CONTENTS
Introduction
Introduction of Industry
Power Transmission
Departments
Production Process
TPM
References
INTRODUCTION
 A transmission tower is usually a steel lattice tower, used to support
an overhead power line.
 Used in high voltage AC and DC systems.
 Manufactured in wide variety of shapes and sizes, typical height
ranges from 15 to 55 meters.
 All the electricity stations, mobile networking, radio broadcasting
and television antennas are connected via these towers.
 Power transmission tower takes up to two weeks to be completed.
Introduction of Industry
 KEC International ltd. which was known as Kamani Engineering
corporation Ltd., was Founded by Ramjibhai Kamani in 1945.
 Established in 1967 at Jhotwara, Jaipur
 In 1982 this company was taken over by RPG enterprises. In 1984
this company was renamed as KEC International Ltd
 One of the world’s largest Power Transmission Engineering
Procurement and Construction companies.
 Became first electric power transmission company in Asia.
Introduction of Industry
 Supplying 3/5 of India’s demand for transmission towers.
 Supplies Towers to more than 45 countries. Major Clients Of
Company are USA, BRAZIL, ARGENTINA,AUSTRALIA etc.
 KEC today is a 4000 crore turnover flagship company of RPG
group
 KEC has the largest tower testing station in the world. It is a matter
of pride for KEC that it has been awarded ISO 9001 on April 26,
1995. and ISO 14000 on March 11, 2000.
Jaipur, Rajasthan
Capacity
36,000 MTs per annum of lattice towers
BRANCHES IN INDIA
Nagpur, Maharashtra
Capacity
55,000 MTs per annum of lattice towers
Jabalpur, Madhya Pradesh
Capacity
60,000 MTs per annum of lattice towers
KEC PRODUCTES:-
TRANSMISSION
CABLES
RAILWAYS
DISTRIBUTION
TELECOM
WATER
TREATMENT
Power Transmission
Transmission towers are used to
transmit power from one place to
another.
Major application areas:
 Mobile Networking
 Radio Broadcasting
 Television antennas
 Electricity transmission
SIMPLE STRCTURE OF
TRANSMISSION TOWER
Arm
Foundation
Damper
Peak of transmission tower
The portion above the top cross
arm is called peak of transmission
tower. Generally earth shield wire
connected to the tip of this peak.
Cross Arm of transmission
tower
Cross arms of transmission tower
hold the transmission conductor.
Cage of transmission tower
The portion between tower
body and peak is known as cage
of transmission tower. This
portion of the tower holds the
cross arms
Fig 1: A transmission tower
Departments
 Yard
 Quality Assurance
 Pre Production
 Fabrication
 Galvanizing
 Maintenance
 TPM
PRODUCTION PROCESSES
1. Straightening
2. Bending
3. Punching
4. Cutting
5. Stamping
6. Notching
7. Drilling
8. Galvanizing
TPM
TPM is a productive maintenance implemented by
all employees in an organization.
TPM involves everyone in the organization from
operators to senior management in equipment
improvement.
Total = All individuals in the organization
working together.
Productive = production of goods that
meet or exceed customer’s
expectations.
Maintenance = keeping equipment and
plant in good condition at all times.
TPM in three words:
 Breakdown maintenance
 Preventive maintenance
.periodic maintenance( time based maintenance)
.Predictive maintenance
 Corrective maintenance
 Maintenance prevention
Types of maintenance
 Repairs or replacements performed after
a machine has failed to return to its
functional state following a malfunction
or shutdown.
 e.g., an electric motor of a machine tool
will not start, a belt is broken, etc.
 Under such conditions, production
department calls on the maintenance
department to rectify the defect.
 After removing the fault, maintenance
engineers do not attend the equipment
again until another failure or breakdown
occurs.
Breakdown maintenance
 The primary goal of preventive
