 PROGRESS REPORT
VISION 2030 PROGRESS REPORTVISION 2030 PROGRESS REPORT
VISION 2030 PROGRESS REPORT
 
Stuart Anstee, Rio Tinto - Presentation - UNAA Vic Natural Capital Seminar
Stuart Anstee, Rio Tinto - Presentation - UNAA Vic Natural Capital SeminarStuart Anstee, Rio Tinto - Presentation - UNAA Vic Natural Capital Seminar
Stuart Anstee, Rio Tinto - Presentation - UNAA Vic Natural Capital Seminar
 
Sgcp12 forte-incrops
Sgcp12 forte-incropsSgcp12 forte-incrops
Sgcp12 forte-incrops
 
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE
THE ROLE OF PRIVATE SECTOR IN EIA, THE RTNMC/CBNC EXPERIENCE
 
Smoke on water – Countering global threats from peatland loss and degradation...
Smoke on water – Countering global threats from peatland loss and degradation...Smoke on water – Countering global threats from peatland loss and degradation...
Smoke on water – Countering global threats from peatland loss and degradation...
 
RSPO PT Agro Bukit Kalimantan Tengah 2008
RSPO PT Agro Bukit Kalimantan Tengah 2008RSPO PT Agro Bukit Kalimantan Tengah 2008
RSPO PT Agro Bukit Kalimantan Tengah 2008
 
PT Freeport-Indonesia's Sustainability Development Framework (SDF): Kuala Ke...
PT Freeport-Indonesia's Sustainability Development Framework (SDF):  Kuala Ke...PT Freeport-Indonesia's Sustainability Development Framework (SDF):  Kuala Ke...
PT Freeport-Indonesia's Sustainability Development Framework (SDF): Kuala Ke...
 
Clean Development Biogas Processing
Clean Development Biogas ProcessingClean Development Biogas Processing
Clean Development Biogas Processing
 
Corporate Profile
Corporate ProfileCorporate Profile
Corporate Profile
 
Daikin Corporate Profile
Daikin Corporate Profile Daikin Corporate Profile
Daikin Corporate Profile
 

Plus de Habibie Razak

Asean Engineer Register
Asean Engineer RegisterAsean Engineer Register
Asean Engineer RegisterHabibie Razak
 
Ska Lpjk Pii Teknik Sipil
Ska Lpjk Pii   Teknik SipilSka Lpjk Pii   Teknik Sipil
Ska Lpjk Pii Teknik SipilHabibie Razak
 
Ska Lpjk Pii Struktur
Ska Lpjk Pii   StrukturSka Lpjk Pii   Struktur
Ska Lpjk Pii StrukturHabibie Razak
 
Ska Lpjk Pii Transportasi
Ska Lpjk Pii   TransportasiSka Lpjk Pii   Transportasi
Ska Lpjk Pii TransportasiHabibie Razak
 
Ska Lpjk Pii Geoteknik
Ska Lpjk Pii   GeoteknikSka Lpjk Pii   Geoteknik
Ska Lpjk Pii GeoteknikHabibie Razak
 
Ska Lpjk Pii Sumber Daya Air
Ska Lpjk Pii   Sumber Daya AirSka Lpjk Pii   Sumber Daya Air
Ska Lpjk Pii Sumber Daya AirHabibie Razak
 
To Whom It May Concern Marty Holmberg, P.Eng
To Whom It May Concern   Marty Holmberg, P.EngTo Whom It May Concern   Marty Holmberg, P.Eng
To Whom It May Concern Marty Holmberg, P.EngHabibie Razak
 
(1)Habibie CV (October 2010)
(1)Habibie CV (October   2010)(1)Habibie CV (October   2010)
(1)Habibie CV (October 2010)Habibie Razak
 
Pt Kinhamas Abadi Company Profile
Pt Kinhamas Abadi    Company ProfilePt Kinhamas Abadi    Company Profile
Pt Kinhamas Abadi Company ProfileHabibie Razak
 
Company Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaCompany Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaHabibie Razak
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Habibie Razak
 
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...Managing Environmental Project at PT Inco; Actualization of Professional Ethi...
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...Habibie Razak
 

Plus de Habibie Razak (15)

