SlideShare une entreprise Scribd logo
1  sur  20
Internship in Nestle Pakistan-SKP Factory
Supervisor: Miss Iqra Ashraf & Mr. Mohsin
Area: Engineering Utilities
Assistance: Plant Managers/Team Leaders of different Plants.
Area: MRU&STD, D&J, Chilled Dairy, Water
Intern: Hafiz Muhammad Bilal (Mechatronics Engineer) from University of Engineering &
Technology, Lahore
1
Safety Training:
Safety is not a slogan, it’s a way of Life
 Plant Safety requirement during visit.
 LOTO Procedure
 Danger Alarms
 Nestle guidelines for plants visit
 Introduction to 5S
 Introduction to PPE’s
2
Projects:
 Single Line Diagram
 P&ID of Compressors
 Raw water pumps automation
 Boiler’s instruments calibration
 Online data receiving of flow meters
3
Project1:
Single Line Diagram (SLD):
 Assigned proper tag to each breaker
 Format of tag: Output of breaker-Transformer-Panel Building-Panel #.Lock #
 Re-numbering of panels of all Control Rooms
 Updated Excel Sheet
 Updated SLD on AutoCAD
 Format on AutoCAD:
 Made a detailed REPORT describing each step of project and learning outcomes.
 Learnt about power distribution and made a report on it.
4
ACB or MCCB
Current Rating
Make
Model
Tag
Project2:
Piping & Instrumentation Diagram (P&ID):
 Updated P&ID of SABROE, ATLAS & GEA Compressors.
 Line tracing & proper tagging for identification.
 Updated Excel sheets of all pipes, instruments and valves etc.
 Made a detailed REPORT describing each step of project and learning outcomes.
5
Project3:
WWRO Pumps Control:
 Cable Sizing calculation
 Contact with Nestle vendor (Nafees Cables) and received Cable Charts.
 Suggested proper LT Room for supply considering cost optimization and efficiency.
 Suggested proper room for VFD panel.
 Made a detailed REPORT describing each step of project and learning outcomes.
6
Project4:
Boilers Instruments Calibration:
 Learnt about calibration of instruments.
 Calibrated Boiler instruments i.e. Pressure transmitters, pressure gauges &
temperature transmitters etc.
 Made a detailed REPORT describing each step of project and learning outcomes.
7
Project5:
Online data receiving of Flow Meters:
 Inspected flow meters of Raw Water, Steam and Compressed Air by tracing
Profibus.
 Suggested place of new installed flow meters in Profibus.
 Differentiated between DP & PA Profibus.
 Checked Profibus termination.
 Updated excel sheet by including new installed flow meters.
 Made a detailed REPORT describing each step of project and learning outcomes.
8
Utilities Area Visit:
 Compressors
 SABROE Compressors
 ATLAS COPCO Compressors
 GEA Compressors
 Prepare a detailed REPORT on the working of all compressors and made Process
Flow Diagrams of each.
 All Control Rooms (HT & LT) and learnt about control panels, circuit breakers and
their technical terminologies.
 Transformer Room
 Developed a Power Distribution Flow Diagram.
9
PLC:
 Basic components of PLC
 Types of PLC
 PLC Programming Software's
 HMI Software's
 Studied some Ladder Logic codes on RS Logix500.
10
Plant Orientation:
 Visited all plants:
 MRU&STD
 Water
 Dairy & Juice
 Tetra Hall
 Chilled Dairy
 PLE Hall
 Developed Process Flow Diagrams of each plant.
 Made a detailed REPORT describing each process and Working Principles of all
machines.
11
MRU:12
Milk Tankers
Analysis
Pumps (15 kW)
Duplex Filters Chillers
Raw Milk Silos
Pumps (5.5 kW)
Buffers Discharge Pump
Clarifier
Pump
Heating 90 sec Holding
Cooling
Thermized Milk Silos
STD:13
Cream
Separator
Cream
Buffer
Pump (7.5kW)
PHE (90°C)
Deodorizer
Deodorizer
extraction pump(75-
80°C)
PHE(30-35°C)
Homogenizer
Scanma Mixer
6 Silos
Skim Milk
Pump
PHE
60 sec holding
Chilling
Silo (64ton)
Silo (100ton)
TMS
Buffer
Pump (5.5
kW)
Water Treatment Plant:14
Deep Well Cartridge Filter UV Sand Filtration
FDP Mix Proof Valves Cartridge Filter UV
RO Mix Proof Valves Permeate Tank Re-Mineralization
Balance Tank Ozonation Filling
Juice Plant:
15
Chemical
Addition
Mixer
Mixer
Tank
Bermatic Tank
Pulp (Frozen or
Septic)
Concentrate
Pulp
Pushing up
drums through
Hydraulic
Catcher
HopperSimPulp Tank
Fistalic Pump Bermatic Tank
Glucose
Screw
Conveyer
Sugar Tank (6
ton)
Magnet FilterCone FilterBermatic Tank
16
Bermatic Tank Filter Feeding Pump Balance Tank
Pre Heater1
(55-60°C)
De-aerator
(50-55°C)
Pre-Heater2
(65°C)
22sec Holding
(98-101°C)
Pasteurizer
Pre-Heater2
(Cooling)
Pre-Heater1
(20-25°C)
Booster Pump
Acceptic TankFilling Machines
Tetra Hall:17
Peper Roll ASU ASSU H2O2 Bar
Squeezy
Roller
Heater
Aseptic
Chamber
Tube
Formation
Bending of
Packet
Filling Product
in Tube
Head Space
Injuction
Jaw System
Infeed
Conveyer
Flaps Presser
Out feed
Conveyer
PLE Hall
Chilled Dairy:
18
Questions & Answers 
19
Thanks!!!
20

