SlideShare une entreprise Scribd logo
1  sur  18
Télécharger pour lire hors ligne
PROJECT BRIEF
Module: Introduction to Construction Industry
Project: 2, Part Ai
Group: B
Group Leader: Muhammad Haziq bin Hj Zariful
Group Members: Muhd Syafiq bin Hj Zariful
Mahi Abdul Muhusin
Garnette Dayang Robert
Nur Annisa binti Habib
Kelvin Ng
TABLE OF CONTENTS
1.1 PURPOSE
1.2 BACKGROUND
1.3 OBJECTIVES
1.4 BENEFITS
1.5 SUCCESS CRITERIA
2 PROJECT DEFINITION
2.1 BUDGET
2.2 SCHEDULE
2.3 CONSTRAINT
3.1 PROJECT LAYOUT PLAN
3.2 SITE ANALYSIS
3.3 OUTPUT
3.4 AUTHORIZATION PROCUREMENT PROCEDURE
4 RISKS
5 PROJECT ORGANIZATION
1.1PURPOSE
The purpose of this project is for students to find amusement and outing with
friends quick for them without the need to find taxis or buses to go to other
places. The purpose of the food stalls are for students to find a place to rest
from their outing and have a place to hang out and have fun.
1.2BACKGROUND
Taylor’s University is full of facilities that would help students in many
problems. Although, students still take their time going to Sunway Pyramid to
reduce stress and have a fun time with their friends with the sole purpose of
celebrating such as birthdays or finishing a hard assignment without the need
to even shop. Some people were left out of the celebrating group as the
celebration might end at a late time and they need to get back to their homes
quickly. This project, which would be built in the campus would make a good
way to prevent such things, as it would amuse students and have fun with
their friends inside the campus, with facilities such as arcade games,
skateboard ramps, paintball and laser tag games, a great way to enhance
bonds between friends. Students can just take a quick 30 minutes in the area
rather than spending hours in Sunway Pyramid, also needing to find taxis or
wait for the bus.
1.3OBJECTIVES
• Creating space to allow Taylor’s students to have fun and release
stress
• Another land mark for Taylor’s Lakeside
• Attract people to come and study at Taylor’s Lakeside
• Another development project for Taylor’s
• To provide opportunity of business
• Enhance rate of investment
• Potentially attract crowd into university without spending money to
make advertisement
1.4BENEFITS
• Encourages social interaction
• Enhance bonds between friends
• A place for students to hang out and get to know each other
• Provides a pleasant atmosphere right outside classes, to get away
from stress from studies
• Improves communication skills between students
• Develop new relationships
• Cost effective leisure for students
• A Source Of Healthy Entertainment
• Improves the image of the university
The amusement park will provide complete satisfaction to the students.
During their visit, they will not only participate and get entertained but
also derive thrill. The food is going to be heavenly and the facilities
available at the park are educative for the students and informative for
the adults.
• Amusement Park as a Source of Education
Most of the university students in the country are confined to theoretical
academic curriculum, which tends to be stereotype, monotonous and
less receptive. When the education is coupled with entertainment, it
brings out the desired results. By visiting this amusement park, they
learn to work and enjoy work as a group and team spirit is inculcated in
them. They are taught discipline, patience and tolerance etc. As during
their visit to the park they have to wait for their turn, enjoy even while
striking against each other and tolerate any discomfort. That is the
reason why this Amusement park is very important
1.5SUCCESS CRITERIA
Success has always been the ultimate goal of every activity, and a