maintenance is to prevent the failure
of equipment before it actually occurs.
 It is designed to preserve and
enhance equipment reliability by
replacing worn components before
they actually fail.
 It is a daily maintenance which
includes cleaning, inspection, oiling
and re-tightening of equipments.
Preventive
maintenance(1951)
 Time based maintenance consists of
periodically inspecting, servicing and
cleaning equipment and replacing parts
to prevent sudden failure and process
problems.
Benefits:
 Extended life and use of the equipment.
 Reliable production at the times when
machine is needed most.
Periodic maintenance (TBM)
 This is a method in which the service
life of important part is expected
based on inspection or diagnosis, in
order to use the parts to the limit of
their service life.
 Compared to periodic maintenance,
predictive maintenance is condition
based maintenance.
Predictive maintenance
 Based on five Japanese words that begin
with ‘S’, the 5S Philosophy focuses on
effective work place organization and
standardized work procedures.
5 S’s
1. Sort :(Seiri)
2. Set In Order:(Seiton)
3. Shine: (Seiso)
4. Standardize: (Seiketsu)
5. Sustain: (Shitsuke)
5S Philosophy
 The first S focuses on eliminating
unnecessary items from the
workplace.
 An effective visual method to identify
these unneeded items is called red
tagging.
 A red tag is placed on all items not
required to complete your job. These
items are then moved to a central
holding area.
 This process is for evaluation of the red
tag items.
Sort :(Seiri)
 second S focuses on efficient and
effective storage methods and how to
organize the work area.
 Strategies for effective Set In Order
are painting floors, outlining work
areas and locations, shadow boards,
and modular shelving and cabinets for
needed items such as trash cans,
brooms, mop and buckets
Set In Order:(Seiton)
 Once you have eliminated the clutter and
junk that has been clogging your work
areas and identified the necessary items,
the next step is to thoroughly clean the
work area.
 Workers will also begin to notice
changes in equipment and facility
location such as air, oil, coolant leaks,
fatigue, breakage, and misalignment.
 These changes, if left unattended, could
lead to equipment failure and loss of
production.
Shine: (Seiso)
 Now the first three S’s are
implemented.
 Use standard methods to keep Sort,
Set In Order, and Shine to a condition
.
 Allow your employees to participate in
the development of such standards.
Standardize: (Seiketsu)
 This is the most difficult S to
implement and achieve.
 Maintain through empowerment,
commitment, and discipline .
 Sustain focuses on defining a new
status quo and standard of work place
organization.
Sustain: (Shitsuke)
 Simplifies work environment
 reduces waste
 Improves quality
 Improves safety
 Provide self esteem for everyone in
the organization.
Benifits of 5 S’s
References
 [1] J.A. Martinez and F. Castro-Aranda, “Lightning
performance analysis of overhead transmission lines using
the EMTP,” approved for publication in IEEE Trans. on Power
Delivery.
 [2] IEEE TF on Fast Front Transients (A. Imece, Chairman),
“Modeling guidelines for fast transients,” IEEE Trans. on
Power Delivery, vol. 11, no. 1, pp. 493-506, January 1996.
 [3] “Modeling and Analysis of System Transients Using
Digital Programs,” A.M. Gole, J.A. Martinez-Velasco and
A.J.F. Keri (Eds.), IEEE PES Special Publication, TP-133-0,
1999.
 [4] C.F. Wagner and A.R. Hileman, “A new approach to the
calculation of the lightning performance of transmission lines
– Part III,” AIEEE Trans. Part III, vol. 79, no. 3, pp. 589-603,
October 1960.
 [5] M.A. Sargent and M. Darveniza, “Tower surge
impedance,” IEEE Trans. on Power Apparatus and Systems,
vol. 88, no. 3, pp. 680-687, May 1969.
Any questions…….?
THANK YOU