Contenu connexe

Tendances (7)

Expert Brugge 7 atd 2011
Expert Brugge 7 atd 2011Expert Brugge 7 atd 2011
Expert Brugge 7 atd 2011
 
MIS External
MIS ExternalMIS External
MIS External
 
Using HTRI technology within Petro-SIM
Using HTRI technology within Petro-SIM Using HTRI technology within Petro-SIM
Using HTRI technology within Petro-SIM
 
CV Ahmed 2016
CV Ahmed 2016CV Ahmed 2016
CV Ahmed 2016
 
Technical Data 2468 Pitot Primary Standard
Technical Data 2468 Pitot Primary StandardTechnical Data 2468 Pitot Primary Standard
Technical Data 2468 Pitot Primary Standard
 
Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)
 
ITSP Dual Rail Project
ITSP Dual Rail ProjectITSP Dual Rail Project
ITSP Dual Rail Project
 

En vedette

SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012
SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012
SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012Guillaume COUSIN
 
Translators USA, LLC - interpretation services
Translators USA, LLC -  interpretation servicesTranslators USA, LLC -  interpretation services
Translators USA, LLC - interpretation servicesTranslatorsUSA
 
How to avoid Ransomware damage
How to avoid Ransomware damageHow to avoid Ransomware damage
How to avoid Ransomware damageSpinbackup
 
Unidad Integrada 2
Unidad Integrada 2Unidad Integrada 2
Unidad Integrada 2ezegn
 
Wenell_PL_intyg024
Wenell_PL_intyg024Wenell_PL_intyg024
Wenell_PL_intyg024Jens Ekberg
 
Como montar seu projeto de fribra
Como montar seu projeto de fribraComo montar seu projeto de fribra
Como montar seu projeto de fribrajalvesf
 
Manual de instalacão de Cabo de Fibra Optica FO Autosustentada
Manual de instalacão de Cabo de Fibra Optica FO AutosustentadaManual de instalacão de Cabo de Fibra Optica FO Autosustentada
Manual de instalacão de Cabo de Fibra Optica FO AutosustentadaLemuel Sautier
 
Unit dentar fona nou DenTam Creation
Unit dentar fona nou DenTam CreationUnit dentar fona nou DenTam Creation
Unit dentar fona nou DenTam CreationDenteam Creation
 

En vedette (17)

hp certificate
hp certificatehp certificate
hp certificate
 
SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012
SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012
SDA Bocconi Luxury Arts Club - Parisian Glam trip - Feb 2012
 
Translators USA, LLC - interpretation services
Translators USA, LLC -  interpretation servicesTranslators USA, LLC -  interpretation services
Translators USA, LLC - interpretation services
 
Annunciation
AnnunciationAnnunciation
Annunciation
 
Gabon / Alerta, les infraccions són la prèvia de l'accident
Gabon / Alerta, les infraccions són la prèvia de l'accidentGabon / Alerta, les infraccions són la prèvia de l'accident
Gabon / Alerta, les infraccions són la prèvia de l'accident
 
How to avoid Ransomware damage
How to avoid Ransomware damageHow to avoid Ransomware damage
How to avoid Ransomware damage
 
elliott_resume_1
elliott_resume_1elliott_resume_1
elliott_resume_1
 
CV_GARGY GOPAL
CV_GARGY GOPALCV_GARGY GOPAL
CV_GARGY GOPAL
 
CV
CVCV
CV
 
Seif Khairy CV
Seif Khairy CVSeif Khairy CV
Seif Khairy CV
 
Certificate FSc.
Certificate FSc.Certificate FSc.
Certificate FSc.
 