construction project is no exception. Due to the ambiguous definition of
project success and the different perceptions of participants toward this
concept, it may be difficult to tell whether a project is successful as there is a
lack of consensus. Time, cost, and quality have long been the success criteria
used to evaluate the performance of a construction project. However, such a
list has been criticized as not being comprehensive. Even studies of the
project success of a particular construction method, such as the design/build
procurement system, are lacking in most previous research considering
construction projects in general.
2.PROJECT DEFINITION
2.1 BUDGET
2.2 SCHEDULE
2.3 CONSTRAINT
COST / RESOURCE
• Statistics used in preparing the estimates are unreliable.
• The consulting requirements from outside cannot be accurately
estimated
TIME
• Deliverables submitted for approval will require only working days for
review.
• There is no limit to review and approval cycles.
• Equipment order lead times cannot be specified with accuracy in time.
• The project might be delayed because of weather which most of the
time is raining.
• The muslim worker might work slower than other because the
construction is in fasting month.
SCOPE
• The scope of the project is unclear and hard to evaluate .
• The project depends upon receiving data from other, such as external
applications and private application.
• Key decision-makers are difficult to contact when issues arise with the
project.
• Key staff resources will be available only on a part-time basis not full-
time.
• Computer resources will be available on a limited basis
3.1 Project Plan
The Inner Layout
Skate
Boarding
Thispartwill
bebrokento
makeabridge
Bench
Snacks
/Junkfood
stall
LaserTagplace
Paintball
place
ArcadeGAMES
Enterfor
only
Taylorians
Heptagon
Tables
Ice-cream
and Juice
stall
The Outer Layout
classesDivisionalOffice
Bridge
Entrance
SoundproofceilingSoundproofceiling
Project Brief
ICI Group B Project 2
3.2 SITE ANALYSIS
between the gap, there are
structured pillars which is
for the rooftop
the site is on the 2nd floor of the 2 buildings connected together
height:
Project Brief
ICI Group B Project 2
The only
possible
entrance
in the
area
a gap in our surface
area between two
buildings
the site is facing
the sports &
recreational area
(and also the
new construction
building
one of the
pillars that
supports the
building
this area almost
cover around 3/4
of our maximum
site area
Project Brief
ICI Group B Project 2
3.3 OUTPUT
SUCCESS CRITERIA FOR A DESIRABLE OUTPUT
On Budget
The project is completed at or under the contracted
cost.
On Schedule
The project is completed on or before the contracted
finish date.
Meets Specifications
The completed project meets or exceeds all technical
performance specifications provided by the owner.
Conforms to User's
Expectations
The completed project meets or exceeds the user’s
envisioned functional goals (fitness for purpose).
High Quality of
Workmanship
The completed project meets or exceeds the accepted
standards of workmanship in all areas.
Minimizes Construction
Aggravation
The construction process does not unduly burden the
owner's project management staff.
Establish Cost
Secure a project cost before the start of detailed
design.
Reduce Cost
Decrease the overall project cost as compared to
other procurement methods (design-bid-build,
construction management, etc.).
Establish Schedule
Secure a project schedule before the start of
detailed design.
Shorten Duration
Decrease the overall project completion time as
compared to other procurement methods (design-
bid-build, construction management, etc.).
Reduce Claims
Decrease litigation due to separate design and