Asean Engineer Register
Asean Engineer RegisterAsean Engineer Register
Asean Engineer Register
 
Evm Training
Evm TrainingEvm Training
Evm Training
 
Ska Lpjk Pii Teknik Sipil
Ska Lpjk Pii   Teknik SipilSka Lpjk Pii   Teknik Sipil
Ska Lpjk Pii Teknik Sipil
 
Ska Lpjk Pii Struktur
Ska Lpjk Pii   StrukturSka Lpjk Pii   Struktur
Ska Lpjk Pii Struktur
 
Ska Lpjk Pii Transportasi
Ska Lpjk Pii   TransportasiSka Lpjk Pii   Transportasi
Ska Lpjk Pii Transportasi
 
Ska Lpjk Pii Geoteknik
Ska Lpjk Pii   GeoteknikSka Lpjk Pii   Geoteknik
Ska Lpjk Pii Geoteknik
 
Ska Lpjk Pii Sumber Daya Air
Ska Lpjk Pii   Sumber Daya AirSka Lpjk Pii   Sumber Daya Air
Ska Lpjk Pii Sumber Daya Air
 
Ipm License Habibie
Ipm License   HabibieIpm License   Habibie
Ipm License Habibie
 
To Whom It May Concern Marty Holmberg, P.Eng
To Whom It May Concern   Marty Holmberg, P.EngTo Whom It May Concern   Marty Holmberg, P.Eng
To Whom It May Concern Marty Holmberg, P.Eng
 
(1)Habibie CV (October 2010)
(1)Habibie CV (October   2010)(1)Habibie CV (October   2010)
(1)Habibie CV (October 2010)
 
Pt Kinhamas Abadi Company Profile
Pt Kinhamas Abadi    Company ProfilePt Kinhamas Abadi    Company Profile
Pt Kinhamas Abadi Company Profile
 
Company Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaCompany Profile Pt Minspec Indonesia
Company Profile Pt Minspec Indonesia
 
Pom Certificate
Pom CertificatePom Certificate
Pom Certificate
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
 
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...Managing Environmental Project at PT Inco; Actualization of Professional Ethi...
Managing Environmental Project at PT Inco; Actualization of Professional Ethi...
 

Dernier

Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
The Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticThe Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticTiaFebriani
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 

Dernier (20)

Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
The Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticThe Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aesthetic
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 

Managing Environmental Project at PT Inco; Actualization of Professional Ethics as a Professional Engineer of Indonesia

