Single Line Diagram
Power Transformer
Current Transformer
Isolator
Lightining Arrester
Wave Trap
Grounding
BATTERY Room
Control Room
Potential Transformer
Conductor
Circuit Breaker
Introduction
Sub-station is a subsidiary station of an
electricity transmission and distribution system
where voltage is transformed from high to low
or low to high voltage using transformers.
TYSYS
TYPICAL AC SUPPLY SYSTEM
DESG
• Sub-station should be located at load center
• Sufficient land area
• Grounding
• Easy of maintenance
• Reliability and Security
• Electrical design considerations
1LD
ISO
Lightening arrester is first equipment of GSS, it is protected all the equipment
against the high voltage lightening surge.
For 400kV line : Taran Tulla and Marculla conductor.
For 220kV line : Zebra conductor is used composite of Aluminium strands and
Steel wires.
For 132kV line : Panther conductor is used composite of Aluminium strands and
Steel wires.
For 66Kv line : Dogi conductor is used seven steel wire and seven AL wires.
For 33Kv Line : Vigal conductor is used seven conductor of aluminum.
I. POWER TRANSFORMER
II. CUREENT TRANSFORMER
III. CVT/POTENTIAL
TRANSFORMER
CLNG
To step-up or step-down the voltage and transfer
power from one a.c. voltage to another a.c. voltage at
the same frequency.
PT
It is used for measurement the of electrical primary
winding current , The current transformer is always connected in
series.
Used for step-down voltage for measurement protecting &
control.
CB
TF
 Isolator is a switching devices used to open or closed
a circuit either when a negligible current exit , To disconnect
transmission line under no-load condition.
CB
•Air Blast Circuit Breaker
•SF6 (Sulphure hexa floride) Circuit Breaker
•Vacuum Circuit Breaker
•Minimum oil Circuit Breaker
WVTP
Ground is the reference point in an electrical circuit from which other
voltages are measured, a common return path for electric current (earth
return or ground return), or a direct physical connection to the Earth.
 To operate all the equipment or
device from operator room is
called control room.
In a GSS, separate dc supply is maintained for signalling remote
position control, alarm circuit etc.
Direct current can be obtained from battery at 120volt.(55 battery,each
2.2v)
Power Line Carrier Communication (PLCC) Provides Communication
From One Gss To Other Gss.
 Wave trap is used to trap the communication signals & send PLCC
through CVT.
It’s rating is 0.3mH.
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)

Contenu connexe

Tendances

Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationRahul Prajapati
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminarShrikant Bhansali
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurkishankky
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYRohitashav Goyal
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentationkumarmayursinha
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation Tejveer Choudhary
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
Load Distribution
Load DistributionLoad Distribution
Load DistributionArpit Gupta
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Sakshi Rastogi
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirSheikh Shakir
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportArijit Basu
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 

Tendances (20)

Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-Station
 
132kv G.S.S. Jalore
132kv G.S.S. Jalore132kv G.S.S. Jalore
132kv G.S.S. Jalore
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
Mit ppt 132/33kv ppt
Mit ppt 132/33kv pptMit ppt 132/33kv ppt
Mit ppt 132/33kv ppt
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
220 kv G.S.S (report)
220 kv G.S.S (report)220 kv G.S.S (report)
220 kv G.S.S (report)
 
66 kv substation
66 kv substation66 kv substation
66 kv substation
 
132 kv
132 kv132 kv
132 kv
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITY
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
substation internship report
substation internship report substation internship report
substation internship report
 

En vedette

Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission networkIsaac Muyinza
 
Don’t miss the chance to enjoy your life with Rocknroll
Don’t miss the chance to enjoy your life with RocknrollDon’t miss the chance to enjoy your life with Rocknroll
Don’t miss the chance to enjoy your life with RocknrollRocknRoll
 
Obras seguras-integracao-padronizada-obras
Obras seguras-integracao-padronizada-obrasObras seguras-integracao-padronizada-obras
Obras seguras-integracao-padronizada-obrasElder Frascolli Oliveira
 
Actividad Nro.-1 Ensayo
Actividad Nro.-1 EnsayoActividad Nro.-1 Ensayo
Actividad Nro.-1 EnsayoEdinsonGimenez
 
Laz parking presentation
Laz parking presentationLaz parking presentation
Laz parking presentationEnigmaWinner123
 
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite Zürich
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite ZürichComfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite Zürich
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite ZürichSocialZebras
 