construction entities.
Large Project
Size/Complexity
The project’s shear magnitude is too complex to be
managed through multiple contracts.
Constructability/Innovation
Introduce construction knowledge into design early
in the process.
Project Brief
ICI Group B Project 2
3.4 AUTHORIZATION PROCUREMENT PROCEDURE
No Procedure Time
to
comp
lete
Cost
associa
ted
MRM
1 Obtain Sewerage Approval
Agency: Sewage Services Department IWK
14 0
2 Obtain Fire Safety (Arch) Comment
Fire safety procedures are regulated by Fire Services
Act 1988 and Uniform Building Bylaws 1984 (Chapter
8)
Agency: Fire Department (Bomba)
14 0
3 Obtain Hoarding & Signboard Approval
Agency: Municipality of Subang Jaya MPSJ
7 1,514
4 Obtain Landscape Approval
Agency: Taylor’s University Lakeside Campus
7 0
5 Obtain Car Park Approval
Agency: Taylor’s University Lakeside Campus
7 0
6 Obtain Building Plan Approval
The approval of the building plans authorizes
construction of the building within 12 months from the
date of approval. Approval is granted by the Building
Department of the local authority.
The filing fees for the application for building plan
approval are MYR 10.00 per 10 sq. m. or any part
thereof (a minimum of MYR 100.00) under the First
Schedule of the Federal Territory of Kuala Lumpur
Building By-Laws of 1985. In the case here, involving
a 1,300.6 sq. m. built-up area, the application fee
would be MYR 1,300.60.
Agency: Taylor’s University Lakeside Campus
17 1301
Project Brief
ICI Group B Project 2
7 Obtain Fire Safety (M&E) Approval
Agency: Fire Department (Bomba)
14 0
8 Obtain Permission to start work from
Building Department (KMB)
Agency: Taylor’s University Lakeside Campus
1 0
9 Notification to start Earthwork from
Engineering Department (B FORM)
Agency: Municipality of Subang Jaya MPSJ
1 0
10 Request sewerage inspection
Agency: Sewage Services Department IWK
1 0
11 Sewerage inspection
Agency: Sewage Services Department IWK
1 0
12 Road and Drainage Inspection
Agency: Municipality of Subang Jaya MPSJ
1 0
13 Road and Drainage Report
Agency: Municipality of Subang Jaya MPSJ
12 0
14 Request Sewerage Clearance
Agency: Sewage Services Department IWK
1 0
15 Sewerage Inspection
Agency: Sewage Services Department IWK
1 0
16 Sewerage Report 12 0
Project Brief
ICI Group B Project 2
Agency: Sewage Services Department IWK
17 Request Fire Safety Clearance
Agency: Fire Department(Bomba)
1 111
18 Fire Safety Inspection
Agency: Fire Department(Bomba)
1 0
19 Fire Safety Report
Agency: Fire Department(Bomba)
12 0
20 Request Water Clearance
Agency: Water Authority SYABAS
1 1000
21 Water Inspection
Agency: Water Authority SYABAS
1 0
22 Water Report
Agency: Water Authority SYABAS
11 3
23 Deposit G1 - G21 Forms and F Form to
Board of Arch / Eng Malaysia
A copy of forms G1 G2 should also be submitted to
the Order of Architects and Engineers of Malaysia
Agency: Board of Architecs and Engineers of
Malaysia
1 0
24 Obtain Water Connection
Agency: Water Authority SYABAS
1 30
25 Obtain Telco Connection
Agency: Telekom Malaysia (Telco)
15 495
Project Brief
ICI Group B Project 2
4. RISKS
The many students going in and out of the amusement park and food stalls
would give so much noise, where the arcade games, skateboarding, paintball &
laser tag games would contribute too. This would distract studies from the
classroom, which is just next to the site. Moreover, it would distract lecturers as
the Divisional office is also next to the site.
The site also contains an important part on ventilation for the classrooms and
divisional offices, making a building on the site would eliminate the ventilation for
the buildings.
5. PROJECT ORGANIZATION
Project Brief
ICI Group B Project 2