  • 1. Managing Environmental Project at PT Inco; Actualization of Professional Ethics as a Professional Engineer of Indonesia (Nursery Project) Habibie, Ir., IP, Ridwan Setiawan, Ir PT Inco Central Engineering DP.08, Sorowako, South Sulawesi 92984, Indonesia Andi Erwin Syarif, Ir, IP., MT PT Inco Government Relation, DP.23, Sorowako, South Sulawesi 92984, Indonesia 1. PT Inco Profile; One of the World’s Premier Nickel Producers 1.2. Vision 1.1. General Overview PT Inco intends to remain a leader among PT Inco for more than three decades, since multinational businesses based in Indonesia the signing of its Contract of Work with the by consistently producing high returns on Indonesian Government in 1968, the investment while adhering to strong Company has provided skilled jobs, shown corporate values. concern for the needs of the communities in which it operates, benefited shareholders We will realize our vision by enabling and contributed positively to the Indonesian employees to reach their full career economy. potential and achieve outstanding results for our Company. PT Inco produces nickel in matte, an intermediate product, from lateritic ores at We will strive to provide a safe, healthy its integrated mining and processing and stimulating work environment that facilities near Sorowako on the island of maximizes opportunities to enhance PT Sulawesi. Its entire production is sold in US Inco’s success as a high quality nickel Dollars under long-term contracts for producer. refining in Japan. PT Inco’s competitive strengths include abundant ore reserves, a We take pride in promoting environmental skilled, well-trained workforce, low-cost responsibility and advancing community hydroelectric power, modern production development. facilities and an assured market for its product. 1.3. Mission The Company is owned 60,80 percent We will meet our commitment to: owned by CVRD Inco, 20,1 percent owned by Sumitomo Metal Mining Co. Ltd, 17,9  Investors through sustainable and percent owned by publics and The others consistent long-term earnings are owned by consortium of 4 Japanese growth. Company.  Employees by ensuring safe, Through the strength of our people and healthy and rewarding work. resources, we strive to be a safe, reliable, and profitable growth-oriented primary  Customers by meeting our nickel producer. obligations with respect to the quality and timely delivery of our 1
  • 2. products. form of Post Mining Areas Rehabilitation, Sediment Control, Liquid Waste Control as  Indonesia through responsible well as Dust Emission Control. corporate citizenship, fulfilling our Contract of Work commitments and community and environmental responsibilities. PT Inco is committed to ensuring that it will operate in a clean, healthy and safe work environment; will take necessary steps and invest approximately to meet its environmental obligation Figure 2 - Plantation of Work in Post Mining Land 2. PT Inco’s Commitment in Environmental around Contract of Work Since the post mining area reclamation was started on 1980, PT Inco has conducted continual improvement on their 2.1. Environmental Management in performance with sustainable development Mining Land Operation principle. When the post mining area reclamation was started, they focused on The commitment is spelled out in the erosion control. Since then many efforts has Company policy relating to environment, been done to improve the performance. health and safety stating that PT Inco is committed to sustainable development In 2003, PT Inco created standardization of concept, taking into account the equitable post mining area reclamation which has balance between economic growth and been certified by Directorate General of sound handling of human health and Mining to meet the demand for an optimum environmental protection result entirely. It consists of best practice of post mining area reclamation activities. Since then, the activities became an un- separated part of mining plan until execution level. Up to the end of 2005 PT Inco Tbk has re- vegetated 2.844 hectares of post mining areas. PT Inco Tbk has cooperated with PSl-UNHAS and The Biotechnological Forest Laboratorium IPB in doing repeated Figure 1 - Nursery Activities for Mining surveys and studying the reproduction of Rehabilitation many local endemic plants to support the local endemic revegetation program. The policy necessitates PT Inco not only to meet, but whenever possible, to surpass PT. Inco always tries to integrate the post environmental national standard established mining area reclamation program with the by existing regulation. community development program so people can take advantages from the PT Inco is committed to ensuring that it company. The company invited Mr. Zukri will operate in a healthy environment, by Saad (consultant, former Executive conducting continual improvement on the Director of WALHI), to evaluate the living environment performance, in the reclamation program and to give 2