Contenu connexe

Tendances

Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1
Mohd Suliman
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
Neel Patel
 
Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3
IAEME Publication
 
Ali Raza CV
Ali Raza CVAli Raza CV
Ali Raza CV
Ali Raza
 
Andrew R Martino Resume 2016
Andrew R Martino Resume 2016Andrew R Martino Resume 2016
Andrew R Martino Resume 2016
Andrew Martino
 

Tendances (20)

NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1
 
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNITDESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT
 
SIP PRESENTATION
SIP PRESENTATIONSIP PRESENTATION
SIP PRESENTATION
 
vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_
 
Resume_Amol Sawandkar_Instrumentation & Control
Resume_Amol Sawandkar_Instrumentation & ControlResume_Amol Sawandkar_Instrumentation & Control
Resume_Amol Sawandkar_Instrumentation & Control
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
Internship report
Internship report Internship report
Internship report
 
Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Cv ajay parikh
Cv ajay parikhCv ajay parikh
Cv ajay parikh
 
Ali Raza CV
Ali Raza CVAli Raza CV
Ali Raza CV
 
Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
Andrew R Martino Resume 2016
Andrew R Martino Resume 2016Andrew R Martino Resume 2016
Andrew R Martino Resume 2016
 
Resume
ResumeResume
Resume
 

En vedette

KEC International Corporate Presentation
KEC International Corporate PresentationKEC International Corporate Presentation
KEC International Corporate Presentation
AICL Communications
 
Resume for Donna K Collier
Resume for Donna K CollierResume for Donna K Collier
Resume for Donna K Collier
Donna Collier
 
Gestion de stress au travail
Gestion de stress au travailGestion de stress au travail
Gestion de stress au travail
Adiil Jadba
 

En vedette (13)

KEC International Corporate Presentation
KEC International Corporate PresentationKEC International Corporate Presentation
KEC International Corporate Presentation
 
Sande Bailey-Gwinn Resume
Sande Bailey-Gwinn ResumeSande Bailey-Gwinn Resume
Sande Bailey-Gwinn Resume
 
ȘOmajul
ȘOmajulȘOmajul
ȘOmajul
 
Construire une culture de promotion de la santé mentale et de prévention du s...
Construire une culture de promotion de la santé mentale et de prévention du s...Construire une culture de promotion de la santé mentale et de prévention du s...
Construire une culture de promotion de la santé mentale et de prévention du s...
 
Resume for Donna K Collier
Resume for Donna K CollierResume for Donna K Collier
Resume for Donna K Collier
 
Pulvérisation et dérives
Pulvérisation et dérivesPulvérisation et dérives
Pulvérisation et dérives
 
Lançamentos planeta
Lançamentos planetaLançamentos planeta
Lançamentos planeta
 
Référentiel de formation "Sécurisation des parcours professionnels et emploi ...
Référentiel de formation "Sécurisation des parcours professionnels et emploi ...Référentiel de formation "Sécurisation des parcours professionnels et emploi ...
Référentiel de formation "Sécurisation des parcours professionnels et emploi ...
 
Gestion de stress au travail
Gestion de stress au travailGestion de stress au travail
Gestion de stress au travail
 
как заставить соц. сети работать на ваш бизнес
как заставить соц. сети работать на ваш бизнескак заставить соц. сети работать на ваш бизнес
как заставить соц. сети работать на ваш бизнес
 
Breathtaking Women
Breathtaking WomenBreathtaking Women
Breathtaking Women
 
Is the grass greener in ireland? A comparison of UX in Dublin and Melbourne
Is the grass greener in ireland? A comparison of UX in Dublin and MelbourneIs the grass greener in ireland? A comparison of UX in Dublin and Melbourne
Is the grass greener in ireland? A comparison of UX in Dublin and Melbourne
 
Bibliothèque Agriculture SPW – Nouveautés Décembre 2016
Bibliothèque Agriculture SPW – Nouveautés Décembre 2016Bibliothèque Agriculture SPW – Nouveautés Décembre 2016
Bibliothèque Agriculture SPW – Nouveautés Décembre 2016
 

Similaire à Kec international ltd.

electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
Bharjendu vimal
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
Mark Barbour
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docx
florriezhamphrey3065
 
Project report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and DrivesProject report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and Drives
RAGHAVENDRA M R
 

Similaire à Kec international ltd. (20)

electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless TurbineIRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
 
subrat resume
subrat resumesubrat resume
subrat resume
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
viklesh essar
viklesh essarviklesh essar
viklesh essar
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docx
 
MRINAL RESUME
MRINAL RESUMEMRINAL RESUME
MRINAL RESUME
 
wordf (2)
wordf (2)wordf (2)
wordf (2)
 
Project report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and DrivesProject report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and Drives
 
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
 
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door Segment
 
Shanahan Engineering Presentation
Shanahan Engineering PresentationShanahan Engineering Presentation
Shanahan Engineering Presentation
 
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative StudyEstimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
 
Cv hardik chauhan
Cv hardik chauhanCv hardik chauhan
Cv hardik chauhan
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
 
IRJET- Trouble Shooting of Rotary Equipments using Vibration Anaysis
IRJET- Trouble Shooting of Rotary Equipments using Vibration AnaysisIRJET- Trouble Shooting of Rotary Equipments using Vibration Anaysis
IRJET- Trouble Shooting of Rotary Equipments using Vibration Anaysis
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Prsentation of final report.pptx
Prsentation of final report.pptxPrsentation of final report.pptx
Prsentation of final report.pptx
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 

Dernier

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Dernier (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Kec international ltd.