Contenu connexe

Tendances

Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
Adila Zaas
 
HKR Architects Logistics Parks SEZ Portfolio
HKR Architects Logistics Parks SEZ PortfolioHKR Architects Logistics Parks SEZ Portfolio
HKR Architects Logistics Parks SEZ Portfolio
HKR Architects
 

Tendances (20)

Case study inferences
Case study inferencesCase study inferences
Case study inferences
 
Decoding future streetscapes of Delhi
Decoding future streetscapes of DelhiDecoding future streetscapes of Delhi
Decoding future streetscapes of Delhi
 
street children rehabilitation study
street children rehabilitation studystreet children rehabilitation study
street children rehabilitation study
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
OCC Royal Ontario Museum
OCC Royal Ontario Museum OCC Royal Ontario Museum
OCC Royal Ontario Museum
 
DLF Cybercity- Chennai
DLF Cybercity- ChennaiDLF Cybercity- Chennai
DLF Cybercity- Chennai
 
Fuji kindergarten
Fuji kindergartenFuji kindergarten
Fuji kindergarten
 
Marina One, Singapore: A Case Study of Green Architecture
Marina One, Singapore: A Case Study of Green ArchitectureMarina One, Singapore: A Case Study of Green Architecture
Marina One, Singapore: A Case Study of Green Architecture
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 
Jewish Museum Precedent Studies Board
Jewish Museum Precedent Studies BoardJewish Museum Precedent Studies Board
Jewish Museum Precedent Studies Board
 
Architectural Design Project (Project 1C- Final Executive Report)
Architectural Design Project (Project 1C- Final Executive Report)Architectural Design Project (Project 1C- Final Executive Report)
Architectural Design Project (Project 1C- Final Executive Report)
 
Sensory Garden in Special Schools: The Issues, Design and Use
Sensory Garden in Special Schools: The Issues, Design and UseSensory Garden in Special Schools: The Issues, Design and Use
Sensory Garden in Special Schools: The Issues, Design and Use
 
Report on Solaris - Singapore [BSC]
Report on Solaris - Singapore  [BSC]Report on Solaris - Singapore  [BSC]
Report on Solaris - Singapore [BSC]
 
site & case study
site & case studysite & case study
site & case study
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
 
Site analysis
Site analysis Site analysis
Site analysis
 
Fourth Year Architecture Portfolio
Fourth Year Architecture PortfolioFourth Year Architecture Portfolio
Fourth Year Architecture Portfolio
 
HKR Architects Logistics Parks SEZ Portfolio
HKR Architects Logistics Parks SEZ PortfolioHKR Architects Logistics Parks SEZ Portfolio
HKR Architects Logistics Parks SEZ Portfolio
 
Site analysis
Site analysisSite analysis
Site analysis
 
Hot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar AvoidanceHot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar Avoidance
 

En vedette

Client brief report for digital video
Client brief report for digital videoClient brief report for digital video
Client brief report for digital video
BenT1990
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lee Pei Gie
 

En vedette (13)

The Creative Brief Project
The Creative Brief ProjectThe Creative Brief Project
The Creative Brief Project
 
Psychology final Project brief Video Clip, Presentation and Report/ Group pro...
Psychology final Project brief Video Clip, Presentation and Report/ Group pro...Psychology final Project brief Video Clip, Presentation and Report/ Group pro...
Psychology final Project brief Video Clip, Presentation and Report/ Group pro...
 
Client brief report for digital video
Client brief report for digital videoClient brief report for digital video
Client brief report for digital video
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Case Study of a Pizza Restaurant using House of Quality or Quality Function D...
Case Study of a Pizza Restaurant using House of Quality or Quality Function D...Case Study of a Pizza Restaurant using House of Quality or Quality Function D...
Case Study of a Pizza Restaurant using House of Quality or Quality Function D...
 
QFD For Pizza
QFD For PizzaQFD For Pizza
QFD For Pizza
 
Making UX Matter to Your Company
Making UX Matter to Your CompanyMaking UX Matter to Your Company
Making UX Matter to Your Company
 
How to Teach UX Design
How to Teach UX DesignHow to Teach UX Design
How to Teach UX Design
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
UX Design + UI Design: Injecting a brand persona!
UX Design + UI Design: Injecting a brand persona!UX Design + UI Design: Injecting a brand persona!
UX Design + UI Design: Injecting a brand persona!
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 

Similaire à Project brief

Project brief
Project brief Project brief
Project brief
PK146
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
itsmylifesl
 
Project Name
 Project Name                                       Project Name
Project Name
TatianaMajor22
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
Pinky Chan
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
JamesMoy7
 

Similaire à Project brief (20)

Project brief
Project brief Project brief
Project brief
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Project background
Project backgroundProject background
Project background
 
Project
Project Project
Project
 
Project Name
 Project Name                                       Project Name
Project Name
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
project plan document(ppd)
project plan document(ppd)project plan document(ppd)
project plan document(ppd)
 