  • 3. recommendation over reclamation program sedimentation in during Mining which is integrated with community and exploration, operation and post mining local government development program. operation. PT Inco also had been doing the installation of new high technology called Off Gas Cleaning System throughout all the Processing Plant System starting from Furnace System since year of 2004. The objective of this project is to reduce the amount of gas emission produced by the process plant operation. The other program is Hydrocarbon Management which is ensuring that all the hydrocarbon use must comply with Figure 3 - Areas Rehabilitation Status at the End of environmental regulation by Indonesian 2004 PT International Nickel Indonesia Performance Monitoring Post Mining Areas Law. The scopes of the program covered in Re-vegetation Status Q4 - 2004 Environmental Management Standard – EMS 01 produced by PT Inco with the purposes are: a. To ensure all Hydrocarbon facilities at PT Inco recorded in a Central PTI Hydrocarbon Management Register that will be accessible and kept up to date. b. To ensure all Hydrocarbon facilities are subject to a formal environmental risk assessment and that appropriate control are implemented. 3. Support and Engineering Services Department of PT Inco; Place for Managing the Capital Projects 3.1. General Overview Support and Engineering Services (SES) Figure 4 – ADITAMA Reward Gold Achievement provides support to the entire PTI from Energy and Mineral Resources Department, organization in the form of Capital Project Republic of Indonesia. Management, Engineering services, Construction Services, Fabrication, Maintenance System support and Shutdown 2.2. Environmental Management in Planning. There are approximately 500 PTI Processing Plant Area employees in the department, while approximately another 500 people are In the year of 2006, PT Inco also Achieve managed through contractors. the Gold of Aditama Reward from Energy and Mineral Resources Department, 3.2. Vision Republic of Indonesia due to the successful in controlling the erosion and managing the 3
  • 4. Excellence in selection, installation and maintenance of Assets required by PTI to 1. To provide facilities that will be able to meet is vision. A team of highly skilled, cover the nursery process in one energized professionals delivering this complete facility. The new Nursery was Support Safely, reliably and predictably. intended to get 1 Million of trees per year. 3.3. Mission 2. To provide the international class of nursery which also a laboratory for Provide Asset Management Support to the students and to learn how to understand entire PTI organization in the form of the reproduction of endemic population Capital Project Management, Engineering in Sorowako area. services, Construction Services, 3. A recreation place for various of Fabrication, Maintenance System support plantation in Sorowako which also can and Shutdown Planning. be a training facility for community around Luwu Timur area. 3.4. Goals and Objective a. Capital Projects delivered safely, on 4.2. Project Life Cycle time, on budget and meeting the owner’s expectations. The life cycle of the project was started b. Safe, cost effective, timely and high from project initiation until close out quality delivery of construction process as follows: projects. c. Installation of the Asset Management 4.2.1. Project Initiation Framework. d. Support for the operating departments Project initiation, was started in January to maintain PTI’s assets to fulfill the 2005, there were several part in this phase: stakeholders’ sustainability a. Business case submission to strengthen expectations. the justification was submitted by INCO CAPITAL PROJECT DEVELOPMENT PROCESS e. Effective and efficient maintenance Manager Mining and the Project Sponsor. It was consisting of the INCEPTION shutdowns every time. IDEA / OPPORTUNITY Q /A MANAGEMENT GATE 1 f. Effective People meeting personal background why the request should be - OPPORTUNITY REVIEW - RISK RANKING 1 NO and organizational goals. approved, the safety and environment - BUSINESS PLAN FIT ( CAPITAL REVIEW TEAM / MANAGEMENT APPROVAL ) YES risk ranking process, defining the PRELIMINARY NO MANAGEMENT GATE 2 FEASIBILITY STUDY Q /A PRELIMINARY REVIEW alternatives of what we’re going to do - EVALUATION OF ALTERNATIVES - RISK ASSESSMENT 2 NO to solve the issue, and providing - BUSINESS PLAN FIT 4. Nursery Facility Project - STRATEGIC PLAN FIT ( CAPITAL REVIEW TEAM / MANAGEMENT APPROVAL ) YES sensitivity analysis of return on VIABILITY TECHNICAL FEASIBILITY STUDY investment and payback period. MANAGEMENT GATE 3 Q /A 4.1. The Background and Key Objectives FEASIBILITY REVIEW - PROJECT VIABILITY YES NO b. Capital review committee was doing 3 - BUSINESS PLAN FIT - STRATEGIC PLAN FIT ( CAPITAL REVIEW TEAM ) YES The background of this project was the the risk ranking and approved to be CAR PREPARATION capitalized as unplanned capital project Q /A previous nursery facility could not provide MANAGEMENT GATE 4 4 NO more contribution to rehabilitation need in early of 2005. CAR APPROVAL YES since the land of post mining required more c. Engineering work request (EWR) was ORGANIZE PROJECT Reject & File raised by the Mining Department as the EXECUTION seeding and variety of trees to be re- PROJECT KICK-OFF vegetated. The existing facility also was not Owner to Central Engineering to ENGINEERING / PROCUREMENT Q/A PEER REVIEWS continue the project to the process. / PROJECT QUALITY PLAN presenting the face of commitment of PT Inco to provide international quality of re- d. Superintendent of Engineering to assign CONSTRUCTION vegetation result in post mining process. the Project Manager and Team. COMMISSIONING Q /A In this phase, the sponsor also provided the MANAGEMENT GATE 5 OWNER ACCEPTANCE ( CARE, CUSTODY & CONTROL ) 5 In 2005, PT Inco decided to start to build presentation called “Preliminary Study YES START-UP / RAMP-UP Stage” as the part of business case COMPLETION the world class of Nursery (total area is 2.5 Ha) with the objectives are: submission consist the background of the POST PROJECT REVIEW Q /A NO TURN-OVER YES CLOSE-OUT MANAGEMENT GATE 6 4 QUALITY ASSURANCE OWNER FINAL ACCEPTANCE 6 Q /A PEER YES REVIEWS ARCHIVE PROJECT Q /A MARCH 31, 2004