Nawaf C.V.
Nawaf C.V.Nawaf C.V.
Nawaf C.V.
 
Unidad Integrada 2
Unidad Integrada 2Unidad Integrada 2
Unidad Integrada 2
 
Wenell_PL_intyg024
Wenell_PL_intyg024Wenell_PL_intyg024
Wenell_PL_intyg024
 
Como montar seu projeto de fribra
Como montar seu projeto de fribraComo montar seu projeto de fribra
Como montar seu projeto de fribra
 
Manual de instalacão de Cabo de Fibra Optica FO Autosustentada
Manual de instalacão de Cabo de Fibra Optica FO AutosustentadaManual de instalacão de Cabo de Fibra Optica FO Autosustentada
Manual de instalacão de Cabo de Fibra Optica FO Autosustentada
 
Unit dentar fona nou DenTam Creation
Unit dentar fona nou DenTam CreationUnit dentar fona nou DenTam Creation
Unit dentar fona nou DenTam Creation
 

Similaire à Hafiz Muhammad Bilal

CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11Emerson Exchange
 
prakash_final
prakash_finalprakash_final
prakash_finalPrakash B
 
Automated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLCAutomated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLCMayank Mathur
 
Technical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptxTechnical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptxAnnamalai90
 
Micrcontroller iv sem lab manual
Micrcontroller iv sem lab manualMicrcontroller iv sem lab manual
Micrcontroller iv sem lab manualRohiniHM2
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_ReportVansh Kumar
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe Liu
 
Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Roger Colee
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Mahdy Hammad
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergyJim Cahill
 
Best of breed control of platinum reactors
Best of breed control of platinum reactorsBest of breed control of platinum reactors
Best of breed control of platinum reactorsRotimi Agbebi
 
Liquid foilling machine project
Liquid foilling machine projectLiquid foilling machine project
Liquid foilling machine projectUDYAASEKHARJ
 
Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...IJRES Journal
 
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.neeraj mishra
 

Similaire à Hafiz Muhammad Bilal (20)

CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 
prakash_final
prakash_finalprakash_final
prakash_final
 
Automated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLCAutomated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLC
 
Technical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptxTechnical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptx
 
Micrcontroller iv sem lab manual
Micrcontroller iv sem lab manualMicrcontroller iv sem lab manual
Micrcontroller iv sem lab manual
 
I012455457
I012455457I012455457
I012455457
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_Report
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
 
Plant Operation System
Plant Operation SystemPlant Operation System
Plant Operation System
 
Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222Sec Process Control Past Present and Future2222
Sec Process Control Past Present and Future2222
 
Project Fauji Fresh n Freeze
Project Fauji Fresh n FreezeProject Fauji Fresh n Freeze
Project Fauji Fresh n Freeze
 
Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015Eng_ Mahdy CV 8-2015
Eng_ Mahdy CV 8-2015
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves Energy
 
Best of breed control of platinum reactors
Best of breed control of platinum reactorsBest of breed control of platinum reactors
Best of breed control of platinum reactors
 
Liquid foilling machine project
Liquid foilling machine projectLiquid foilling machine project
Liquid foilling machine project
 
Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...Converter station water-cooled pump vibration monitoring and condition assess...
Converter station water-cooled pump vibration monitoring and condition assess...
 
khaled cv
khaled cvkhaled cv
khaled cv
 
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
Presentation on electrical and automation system of cgl plant (CRM-2) JSW KR.
 