  • 1. Poornima Institute of Engineering & Technology A presentation on SUMMER TRAINING At KEC International Ltd. SUBMITTED TO: Mr. DINESH BHATIA Mr. RAHUL GUPTA ASST PROF, ECE DEPT SUBMITTED BY:- HARSH SAINI (PIET/EC/13/517) EC- A, 28 DEPARTMENT OF ELECTRONICS & COMMUNICATION ENGINEERING POORNIMA INSTITUTE OF ENGINEERING & TECHNOLOGY ISI-6, RIICO INSTITUTIONAL AREA, SITAPURA, JAIPUR
  • 2. CONTENTS Introduction Introduction of Industry Power Transmission Departments Production Process TPM References
  • 3. INTRODUCTION  A transmission tower is usually a steel lattice tower, used to support an overhead power line.  Used in high voltage AC and DC systems.  Manufactured in wide variety of shapes and sizes, typical height ranges from 15 to 55 meters.  All the electricity stations, mobile networking, radio broadcasting and television antennas are connected via these towers.  Power transmission tower takes up to two weeks to be completed.
  • 4. Introduction of Industry  KEC International ltd. which was known as Kamani Engineering corporation Ltd., was Founded by Ramjibhai Kamani in 1945.  Established in 1967 at Jhotwara, Jaipur  In 1982 this company was taken over by RPG enterprises. In 1984 this company was renamed as KEC International Ltd  One of the world’s largest Power Transmission Engineering Procurement and Construction companies.  Became first electric power transmission company in Asia.
  • 5. Introduction of Industry  Supplying 3/5 of India’s demand for transmission towers.  Supplies Towers to more than 45 countries. Major Clients Of Company are USA, BRAZIL, ARGENTINA,AUSTRALIA etc.  KEC today is a 4000 crore turnover flagship company of RPG group  KEC has the largest tower testing station in the world. It is a matter of pride for KEC that it has been awarded ISO 9001 on April 26, 1995. and ISO 14000 on March 11, 2000.
  • 6. Jaipur, Rajasthan Capacity 36,000 MTs per annum of lattice towers BRANCHES IN INDIA Nagpur, Maharashtra Capacity 55,000 MTs per annum of lattice towers Jabalpur, Madhya Pradesh Capacity 60,000 MTs per annum of lattice towers
  • 8. Power Transmission Transmission towers are used to transmit power from one place to another. Major application areas:  Mobile Networking  Radio Broadcasting  Television antennas  Electricity transmission
  • 9. SIMPLE STRCTURE OF TRANSMISSION TOWER Arm Foundation Damper Peak of transmission tower The portion above the top cross arm is called peak of transmission tower. Generally earth shield wire connected to the tip of this peak. Cross Arm of transmission tower Cross arms of transmission tower hold the transmission conductor. Cage of transmission tower The portion between tower body and peak is known as cage of transmission tower. This portion of the tower holds the cross arms Fig 1: A transmission tower
  • 10. Departments  Yard  Quality Assurance  Pre Production  Fabrication  Galvanizing  Maintenance  TPM
  • 11. PRODUCTION PROCESSES 1. Straightening 2. Bending 3. Punching 4. Cutting 5. Stamping 6. Notching 7. Drilling 8. Galvanizing
  • 12. TPM TPM is a productive maintenance implemented by all employees in an organization. TPM involves everyone in the organization from operators to senior management in equipment improvement.
  • 13. Total = All individuals in the organization working together. Productive = production of goods that meet or exceed customer’s expectations. Maintenance = keeping equipment and plant in good condition at all times. TPM in three words:
  • 14.  Breakdown maintenance  Preventive maintenance .periodic maintenance( time based maintenance) .Predictive maintenance  Corrective maintenance  Maintenance prevention Types of maintenance
  • 15.  Repairs or replacements performed after a machine has failed to return to its functional state following a malfunction or shutdown.  e.g., an electric motor of a machine tool will not start, a belt is broken, etc.  Under such conditions, production department calls on the maintenance department to rectify the defect.  After removing the fault, maintenance engineers do not attend the equipment again until another failure or breakdown occurs. Breakdown maintenance