  • 5. request, the benefit for the company, was it opportunity or stay in business and how significant the product will impact the production and long term company business. The flowchart below (Figure 5) is showing the management of capital project development process at PT Inco. 4.2.2. Project Planning Figure 5 - Inco Capital Project Development Process (Project Initiation Process Group) Project planning, was started the in March 2005 under PT Inco Project Manager. This phase comprise of: d. Risk Planning, the Project Manager, a.Project Engineer will be assigned to help Project Engineer and Team to review ger related to Technical Issue during pro life cycle. ject the documentation of related b.Established project scope definition information, gathering the information sponsor to get information deeper about “why are we doing such as the location of the project in tives, the generic project scope requirements, the location term of physical condition, community on, the major material and equipment required for this and social condition, the topographical ment, health and safety requirement, what the product will assessment, the security and safety dget, project constraints and risk planning, and other related aspects to be considered during the project life cycles so the risk can be c.Scope planning and project planned, solved, monitored and development, to seek more input about the requirement of responded as it should be. Also the phase was really important to ensure the operation people, analysis of assumptions and constraints tative and the owner were in the same perception of the end should be collected to ensure we had The project manager required to understand what the the quick and proper response risk pen in this nursery (Hazop study), what kind of facility and planning. red to ensure the operation is running, the type of materials e. Provided preliminary Layout and Work re interruption after the product completed. There were so Breakdown Structure (WBS) to ensure must be addressed prior to procurement and design phase. there were no work packages were missed as agreed scope with the sponsor of the project. f. Arranged CAR and budget book comprises of: - Statement of objectives and deliverables of the project, - Budget Estimate, - Scope of Work. - Schedule Development and Network Diagram, - Hazard and Operability (Hazop) study result, technical feasibility study (including environment and safety evaluation). - Human resources planning and organization chart. The type of the organization is Composite type where all the project Manager’s team were taken from different 5
  • 6. Functional Manager and some of the team also were doing other projects and daily activities and report to their Manager which was outside this project activities. Figure 7 - Simple Project Organization Chart of Nursery Project 4.2.3. Project Execution Project Execution, was started on June 2005 and finish on April 2006. There were several phases to be included as the part of execution phase, these could continue after the CAR/Budget Book have been approved by PTI Senior Management Level. a. Continued the Approved Preliminary Lay Out into the detail design phase. The process of the design consist drafting of the drawing and bill of material calculation, scope of work, specification detail. These whole works Figure 6 - Failure to Communicate Scope were collected into the product called “Engineering Work Package – EWP”. In this phase, the Project Manager worked b. Tendering and Contract Process. This with the Project Engineer to ensure all the process was involving contract services related aspects of the project requirements department to assign Contract Engineer were fulfilled. The organization chart of the to help the Project Manager in project was shown in CAR/Budget Book arranging the tender (pretender meeting submission as shown below. The budget of and site visit with the contractor) and the project was US$150,000 at the first contract submission with the awarded stage, due to scope creep the project value contractor afterward. became US$ 350,000 by the end of the c. Procurement Process. The required project. materials as per Bill of Material could Owner: Harry Asmar be directly ordered as warehouse stock Manager of Mining and/or direct purchase. The phase of the purchase could be divided by three major processes are: provided MR, Sponsor: Dwayne Kroll select the best vendor and produce the Mine Engineering Department contract to liaise with the selected vendors. d. Construction Process. The construction Project Manager of the Nursery Project was undertaken Glenn Schrum, P.Eng by 2 main contractors as the project was divided by two major works: Project Engineer Construction Manager i. Landscaping work by PT Mitra Habibie, Ir., IP Terry Cavender Ateda using Turnkey project type. The contractor was responsible to Design Engineer: Contractor: PT. Mitra Ateda, Jakarta PT. Capra Karya 6 Habibie, Oesman Reza, PT. Mitra Ateda Selaras Alamsyah Syamsuddin