IDD Project-3조
IDD Project-3조IDD Project-3조
IDD Project-3조bcpfdream
 
Rejoice Evermore: A Motivational Teaching by Bishop Itse Enonuya
Rejoice Evermore: A Motivational Teaching by Bishop Itse EnonuyaRejoice Evermore: A Motivational Teaching by Bishop Itse Enonuya
Rejoice Evermore: A Motivational Teaching by Bishop Itse EnonuyaChurch of Christ, Sangotedo, Lekki
 
ซูชิลาบ
ซูชิลาบซูชิลาบ
ซูชิลาบTanon Kesorn
 
Шинэчлэлт болон найдвар
Шинэчлэлт болон найдварШинэчлэлт болон найдвар
Шинэчлэлт болон найдварDulguuntamir Batjargal
 
My perfect world
My perfect worldMy perfect world
My perfect worldalyumega
 
Okul deneyimi ders notları etkinlik8 ve9
Okul deneyimi ders notları etkinlik8 ve9Okul deneyimi ders notları etkinlik8 ve9
Okul deneyimi ders notları etkinlik8 ve9Eser Çeker
 
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse Enonuya
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse EnonuyaStudy To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse Enonuya
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse EnonuyaChurch of Christ, Sangotedo, Lekki
 
School Trip to France-Rocknroll Adventures Ltd
School Trip to France-Rocknroll Adventures LtdSchool Trip to France-Rocknroll Adventures Ltd
School Trip to France-Rocknroll Adventures LtdRocknRoll
 
Sanja Rupnik-preview (3) 2016 NAJNOVIJI
Sanja Rupnik-preview (3) 2016 NAJNOVIJISanja Rupnik-preview (3) 2016 NAJNOVIJI
Sanja Rupnik-preview (3) 2016 NAJNOVIJISanja Rupnik
 

En vedette (20)

Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission network
 
Don’t miss the chance to enjoy your life with Rocknroll
Don’t miss the chance to enjoy your life with RocknrollDon’t miss the chance to enjoy your life with Rocknroll
Don’t miss the chance to enjoy your life with Rocknroll
 
The Christian Sister and Her Social Life
The Christian Sister and Her Social LifeThe Christian Sister and Her Social Life
The Christian Sister and Her Social Life
 
Obras seguras-integracao-padronizada-obras
Obras seguras-integracao-padronizada-obrasObras seguras-integracao-padronizada-obras
Obras seguras-integracao-padronizada-obras
 
Actividad Nro.-1 Ensayo
Actividad Nro.-1 EnsayoActividad Nro.-1 Ensayo
Actividad Nro.-1 Ensayo
 
Laz parking presentation
Laz parking presentationLaz parking presentation
Laz parking presentation
 
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite Zürich
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite ZürichComfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite Zürich
Comfort Zone Crushing | Stefan Meier & Charlie Rüffieux | Ignite Zürich
 
IDD Project-3조
IDD Project-3조IDD Project-3조
IDD Project-3조
 
Rejoice Evermore: A Motivational Teaching by Bishop Itse Enonuya
Rejoice Evermore: A Motivational Teaching by Bishop Itse EnonuyaRejoice Evermore: A Motivational Teaching by Bishop Itse Enonuya
Rejoice Evermore: A Motivational Teaching by Bishop Itse Enonuya
 
ซูชิลาบ
ซูชิลาบซูชิลาบ
ซูชิลาบ
 
From midnight to victory by Bro. Effiong Tom
From midnight to victory by Bro. Effiong TomFrom midnight to victory by Bro. Effiong Tom
From midnight to victory by Bro. Effiong Tom
 
Шинэчлэлт болон найдвар
Шинэчлэлт болон найдварШинэчлэлт болон найдвар
Шинэчлэлт болон найдвар
 
Being A Christian is not Enough
Being A Christian is not EnoughBeing A Christian is not Enough
Being A Christian is not Enough
 
Making Choices the Godly Way by Deacon Michael Ebong
Making Choices the Godly Way by Deacon Michael EbongMaking Choices the Godly Way by Deacon Michael Ebong
Making Choices the Godly Way by Deacon Michael Ebong
 
My perfect world
My perfect worldMy perfect world
My perfect world
 
Okul deneyimi ders notları etkinlik8 ve9
Okul deneyimi ders notları etkinlik8 ve9Okul deneyimi ders notları etkinlik8 ve9
Okul deneyimi ders notları etkinlik8 ve9
 