CV
CVCV
CV
 

Hafiz Muhammad Bilal

  • 1. Internship in Nestle Pakistan-SKP Factory Supervisor: Miss Iqra Ashraf & Mr. Mohsin Area: Engineering Utilities Assistance: Plant Managers/Team Leaders of different Plants. Area: MRU&STD, D&J, Chilled Dairy, Water Intern: Hafiz Muhammad Bilal (Mechatronics Engineer) from University of Engineering & Technology, Lahore 1
  • 2. Safety Training: Safety is not a slogan, it’s a way of Life  Plant Safety requirement during visit.  LOTO Procedure  Danger Alarms  Nestle guidelines for plants visit  Introduction to 5S  Introduction to PPE’s 2
  • 3. Projects:  Single Line Diagram  P&ID of Compressors  Raw water pumps automation  Boiler’s instruments calibration  Online data receiving of flow meters 3
  • 4. Project1: Single Line Diagram (SLD):  Assigned proper tag to each breaker  Format of tag: Output of breaker-Transformer-Panel Building-Panel #.Lock #  Re-numbering of panels of all Control Rooms  Updated Excel Sheet  Updated SLD on AutoCAD  Format on AutoCAD:  Made a detailed REPORT describing each step of project and learning outcomes.  Learnt about power distribution and made a report on it. 4 ACB or MCCB Current Rating Make Model Tag
  • 5. Project2: Piping & Instrumentation Diagram (P&ID):  Updated P&ID of SABROE, ATLAS & GEA Compressors.  Line tracing & proper tagging for identification.  Updated Excel sheets of all pipes, instruments and valves etc.  Made a detailed REPORT describing each step of project and learning outcomes. 5
  • 6. Project3: WWRO Pumps Control:  Cable Sizing calculation  Contact with Nestle vendor (Nafees Cables) and received Cable Charts.  Suggested proper LT Room for supply considering cost optimization and efficiency.  Suggested proper room for VFD panel.  Made a detailed REPORT describing each step of project and learning outcomes. 6
  • 7. Project4: Boilers Instruments Calibration:  Learnt about calibration of instruments.  Calibrated Boiler instruments i.e. Pressure transmitters, pressure gauges & temperature transmitters etc.  Made a detailed REPORT describing each step of project and learning outcomes. 7
  • 8. Project5: Online data receiving of Flow Meters:  Inspected flow meters of Raw Water, Steam and Compressed Air by tracing Profibus.  Suggested place of new installed flow meters in Profibus.  Differentiated between DP & PA Profibus.  Checked Profibus termination.  Updated excel sheet by including new installed flow meters.  Made a detailed REPORT describing each step of project and learning outcomes. 8
  • 9. Utilities Area Visit:  Compressors  SABROE Compressors  ATLAS COPCO Compressors  GEA Compressors  Prepare a detailed REPORT on the working of all compressors and made Process Flow Diagrams of each.  All Control Rooms (HT & LT) and learnt about control panels, circuit breakers and their technical terminologies.  Transformer Room  Developed a Power Distribution Flow Diagram. 9
  • 10. PLC:  Basic components of PLC  Types of PLC  PLC Programming Software's  HMI Software's  Studied some Ladder Logic codes on RS Logix500. 10
  • 11. Plant Orientation:  Visited all plants:  MRU&STD  Water  Dairy & Juice  Tetra Hall  Chilled Dairy  PLE Hall  Developed Process Flow Diagrams of each plant.  Made a detailed REPORT describing each process and Working Principles of all machines. 11
  • 12. MRU:12 Milk Tankers Analysis Pumps (15 kW) Duplex Filters Chillers Raw Milk Silos Pumps (5.5 kW) Buffers Discharge Pump Clarifier Pump Heating 90 sec Holding Cooling Thermized Milk Silos
  • 13. STD:13 Cream Separator Cream Buffer Pump (7.5kW) PHE (90°C) Deodorizer Deodorizer extraction pump(75- 80°C) PHE(30-35°C) Homogenizer Scanma Mixer 6 Silos Skim Milk Pump PHE 60 sec holding Chilling Silo (64ton) Silo (100ton) TMS Buffer Pump (5.5 kW)
  • 14. Water Treatment Plant:14 Deep Well Cartridge Filter UV Sand Filtration FDP Mix Proof Valves Cartridge Filter UV RO Mix Proof Valves Permeate Tank Re-Mineralization Balance Tank Ozonation Filling
  • 15. Juice Plant: 15 Chemical Addition Mixer Mixer Tank Bermatic Tank Pulp (Frozen or Septic) Concentrate Pulp Pushing up drums through Hydraulic Catcher HopperSimPulp Tank Fistalic Pump Bermatic Tank Glucose Screw Conveyer Sugar Tank (6 ton) Magnet FilterCone FilterBermatic Tank
  • 16. 16 Bermatic Tank Filter Feeding Pump Balance Tank Pre Heater1 (55-60°C) De-aerator (50-55°C) Pre-Heater2 (65°C) 22sec Holding (98-101°C) Pasteurizer Pre-Heater2 (Cooling) Pre-Heater1 (20-25°C) Booster Pump Acceptic TankFilling Machines
  • 17. Tetra Hall:17 Peper Roll ASU ASSU H2O2 Bar Squeezy Roller Heater Aseptic Chamber Tube Formation Bending of Packet Filling Product in Tube Head Space Injuction Jaw System Infeed Conveyer Flaps Presser Out feed Conveyer PLE Hall