  • 7. design, procure, construct and c. Scope Control and Verification, to provide 3 months warranty after the ensure the scope of the project still product of the project was meet the updated project scope completed. The landscaping work definition as the Project Sponsor product will be detailed in requested and ensuring the product of deliverables of the project. the project to be accepted in every ii. Main access road, drainage, phase or process of the project. electrical power supply and lighting d. Risk Monitoring and Controlling, this facilities. process was intended to identify, e. Commissioning Process. The analyze, and planning for new risk and commissioning of the facilities to be keeping on track the current risk that divided in four major disciplines, the has been identified in Risk building itself, the electrical and Identification/Risk Planning. In this instrumentation system and mechanical particular case, the risk of the project commissioning consists of pump, tank was only concern on schedule and sprinkler commissioning. achievement due to the new facilities During Project Execution Process Group will be inaugurated by the Minister of the Project Manager will give more Forestry on April 2007. Other related responsibility to Project Engineer to set up risk such as material and equipment and implement the Quality Assurance; is delivery from manufacturer to project the application of planned, systematic site was very low. quality activities to ensure that the project will employ all process needed to meet the 4.2.5. Project Close Out requirements. This phase was intended to close out the 4.2.4. Project Monitoring and project that was started on May 2006 and Controlling completed on August 2007. The closing out process divided into two major activities; This phase consisted of several Process administrative closure and contract close Group: out. Arrangement of Care, Custody and a. Managed Project Team, during this Control was taking place formalizing the phase the Project Manager was strongly final acceptance of the Sponsor to the final recommended to keep the team product. consistent to the completion of the project. Building the team spirit and The final product from this project resolving the conflict during the comprised of several facilities as follows: execution of the project. The Project  Office building, Senior Supervisor of Manager should be able to ensure the Re-vegetation of PT Inco and his crews project was finished on time, on budget, getting the office for daily activities to on schedule without Disabling Injuries. plan, execute, monitor and control the b. Quality Control Program, the inspection nursery activities. of quality control should be the part of  Parking area access road along the area. the Project Manager’s responsibility to  Water tank with capacity 50,000 liters ensure the satisfaction of the client after for watering the plantation. the project was handed over to the  Electric pump to operate the Operation (project Sponsor). The sprinkler/spray system. quality control program such as  Open area for watering area/hardening concrete compressive strength test, (sprinkling area). Place for seed to galvanized film and painting thickness adapt before planted on the field, of the structure, electrical grounding automatic spray system. The capacity is test, pressure test, and other related 600,000 plants per cycle. inspection and testing plan (ITP). 7
  • 8. Media handling, the open building to determine the actual results of the prepare the seed. project with respect to Savings, Profits,  Germination house, the facility to for etc. seed reproduction using generative  To recognize subsequent actions which method and place for sprinkling the may be necessary that was not taken in seed. The capacity is around 300,000 the project from beginning till the end. seeds per cycle. We called it work breakdown structure  Propagation house, facility for local lessons learned. plant reproduction using vegetative method. The capacity is 400,000 per cycles. The use of sprinkling for adequate watering, the light intensity is 75% and the roof type of the facility is using UV plastic.  Mycorrhiza house, the facility to produce the fertilizer with the capacity 2 tons/year. Areal pembibitan berdiri di atas lahan seluas 2,5 hektar.  Hydroponik training facility. Fasilitas pembibitan terbesar industri tambang di Indonesia.  Seed storage container.  Wooden house for recreation and Germinationn House refreshing. Seed Container Propagation House Media handling Shaded House Hardening Hydroponik Training Facility Pump Mycorrhiza House Office Water Tank Figure 8 - Final Product of Nursery Facility Project Other things should be the part of close out 5. Code of Ethics as Professional process group is to complete the post audit Engineer of Indonesia contains lessons learned with the purposes as follows: 5.1. The Ethical Professional Engineers  To provide valuable source of The Institution of Engineers, Indonesia information for improving the project (PII) declared the professional ethics that and any lesson shared. should be practiced by all the Engineers of  To provide opportunity to create Indonesia as per Anggaran Dasar and accountability within the process for Anggaran Rumah Tangga of PII. estimates given and any decision made during the project execution phase. We know exactly that the Engineering is an  To provide an important financial important and learned profession. As control mechanism, to look back and members of PII, engineers are expected to 8