Final Project
Final ProjectFinal Project
Final Project
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project Success
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
 
Student Project
Student ProjectStudent Project
Student Project
 

Plus de Haziq1511

Plus de Haziq1511 (20)

Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
IBS - Business Plan
IBS - Business PlanIBS - Business Plan
IBS - Business Plan
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
 
Management Science Assignment
Management Science AssignmentManagement Science Assignment
Management Science Assignment
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
 
Psychology Research Proposal
Psychology Research ProposalPsychology Research Proposal
Psychology Research Proposal
 
Psychology Journal 2
Psychology Journal 2Psychology Journal 2
Psychology Journal 2
 
Psychology Journal 1
Psychology Journal 1Psychology Journal 1
Psychology Journal 1
 
Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)
 
Business studies - charity report
Business studies - charity reportBusiness studies - charity report
Business studies - charity report
 
Accounting project - Financial Ratio Analysis
Accounting project - Financial Ratio AnalysisAccounting project - Financial Ratio Analysis
Accounting project - Financial Ratio Analysis
 
English 2 - Report of 3 businesses
English 2 - Report of 3 businessesEnglish 2 - Report of 3 businesses
English 2 - Report of 3 businesses
 
English 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay AssignmentEnglish 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay Assignment
 
English 2 Descriptive Essay
English 2 Descriptive EssayEnglish 2 Descriptive Essay
English 2 Descriptive Essay
 
November Penang Trip - Short Journal
November Penang Trip - Short JournalNovember Penang Trip - Short Journal
November Penang Trip - Short Journal
 

Dernier

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Dernier (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