  • 16.  The primary goal of preventive maintenance is to prevent the failure of equipment before it actually occurs.  It is designed to preserve and enhance equipment reliability by replacing worn components before they actually fail.  It is a daily maintenance which includes cleaning, inspection, oiling and re-tightening of equipments. Preventive maintenance(1951)
  • 17.  Time based maintenance consists of periodically inspecting, servicing and cleaning equipment and replacing parts to prevent sudden failure and process problems. Benefits:  Extended life and use of the equipment.  Reliable production at the times when machine is needed most. Periodic maintenance (TBM)
  • 18.  This is a method in which the service life of important part is expected based on inspection or diagnosis, in order to use the parts to the limit of their service life.  Compared to periodic maintenance, predictive maintenance is condition based maintenance. Predictive maintenance
  • 19.  Based on five Japanese words that begin with ‘S’, the 5S Philosophy focuses on effective work place organization and standardized work procedures. 5 S’s 1. Sort :(Seiri) 2. Set In Order:(Seiton) 3. Shine: (Seiso) 4. Standardize: (Seiketsu) 5. Sustain: (Shitsuke) 5S Philosophy
  • 20.  The first S focuses on eliminating unnecessary items from the workplace.  An effective visual method to identify these unneeded items is called red tagging.  A red tag is placed on all items not required to complete your job. These items are then moved to a central holding area.  This process is for evaluation of the red tag items. Sort :(Seiri)
  • 21.  second S focuses on efficient and effective storage methods and how to organize the work area.  Strategies for effective Set In Order are painting floors, outlining work areas and locations, shadow boards, and modular shelving and cabinets for needed items such as trash cans, brooms, mop and buckets Set In Order:(Seiton)
  • 22.  Once you have eliminated the clutter and junk that has been clogging your work areas and identified the necessary items, the next step is to thoroughly clean the work area.  Workers will also begin to notice changes in equipment and facility location such as air, oil, coolant leaks, fatigue, breakage, and misalignment.  These changes, if left unattended, could lead to equipment failure and loss of production. Shine: (Seiso)
  • 23.  Now the first three S’s are implemented.  Use standard methods to keep Sort, Set In Order, and Shine to a condition .  Allow your employees to participate in the development of such standards. Standardize: (Seiketsu)
  • 24.  This is the most difficult S to implement and achieve.  Maintain through empowerment, commitment, and discipline .  Sustain focuses on defining a new status quo and standard of work place organization. Sustain: (Shitsuke)
  • 25.  Simplifies work environment  reduces waste  Improves quality  Improves safety  Provide self esteem for everyone in the organization. Benifits of 5 S’s
  • 26. References  [1] J.A. Martinez and F. Castro-Aranda, “Lightning performance analysis of overhead transmission lines using the EMTP,” approved for publication in IEEE Trans. on Power Delivery.  [2] IEEE TF on Fast Front Transients (A. Imece, Chairman), “Modeling guidelines for fast transients,” IEEE Trans. on Power Delivery, vol. 11, no. 1, pp. 493-506, January 1996.  [3] “Modeling and Analysis of System Transients Using Digital Programs,” A.M. Gole, J.A. Martinez-Velasco and A.J.F. Keri (Eds.), IEEE PES Special Publication, TP-133-0, 1999.  [4] C.F. Wagner and A.R. Hileman, “A new approach to the calculation of the lightning performance of transmission lines – Part III,” AIEEE Trans. Part III, vol. 79, no. 3, pp. 589-603, October 1960.  [5] M.A. Sargent and M. Darveniza, “Tower surge impedance,” IEEE Trans. on Power Apparatus and Systems, vol. 88, no. 3, pp. 680-687, May 1969.