  • 9. exhibit the highest standards of honesty and  Develops and implements the planning, integrity. Engineering has a direct and vital scheduling and estimating of the impact on the quality of life for all people. Engineering function. Accordingly, the services are provided by  Responsible for the quality, technical the engineers require honesty, impartiality, competence and professionalism of the fairness and equity, and must be dedicated Engineering effort. to the protection of the public health, safety  Complete engineering design and welfare. calculations to meet accepted design standards, project scope and PTI In fulfilling our professional duties, we standard specifications. shall:  Prepare and collate Engineering Work  Hold paramount the public’s health, Package documentation, to ensure all safety and welfare. aspects of construction, safety and  Perform services only in areas of our quality are clearly defined. competences.  Provides Engineering direction and  Avoids conflict of interests. support for Procurement and  Act as a faithful agents or trustees of Construction groups in the formulation our client’s interest. of the Procurement and Construction Plans.  Avoid improper conduct in the  Resolve technical issues during project solicitations for assignments. execution and commissioning, to ensure  Act to uphold honor, integrity and the the project meets the planned objectives dignity of our professions. and quality.  Maintain competence in our professions  Informing the project manager through continuing education and regarding progress on tasks and report training. immediately when a judgment is made  Respect our community and that the output targets cannot be met, or environment in all of our endeavors. more can be achieved.  Asking the project manager for clarification, when needed, on what is 5.2. Project Engineer’s Role as an expected of the role. Actor who Implemented  Taking the initiative to improve your Professional Ethics work, the overall business, and promote the goals of the organization. In PT Inco, Project Engineer has more  Working effectively and collaterally responsibility rather than other project team with immediate colleagues and others to run the project to meet the deliverables in cross-functional relationships, on of the final product, safety, cost and related tasks within the context of corporate Key Performance Indicator (KPI) factors. policy, values, and culture. In this case, the purpose of Project There are a lot of accountabilities should be Engineer’s role is to provide Civil performed by Project Engineer of PT Inco Engineering Technical Expertise to support and should be relevant to actualization of all civil work related to Engineering Professional Ethics as Professional Department’s Accountability. Managing Engineers. Engineering projects related to civil engineering and implementation program. During working in Nursery Project, there Generic Accountabilities (all employees will were several engineering activities be accountable for the following): decisions made up by the project engineer such as:  Determined the best location of new Nursery Facility as per Feasibility 9
  • 10. 1 Study conducted together with project Project Management Body of Knowledge, team. This means, the decision was 3rd Edition. Project Management Institute, made based technical judgment as the Four Campus Boulevard, Newton Square, way should be (no conflict of interest). USA, 2004  Managed the scope limitation between 2 the two contractors who did the works. Capital Project Owner’s and Sponsor’s The scope of works had been performed Handbook. PT International Nickel in the contract and tender arrangement Indonesia, 2005 before then. No works shall proceed 3 without contract agreement and so the Engineering Procedures Manual. PT contract must be detailed on what and International Nickel Indonesia, 2006 who’s doing the related works. 4  Managed the construction works on the AD/ART & Susunan Pengurus Masa Bakti field, fair in making the decision if 2006 - 2009 Persatuan Insinyur Indonesia. there was a deviation to quality or Persatuan Insinyur Indonesia (PII), 2006 scope of works performed by the 5 contractors. They should rework and/or Sid Dewberry GMU Graduation Speech, repair the defects if it was not meeting 2005. the quality satisfaction. 6  Conducted the safety layer audit (SLA) PT Inco website: http://www.pt- to ensure all the workers were working inco.co.id/new/profil.php, 2006. safely and returns at home safely. The professional engineers should hold the responsibility to protect and help the project team (from PTI project team or contractor) with ensuring the done the right, safe and proper actions.  Improved the designs that were raised by the consultant to meet the standard and specification of PT Inco such as the installation of vertical and horizontal bar inside the concrete block walls to ensure the building is strong enough from seismic design since Sorowako area is very closed to central of earth work (zone#4).  Approved all the design changes done by the contractor which were expected to change the quality of required designs and specifications. Professional Engineers should always rely on technical judgment during project execution.  Decided to install the disconnect switch outside the office building for electric pump to ensure the power could be switch off if the failure occur to the existing system. Reference: 10