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse Enonuya
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse EnonuyaStudy To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse Enonuya
Study To Show Yourself Approved - 2 Timothy 2:15 by Bishop Itse Enonuya
 
School Trip to France-Rocknroll Adventures Ltd
School Trip to France-Rocknroll Adventures LtdSchool Trip to France-Rocknroll Adventures Ltd
School Trip to France-Rocknroll Adventures Ltd
 
Sanja Rupnik-preview (3) 2016 NAJNOVIJI
Sanja Rupnik-preview (3) 2016 NAJNOVIJISanja Rupnik-preview (3) 2016 NAJNOVIJI
Sanja Rupnik-preview (3) 2016 NAJNOVIJI
 
The Truth (Part 1) by Evang Effiong Tom
The Truth (Part 1) by Evang Effiong TomThe Truth (Part 1) by Evang Effiong Tom
The Truth (Part 1) by Evang Effiong Tom
 

Similaire à Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)

Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Gangwal
 
Indian grid system
Indian grid systemIndian grid system
Indian grid systemPRANAY GUPTA
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limitedVSRAGHU
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660bhagat ram meena
 
Kamal final presentation eee reb- comilla
Kamal final presentation eee  reb- comillaKamal final presentation eee  reb- comilla
Kamal final presentation eee reb- comillasiam hossain
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxHimanshuShrivastava74
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 

Similaire à Harvindar 132 KV GSS from ARYA college (fb.com/hrrock) (20)

Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
33kv substation
33kv substation33kv substation
33kv substation
 
Substation
SubstationSubstation
Substation
 
Kamal final presentation eee reb- comilla
Kamal final presentation eee  reb- comillaKamal final presentation eee  reb- comilla
Kamal final presentation eee reb- comilla
 
summer internship
summer internshipsummer internship
summer internship
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptx
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 

Dernier

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Dernier (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)

  • 1. Submitted to: Mr. Deepak Sharma (Head of department) EE Submitted by: Harvindar Singh 11EAYEE016 B.Tech. 4th Year VII Sem.
  • 2.  PLCC Single Line Diagram Power Transformer Current Transformer Isolator Lightining Arrester Wave Trap Grounding BATTERY Room Control Room Potential Transformer Conductor Circuit Breaker Introduction
  • 3. Sub-station is a subsidiary station of an electricity transmission and distribution system where voltage is transformed from high to low or low to high voltage using transformers. TYSYS
  • 4. TYPICAL AC SUPPLY SYSTEM DESG
  • 5. • Sub-station should be located at load center • Sufficient land area • Grounding • Easy of maintenance • Reliability and Security • Electrical design considerations 1LD
  • 6.
  • 7. ISO Lightening arrester is first equipment of GSS, it is protected all the equipment against the high voltage lightening surge.
  • 8. For 400kV line : Taran Tulla and Marculla conductor. For 220kV line : Zebra conductor is used composite of Aluminium strands and Steel wires. For 132kV line : Panther conductor is used composite of Aluminium strands and Steel wires. For 66Kv line : Dogi conductor is used seven steel wire and seven AL wires. For 33Kv Line : Vigal conductor is used seven conductor of aluminum.
  • 9. I. POWER TRANSFORMER II. CUREENT TRANSFORMER III. CVT/POTENTIAL TRANSFORMER
  • 10. CLNG To step-up or step-down the voltage and transfer power from one a.c. voltage to another a.c. voltage at the same frequency.
  • 11. PT It is used for measurement the of electrical primary winding current , The current transformer is always connected in series.
  • 12. Used for step-down voltage for measurement protecting & control.
  • 13. CB
  • 14. TF  Isolator is a switching devices used to open or closed a circuit either when a negligible current exit , To disconnect transmission line under no-load condition.
  • 15. CB
  • 16. •Air Blast Circuit Breaker •SF6 (Sulphure hexa floride) Circuit Breaker •Vacuum Circuit Breaker •Minimum oil Circuit Breaker WVTP
  • 17. Ground is the reference point in an electrical circuit from which other voltages are measured, a common return path for electric current (earth return or ground return), or a direct physical connection to the Earth.
  • 18.  To operate all the equipment or device from operator room is called control room.
  • 19. In a GSS, separate dc supply is maintained for signalling remote position control, alarm circuit etc. Direct current can be obtained from battery at 120volt.(55 battery,each 2.2v)
  • 20. Power Line Carrier Communication (PLCC) Provides Communication From One Gss To Other Gss.
  • 21.  Wave trap is used to trap the communication signals & send PLCC through CVT. It’s rating is 0.3mH.