Project brief

  • 1. PROJECT BRIEF Module: Introduction to Construction Industry Project: 2, Part Ai Group: B Group Leader: Muhammad Haziq bin Hj Zariful Group Members: Muhd Syafiq bin Hj Zariful Mahi Abdul Muhusin Garnette Dayang Robert Nur Annisa binti Habib Kelvin Ng
  • 2. TABLE OF CONTENTS 1.1 PURPOSE 1.2 BACKGROUND 1.3 OBJECTIVES 1.4 BENEFITS 1.5 SUCCESS CRITERIA 2 PROJECT DEFINITION 2.1 BUDGET 2.2 SCHEDULE 2.3 CONSTRAINT 3.1 PROJECT LAYOUT PLAN 3.2 SITE ANALYSIS 3.3 OUTPUT 3.4 AUTHORIZATION PROCUREMENT PROCEDURE 4 RISKS 5 PROJECT ORGANIZATION
  • 3. 1.1PURPOSE The purpose of this project is for students to find amusement and outing with friends quick for them without the need to find taxis or buses to go to other places. The purpose of the food stalls are for students to find a place to rest from their outing and have a place to hang out and have fun. 1.2BACKGROUND Taylor’s University is full of facilities that would help students in many problems. Although, students still take their time going to Sunway Pyramid to reduce stress and have a fun time with their friends with the sole purpose of celebrating such as birthdays or finishing a hard assignment without the need to even shop. Some people were left out of the celebrating group as the celebration might end at a late time and they need to get back to their homes quickly. This project, which would be built in the campus would make a good way to prevent such things, as it would amuse students and have fun with their friends inside the campus, with facilities such as arcade games, skateboard ramps, paintball and laser tag games, a great way to enhance bonds between friends. Students can just take a quick 30 minutes in the area rather than spending hours in Sunway Pyramid, also needing to find taxis or wait for the bus. 1.3OBJECTIVES • Creating space to allow Taylor’s students to have fun and release stress • Another land mark for Taylor’s Lakeside • Attract people to come and study at Taylor’s Lakeside • Another development project for Taylor’s • To provide opportunity of business • Enhance rate of investment • Potentially attract crowd into university without spending money to make advertisement 1.4BENEFITS • Encourages social interaction • Enhance bonds between friends • A place for students to hang out and get to know each other • Provides a pleasant atmosphere right outside classes, to get away from stress from studies • Improves communication skills between students • Develop new relationships • Cost effective leisure for students • A Source Of Healthy Entertainment • Improves the image of the university
  • 4. The amusement park will provide complete satisfaction to the students. During their visit, they will not only participate and get entertained but also derive thrill. The food is going to be heavenly and the facilities available at the park are educative for the students and informative for the adults. • Amusement Park as a Source of Education Most of the university students in the country are confined to theoretical academic curriculum, which tends to be stereotype, monotonous and less receptive. When the education is coupled with entertainment, it brings out the desired results. By visiting this amusement park, they learn to work and enjoy work as a group and team spirit is inculcated in them. They are taught discipline, patience and tolerance etc. As during their visit to the park they have to wait for their turn, enjoy even while striking against each other and tolerate any discomfort. That is the reason why this Amusement park is very important 1.5SUCCESS CRITERIA Success has always been the ultimate goal of every activity, and a construction project is no exception. Due to the ambiguous definition of project success and the different perceptions of participants toward this concept, it may be difficult to tell whether a project is successful as there is a lack of consensus. Time, cost, and quality have long been the success criteria used to evaluate the performance of a construction project. However, such a list has been criticized as not being comprehensive. Even studies of the project success of a particular construction method, such as the design/build procurement system, are lacking in most previous research considering construction projects in general.
  • 7. 2.3 CONSTRAINT COST / RESOURCE • Statistics used in preparing the estimates are unreliable. • The consulting requirements from outside cannot be accurately estimated TIME • Deliverables submitted for approval will require only working days for review. • There is no limit to review and approval cycles. • Equipment order lead times cannot be specified with accuracy in time. • The project might be delayed because of weather which most of the time is raining. • The muslim worker might work slower than other because the construction is in fasting month. SCOPE • The scope of the project is unclear and hard to evaluate . • The project depends upon receiving data from other, such as external applications and private application. • Key decision-makers are difficult to contact when issues arise with the project. • Key staff resources will be available only on a part-time basis not full- time. • Computer resources will be available on a limited basis
  • 8. 3.1 Project Plan The Inner Layout Skate Boarding Thispartwill bebrokento makeabridge Bench Snacks /Junkfood stall LaserTagplace Paintball place ArcadeGAMES Enterfor only Taylorians Heptagon Tables Ice-cream and Juice stall
  • 9.
  • 11. Project Brief ICI Group B Project 2 3.2 SITE ANALYSIS between the gap, there are structured pillars which is for the rooftop the site is on the 2nd floor of the 2 buildings connected together height:
  • 12. Project Brief ICI Group B Project 2 The only possible entrance in the area a gap in our surface area between two buildings the site is facing the sports & recreational area (and also the new construction building one of the pillars that supports the building this area almost cover around 3/4 of our maximum site area
  • 13. Project Brief ICI Group B Project 2 3.3 OUTPUT SUCCESS CRITERIA FOR A DESIRABLE OUTPUT On Budget The project is completed at or under the contracted cost. On Schedule The project is completed on or before the contracted finish date. Meets Specifications The completed project meets or exceeds all technical performance specifications provided by the owner. Conforms to User's Expectations The completed project meets or exceeds the user’s envisioned functional goals (fitness for purpose). High Quality of Workmanship The completed project meets or exceeds the accepted standards of workmanship in all areas. Minimizes Construction Aggravation The construction process does not unduly burden the owner's project management staff. Establish Cost Secure a project cost before the start of detailed design. Reduce Cost Decrease the overall project cost as compared to other procurement methods (design-bid-build, construction management, etc.). Establish Schedule Secure a project schedule before the start of detailed design. Shorten Duration Decrease the overall project completion time as compared to other procurement methods (design- bid-build, construction management, etc.). Reduce Claims Decrease litigation due to separate design and construction entities. Large Project Size/Complexity The project’s shear magnitude is too complex to be managed through multiple contracts. Constructability/Innovation Introduce construction knowledge into design early in the process.
  • 14. Project Brief ICI Group B Project 2 3.4 AUTHORIZATION PROCUREMENT PROCEDURE No Procedure Time to comp lete Cost associa ted MRM 1 Obtain Sewerage Approval Agency: Sewage Services Department IWK 14 0 2 Obtain Fire Safety (Arch) Comment Fire safety procedures are regulated by Fire Services Act 1988 and Uniform Building Bylaws 1984 (Chapter 8) Agency: Fire Department (Bomba) 14 0 3 Obtain Hoarding & Signboard Approval Agency: Municipality of Subang Jaya MPSJ 7 1,514 4 Obtain Landscape Approval Agency: Taylor’s University Lakeside Campus 7 0 5 Obtain Car Park Approval Agency: Taylor’s University Lakeside Campus 7 0 6 Obtain Building Plan Approval The approval of the building plans authorizes construction of the building within 12 months from the date of approval. Approval is granted by the Building Department of the local authority. The filing fees for the application for building plan approval are MYR 10.00 per 10 sq. m. or any part thereof (a minimum of MYR 100.00) under the First Schedule of the Federal Territory of Kuala Lumpur Building By-Laws of 1985. In the case here, involving a 1,300.6 sq. m. built-up area, the application fee would be MYR 1,300.60. Agency: Taylor’s University Lakeside Campus 17 1301
  • 15. Project Brief ICI Group B Project 2 7 Obtain Fire Safety (M&E) Approval Agency: Fire Department (Bomba) 14 0 8 Obtain Permission to start work from Building Department (KMB) Agency: Taylor’s University Lakeside Campus 1 0 9 Notification to start Earthwork from Engineering Department (B FORM) Agency: Municipality of Subang Jaya MPSJ 1 0 10 Request sewerage inspection Agency: Sewage Services Department IWK 1 0 11 Sewerage inspection Agency: Sewage Services Department IWK 1 0 12 Road and Drainage Inspection Agency: Municipality of Subang Jaya MPSJ 1 0 13 Road and Drainage Report Agency: Municipality of Subang Jaya MPSJ 12 0 14 Request Sewerage Clearance Agency: Sewage Services Department IWK 1 0 15 Sewerage Inspection Agency: Sewage Services Department IWK 1 0 16 Sewerage Report 12 0
  • 16. Project Brief ICI Group B Project 2 Agency: Sewage Services Department IWK 17 Request Fire Safety Clearance Agency: Fire Department(Bomba) 1 111 18 Fire Safety Inspection Agency: Fire Department(Bomba) 1 0 19 Fire Safety Report Agency: Fire Department(Bomba) 12 0 20 Request Water Clearance Agency: Water Authority SYABAS 1 1000 21 Water Inspection Agency: Water Authority SYABAS 1 0 22 Water Report Agency: Water Authority SYABAS 11 3 23 Deposit G1 - G21 Forms and F Form to Board of Arch / Eng Malaysia A copy of forms G1 G2 should also be submitted to the Order of Architects and Engineers of Malaysia Agency: Board of Architecs and Engineers of Malaysia 1 0 24 Obtain Water Connection Agency: Water Authority SYABAS 1 30 25 Obtain Telco Connection Agency: Telekom Malaysia (Telco) 15 495
  • 17. Project Brief ICI Group B Project 2 4. RISKS The many students going in and out of the amusement park and food stalls would give so much noise, where the arcade games, skateboarding, paintball & laser tag games would contribute too. This would distract studies from the classroom, which is just next to the site. Moreover, it would distract lecturers as the Divisional office is also next to the site. The site also contains an important part on ventilation for the classrooms and divisional offices, making a building on the site would eliminate the ventilation for the buildings. 5. PROJECT ORGANIZATION
  • 18. Project Brief ICI Group B Project 2